HomeMy WebLinkAboutDaily report 08-05-2022CANNON CONSTRUCTION MANAGEMENT DIVISION RESIDENT ENGINEER'S DAILY REPORT ASSISTANT RESIDENT ENGINEER'S DAILY REPORT Report No: CEM-4601 (Mod. 6/2011)Date: M T W T F S Su (Select Day) Shift Hours:8 Start Stop 5 6+ 5 6+ 6+ 5 5 5 5 5 5 8 8 RE Hours Onsite Signature Title j 5 Luis Gonzales Cat CB34B Anselmo Garcia mini ex Cat 308E Ford/Souzap/u truck sub- CCTS Joventino Garcialaborer1 sub- Wildbloom Roller laborer Matthew Natividad APWA CP II 2 operator/laborer 1 laborer skip and drag 2 sub- " Acasia"2 Ford/Okeefep/u truck 7:00A-3:30P laborer1 1 Dennis Masey 1 operator Ryan O Keefe 1 foreman Ty Souza 1 operator Ruben Hernandez 1 operator August 5,2022 7:00a 3:30p Location & Description of Work : Extra work : HMA paving part of Righetti job to transition new pavement delineation of the roundabout project. EQUIP. NO. NO. MEN DESCRIPTION (of Equipment or Labor) EQUIPMENT AND/OR LABOR 22, 2492,93,94EWIDLE OR DOWN61F- 83F sunny EST. HOURS - ITEM NO. Josh Kolver/Victor Rafael Gutierrez Case 570 MXT City Of San Luis Obispo Tank Farm Road & Orcutt Rd. Roundabout Cannon ID 210332 Distribution (All projects): Original local agency project (field office). Reports covering extra work should be filed seperately. THE RELENTLESS PURSUIT OF THE ELEGANT SOLUTION CANNON CONSTRUCTION MANAGEMENT DIVISION RESIDENT ENGINEER'S DAILY REPORT ASSISTANT RESIDENT ENGINEER'S DAILY REPORT CEM-4601 (Mod. 6/2011) Report No:Date:M T W T F S Su (Select Day) Shift Hours: Start Stop Temperature:Min:Max: SIGNATURE TITLE THE RELENTLESS PURSUIT OF THE ELEGANT SOLUTIONTHE RELENTLESS PURSUIT OF THE ELEGANT SOLUTION City Of San Luis Obispo Tank Farm Road & Orcutt Rd. Roundabout Cannon ID 210332 Extra work : Souza Construction paving crew performed approve extra work to pave the utility trench at Orcutt Rd. that is part of the Righetti development project. Trench 235LF + 5' W and at 2.5" section. Work was necessary to transition the new pavement delineation of the roundabout project before opening the roundabout. Extra work was approve by City of Slo. Extra work also included the set up of temp. traffic control at Orcutt with signs installed as per City directive. Item no. 22,24 ( Irrigation , Topsoil Backfill) Sub Contractor Wildbloom Landscaping was on site and continued the planting work at designated planter areas shown on plans. Work in progress. Item no. 92,93,94 ( Roadside Signs ) Sub Contractor " CCTS " was on site today and performed the installation of new roadside signs and also removed the jobsite CAS . Item no. 25 ( Hydroseed ) Su contractor " Acasia " was on site today and perfomed the hydroseeding of the areas shown on erosion control plans and the areas discussed in the field with City inspector Bobby and Cannon Charli G. Note: Talked to Jennifer today and according to her the Art team wants to have some plants at the center of the Art Sculpture as long as they are plant coverings species. Ben City inspector and Justin City staff approve the pavement delineation at conform of Orcutt Rd. prior to opening of roundabout. Around 3:15P, roundabout was opened. CANNON CONSTRUCTION MANAGEMENT DIVISION RESIDENT ENGINEER'S DAILY REPORT ASSISTANT RESIDENT ENGINEER'S DAILY REPORT CEM-4601 (Mod. 6/2011) Report No:Date:M T W T F S Su (Select Day) Shift Hours: Start Stop Temperature:Min:Max: SIGNATURE TITLE THE RELENTLESS PURSUIT OF THE ELEGANT SOLUTION .