HomeMy WebLinkAboutDaily report 07-29-2022CANNON CONSTRUCTION MANAGEMENT DIVISION
RESIDENT ENGINEER'S DAILY REPORT
ASSISTANT RESIDENT ENGINEER'S DAILY REPORT Report No:
CEM-4601 (Mod. 6/2011)Date:
M T W T F S Su (Select Day)
Shift Hours:8 Start Stop
8
8 2
8
8
8
8
8
8+
8+
8+8
5+
8+
RE Hours Onsite Signature Title
j
2
Mark M./Steve H./Hylan/JC
Anselmo G./Joventino/Rafael
Ty S./Ruben H
Sub CCTS2
Sub- Super Seal
Cat 308 Emin ex
Sub- CCTS- 8 hrs.
laborers3
operators
Matthew Natividad APWA CP II
2 mason/apprentice
laborer
2 flaggers
5
Francisco/Abraham/Sub Landscape5
7:00A-3:30P
carpenters4
3
Edgar /Carlos
3 mason Christian/Luis /George
1 foreman Ruben R.
2 mason Julio C./Sergio C
3 mason/flagger
July.29,2022
7:00a 7:30p
Location & Description of Work :
Striping new pavement delineation. Raising of utilities to FG elevations. Irrigation work.
Sign foundation work.
EQUIP.
NO.
NO.
MEN
DESCRIPTION
(of Equipment or Labor)
EQUIPMENT AND/OR LABOR
57369,7292,9322103,104,105ccoIDLE OR DOWN55F- 75F AM cloudysunny
EST. HOURS - ITEM NO.
Gilberto/Isaac
Cole F.
City Of San Luis Obispo
Tank Farm Road & Orcutt Rd.
Roundabout
Cannon ID 210332
Distribution (All projects): Original local agency project (field office). Reports covering extra work should be filed seperately.
THE RELENTLESS PURSUIT OF THE ELEGANT SOLUTION
CANNON CONSTRUCTION MANAGEMENT DIVISION
RESIDENT ENGINEER'S DAILY REPORT
ASSISTANT RESIDENT ENGINEER'S DAILY REPORT
CEM-4601 (Mod. 6/2011)
Report No:Date:M T W T F S Su (Select Day)
Shift Hours:
Start Stop Temperature:Min:Max:
SIGNATURE TITLE
THE RELENTLESS PURSUIT OF THE ELEGANT SOLUTIONTHE RELENTLESS PURSUIT OF THE ELEGANT SOLUTION
City Of San Luis Obispo
Tank Farm Road & Orcutt Rd.
Roundabout
Cannon ID 210332
Item no. 57 ( Minor Concrete -Stamped concrete )
Rubens crew poured the stamped concrete for the median along the T line. Formed and poured the
stamped concrete median along OE line and at the street light location OE 56 + 50 +-
Item no. 3 ( Temporary Traffic Control )
CCTS flaggers flaggers performed one lane traffic control during the concrete pour , striping lay out and
raising of valves to finish surface elevations work. 7"00 A -5:00P +
Item no. 22 ( Irrigation )
Sub Contractor Wildbloom Landscaping was on site around 10:30 P and continued their work at the
irrigation P.O.C.
Item no. 92,93 ( Roadside sign -one post-two post )
CCTS was on site today and continue the foundation work for the new signs to be installed on
Monday..Work in progress
Item no. ( CCO -Arch footings )
Mark, Steve , JC nad Hylan of Souza was on site today and poured the Arch footing and beam using
approve mix design 550GN 1040
Item no. 69, 72 ( Adjust Water Valve, Adjust gas valve, -Adjust Sewer Manhole to FG )
Ty Souzas crew performed utility adjustment to finish surface work as per City STD details 6040.
Item no. 103, 104, 105 ( Striping )
Sub contractor Super Seal and stripe was on site today and performed the installation of thermoplastic
stripe as per sheet PD 1 of approve plans.
Item no. 99 ( Midwest Guiderail System )-Sub CCF was on site and installed the gusrdrail as per sheet 9
Note:
Mentioned to Ty souza that the reclaimed water valves is per City STD 6040 which calls for G4 box and
triangular lid. He will replaced the two installed at the very east end where wrong box and lid were
installed .
Luke and Justin of City planning department was on site around 11:30 A to change the new striping detail
at the east end work limits due to Souzas error in pouring the median.
CANNON CONSTRUCTION MANAGEMENT DIVISION
RESIDENT ENGINEER'S DAILY REPORT
ASSISTANT RESIDENT ENGINEER'S DAILY REPORT
CEM-4601 (Mod. 6/2011)
Report No:Date:M T W T F S Su (Select Day)
Shift Hours:
Start Stop Temperature:Min:Max:
SIGNATURE TITLE
THE RELENTLESS PURSUIT OF THE ELEGANT SOLUTION
.