RESIDENT ENGINEER'S DAILY REPORT
ASSISTANT RESIDENT ENGINEER'S DAILY REPORT Report No:
CEM-4601 (Mod. 6/2011)Date:
M T W T F S Su (Select Day)
Shift Hours:8 Start Stop
8
8
8
RE Hours Onsite Signature Title
j
City Of San Luis Obispo
Tank Farm Road & Orcutt Rd.
Roundabout
Cannon ID 210332
Distribution (All projects): Original local agency project (field office). Reports covering extra work should be filed seperately.
THE RELENTLESS PURSUIT OF THE ELEGANT SOLUTION
August 2,2022
7:00a 3:30p
Location & Description of Work :
Raising of utilities to FG surface and pour concrete collars
HMA paving of vehicle maintenace area. Irrigation and planting work.
EQUIP.
NO.
NO.
MEN
DESCRIPTION
(of Equipment or Labor)
EQUIPMENT AND/OR LABOR
69,723IDLE OR DOWN61F- 81F sunny
EST. HOURS - ITEM NO.
3 foreman/operators Ty S./Ryan O/Ruben H
2 laborers Luis G./Rafael G.
3 laborers Anselmo G./Victor G./Cole F.
Matthew Natividad APWA CP II
7:00A-3:30P
Sub- Wildbloom3
CANNON CONSTRUCTION MANAGEMENT DIVISION
RESIDENT ENGINEER'S DAILY REPORT
ASSISTANT RESIDENT ENGINEER'S DAILY REPORT
CEM-4601 (Mod. 6/2011)
Report No:Date:M T W T F S Su (Select Day)
Shift Hours:
Start Stop Temperature:Min:Max:
SIGNATURE TITLE
THE RELENTLESS PURSUIT OF THE ELEGANT SOLUTIONTHE RELENTLESS PURSUIT OF THE ELEGANT SOLUTION
City Of San Luis Obispo
Tank Farm Road & Orcutt Rd.
Roundabout
Cannon ID 210332
Item no. 22,24 ( Irrigation , Topsoil Backfill)
Sub Contractor Wildbloom Landscaping was not on site today.
Item no. 69, 72 ( Adjust Water Valve, Adjust gas valve, -Adjust Sewer Manhole to FG )
Ty Souzas crew continued the utility adjustment to finish surface work as per City STD details 6040. Work
in progress.
1.Also performed HMA paving of the maintenance vehicle pullout as per detail V sheet 21 of approve
plans. 3" HMA and 2" base section.
2. Performed jobsite clean up work .
3. Shoulder backing at new berm ON line.
Note: Mentioned to Ty Souza that he incorrectly installed g4 boxes on supposedly water valves at Sta: 59
+30 +-and 54 + 30 +-which requires g5 box and lid.
CANNON CONSTRUCTION MANAGEMENT DIVISION
RESIDENT ENGINEER'S DAILY REPORT
ASSISTANT RESIDENT ENGINEER'S DAILY REPORT
CEM-4601 (Mod. 6/2011)
Report No:Date:M T W T F S Su (Select Day)
Shift Hours:
Start Stop Temperature:Min:Max:
SIGNATURE TITLE
THE RELENTLESS PURSUIT OF THE ELEGANT SOLUTION
.