4
8
8
2 6
20 48
4
8
8
4
8
16
16 16
RE Hours Onsite Signature Title
CAT CS56B
Wild Bloom (4-Man Crew + Utility
Truck + F250 + Bobcat S570)
EST. HOURS - ITEM NO.
1 Operator
1 Mason FM
EQUIP.
NO.
NO.
MEN
DESCRIPTION
(of Equipment or Labor)
1 Operator FM 32 - Class 2 Base86/87/110 - Fencing22 - Irrigation24 - Topsoil Backfill50 - Minor Concrete54 - Minor ConcreteIDLE OR DOWNWEATHER
Foggy then Sunny, 47-69 deg F
Matt Branch
Case 570N
F450 - Ruben
F250 - Steve
REMARKS
(Reason for Idleness or
other remarks)
Steve Bucknam
86/87/110 - Fencing - Revised per CRB No. 8 Rev 1; 22 - Irrigation & 24 - Topsoil Backfill
54 - Minor Concrete (Modified City Std 4030 Curb and Gutter)
Distribution (All projects): Original local agency project (field office). Reports covering extra work should be filed seperately.
THE RELENTLESS PURSUIT OF THE ELEGANT SOLUTION
4
Utility Truck
Operator Johhny Puderich
Work Truck
1
6 Mason
Fencing SUB2
City of San Luis Obispo
Tank Farm Road & Orcutt Road Roundabout
Cannon No. 210332
5/20/2022
7:00AM 3:30PM
32 - Class 2 Aggregate Base; 50 - Minor Concrete (Caltrans Type D4 Curb)
Water Truck
EQUIPMENT AND/OR LABOR
Skip Loader
Smooth Drum Roller
Ruben Ramos
5
Landscaping SUB
Charlie Gray/Matt Scholfield Resident Engineer/Inspector
Central Coast Fencing (2-Man Crew +
Utility Truck + Bobcat 863 w/Drill)
CANNON CONSTRUCTION MANAGEMENT DIVISION
RESIDENT ENGINEER'S DAILY REPORT
ASSISTANT RESIDENT ENGINEER'S DAILY REPORT
CEM-4601 (Mod. 6/2011)
Report No:Date:M T W T F S Su (Select Day)
Shift Hours:
Start Stop Temperature:Min:Max:
SIGNATURE Charlie Gray/Matt Scholfield TITLE Resident Engineer/Inspector
THE RELENTLESS PURSUIT OF THE ELEGANT SOLUTION
32 - Class 2 Aggregate Base
Souza was continuing fine grading the detached curb/gutter per Modified City Std 4030 along "L1" line STA 57+00 to 60+00.
Additional median and sidewalk planter areas were excavated in preparation for the landscape SUB to install irrigation piping and
backfill with topsoil.
86/87/110 - Fencing - Revised per CRB No. 8 Rev 1 & 5/17/2022 Email from Charlie Gray to Souza
Fencing subcontractor (Central Coast Fencing) arrived onsite at approximately 8:00AM. The fence is being installed per CRB No.
08 Rev 1 updated 5/17/2022 via email from Cannon to Souza.
22 - Irrigation & 24 - Topsoil Backfill
Landscaping subcontractor (Wild Bloom) continued importing and installing topsoil backfill is center and sidewalk medians.
Concurrently with backfil, Wild Bloom is continuing to install PVC (purple) irrigation piping withing the planter areas.
50 - Minor Concrete (Caltrans Type D4 Curb)
Souza poured outer roundabout curb (Caltrans Type D4) per Detail C/C1 at 7:30AM. Souza verified offsets and elevations prior to
placement. Rebar and dowels were installed and secured.
54 - Minor Concrete (Modified City Std 4030 Curb and Gutter)
Souza began forming and installing rebar for the detached curb/gutter per Modified City Std 4030 along "L1" line STA 57+00 to
60+00. Placement of this curb and gutter is scheduled for 7:30AM Monday 5/23/22.
Notes:
1. Idle equipment includes CAT 305, CAT 966F Loader, CAT 140M Grader, CAT CB64 & CB54 rollers.
2. Masons - Julio Castillo, Sergio Castillo, Jorge Garcia, Luis Lemos, Gilbert Sanchez, Christian Vasquez
3. Central Coast Fencing Crew - Jason Partridge, Adam Madrigal
4. Wild Bloom Crew - Roman Romel, Abraham Flores, Roberto Norajo, Francisco Norajo
5. Matt Scholfield conducted a SWPPP inspection. Wild Bloom has placed topsoil on or immediatealy adjacent to storm drain DI's.
Multiple DI's also had inadeqquate protection and the adjacent gutters were not clean nor free of debris.
City of San Luis Obispo
Tank Farm Road & Orcutt Road Roundabout
Cannon No. 210332
5/20/2022
7:00 AM 3:30 PM
CANNON CONSTRUCTION MANAGEMENT DIVISION
RESIDENT ENGINEER'S DAILY REPORT
ASSISTANT RESIDENT ENGINEER'S DAILY REPORT
CEM-4601 (Mod. 6/2011)
Report No:Date:M T W T F S Su (Select Day)
Shift Hours:
Start Stop Temperature:Min:Max:
SIGNATURE TITLE
City of San Luis Obispo
Tank Farm Road & Orcutt Road Roundabout
Cannon No. 210332
5/20/2022
THE RELENTLESS PURSUIT OF THE ELEGANT SOLUTION
CANNON CONSTRUCTION MANAGEMENT DIVISION
RESIDENT ENGINEER'S DAILY REPORT
ASSISTANT RESIDENT ENGINEER'S DAILY REPORT
CEM-4601 (Mod. 6/2011)
Report No:Date:M T W T F S Su (Select Day)
Shift Hours:
Start Stop Temperature:Min:Max:
SIGNATURE TITLE
City of San Luis Obispo
Tank Farm Road & Orcutt Road Roundabout
Cannon No. 210332
5/20/2022