HomeMy WebLinkAboutDaily report 08-03-2022CANNON CONSTRUCTION MANAGEMENT DIVISION RESIDENT ENGINEER'S DAILY REPORT ASSISTANT RESIDENT ENGINEER'S DAILY REPORT Report No: CEM-4601 (Mod. 6/2011)Date: M T W T F S Su (Select Day) Shift Hours:8 Start Stop 8 8 8 8+ 8+ RE Hours Onsite Signature Title j Wildbloomlaborers- Sub Matthew Natividad APWA CP II 2 flaggers 7:00A-3:30P 5 Anselmo G./Victor G./Cole F. 3 foreman/operators Ty S./Ryan O/Ruben H 2 laborers Luis G./Rafael G. 3 laborers August 3,2022 7:00a 3:30p Location & Description of Work : Raising of utilities to FG surface and pour concrete collars Irrigation and planting work EQUIP. NO. NO. MEN DESCRIPTION (of Equipment or Labor) EQUIPMENT AND/OR LABOR 69,72322, 24IDLE OR DOWN61F- 83F sunny EST. HOURS - ITEM NO. Mark M./Steve H. City Of San Luis Obispo Tank Farm Road & Orcutt Rd. Roundabout Cannon ID 210332 Distribution (All projects): Original local agency project (field office). Reports covering extra work should be filed seperately. THE RELENTLESS PURSUIT OF THE ELEGANT SOLUTION CANNON CONSTRUCTION MANAGEMENT DIVISION RESIDENT ENGINEER'S DAILY REPORT ASSISTANT RESIDENT ENGINEER'S DAILY REPORT CEM-4601 (Mod. 6/2011) Report No:Date:M T W T F S Su (Select Day) Shift Hours: Start Stop Temperature:Min:Max: SIGNATURE TITLE THE RELENTLESS PURSUIT OF THE ELEGANT SOLUTIONTHE RELENTLESS PURSUIT OF THE ELEGANT SOLUTION City Of San Luis Obispo Tank Farm Road & Orcutt Rd. Roundabout Cannon ID 210332 Item no. 22,24 ( Irrigation , Topsoil Backfill) Sub Contractor Wildbloom Landscaping was on site and continued the planting work at designated planter areas shown on plans. Work in progress. Item no. 69, 72 ( Adjust Water Valve, Adjust gas valve, -Adjust Sewer Manhole to FG ) Ty Souzas crew did the following. 1. Adjusted to grade the sewer manhole at Sta: 51 + 90 +-. 2. Grouted the manhole risers. 3. Shoulder backing along the OE line edge of shoulder and ON line edge of shoulder. Item no. 3 ( Temporary Traffic Control ) Souza flaggers performed one lane 2 flaggers traffic control from Wavertree to Spanish Oaks. 7:00 A-3:30 ++ Note: Mentioned to Ty Souza that he incorrectly installed the boxes and lids for the reclaimed water valves at Sta: 53 + 30 +-. He installed a regular G5 box and lid with water markings instead of the required G4 box and lid for reclaimed water. Meeting on site with Jennifer( City ), Pat,( Cannon) Travis , ( Righetti )Ben ( City ) and discussed the temporary pavement delineation to tie in with the new pavement delineation of the roundabout project. It was agreed to pave with HMA the trench along Orcutt +-235 LF to match lane line and centerline of new pavement delineation of the roundabout project. Jennifer will follow up with an email. CANNON CONSTRUCTION MANAGEMENT DIVISION RESIDENT ENGINEER'S DAILY REPORT ASSISTANT RESIDENT ENGINEER'S DAILY REPORT CEM-4601 (Mod. 6/2011) Report No:Date:M T W T F S Su (Select Day) Shift Hours: Start Stop Temperature:Min:Max: SIGNATURE TITLE THE RELENTLESS PURSUIT OF THE ELEGANT SOLUTION .