Loading...
HomeMy WebLinkAboutDaily report 08-01-2022CANNON CONSTRUCTION MANAGEMENT DIVISION RESIDENT ENGINEER'S DAILY REPORT ASSISTANT RESIDENT ENGINEER'S DAILY REPORT Report No: CEM-4601 (Mod. 6/2011)Date: M T W T F S Su (Select Day) Shift Hours:8 Start Stop 8 8 2 8+ 8 8 8+ 8+ 8 8+ RE Hours Onsite Signature Title j Mark M./Steve H./Cole F. Rafael/Luis Ty S./Ruben H/Ryan O Sub CCTS2 Jose/ Cat 308min ex laborers2 operators Matthew Natividad APWA CP II laborer Francisco/Abraham/Sub Landscape5 7:00A-5:30P 3 3 Joventino/Anselmo 1 foreman Ruben R. 4 mason Carlos,Luis, George,Isaac 2 flaggers -Souza August 1,2022 7:00a 5:30p Location & Description of Work : New signs installation. Raising of utilities to FG surface and pour concrete collars New concrete improvements punchlist items. Irrigation and planting work. EQUIP. NO. NO. MEN DESCRIPTION (of Equipment or Labor) EQUIPMENT AND/OR LABOR 57369,7292,9322,2424IDLE OR DOWN61F- 73F sunny EST. HOURS - ITEM NO. City Of San Luis Obispo Tank Farm Road & Orcutt Rd. Roundabout Cannon ID 210332 Distribution (All projects): Original local agency project (field office). Reports covering extra work should be filed seperately. THE RELENTLESS PURSUIT OF THE ELEGANT SOLUTION CANNON CONSTRUCTION MANAGEMENT DIVISION RESIDENT ENGINEER'S DAILY REPORT ASSISTANT RESIDENT ENGINEER'S DAILY REPORT CEM-4601 (Mod. 6/2011) Report No:Date:M T W T F S Su (Select Day) Shift Hours: Start Stop Temperature:Min:Max: SIGNATURE TITLE THE RELENTLESS PURSUIT OF THE ELEGANT SOLUTIONTHE RELENTLESS PURSUIT OF THE ELEGANT SOLUTION City Of San Luis Obispo Tank Farm Road & Orcutt Rd. Roundabout Cannon ID 210332 Item no. 57 ( Minor Concrete -Stamped concrete ) Rubens crew performed concrete improvements punchlist items work. Item no. 3 ( Temporary Traffic Control ) Souza flaggers flaggers performed one lane traffic control during the concrete pour , striping lay out and raising of valves to finish surface elevations work. 7"00 A -5:00P + Item no. 22,24 ( Irrigation , Topsoil Backfill) Sub Contractor Wildbloom Landscaping was on site continued the planting of tree species as called for on planting plan sheet 51 and 52 Also place top soil at roundabout and OE and T line medians. Item no. 92,93 ( Roadside sign -one post-two post ) CCTS was on site today and installed the new signs as per sheets 44-48 of approve plans. Item no. 24 ( Topsoil Backfill ) Mark, Steve , and Cole graded the area at the center of the roundabout and median along OE line for topsoil backfill. Item no. 69, 72 ( Adjust Water Valve, Adjust gas valve, -Adjust Sewer Manhole to FG ) Ty Souzas crew continued the utility adjustment to finish surface work as per City STD details 6040. Work in progress. Note: The City has decided not to fully open the new roundabout today. Mentioned to Ty Souza that reclaimed water valves requires a G4 box with triangular lids with reclaimed water markings as per City STD 6040. Ty installed the wrong box at the reclimed water by the new reclaimed water hydrant. CANNON CONSTRUCTION MANAGEMENT DIVISION RESIDENT ENGINEER'S DAILY REPORT ASSISTANT RESIDENT ENGINEER'S DAILY REPORT CEM-4601 (Mod. 6/2011) Report No:Date:M T W T F S Su (Select Day) Shift Hours: Start Stop Temperature:Min:Max: SIGNATURE TITLE THE RELENTLESS PURSUIT OF THE ELEGANT SOLUTION .