Loading...
HomeMy WebLinkAboutF-109C IT Y C LERR"S FILE 110..E-ing SUBJECT: • KENNErH HARRY HFS6 nwc MTICT �_.�, C10 C. Mwiu pin �lr VCnTUw1. C•.L lfOwnln Pvorvc MI 9.ppnp 12 June 1954 The Honorable Council of the City of San Luis Obispo 990 Palm Street, San Luis Obispo, California Gentlemen: Recent illness has prevented my appearing before you concerning the status of your recently constructed Fire Station No. 2 and of the final payment due the Maine Construction Company. After a final inspection by the undersigned in the company of the Contractor and Mr. Waldmeir, Chief of the Fire Department, it was found that a crack in the shower room floor constituted the only condition causing any concern. It has been reported to me that the final inspection by your Council also agreed that the building was acceptable with this one condition noted. While contractors could hardly be expected to guarantee that a concrete floor slab on grade would not show hairline cracks such as are inherent in the material, Mr Maino,on the occassion of our final inspection, volunteered to watch the behavior of the slab, and, if it failed to close up after complete curing, to cover it with asphalt tile. Any such action on his part would be, or should be considered as a gift. Concrete is a plastic material subject to considerable stress and shrinkage when curing. In structural members where cracks caused by shrinkage must be avoided at any cost, reinforcing steel is placed to resist the internal stresses developed. The slab now in question is reinforced only nominally and, if I had required enough steel to avoid all possibility of cracking, I probably would have been criticized for the excessive additional costs involved. With building costs being what they are we can seldom afford the luxury of structural reinforcing in slab$ on grade. Cracks such as in this example are caused by the top surface of the wet concrete drying out thru the action of wind, warm wea- ther or too fresh cement while the lower part of the slab remains saturated. The crack is probably only an inch or so deep and in many cases will close up as the shrinkage of drying progresses to the bottom surface. For economy's sake it is now the practice to hope for a minimum of cracking in exposed concrete floors,and, if unsuccessful, to be reconciled to their existence until they can be covered with a finish floor. Only where the floor will, by its purpose,remain as an exposed concrete surface (as in the apparatus room) do we spend the necessary money in heavy reinforc- ing. 1. Ltr. 12 June 54, re: Fire Station No. 2, recommending payment of retained percentage. Under the circumstances outlined above there seems to be no ,justification for the further retention of the funds withheld from the contractor and it is therefor recommended that the Yaino Construction Company be paid the remaining balance of their contract with the City of San Luis Obispo in the sum of Three Thousand, Six Hundred Sixty-eight and 80/100ths ($3,668.80) Dollars. Though your Fire Station was the first job on which your con- tractor and this office have been associated, his reputation thruout the State gives me confidence that, despite his having received full payment on this contract, he will keep his volun- teered promise concerning covering the cracked floor with some material such as asphalt tile. When that is done the City will have gained. I regret, very much, that this item arose. It has been extremely pleasant working with your Fire Department and Engineering De- partment personnel. Their cooperation has been of the best and I had hoped that my association with your City would continue. My first illness of my life came at a most inconvenient time preventing my following up this job as I had wished to do. Very truly ours, RENNETH N HESS Architect MAINO CONSTRUCTION CAD. gBnnal ContYactou fl�plyN P. O. BOX 709 2238 BROAD STREET SAN LUIS OBISPO. CALPORNIA TELEPHONE 3111 HONORABLE MAYOR & CITY COUNCIL CITY OF SAN LUIS OBISPO 990 PALM STREET SAN LU15 OBISPO. CALIFORNIA GENTLEMEN' JUNE 11, 1954 RE: SAN LUIS OBISPO FIRE STATION V2 ON MARCH 15, 19%, FOLLOWING AN INSPECTION BY YOUR ARCHI- TECT, WE SUSMt TTEO A PAYMENT REQUEST SHOWING THAT THIS JOB WAS COMPLETE. WE RECEIVED PAYMENT COVERING THIS RE- QUEST ON APRIL 9, 1954. OUR CONTRACT SAYS THAT THIRTY-FIVE DAYS AFTER THE FINAL INSPECTI'N THE CITY WILL PAY THE 1.7,E RETAINED FROM OUR CONTRACT AMOUNT. ACCORDINGLY, ON APRIL 21, WE REQUESTED THROUGH MR. HESS, YOUR ARCHITECT, THAT FINAL PAYMENT BE MADE. WE HAVE HAD NO WORD FROM MR. HE55, OR ANY OTHER RESPONSIBLE PERSON IN THE CITY ORGANIZATION, IN ANSWER TO OUR REQUEST FOR FINAL PAYMENT NOR HAVE WE HAD ANY WORD AS TO WHY THESE PAYMENTS WERE DELAYED. INE ASK THAT THE CITY COB VCIL APPROVE THIS REQUEST FOR PAYMENT AND SINCE THE BUILDING HAS BEEN COMPLETED FOR OVER THREE MONTHS, THAT PAYMENT BE MADE IMMEDIATELY# WITH- OUT RECOURSE TO THE THIRTY -GIVE DAY PERIOD LISTED IN THE SPECIFICATIONS. VERY TRULY YOURS, MAINO CONSTRUCTION COMPANY By T. C. MAINO TCM/HW ,> Jt1N t954 ti. A cr,: MR. KENNETH HEss n RFk- EJ ED �` �:ITytiiziK ;AL. I`IF i.. in acccr3ence vi.th the term 2nd :.ly of se te,b 19 Naino Cons true tioa_Coapaay__ the City of San Luis Obia_po ._ __- Owner. `.'or the construction of Fire Station No. 2. 12th June_ 54 Three Thousand, Six Hundred Sixty-eight and 80j100tha 36,137.00 569.65 36,706.65 18.45 36,689.20 36,689.20 "0! 167181g��i .� SLO erk D �F2tta� STATEMENT OF .ACCOUNT -pate of Iss,,�oee Harsh 16, 1934 IS CERTI'.'Y Last, in nccoria,— ...._ ed `.'u; 2nd day r, September 53 Haino Construction Company the City of San Luis Obispo _ _. ._ the construction of Fire Station No. 2 16 March 54 - Two Thousand Fourteen and 04/100_($2,014.04) 36,137.00 569.65 36,706.65 18.45 36,688.20 33,019.40 - ,, �33,, 668. 80 0 OF ACCOUNT 1�0. of Certificate —&— Date of jesance February 22, 1934 13 IS 110 CUP, i" th the teri:r, 2nd September 19 14 Maino Construction Company --contrae lor City of San.,Luia Obispo Owner, for the construction of Fire Station No. 2 payable from the Owner to the Contractor, 22nd February -,,g 54 , tine 0= of Three Thousand six hundred sixty three and 99/100 Dolls ra. - . . . . . . . . . . . . . 36, 137. 00 569.65 SLL�., P111a AAditiona . . . . . . . 36,706.65 DedtwE'C-as tDnt,. hereof . . . . . . . . . . 18.45 u.r " �-!' ae 36,698.20 t, I ir f ied' including L e' this Certificate . . . 31,005.36 -'t 5,682.84 0 1t; Ohl* ct%A� . 0 • STATEt1ENT OF ACCOUNT t;o. of Certificate 3 Date of Iesue.ncc J=-uary 26, 1954 THIS IS TO CERTIFY that, in accordance with the tcrms o£ a contract executed the 2nd day o£„_��,�mUcr 19 s:r an8 between Ma .no snd City of San Luca Gb,-sIo Owner, eor ',h_ Con-,' ruction Of Fare Jtfl t:oi, there will be due sad payable from the Owuer to the COntrnchur. s�>on the 26th da^ of jar, :r.. 19 .': the sum o: F:.:. ino,.o:ond Se unity Six and 1!,,"OG of account under the above contract Poll Cwa : ,r'e 'n::_ Controet Sum. . . . . . :u '%-, •/.,^gyp Additions to date hereof . . . . . . Origin*). Sum, Plus Additions. . . . . . . . . . . . Ded*ic*ions to bete. hereof . . . . . . . . ... . . D'�w ^rice Tote.'. Certified, including .artifiCate CHAf.GE ORDER NO. 3 Fire Station No. 2 for City of San Luis Obispo, California January 25, 1954 hiaino Construction Company P.O..Box 709 San Luis Obispo, California You are hereby authorized to make the folloving changes in the Contract you now hold with the City of San Luis Obispo for the construction of Fire Station No. 2. Requested by the City Engineer: Increase thickness of edges of approach reap to 12" below 3rade to Porn a cutoff wall against surface water . . . . . . . . . add. . . . . . . . . . . $256.00 Original Gontraot Price. . . . . . . . . . . .$36,137.00 Added, this Change Order. . . . . . . . 256.00 Added, Change Order No's 1 & 2. . . . . . . . 313.65 Deducted, Change Order No.l. . . . . . . . . 18.45 New Contract Price . . . . . . . . . . . . . . $36,689.20 Appro,ied: Accepted: City of San Luis Obispo Genera'_ Contractor Architect ;�t'Fa_t r CHANCE ORDER NO. 2 Fire Station No. 2 for City of $an Luis Obispo, California January 25, 1954 11aino Construction Company P. 0. Box 709 San Luis Obispo, Ca ?_iPOrtis You are hereby authorized to auto the following ehanges in the contract you now hold with the Ckty Of San Luis Obispo for the construction of Fire Station No. 2. The following requested by the Architects 1. Switch outside light at Dormitory r.ith outside kitchen light to correct error on plans. . .add. . .$14.00 2. Delete circuit to Apparatus Room heater. Not required. . . . . . . . .subtract. . . . . . . . . . 18.45 The following requested by the Fire Chief: 3. Switch circuit #8 by 3-ways each side of Dormitory. This circuit was to be automatic with alarm system. Cancellation o plans for alarm system makes switches necessary. . add. . . . 51.75 4. Tvo additional phone Jacks to be located on two Walls (between beds} in Dormitory. . .add. . . . . . 27.30 5. Install flood light in front entrance to the Apparatus Room. . . . . . . add. . . . . 35.00 6. Install another "H" fixture on column of the Apparatus Room entrance. .add. . 27.60 7. Make provisions for time clock for "H" fiature.Add. .15.00 Original Contract Price. . . . . . . . . . . .$36,137.00 Added, this Change Order. . . . . . . . . . . 170.65 Added, Change Order Is. 1. . . . . . . . . . . 143.00 Deducted, this Change Order. . . . . . . . .18.45 New Contract Price . . . . . . . . . . . . . .$36,432.20 Approved: Accepted: City of S n �u/s/J/mob ie/p/o re Wr a1 Contractor Arcniteot x CHANGr ORDER NO. 1 Fire Station '.o. 2 for City of San Luis Obispo, California January 25, 7.S54 l.:aiho Construction Company P. 0. Box 709 San Luis Obispo, California You are hereby ,authorized to make the following changes !.r the oontract you now hold with the City of San -Luis Obispo for the construction of Fire Station No. 2. _. Increased coat of stee�. sash and sheet metal. due to delay in signing contract. . . . . . add. . . . . .$143.00 Original Contract Price. . . . . . . . . .$36;137.00 Added, this Change Order. . . . . . . . . . 143.00 New Contract Price . . . . . . . . . . . . . . $36,280.00 Approved: Accepted: a.-" � C a City of'un Luis Obispo/ GenVal Contractor —' 3.rciEect qrt 1 F v �� e`S. ,Y1 2 Decembea�?'%`'�J'_953 2nd September 53 Maine Construction Company City of San Luis Obispo _ Construction of Fire Station No. 2 24th December 53 Four Thousand Two Hundred Sixty Two and 53/100 - 36,137.00 None _.. 36,137.00 None . 36,137.00 . 22,265.23 LL13,871.77 y November 20,1953 2nd -. September 53 Maino Const. Co. . City. of. San. Luis Obispo Construction of a Fire Station Nc. 2 20th November 53 Eighteen Thousand Two and 701,100 ($18 002.70). 36,137.00 . None - 36,137.00 None 18,002.70 18, 134.30 RESOLUTION N012_42_ (New Series) A RESOLUTION PRUVIDINO FOR THE ZMCUTION OF A CONTRACT WITH MAINO CONSTRUCTION COMPANY BE IT RESOLVED by the Council of the City of San Luis Obispo as follows: That the City of San Luis Obispo exseute that certain contract dated September 2, 1953 with Maino Construction Company regarding the construction of a fire station on old Morro Road. BE IT FURTHER RESOLVED that the Mayor of the City of San Luis Obispo be, and he is hereby, authorised to execute said for and on behalf of the said City, which execution stall be attested by the City Clerk. PASSED AND ADCFTYD this 6th day of September, 1953 by the following motet AllgiNels Peck.Paula_n=..+g_ginhard R_Gra N_Ken neth vJ.Jones. Fred H. Lucksinger NOES: I ABSENT: w ne ATTESTS ARTICLES GF AGREEMENT THIS AGREEMENT, made and entered into this 2 day of 9s��lilBt.e *mRPMP 1953, between the CITY OF SAN LUIS OaISPO, acting by and through its City Council, First Party, sometimes hereafter called the OWNER or CITY, and MAINO CONSTRUCTION COMPANY, Second Party, sometimes hereafter called the CONTRACTOR. WITNESSETH: That the parties have mutually covenanted and agreed, and by these presents do covenant and agree with each other, as follows: 1. THE WORK: Said Contractor agrees to furnish all tools, equipment, apparatus, facilities, labor and material necessary to perform and complete in a good and workmanlike manner, the work of construction of a new fire station for the City of San - uis ubispo, and other works as called for, and in the manner designated in, and in strict conformity with, the Plans and Specifications adopted by said City Council and as prepared by Kenneth H. Hess, ARCHITECT, which said plans and specifications are entitled respectively: Group I -- Drawings: Sheets 1 through 6 Sheet PE-1 Approved by the City of San Luis vbispo on April 11, 1953, Job No. 263. Group II - Specifications: Division 1 -- Contracts. Division 2 -- General Conditions. Division 3 -- Special Conditions. Division. 4 -- Excavation and Grading. Division 5 -- Concrete. Division 6 -- Masonry. Division 7 -- Rough Lumber and Carpentry. Division 8 -- Furnishing Millwork. Division 9 -- Finish Carpentry. Division 10 - Steel Sash. Division 11 - Glass and Glazing. Division 12 - Sheet Metal. Division 13 - Lath and Plastering. Division 14 - Roofing. Division 15 - Painting. Division 16 - Finish Hardware. Division 17 - Ceramic Tile. Division 18 - Formica, Linoleum, asphalt Tile Floors. Division 19 0 Flurbing. Division 20 - Heating. Division 21 - Electrical. Division 22 - Caulking. Division 23 - Cleaning. Division 24 - Overhead Doors. -1- 0 E and copies of which plans and specifications are in the possession of each of the parties hereto. It is understood and agreed that said work shall be performed and completed as required in said Plans and Specifications under the direction of, and supervision of, and subject to the approval of Kenneth H. Hess, Architect, or his representative. 2. LOCATION OF WORK: Said building is to be erected upon a lot of land situated in the City of San Luis Obispo and described as follows: Lot 21 in Block 5 of Tract No. 66. 3. THE CONTRACT DOCUMENTS: The complete contract consists of the following documents, to -wit: the Notice to Contractors, the Instructions to Bidders, the Accepted Bid, the Agreement, and General Conditions, the Specifications, the Drawings, and all modifications incorporated in those documents before their execution, prepared by Kenneth H. Hess, Architect. Any and all obligations of the City and Contractor are fully set forth and described therein. All of the above documents are intended to cooperate so that any work called for 1n one and not mentioned in the other or vice versa is to be executed the aame as if mentioned in all a aid documents. The documents comprising the complete contract are sometimes hereinafter referred to as the Contract Documents. 1j. LOSS OR DAMAGE: That the City Council or their authorized representative shall not in any way or manner be answerable or suffer loss, damage, expense or liability for any loss or damage that may happen to said work, or any part thereof, or in or about the same during its construction and before acceptance, and the said Contractor snall assume all liabilities of every kind or nature arising from said work, either b accident, negligence, theft, vandalism, or any cause whatever; and shall hold the City Council or their a--thorized representative harmless from all liability of every kind and nature arising from accident, negligence or any cause whatever. 5. PROSECUTION OF WORK: If the Contractor should neglect to prosecute the work properly or f ail to perform any provisions of this Contract, the City, after three days' written notice to the Contractor, may, without prejudice to any other remedy he any have, make good such deficiencies and may deduct the cost thereof from the payment then or thereafter due the Contractor, provided, however, that the Architect shall approve both such action and amount charged to the Contractor. 6. TERMINATION BY THE CITY FOR BREACH, ETC.: If the Contractor should be adjudged a bankrupt, or if b should make a general assignment for the benefit of nip creditors, or if a receiver should be a ppointed on account of nia insolvency, or if he or any of his sub -contractors should violate any of the provisions of the Contract, or if he should persistently or repeatedly refuse or should fail, except in cases for which extension of time is provided, to supply enough properly skilled workmen or proper materials, or if he should fail to make prompt payment to sub -contractors or for material or labor, or persistently disregard laws, ordinances or the instructions of the Architect, then the City may, upon the certificate of the Architect that sufficient cause exists to justify such action, serve written notice upon the Contractor and his surety of its intention to -2- • to terminate the Contract, such notice to contain the reasons for such intention to terminate the Contract, and unless within five (5) days after the serving of such notice, such violation shall cease and satisfactory arrangements for correction thereof be made, the Contract shall, upon expiration of said five (5) days, cease and terminate. In the event of any such termination, the City shall imnediately serve written notice thereof upon the surety and the Contractor, and the surety shall have the right to take over and perform the Contract, provided, however, that if the surety within ten (10) days after the serving upon it of notice of termination doesnot give the City written notice of its intention tot ake over and perform the Contract or does not commence performance thereof within the ten (10) days stated above from the date of the serving of such notice, the City may take over the work and prosecute the same to completion by Contract or by any other method it may deem advisable, for the account and at the expense of the Contractor, and the Contractor and his surety shall be liable to the City for any excess cost occasioned the City thereby, and in such event the City may without liability for so doing, take possession of and utilize in completing the work such materials, appliances, plant and other property belonging to the Contractor as may be on the site of the work and necessary therefor. In such case the Contractor shall not be entitled to receive any further payment until the work is finished. If the unpaid balance of the contract price shall exceed the axpense of finishing the work, including compensation for additional managerial and administrative services, such excess shall be paid to the Contractor. If such expense shall exceed the such unpaid balance, the Contractor shall pay the difference to the City. The expense incurred by the City as herein provided, and damage incurred through the Contractor's default, shall be certified b; the Architect. 7. PROGRESS PA1'NLNTS: The price to be paid said Contractor as hereinafter provided shall be paid in legally executed and regularly issued warrants of the said City, drawn on the appropriate fund or funds as required by law, and the order of said City upon certificates issued by its agent, the Architect. Once each month, there shall be paid to the contractor ninety (90) per cent of the value of the labor and material incorporated In the work, as approved by the Architect, less the aggregate of previous payments, and thirty-five (35) days after the completion of the entire work and the acceptance thereof by the City and the Architect, a sum sufficient to increase the total payments to One Hundred (100) per cent of the contract price, provided that: a. The Contractor shall nave furnished satisfactory evidence that all claims for labor and materials have been paid; and b. That no claim shall have been presented to the City by any person based upon any acts or omissions of the Contractor and no liens or withhold notices shall have been filed against the said work or the property whereon it was done. The payment of the progress payments by the City shall not be construed as an absolute acceptance of the work done up to the time of such payments. -3- a 0 8. PAYMENTS WITHIY4: The architect may withhold, or on account of subsequently discovered evidence, nullify the whole or a part of any certificate to such extent as may be necessary to protect the City from loss on account of: a. Defective work not remedied. b. Claims filed or reasonable evidence indicating probable filing of claims. c. Failure of the Contractor to make payments properly to sub -contractors, or for materials or labor. d. A reasonable doubt that the contract can be completed for the balance then unpaid. e. Damage to another contractor. When the above grounds are removed, payment shall be made for amounts withheld because of them. ). UNI'PED STATES' A]ATERIALL: Only such unmanufactured articles, materlale and supplies as have been mined or produced in the United States, and only such manufactured articles, materials and supplies mined, produced or so manufactured, as the case may be, in the United States, shall be used in the performance of this contract. However, such provisions shall not apply if articles, materials or supplies of this class or kind to be used, or the materials, articles or supplies from which they are manufactured, as the case may be, in the United States. The above references to the united States mean the United States of America, and include any territory or insular possession thereof. 10. CONVICT-P^.ADE MATERIALS: The Contractor agrees that no materials manufactured or produced in a penal or correctional institution shall be incorporated in the project under this Contract. 11. WAGE RATES: In case it becomes necessary for the Contractor or any sub -contractor to employ on the work under this Contract any person in a trade or occupation (except executive, supervisory, administrative, clerical or other non -manual workers as such) for which no minimum wage rate is herein specified, the Contractor shall immediately notify the City who will promptly thereafter determine the prevailing rate for such additional trade or occupation and shall furnish the Contractor with the minimum rate based thereon. The minimum rate thus furnished shall be anulicable as a minimum for such trade or occupation from the time of the initial employment of the person affected and during the continuance of such employment. 12. CONTRACT PRZ CE: Tnat in consideration of the foregoing covenants, promises and agreements on the part of the Contractor, and the strict and literal fulfillment of each and every such covenant, promise and agreement, and as compensation agreed upon for seid work and construction, erection and completion as aforesaid, the City of San Luia Obispo, through its City Council, covenants, promises and agrees that it will well and truly pay and cause to be paid to the Contractor in full, and as for the full Contract price and compensation for said construction., erection and completion of the work hereinbefore agreed to be performed by the Contractor, the sum of Thirty-six Thousand One Hundred Thirty-seven (06,137.00) Dollars lawful money of the United States, which sum is to be paid according to the schedule hereinbefore provided and subject to additions and deductions as hereinbefore provided in this Contract. -4- The signing of this agreement will constitute an order by the Council for the Contractor to begin work i=ediately. IN WITNESS WHEREOF, the parties hereto, the Party of the First Part by its City Council thereunto duly authorized, and the Party of the Second Part have hereunto set their hands and seals the day and year first above written. CITY COUNCIL OF THE CITY OF SAN LUIS / /OBISPO Mayor, City of San Luis Obispo, Colifomia City Clerk City of SLvis Obis California an arty of the irst art CONTRACTOR MAINO Cox 'CTION COMPANY BY -Y AGREELa-M WITH i=METH H. hESS PhIS AGRziaQMT ;aada the /Ud day of';arch, 1953, by and between the CITY OF SAN LUIS OBISPO, hereinafter called the City, and kS`r'Ni1M H. H5.'SS, hereinafter called the Architect, VJITt7ESSETH: That whereas, the City intends to erect a Fire Station on Foothill Boulevard in said City. NOW, T`11&?EFOR'_, the City and the Architect, for the considerations hereinafter named, agree as follows: The Architect agrees to perform, for the above -named work, professional services as hereinafter set forth. The City agrees to pay the Architect for such services a fee of five pe: cent (5>) of the cost of the work, with other payments and reimbursements as hereinafter provided, the said percentage being hereinafter referred to as the "basic rate". The parties hereto further agree to the folloaning condi- tions: 1. The Architect's professional services consist of the necessary conferences, the preparation of preliminary studies, working drawings, specifications, large scale and full size detail drawings; the drafting of forms of proposals and contracts; the issuance of certificates of payment; the keeping of accounts; the general administration of the business and supervision of the work. 2. If any work designed or specified by the Architect is abandoned or suspended the Architect is to be paid for the service rendered on account of it. 3. Payments to the i%rehlteet on account of his fee shall be made as follows: Upon completion of the preliminary studios, a sum equal to 257� of the basic rate computed upon a reasonable estimated cost. Upon completion of specifications and general working drawings (exclusive of details) a sum sufficient to increase Payments on the fee to 75ro of the rate or rates of commission arising from this agreement, computed u,,on a reasonable cost estimated on such completed specifications and drawings, or if bids have beba r3celved, th;;n computed upon the lowest bona fide bid or bids. From time to time during the execution of work and in proportion to the amount of service rendered by the Architect, payments shall be made until the aggregate of all payments made on account of the fee under this Article, shell be a sum equal to the rate or rates of commission arising from this agreement, computed upon the final cost of the work. Payments to the Architect, other than those on his fee, fall due from time to time as his work is done or as costs are incurred. Peyments tc the Architect shall at no time be greater than the amount of the approved payments to the Contractor or Contractors, multiplied by the basic rate, except in the cases covered by the follo•;ring paragraph. No deductions shall be made from the Architect's fee on account of penalty, liquidated damages, or other sums with- held from payments to Contractors. 4. The City shall, so far as the work under this agree- ment nay require, furnish the Architect with the follo-,wing information: A complete and accurate Survey of the building site, giving the grades and lines of,streets, pavements, and adjoining properties; the rights, restrictions, easement$, boundaries, and contours of the building site, and full • information as to sewer, water, gas and electrical service. The City is to pay for borings or test pits and for chemical, mechanical, or other tests when required. 5. The Architect will endeavor to guard the City against defects and deficiencies in the work of Contractors, but he does not guarantee the performance of their contracts. The supervision of an Architect is to be distinguished from the continuous personal superintendence to be obtained by the employment of a clerk -of -the -works. When authorized by the City, a clerk -of -the -works accept- able to both City and Architect shall be engaged by the Archi- tect at a salary satisfactory to the Owner and paid by the City, upon presentation of the Architect's monthly statements. 6. :','hen requested to do so the Architect will furnish preliminary estimates on the cost of the work, but he does not guarantee the accuracy of such estimates. %. The cost of the work, as herein referred to, means the cost to the owner, but such cost shall not include any Architect's or !engineer's fees or reimbursements or the cost of a clerk -of -the -works. ';lhen labor or material is furnished by the Owner below its :market cost the cost of the work shall be computed upon such market cost. 8. original drawings and specifications as instruments of service are the property of the Architect whether the work for which they are made be executed or not, but "as built" drawing of the actual construction plan will be furnished to the City by the Architect. 9. The City and the Architect, each binds bLuself, his partners, successors, executors, administrators, and assigns to the other party to this agreement, and to the partners, successors, executors, administrators and assigns of such other party in respect to all covenants of this agreement. Except as above, neither the City nor the Architect shall assign, sublet or transfer his interest in this agree- ment without the written consent of the other. The City and the Architect hereby agree to the full performance of the covenants contained herein. IN .'iITNESS VIiEREOF they have executed this agreement, the day and year first above written. CITY OF SAN 13 OBISPO By: Iv yor Attest: ty cer r — — �•�� Ar -4- o'rmrmta O ervwoa omce AGREEMENT COVERING SERVICE RISER PIPE AGREEMENT between PACIMC GAS AND ELECTRIC COMPANY, a California corporation, hereinafter called Pacific, and_.___._ CI"Y OF SAII LL'IS OBISPO hereinafter called Permittee: 1. Pacific hereby gives Permittee permission, free of rent and on the terms and conditions herein stated, to install, maintain and use equipment, consisting of a service riser pipe and wine and appliances connected therewith, on the pole which is designated below or on the reverse aide hereof or on the sheet attached hereto. 2. Permittee shall install and maintain said equipment at its sole risk and expense in the location on said pole designated by Pacific and up to a point eight feet above the ground level. When making such installation Permittee shall leave such length of conductor at the top of said riser pipe as may be necessary, and shall furnish such other materials as may be required, to enable Pacific to complete the connection to its overhead system. Pacific will make no charge for completing said installation. Pacific will thereafter maintain said installation above said eight -foot level at Permittee's expense. S. In the event Pacific desires to have said equipment rearranged on said pole or relocated upon another pole, Pacific shall at its expense rearrange, or detach and reinstall, said equipment above said eight -foot level, and Permittee shall supply any additional materials required therefor and perform all work below said level at its sole risk and expense. 4. Within thirty days after being given written notice by Pacific to do so, and on condition that Pacific shall have removed Permittee's equipment down to said eight -foot level, Permittee shall re- move the remainder of said equipment from said pole, and at the expiration of said time all rights of Permittee to use said pole shall cease. If Permittee shall not have removed said equipment from said pole within said time Pacific shall have the right to do so at Permittee's risk and expense. 5. This permission shall not be assigned in whole or in part without the written consent of Pacific first being had. 6. Any notice to Permittee hereunder shall be deemed given on the date of its deposit in a United States post office enclosed in an envelope, postage prepaid, and addressed to Permittee at last known address. 7. Time is of the essence hereof. // Executed thie_.._.//._.day of���L_.�.A_, 1>!✓�3. RISER POLE LOCATION: J`II� PACMC GAS AND ELECTRIC COMPANY / By_...—__�_� ...... gvwr W CITY OF SAIi LUIS OiSSP0 See reverse side b3, f'rA/i, Gct �. _ title IL, U mo Street. Sm L S Obierio. C lifornia is CONTRACT BOND—CALIFORNIA. FAITHFUL PERFORMANCE —PUBLIC WORK. i Hartford Accident and Indemnity Company ` 1` HARTFORD, CONNEC ICUT Nr O � v g a � 3 1 t Know all Men by there Prererars; That we, ._.�. .. ..._.. _._._.-- --..... __..__ .___....._ _.... _---�...—_ ..._._ ...... .__._....__—.._, as Principal, and the HARTFORD ACCIDENT AND INDEMNITY COMPANY. a Corporation organized and existing under the laws of the State of Connecticut and authorized to transact surety business in the State of California, ae Surety, are held and firmly bound unto .._.._....Ql.gty--0$..S"__LUSS'..-OSI$RQ_._..._...._...._....._..___....____.—._.___ in the sum Of X1G1ISLSN._=WieNA._:`a'.IXTr-E1SxH .._Ai1?_1r0�10.0.-._-.__..._.Dollars lawful money of the United States of America, for the payment whereof, well and truly to be made, we hereby bind ourselves, our heirs, executors, administrators, suecessers and assigns, jointly and ,merally, firmly by theme presents. SIGNED, .sealed with our meals, and dated this _3rd__...__. _ day The condition of the foregoing obligation is such that. whereas the above bounden Principal has entered into a contract dated.._AUFA.� t _?t_...._.__ _.........___, 195).. with said, .._..___CITY...DF_.Y$$....yUZ4. jySjgPO... _.._......._.__.__..__.____to do and perform the following work, to -wit: OONSTRUCTiON FIRI. HOUSE ff2t S.iN LUI3 OBISPO 9 STATE OF CALIFORNIA San j.aia Obla W. COUNTY OF_ ..........................._..... .�e fifty—three On this .... 3�._....... ..day of........_pt �.... to the year one thousand nine hundred and.. .......... ........ .. before me. liRNE..T \fOLi l{@...... _.... a Notary Public in and for said County of.,S&R..I,O.id._`.'A1aFfx, residing therein. duly commissioned and sworn. personally appeated......I+TS.� '�''$..ii.-..-7.TL1C1C212D. known to me to be the ........ of the Hartford Accident and Indemnity Company, the Corporation described in and that executed the within instrument, and also known to me to be the person__.. who executed it on behalf of the Corporation therein named, and ..__he.. _. acknowledged to me that such Corporation executed the same. 9n ltlitA"A (r!ARA2n$, I have hereunto set my hand and affixed my Official Seal, at my office. in the said County of, San..LiLi8... Obia.po, the day and year in this certificate Brat above written. My Commission will Expire ........ - _ flQ.vlSi.r..l.4Jr.j �. _._t'v �.v 4 S.A. to Noun Public in and f¢ Me Cw¢r W .__... _ _. m„¢ a rilaaa¢ SURETY DEPARTMENT • 1111) LET'I'L11 Aa ioord Accideni and Inde�rcniiy Company HARTFORD. COV�I:Ct'ICI'f 0 KNOW ALL MEN BY THESE PRESENTS, that, Whereas... ._.......... MAINO_.CONSTRUCTION CO.. ..................................... ....... ..._._ _. 36N_SAIS ... OBIs�Qt.CdLILOENIA................... ............(hereinafter Called the Bidder) has submitted, or is about to submit, to_ ...... CITY..QF....SAN...LUIS. OBISP.0...........................__........_.__._,..............._. ............_.... ... ..........__.... ...................(hereinafter called the Obligee) a bid dated ..... dU1tlF _1.,1953.................... fee .......... AONaTRUCTI.ON...FIBE..HQUSE..#.2t...... ... ......_............ .... W_LDIS_ pISPQR...CALL@OIiNL1,_._....._....._...,......_.......... which is attached hereto and made a part hereof. Now, Therefore, the HARTFORD ACCIDENT AND INDEMNITY COMPANY, a corporation of the State of Connecticut, duly authorized to transact business in the State of. ... ......CALIF.ORNIA........ ................._................._,.........., as surety, hereby undertakes that if the accompanying bid be accepted in whole or in part, the Bidder shall, within the period specified therefor, or, within ten days after request to do so, enter into a written Contract with the Obligee in accordance with the bid w accepted, and give bond, as may be required, for the faithful performance of such contract, or in the event of the failure of the Bidder to so enter into such contract and give such bond, the Surety shall pay to the Obligee the difference in money between the amount of said bid as accepted and the amount for which the Obligee may contract with another party to perform the work covered by said bid if the latter amount be in excess of the former, provided, however, that the liability of the Surety shall not exceed a sum equal to .... — — -._-..,.'_.....per centum ( 14......__%) of the amount of said bid, Provided and subject to the condition precedent: That any suits at law or proceedings in equity brought or to be brought against the Surety to recover any claim hereunder must be instituted and service had upon the Surety within one year after the acceptance of said bid by the Obligee. In wltrre-ac When. thn Rnmt, h....„wl them ...-...,...... t,e.........a I,—:.. '..,-. _.., STATE OF CALIFORNIA COUNTY OF.San Luis Obispo (as' __........ ..._...._......._ ... fifty-three On this.__�7t(h........ -.day Of- .. leey-._.._..........—in the year one thousand nine hundred and ............ ... before me. ,F_..$„N,_F3T_VOLI.M.TR,.__. a Notary Public in and for said County of..San... LUia.-Ohiapo. residing therein, duly commissioned and sworn, personally appeared.......L&STER..C.B.TOC.KIRD... Attorney -in -Foot knownto me to be the _...... _.._........._._._............ ......____ _........ :.........__......... of the Hartford Accident and Indemnity Company, the Corporation described in and that executed the within instrument. and also known to me to be the person.,,... who executed it on behalf of the Corporation therein named, and ...... he_acknowledged to me that such Corporation executed the same. §A Wne" WAIL 4, 1 have hereunto set my hand and affixed my official Seal, at my office. in the said County oUaaLuia...Obl.s.po_...... the day and year in this certificate first above written. My Commission will Explre.... Y 11Y_ Ptx.n wsiK �..a (a )Ve A&is..Ubi ss.l'rt' A BID FORS City of Sall lui, 0binpo City hall San Luis Obispo, Californin Gantl cmea t Huge � purruant toyour Advortisemaut for the construction of Fire :tericf.:2, tbx undersigned hereby proposes and sgraes to furnish :.ay and al" required labor, maehine-ry, tools, apparatus, material:., fi rnnepor to Gion and services to do the cork in strict aeoordaade ritb the plans, epee iffcations end Contract Documents on file at taw uffine of retmeth fi. lions, Architect, 6n Fast Main Street. :'autos, Californis, fo: the sum of Thiefy� s�ix_ thousend on hundr� ana-no/1W--_--___-Doj' erss. T'�e und-raiguea tins inspected the. site of th, prop3:ad !:as e!:_^a.fullj rt%c --.fined t,ie drawings, syeei;icatlons and a-::d their sufficiency. .ut?:c'i 3d 'iareto. is a list of sub-oantraotwr.+ in comp i;a.t utth the ;rovisions of Section 4102 of the Government Code of t.:> 3Lrzte or Cnllfoania Le required under "Taetructtona to bidd::re" 1e, t:^,w a1ev�f is at ion. 11 uv5rde8 t:.e contract, the audersigned will oomple,c t_.7 xvr:: to the an isf eotxon of the Owner and the Architect oath lr, C�3 Lu,:dred and fifty calendar days of the award of the eoor.;dct The undexalgned viii furniab ana pap for the Faithful Perf� =— aase sad Labas and Mdter:ai bovdm ae specified. Enclosed fiao a ddl6ltxdlJlt{I1 tli¢xafs7)t [f [AIx♦hss[xae bldber'n DJn 6 for ten peroeat of the amouat of the bio as a cuurontse that the underaigned will enter into a coutr:et with the City of Son Luis Cbfvpo if awarded the avntract. Date June 1, 1953 Partnership The g M. Meino 1424 Mill St. San Luis 091spo, Caili. T heg an' LMQen°si s13'GEoyff5t. Respectfully submitt^d, Maine Copyfru coon Com PenX_..__. Address P.O. Box 709 ,San Luis Obis_j.a ►lsaJ,xoo.S,j ..s' llflll.}. ..z:.3,. _ ..+tw ...,..<.x'lkxl• wp�v �-,y _ S P E C I l I C A T I 0 n S a^ labor and P.%torial necees-iry for the construction a: Fire 9 .rt«axa LZ, ror the CITY OF S.0-1 LCIS OBI„PO acid Fire Station to be lcoated on Old 15orso Road S:,n Luis Obispo, California 't3 eb ,•'ia ii r,riu �tit,isrpo: r M, r �5r4if,l'�Cdt 6Yo Bast stain strcZ3q. Venture,. CaliLoln"'-3 TABLE OF CONTINTS TITLE DIVISION NO. Contrac"-,. . . . . . . . . . . . . . . . . . . . . .1 General Condit.ioaa. . . . . . . . . . . . . . . . . . . . 2 Special Conditions . . . . . . . . . . . . . . . . . . . 3 Excavation and Grading . . . . . . . . . . . . . . . . . . 4 Concrete . . . . . . . . . . . . . . . . . . . . . . . . . t Maaonry. . . . . . . . . . . . . . . . .6 Hough Lumber end carpentry . . . . . . . . . . . . . . . . 7 Furnishing Millwork . . . . . . . . . . . . . . . . . . 3 Finish Carpentry . . . . . . . . . . . . . . . . . . . . . 9 Steel Sash. . . . . . . . . . . . . . . . . . . . . . 10 class an3 Glazing . . . . . . . . . . . . . . . . . . . . 11 Sr^et M-tal . . . . . . . . . . . . . . . . . . . .12 Lath can Plastering . . . . . . . . . . . . . . . . . . . .13 Rooting . . . . . . . . . . . . . . . . . . . . . . . . . 14 Pa int iaa" . . . . . . . . . . . . . . . . . . . . . . . . 17 Finish Hardware . . . . . . . . . . . . . . . 16 Caramia Tile . . .17 Formica, Linoleum. Asphalt Tiie•Fleora .16 Plwabiag. . . . . . . . . . . . . . . . . . . . . . . . . 19 Heating . . . . . . . . . . . . . . . . . . . . . . . . .2�- Electrical . . . . . . . . . . . . . . . . . . . . . . . 21 Caulking . . . . 22 Cleaning. . . . . 23 Overhead Door& . . . . . . . . . . . . . . . . . . . . . . 24 0 s Gontraete L ngn CITY' OF SAN LUIS OSISPO ST?TR OF CALIF-ORNIA NOTICE TO CONTRACTORS NOTICE IS 113.cE57 017EN that the City Clerk of the City of San Luis Obispo, State of California, will receive sealed bids on June 1,1953, up to 2:00 o'clock P.D.S.T. at which time they will be publicly opened and read aloud by the City Council, at Its meeting in the Council Chamber in the City Hall in the City of San Luis Obispo, for performing work in said City as follows: Furnish all labor, materiels, transportation and services necessary and requirad to construct Fire Station 02, on Old Morro Road, San Luis Obispo, Californis. All of acid work to be done at the place and in the particular location, of the form, sins and dimennions, and of the materials, and to the lines �,,nd grades and at the elevations as shown in the plane and specific- ations made therefcre and approved by the City Council on Allril 20. 1953 and on file in the offico of the said City Clark and to which reference is hereby expressly made for a particular dose- riptiom of the work to be done and for further particulars. Each bid sball be in aceordanoe with the plans, speeifioatione and other Contract Documents now on file with the City Clerk, City of San Luis Obispo, California. Envelopes containing bids shall be plainly marked "BID ON CONSTRUCTION OF FIRE STATION J2 OLD MORRO ROAD, PROJECT NO, " Copies of the documents may be obtained by depoaitinC 025.00 with the City Clark for each set of Contract Documants so obtained. The amount of the deposit for each set of doc=anta :ill be refu--d:d t8 each bidder or intended bidder who returns such plans and spee- ificationa in good condition within ten (10) days after opening of bids. The attention of all bidders is directed to Ordinance /1-47 Nee Seriaa, of the City of San Luis Obispo, referring to the pre;eraace for employment of Resident Laborers on public works Bidders are hereby notified that pursuant to Section 1770 of the Labor Code of the State of California, the City Council of the City of San Luis Obispo, California, has ascertained the geaerel prevailing hourly nags rates in the locality where this work is to be perrformed, for each craft or type of workman or mechanic neadid to exeeuta the contract which will be awarded the success- ful bidder. The prevailing rates so determined are at follows: i frame - boots truck operator Aar compressor operator A-pi•tlt +.,lant fireman Mire: t:'^x ^Fera.tcr :oewrrte cr a:.phalt plane, .S ».rl�tDY.cr f eCera fir.ish.:r p.•m�µt ftust:er (er.mpntiiticr. 3,r meetie C^r..,rete miser operai.nr-pav;ng type S naf/tle mixer mixer .,peravr - ekip type ;,.,vy .lutyy repairman t1.,v,r patrol clerfttvrp inr;l any type p:,vemevt breiker ,iperetor Heu3f,rc!.ng iror, worker ,.,, oil diving machine orernt,r ,'1Jer optrat:C or i•ulld,'ter Sjwachsne nparatol rt. equipnent nperator (ihave- Cf<Yr1ek cl"ahell. or crane) w, r uVlsra,; 1 Cnntraet� Page $ 2 . S? 9 J_L e.3> 2 {i z.o9 ..t;0 e 4? C L: diu; l.tDe, '1c f,Syr.-at.ict•Iengir.err, oiler. yt^cr3 tr 'plc r'�ke 1` an:k irnr.,r "'arger t•.•n 1 y',r1 :.r larg::r: ie rarrl imp,rviolis 3ue3tbrele deavy luty 't<r>tor• :,n, 1e4'rr �t nnt"mini., ..- 'l•UU,:-, Y'Rr:: L..LQ ma•'hlile }nu m:a'tl"04�'. !rye Y.-r:.rer (Judy !,may rh+p .. trork ,-vivsr ! legu{ payl•.:a ru='lt :rrlver ,gs,... t,e tj;cr Y ta(labn +h, 3,rr4o r11 r.'t:ea ae of per vo-, ur a. 1 ' -P':n motk'. ne may :S 8 11Jtir `;. Tht rsS f.r +.cr err 1 :i be at t.ne ana ona-tta It and doub to Party ,,,or, eauil CJpetifate un, week's wJfr 95i. to n1a"�: tory upnr thr Contractor to whom the Cantrarl a aw..rded and upor. any ander him, t"' yay n<;t !e$u'...G. rnr 3Fecilfed rate t. a;! labn sere, workmen en;: mechwt,3r, rr lby"� by tkem in the <.. i. .. Of the CoutreCt. Sa<h bid shall be bade Qut On a bid trra obtained from the i3 '97'iIO�' 1 Lech, t.ad eSI-ai. 'Sc aceompaniea by a certifieu :;r cashiur' h tee& or bidder's boni made payable to the City r, f" San Luis OF•:.-po, ralifornin ror a', :m ,unr equal to ten (101 percent of the amr..u,t of L1:e DAa, auci, gur-rut,cy to be forfeited should thv bidder t: b,om ct:e contra;t 1- 'carded fail to enter into the eoutruet. !�:1 e1.:..'I have, attached th, retu, a 11vt of sub-rOntr"' lu Campl.iaace rith. $rretlous 4103 to 4106 inelualve ar.3 Secti'n glom or Lhe Government Cede. Thr. City Council of the City of San hat- Otispo, G&iijorc:ia, m. oar ve, the right to re jeet any cr all bins or •ace any inforr. l.i ty 'n a biU. A3. 7. bius are to be cnmpareo or, the basiN of the City Bn¢.tneer'a. e�i;ma tr ref the quantttiek >f WOT& c:. be dune. ka b1A ♦i71 be aeaeptte from a obntrartur who hae not Gera l.can�ed In aceordau,.a wilt, the provi.^.ious ,f rhaptor 9, Division iII �,I, Rvsiaet.s ann ?rnfer.eioas cooe. PI�r,e may be aeetu, an-1 forms of proposal, bend>. c. e:atca, +:, snr. + e>i4 r.c at lots:; nay b- obteinea at the office c.f cT_e Ctcy Clary, Sew Cb.,sGal iPursie or at ine office of Kanl,r-th H. liens, hr-hitect, f e�i °act Ml 27, Strent, lentura, Ga1.ii.:ru3a, upnr, deposit as nf�re- n1M1.t SJLti 1'r�r upet: :a1 xttetction Of pruspeo Gtvc hidurr,. 1- ua.leu to tree and Condition&" auuexed to the tlnna :'orm .. ..r�•y its Ynr f,nll n3fectiow, ea tr b+;+^tog, etr D. tr CITY nP SAN IU1S O13I3P firs fTv gine.r -.. _..---- • DID fJRM C4y rif San L•t:s 70'_apo C it.y fl::ll San Lula Josp-., California GoatlomcD: Purevr,.ae. 2... your: A•Ivertisemeut for the Qtivstractiou of Flry hereby prrpoat•:. and ;grzea to form,,', a:ny :.hd ,I!. re:n'.:.:-re labor, maal,inery, touls, apparatus, matts:aly. irancpurLai ;.,� aad services to do the wort in ssriot aucordan;a citi, th, p14nc, specifi.catioa9 and Contraet Documents or, tile ::z the ,iffice of Kenaech H. Heas, Architect, n20 East Main Street, Veatur. r., Ca11fornia, fa: "tht• ?um of! 1'h. bus irs;pectee the p;q„ of the props.•<a tlar l+, i-a:, carefully esacaiaea the drawings, epee l.f iLetiugs at-d iaLlsdr-' c+:auinan¢v and ackn.uwiedges their euffir:egey. At:.aaheJ hbretn iR a 1t9L of sdb-conzxaitvru it. eJ."JpllalavC with the pvovisiana of :irctt.br'. 4102 of the Gouernaent Lodi• .t the State of California as required under "Instruc ttttns tr, g:rtders" in the spec if!c:t.iuu. 11 a.naraan the contract, the dntierslgne'" a:lt rompl«t.e ihr vnrL, t� the aaiiefaetioa of t:te Owner an❑ t.,e ArchAect vith,i: One handrwn and fifty .•.el.ndar days of the aea ri t!„ contr.ct 'Ih: aad re LgDeo %,,i furnian ,,ad pay for iae fuithlul P^.rf rm d itne and La Lnr acid Material boodr :at, sper i.fied En.leae.-.i find a.ah. Crpck-lt, rertifte,i eh•rt or bijou '" Rona for ten percent of the auaunt of the Did ar a Ru:,rentee that the undrrs.ftned will enter lntca contr-a t mitt, th" C'ty ->f Ban Luis gbiepo it awarded the coCtrect. ;:ate Arspec t!u'ly s.Daitted, ay Address Co:�sxxc ts` Pages to Bidders: i". O)I:111 be m%.do Only un ti:e Sld For, prvvieeed. ''No Otbar propossl form aha Ll. be donsidered, Ldditional copies of Bid Form may be secured at the ofr!e. of tvi� Arabiteet. Kenneth If. Heas, 620 Last Main Strr.et, Yen-iu a. Cn, if or4a h ac:' the City Clexjc, Sen Luis Obispo, Calif Orr. i.a. G.�yiae- inaludea in theft petificat.i.ons are to remain as a part of tLa Contract Documents. Binder nhnll edgn the fid Form in t:te egacr yruvi..ied. ;! i, 11 is mndc- by r yrertaershiy, ur corporation, the name and addr,s. ;t earl: member of the partuersh{p or corporation as well as that of the agrat shall be ibowii. bids must be accompanied by a cash deposit, or tertifi.ed rhecl: or Bidder's Bond of at least ten peraeht. (10%) a the c:oant ,f tht bid, hiyable to the City of BaL Luis Obiepa. f+ 3dcr ah.tll exlm::ne the6e epeeif icsl.:ona, drawibda au9' t. dwcutteot'+ ':nd -hall, visit the site Gf the eorK t... :,1>atrC -oo..l coaaitioma affecting the cnntraet. Niau oltall not iniatn any r:•eapi?ula t{ou of the sork to O� --ee Alterna t'.ve proposals aball not be tied, except inhere collet, f..,y. ;;, oral, trleph-ani.c or teiegrayb{e proposal. or modititeti<;us sill to eonaidere+.. it , ural ±.uterpretation will be made to any bidder as to the riving ni the spec;. f Ira tione and/or the drawings, if any t.rr>orn r uvtez-...tins submitting+ a Uii fnr the Pro;. r! t:or,tract Lv .0 doubt In to 'ebe .tree meaning of h,y part r;f p?ans nr vpetifice-tious y..t aLatl 4ye1J t;, car +Aff ter of ttt, Arcltr.tent for an intvrl•retatioa interpretatlona •ir corrections of the Cvntr.,;t f,1cuaent, wt'.l to mace. in the fcfm of rxitt.en addtueo filet in the Offl" of the cirri::ter' and ae-led t- each bidder c:' te�v.ro. % shad Le the ta!dv..ar .• real:*n4lll!It Y 1•1+ ma a, inquiry us to all denda ::.hued 4, .n to rpr^_Litt A:S oY +'orreationa 1 11 he made Wa: no further a:dend-a 1,aYa3 8C.!'Lnj{ the period nr forty-eight t4A) huure ioAsdiate Ly yrior fo hzur 01 bill opening Lr assure time few 9lsaralnet ;Jn of fill in� format_oa to all binders. Propoaala Say be re`ected It tier- IS any alterat ::-n of toe [or®, add:ticna or aitarnatee net ralle9 f,,r. �.r :rrejulaeities a.ty s,n.:. P14e must be enclosed In a ce:.ie" envelope marked w�.th the title of the ,ob and the name and adiress of the bidder, and del!versd to the City Clerk of the City of Ban Lois Obispo prior t.i the hour advertised for the opening of the bid;. A bidder nay withdraw his bid anOpened, upon written requ at, if made before n t:me of bid opening. Bids Shall have attached thereto ■ list of suDaontrac tors in Page 8 riinrautee 'tn t-^ City, not _s a penalty, but as liquiae.tod demag«a. The each deposit, a'.euk or Bidder's Bond vi.11 be returned to e:aeh un.3ucne3aful bidder upon award to and acoeptence of the coot. r¢et by :he successful bidder; that of the suecesaful bidder upon the execution, delivery and approval of contract and necessary bonds as herein required. Faithful Performance and Labor and Material Bonds: di t?hir., tan (10, days after awarding of the contract, and bafe•': eutsr%rg upon the performance of said work, the sueceaeful bidder shall file with the office of the City Clerk a good and auffteient bond i to be approved by said Clerk, in a sum r,r i-e> than nn:••alt (g) the total amount payable by the terms of the contract erith sureties and conditions us provided by the Act .,f the Legiulaturc of the State of California entitled "An Act to Secure the Payment of Claims of Persons Ecployed by Contractorr< apon 'uhlio P. m4^a and the claims of persons who furnished s�•,n'�:�:+ teatia, implements or n^ehir.^ry used by such ocntractors is t_. performance of said works, and prescribing the duties oe oe.': i.. ublic oft'`.ocz•a -10 rsapeet thereto" approved tiey 10,1919 5 +. ,:te.s 193.9 p. 87) end the amendments thereto. The sudcessfu: bidder shall also file in the ease man'k.ar, with said Clem, a good and sufficient bond to be approved by it, in a sun equal to not Lcs�; tban one-haS-f (f) payable by the ter -.a of tha ocnt:rsat, ;'or the faithful performance of the terms of the valid s.catt•nei. Zanh of cold bonds *hall be exacuted by the Contractor and at lease two sureties or by a corporate eorety in any amount not less than the amount specified in the bond, and an forma available for eraminetton and issue at the office of 1.44 City Clerk, San buia '•7biapo. Alterations to the Contract: Too Owner reserves the right to make addittone to, omit work tncref.em or other alterations to the work required ander this con- tract and such action shall in no way invalidate the contract nor releeae the Contractor from any condition of the coutr;ct. Changes uudov this section shall, further, not jeopardise nor lnvalidete the Quarnnty bonds nor eha'_1 they relieve or releasa the sure.y or ■urct:es of such bonds. Payment for extra work shall be made or credit for decreased qusatittes or sort; and/or material shell be tal-on by the Owner on an baois as follows; 4etbod 1. The Owner reserve& the right, prior to the start n,' t.... -orh, to re ge.ixo the Contractor to furnish a list of unit -doe of ceztsia vo�k upon which subasquent payment or credit .*:ay tr based. Method 2. The Contractor shell furnish s lump sum price for the *hangs prior to the performance of the work. Method 9, The Contractor shall have the work performed only under the direct eupervision of Via inspector or representative of the Architect and shall be paid actual cost plus fifteen per- cent (13%) far profit and overhears if the -nark is performed by the tuntracicr'a pan forces or ten percent (ION) if the work is performed by a:ub-ccntrac tore forces. No shades shall be made without prior written notiae signed by the person inittating the change. The written notice to proceed eitb L Chang shall be made on forms furnished by the Architect end sba17include the price under flethods 1 and ? above, or if metood 3 is =.e^r: a=zto;^e>>-:; relative to the reason such cetaoo ru-plotted. Emote of those informal change orders will be subject to a formml chant,P orde^ in due procee.,. No payment for ertru work will t., uthe�i--ed unless the procedure herein described im strictly a6bero6 to. ?ro sae 8a"Mcuts: The Contractor shall, upon signing the ooatract cith the ✓f San Ln--R Crbi.spo, furnish the City En, *inner and the Architect a detailed o�tlmate of the contract coats. Thouceforth, e_4E on xnntF.ly pY.zl,ta•r�;ylm, -he Contracttor sbull use duplicates of t: estimate indicating tb.�-reon this amokuit, by percentage, of loci. and: material for which p^.ym! nt is el.aimsd. On or before .be expiration of thirty five days after final a*eeptc-.nee the Coat:•actor due/1 furnish to the City of San Luis Obispo a eertifiaoto of canoollation and clearance of all c_aime e:=ainst build'.nga, proaiae, or property that may have aoerusd against the esmo bg reason of this contract. The contractor shall, upon eompletion of his contrast make a final estimate of the work done thereunder; shall. "ti jest a final inspection. The City of San Luis Obispo will pay to the eontrarlir the balance of all a::ms due to include all retained percentages, ereapting only penal.Lies or other sums retained under the contratt, thirty-five days after the completion of the work, Lhe aaeeptanee of thv name by the City Coune it of toe C ty of Saa Luis Obispo ano C9r filing of u Motifs of Completion in the manaer required by Inc. u ..x� -: ...::a.. ..�3M ._.:.. ..a,av�...., cv_..vh�,..l dMnt n+S: At.. E du-wn�'' Y:uakNl�$'f• �._•.—•mraaw Page 1 ."^iad i.at ion., ih^.ae conditions shall apply to all. braaohcs of the ;:ark equally-thether executed under the General Contract (including the several sub -eon irac tore) or under several eontraeta. Bravz;s and _speoi.fieations_ ir::wi-igs and specifications, as instruments of service, rtc:ain the property if tL•e Architect and shall be returned to him at tav completion of the trork. The Architect rill furnish additional sets of plane and specifications so required. The drewiags and specifications are intended to eoapercte 60 any work shown on the drawings and out mentioned it, these ai:auifieations Or mention�d in these specifications and not shorn on the urawings is to be executed to the true intent and maraning thereof, the same as if it sere shown and mentioned in both plena find apeeifioationa. Wnh re not spoaifieaily stated atherwiae, all ,--tore e.nc material ae"ary for each unit of ooastraction, including special constr ration for any specific brand or shape of materials called for, ev even though not specifically mentioned or indicated, shall be furn- iehed and installed fully and completely aii a. part of this cuu"-raet Figured dimensioha on the drauinga eh�ll. govern, but core not d:,-znsicuod shell be coaled or as directed. Large scale details tr-ho preaedenee over smaller acale drawings. Tfork not apacifioally shown, yr e?eoified shu11 be the same as for similar work ahawn or cpaeified or both. Specifications shall govern as to materir.la- Tce Contraetor shall take no advantage of manifest errors or die. ^amr-nt D^t esn ap^clfications and the draaimgs but shall rerueat ejarification from the Architect whose decision ahall be final. Saouid the ^ork of the Contractor interfere with that of a seb oontrrs�.:or or interference result between the work of two sub- contractors both parties shall halt cork at the affected part and c;evure clarifleation from the Architect. rho Architect may furnish additional detaila to fully espl.^.'n the cork. Should these details, in the opinion of the Contractor require more work or elehoration, not+.ce thereof shall be furnished the Architect within five days of the receipt of the detail. She Architect shall then rule on the claim, withdras the detail for revision, order its erseuticn, or approve an extra work order. Shop Brawiag:.: :he Contractor, at hia expense, shall furnish all shop dravincs and material samplos required by these specifications. Shop dru.- inge shall be warted with the name Of the project, supplier and Contractor and shall be submitted to the Architoct for his approval to four (Q) copies. Approval, of shop drawings will be gonoral Genar�zl....Cc;•�a 2:.e�,; Page 2 of his responn?:;eil;.4-. foe P- j,,;;t.. a. the work nor froFa furr.i ri!-r u-:r 6. „r wn stnp dre;miugs when approved. Inou.n-:.:ee (a:) Tae Contractor shall not oomr.anee work under this can-:r of until :.a has ok:tains;l F.':.l lnaLva._ae required herein and untl . or.ch e.r-s-.sc h-a baer.e ,r;pvoved by the Owner; nor shall the Contraotor alic, c�;jy sun-cues".;r:.atcr to commenee work on his 3ub;;o:xtrac :: anti!. of tha sub -contractor hs3 bean oh... tainad End alfroved. (b) The Contractor shall take out and maintain, during the Ill. of th1.a no�tra t, po-tnnn's Co3apen3ation Insurance for all *;^�s rn or at the site of the project. In ease �:+z •]•.�•; the Contractor shall reav:ira the sub. . -aa C. "'cn cacm's Compensation Insurance. for i' &`� - ,�;.A. =tr'iess such employees are eover:l by th:,, prot- .. t'oe..9 c., 'ard cr2 by tl7e Wor!azen's Compensation Ineurenae or.rv'. id b- .. *, o: _::mployee er.;: acd •o,. s,; : t the site of piro ea•., ji,, .,. _ "l ++^,amponaat•iau .itstn-ee, and 'a:: r^e r undter th. +r=k 70a 00-2r- �at . ., ,, . ,.... for any other reason, the Coitrcctt': Ii pr0v ada <r-_.:- =.z yv . .j.r;j.nea ca ,rages as shall be scti.sfs.star•t to t..he Jw-aer of 3i;ch erpldyeeo nst othrrwi„ta ahal take out and eealn3ain, e.urlag C:ae such Publie Liability sad r a :s i1 ,...'..-.e. ., r .c•*,rc him anti the Owner "rc's ,'. ^,•i,. rr,> aceidental death .e C a :or praperty 6,awagnarising frog OperA.ti0nt L d'_"v^ :LL! _. r.' ,•;.Cte: c.rd all sub-eontraatara she!.) e-.ea tatc+_ to-ing minimlum amounts of in;w:.^eae:; For Contracts and sub -contracts_ - p to , to `•$lOb,ZICU 1= 0,000 1CO,o(o and ovaar 1, Public z'ab'-lity Insv-' aca for Injuries Inalad"ag Aceidontal 0ea.th--to any one person 10,000 25,000 50,000 and ^aai,al for orz accident 20,000 5o,Coo 100,Wo '?. 'rro:;e:-ty nv"e-ge Ins. 5.000 -"000 10,000 (d) For e.ny work done under this contract on or at the eita 1:y n. sub-oontraotar, tho Contractor shell also take out and na'n. .. zvct: t:c-atraotor'r Contingent er Pruteotive la3ursaaee chat +x�ll pro'hect bin and the Owner from Damage Claims arising from the gparations of any sal-oentraator. . General Coati Page 3 Wnall zubeontrract ar,7 po--.tioa o_7 nark, 'the Con`>.r-:,ztor s%all require him to take out and rainta:lr: oucb Coatl�gs4tor Frotect'.ve TncuraDie that will protect the primary suh.-aoatrcetor from drmage claims arising from oper:t:UAA of tha seceafi rn_b-eontr-otor. Sv,oh, mouth -gent or protective insurance shall be for 2ha sere atouut as the Contractor's or sub-contraotor's respective ?ublie Liability Insurance and Property Damage Insurance. (e.) Then ai+omotive and truck equipment or r. material ho`c- c+ o_=:::ated on tho site, theee special hazards ahall by coverec rlC::rs to -;;he above martionsd Public Liability lns,srnav and ":•^^r•��i:i De.:�,e :insurance policies or by special it ties of �lsursrss i.:: =;he same amount. {>) T".a-� 4vnar shall at his own erponse maint:;?c a Builder's sk Fire In ?re.nce Polio-, including extended 1'acd3l.. Sn%., =sri z..c_',._=i1os vrisrhief endorseae¢as; a she naxe of Cortractor, pay.ble - t ... .•, ....:. ;, ^+hail be c. .i..d n ..- r0" of a i s c0:,%raat pr ice, less the ;clue of the c t. o.' ..r,. ::g 11: or.;truction site, filling, rra-r ;, . !.a_=uran.ca ;volley or policies shall be a -a -•t ro 5 ..'.rl by tht :�... (-) . Cc- �•.°.e :oa• shall furnish the 3�7rer p„os' f- 'I ar L3,::nss with ell of those 27tc Contract: t:;rner reserves the right to ma''e additi.oz-, to, tz £.4.or ar tiny o£he•r alterations to the wank regui.ed -d c'.tch action she.11 1n no way invalidate the. cu:- no:. :.„r,:r „!:a dontrr_ctor from any condition of the c�ut•�� Cheofeau under this .^eS_on shall, farther, not jeopard`ae r- s.:uid^^a the g+.arsrty bands nor shall they relieve or rel.e-s:: t±e surety or suratiea of such bonds. Paymant for e::t.c work shall be made or credit for dee_.r:,cr. t,daatitien of trork trdfor material obal.l be ta'sen by the Owuer on en e;;uitable b::.els as follows: 1. The Ovaer raeorvea the right, prior to the start o- the wo_'c, to require the Contractor to furnish a list of unit ;:;•ices of certain worle upon which anbsequant payment or credit :may be based. 2. the Con:,rrcto: ahaa furnish a luap .bust price for the c3argo prior to the performance of the work. J. the Contractor shall have the cork performed only cruder the direct aeperviaiou of the Inspector or representative of the nrchit2ct and ghail to paid actual nos, plus fifteen poreent{19, ) nor pr._.fit niLd overhead if thework is perforr:ad by the Coutrastar',, :?,Z 2,:raa:t (10%) :f the .. ns �:.:.m w �e ��y�%. � , ra. - 3s...a.•s:.r�s �, t xu o ,..as n b4u Dzs Y.v ti v'r n6P$ ?RL:L `P rer""eti rt.. _ ., _ ..<d ,. �C:^_ u.0 : Tj en':E =': ..:• ] 6.. .. tY r.._v.t P. .._ .:.V e... :Zilj• ... _. 41... tl;., -at or.'-rrs or pertorv: uroY:ieiuoe t the riceCr_^�. .....fP ."r is^r:C [-r dte ..s CTLYy (AJ .r+'tloa ;dr YS.'. * va2Y, o!' t!a Gr t•ia.-�: i'..ac ea '. L.E j+L, .!!3 f(I -.. .. TCbC^. .tit: ;tg Y^'C:?+'GL R'.Ln t.hS t�.rChlt tCL, L:: r' Cf�Y trietnr 11:lj _106 `-... maitwr LeJore tip:' 01'nt r wROSP dte IniOn shall Any corrac-;:ons, or work direr -tea by the :%rvhitez1 er. :eq•.'.:.rr.; to bring the iop to ecmp ietiou iv tcoruance w.ch there apecif-a at::�ns snail ce done imsed=btely, Le a: 8eiatiaas: tie Contractor shali famil�arizeniaeelf with all lows, ord+- cances cna regulations vhleq say affect his CrLulpment, aatsrl"l or 14•4or ueed on the project. The Contractor shall procure, at hi-: own expense, all p�rmlts end. licenses not otharwlsx provided for in these specif ieatloun. The Contractor asaumea the resy>asibility of defeading any and all suits brcught fur infringement of eny patent claimed to be lnfriaged by the use oi• any sateriela or process, ►hlch he may elect an use, thodah net required to do so by thane syaaifiaations, and DIVISIQki 2 General CoudiM...ana 1"suae 7 tLe 0•.:::.::r ar4,10r its '.UthorlZod ^,ventr can eacoent of cauah Labor ri`o"tic ].OAa: AVI,antion of the Contractor Is called to Ve Labor Code::, entitlad "An Aet to Establish a Labor Code ttc.reby aanaoii.da.tta.; and ..q la,, yelatirZ co Labor red F:aplolmsnt Hci3t Sans, _,.d to -.eBa :.nd axrts of the acts specified ber+.'s" :a:i er::e3zc C ar 90, Sta' ea of 1937, effective dtgna 27 .. alc,4, ,li r.3;d ctr-,ryp'rovicioa of the Labor Cnctc•. -rei.a s•s.ld Labor Code applies or refers to the '5�s:bl�c works shall be and hereby is by reforenee f,ra:n:.i =.v-, ... of these r„talficationo as tnougl: the i .! 3:1 foil. Special attention is c- •.lod to .c. r2e•. ,...,i Libor Code: 'a:';, 2, Cl:..pter 1, Section 551. °c: .. c. ..•. oy>d %A sr.;; oos`-pation of labor is entitled to a e e, 'aet�lvycnt„+arvh Lb�i_tet or sau nostractor or agen or :3 a z ::-,a•. Ugly amploy or e�us^ or a.ilow to be �sork, azy uUun, ex. pt in cases of ertr..ordlLary one € -•: by fi; v-, f -ood, or dah er to life o.c props.rty, or eroept on ,si; '. upan-.pablio, Ellitary or naval defeasea or Torka in tiM. a! ear. „rat.on 1853. Forfeiture for Em ?.0 11xy Ailan: lr. a � o. '.� a,o9§,._,:a ?:o•i.., ;.c3n"'cnitc ontr-a'c$or _._.._......__.. fio v on a oen�.rac%. ✓: .• vorL it ..�arded shall fora'ei't s a penalty to the state or Political cub-divi.alou an Those behalf tbr; eoatr at in at-arded, "ten dollars {$10.001 for each all. n szp'.a;ad in th.e sx7::2-ion of the tahtrac2 for each a :.::^.9rr d^;,, ci portion thevtof,d•:.ring whiah each a14-ea is permitted oe in v oi.atia. of this article. 5c. .rotio.a of L,.bor: No convict labor shall be "played an s: +uol,:e °ro::rds uzdx+ the ,juriadlotion of the Covaty or Sea Luis u'3Fee :aC h.1 s.. Tr:.-: Contractor •hall pay the prevailing rate of per dizn ::ages ,,at.sa fez legal holidays and overtime woxk ea cot fa=tb in the '.;.vert:eessan: f,r bidet herainbefore included. i11ncrin.ende^.00 and SjiUerV aioa: The Contractor sball, at all timra when wori is baing dsae, crop a ar.rpetanl auperistendent at the yob. The auerirtcngsa: shall rrpzesent the Contractor and all inatructlons given him b* the Arahitect or by him to the workmen shall be ac bindinr as though given to or by the Cantra;tur. n;.,: tii`.Ci. A"rii 7 Page . c:tox :!:Al. give the job his persons; att,anAG'o, ,.._.. 'gal easefully study pl•+.aa and sneai..' r-tier: c_,- r ro -:iLh 'he other and shall report at once any "or ::c:ons:st:nay or omission discovered, but he ahn11 nut u, ,e`_d for their existence or discovery. Tae City c.nginovr reserves the right to require the Coatsaotar or env sub -contractor .i di::ehurge any wore:man or workmen d,ae^n::d fneompe:-cnt or improper to be employed. - F_rogxsaa or Work: The progress of the work shell be at a rate sufficient to complete the contract satisfactorily within 150 days from the :warding of the contract. 'Shp., Contractor shrill begin the work within fifteen days t¢r r:ee iz?r., notisa th.::t the Contraet hia been unproved and ).y pros�c U4o t1in same to completion before the of 153 calendar days from the date of said approval. If t.,a satisfactory execution of the contract s'ao11 requ'.x. in greater amounts or g:a_ati:tieia th a set a f, •. a e rp:-aiYications, then the aoxtraot ts+r be :in- c::r' h semi -moxant as tray be determ'ned by t::- 1 ,.r"ti t_et, for exterston o." ti;xio ir, to 7�Yforu at,•. Intl ?r aubm'tted in writing by.s:e Contractor. T:ae aontr-<et eholl be considered as after n1l :'fork ➢ dz has b-a ir: sc.aap ted by the Owner, at.,A th-, Contractor sha:;.l b rc z-,toed fi•c_, F,'.1 ruvther obliga4ion exaopt o.,, to @',--o.nfli,loa.-s E rsq+: i.ra :snS::a ,;. t fortb in his boad. of •h,: Cor•tr:ae:or shell not sublet, sell, or assign .un;:� o ,.. rsrh utder this eontr«et v thdut the paio+ cozsaunt lhaa Awes 4n4 oithe Surety. The rock under _. tract a.`a J.l not be cosasenced until contrast and bonds o v 'b approve4 by t:,e Or;nci Guarantee: The contract,;. i'c., general work shall guarantee all wpr' ship and matorla'r inoarporated in the buiidine and ahal?c,. fron his au;:p7.:,_•.�i,z aad aeb-contractore written guarantees cc suv9rai aortion.c of the work. Generally, all mcteri&iF, work-matship anal,! be gaaranteed for a period of one year fro-- d4:tc of Notice of Completion ereept where speatfia guarantee par:.cd .set forth hereinafter for a apeeitic trade or -atax ai. !visiting Site-. The Contractor and the several xub-contractors shall be held to have visited the cite of the preposed work and to have familer- ised themselves with all conditions thereat of:eotin„e their work bofare submitting their bid. Any condition affecting the projeot and known to the Owner or Arehiteet will be shown an the dr,:,,iaga rTY3�i(.�i x O�i,erel Candi?ions, . sx ,ioned in 'D vision 3, QJ�ea, 1,: C.-.rii"< +s, ia% e'v;s ep;:c>rioati.ona but "ranee or such ment'_en does not relieve _a Contractor of his responsibility. Y,oaever, tl:a Contractor chall e.Gt ua ield liable for the discovery of underground vorks, eub- aurfaco euiesannds, abandoned cesspoola, ate., the prior know- ledge of vhioh cannot reasonably be expeoted. Claartxnoe of Claims: On or before tho expiration of thirty -fits dayn (35) erte., e*tc eta:-ce of the worY., the Contractor mall provide the Cr; with a oartif ioate of oanoellation end aleeranes of all a agaiaut buildings, prasi.ses, or property that may huva ace,::cR again„t same by rea.:eon of this contract. Cequ2=aosv Thr Omer re.arrvea the right to occupy any or all. port: of the pro n,7t at any time prior to the formal eoacptarae cad v-ci. 4fiC t;,l Aney shall me" be construed as, nor sonetitute, final. enCs or such part or parta of the work. T ic.a ,of completion anal Liquidated Aame&ea: It is agreed ey 'i3e ,iertiea to the contract that in case a17 . th.� -roil: called for ard[ r ''i'e ooutract is not nor:y lot%d bsfor-a er upon expiration of th:: time limit tin eel forth in thane apeoi.fie•- "ations, damage will be auatained by the City of San Luis Obispo, - and that it is and rill be impracticable to datermi.ne the ace-ue), 6 sm: a Zhieh +:ho Ciro_., will sustain in the event of end by rensox: u:' ae:eh delay; au?d it ie therefore agreed the the. Contractor till pay to the City of San Tuls Obispo the seam of ten dollm•s .;.,(93.0. W..) per day fox each and every racy°a :i r. lay beyond the tills ..:prescribed to campla8t the work; and the Contractor agrees to ,a;y -auc;e liqui.datad dau€gas as herein p ovtd-�d, end in nose the s Sze are not pain?, asraes that the City of. San Cu:.s Obispo may deduct the :�rount iIierF:i,f rra any money due or thmt. !any b -,,aaa e?:ta the 'Ccs.�.., •�;. ��x.d nr •t?�c contract. The mor3: iaca--.,.reed in til" eontre-tt cana'.'..a.a at• the ion and ecmpictiov, inoludir4 all nr.:chanisal fixed in plumbing, koatiag a. d electric viring, of :i b::iidin.V and ap3,;srt- enences tterato, :a :priming a Fire :nation .nd crevis' living quarter dtrc in eomple Cat when the xu;.ldi.nd :» ready for ?'all nee for i21a purpose intended and all materials and norkt:c:ll c-:.'r caceatcd by the Arih toot and OsneM ca In con ^2ie.nca a':C't'a t_-a N mtraot Doat,7-x?ts. 'a 9aa;, P.P 8� a"nip• ba 'C + tt „. i1. .. -1! _..iR ;n}s❑ an l C—av r';r4, _r't of thin Colltraet, -' l.i, i, C. 1 - a Ties i :ancz f.,s r,'r'tt to n.n fors o, ,'.'vG ae;R -. o- wz o, s+:r ^c:etr..ata, but such vor:: xfi it n ,. ,crd!.eF, A..F^,y no-., a ,..-^i.-.. i.ntertcre with t:ae par'us.,: o.7 Vt is aorar<,at. Site, The loar.'.ion se the pro,'o�t is on Old i"y.rro toad 200 yards north of -tie intcrsect!cn of Old ':iorzO RWd and Foeth';.LL 3oulav4rd in the. C'ty a." San Lain Ob.tsDa, C e.lifcrai.s. Pprote3tion of._G�H "'E.eevt Pro art�r: TMa Coatxaato: shall protect ad,aaaat proper;, and _°i3tiag tress or othe', installations on the site from any damage.. Shou3.d .ny 3a+e;Ze r.icclt iron this wort, whether br neg!13--rce or n essa'tj, this Contr�atcr shall sake proper adjurtztant at his expense. -'h3 tld ;^,aseagc ever adjacent property be ruquirad fey the prosecution of this :wort, this Contractor ahnll make all noncaoary arrarysmenta with the adjacent owner and protect pipe Linea, eidowalks, ourbs, stakes *to., that may be endangered b;; such passage. This Con,rautor, at his own coat, aha11 farni.sh a-nd install s11 nietera, e?,aatrio li hts, power equipment and wiring n�iocsaary to perform his Tork, aeall remove sazra upon aempleti:on of the war!; and shall pay coats for electric service. The cost of water =a- e<sn.'e, for -Ins perforum-ace of the Rork will be paid by the 0-;n�_z. S'?orame of Yin '..crials3 ^..;a4r ator £or gcnerx:l work shall set aalec: .-a c,r.ee for h, ntor:,ga o_' BaP.`.rraalc for his ova work and that of the eae- eoat=ctors. $ita a4lell ba clear of all eetivity in cona^e'.ioas . with the { or% and shall he properly protacud anti sr feguerded. TL•., @n:rt.:>_. r. 6:.:; :'or „antral work shall o,oure and , ag fo:.. pern!.ta, ltcen:cis, etc., required for the eoastrvet-on spocif S.tla-lAr ';?':., poa::;'-7ti.'.i ty ofanother as regnirad h9'hie apse .f .c^ t.c cn sgan•. �R Page 1 Se*z;> of tlore`:c: squrk x.*.ajl inc .ude a7.1 oxeavati.ng, filling* and grr6.irZ necessary to properly complete work ind ica Led on the draw- ings red herein c-qq'�a o'.fied, but shall *%elude all ouch Work Outside of a line teal (10} feet from and Parallel to construction work es.11ed for on the drlr7lugs. rn0a• s'4. - o0 _.—..�, ei%ca°aa:-bion for :.00tings shall be made to depths o: a'-rr,.`a Cc.•.;. adie M;S:j. ar:d of sui"fieient width to permit construction :s;:d r r:- oval of forms and placing of concrete. Bottom of axcavati.ons stall be b.c*,;2ht to indicated or required levols or undisturbed eartt, out level end formed true to indicated or require£: diman- a,anc. iiAi.tcra. of fcotinge shall. be not loan than 1'-6" bel.-v ;attztTt.l. grade. All exaav:tia:as ar.all be tort free fron standing vater. Contractor shall do all. pumping and dreining that may ba ncsessrry to the and or that tea;., be required in carrying on ttae work. Should excavations for footings be but to a greater deyth th'.-' iadic%t.¢d or raq"ljeIr such 194itlonel depth ahal:'. be fillet with concrete as s.acifiad urder 7COnO:ete" at Contvasfor's expense. Po-pths indicatad. ou the 3raxaings shall be need in eomputinc the quantities of Should the krobiteat order extra eaeavation, Cuntraotar shall perform ouch extra wort, and the Owner shalt. pay Zer same °.h:lecordanoe with provision* of the Contract. , m1- .P1.:.1i. "-5- :Ti an sc- :)leVon add when so authOrisad by the Arah"cat, all exc,:'::�::ione shall be baekfillod vith ec.rth to iadieated Or required gr da". b rt'x used for bzslifill shall be fro% from debris, dome- . i..f in s.- lag;ara, noi.stenee. with attar end cezr_sa_ated :o a relative cownetion a?i 90%. CPe.dLUAI ?ill for final Cr-de outside the building shall be degcsi'._9 it not axceedieZ 6"lim thinkneos end shall cvrtain 110 a' - 'a ZoLch sucec:noivo layer shall Oa graded to provi40 PensOde>1.7 e'S.eo th surface, spriu'bled With water and eultiveted suffigieu ly * a:hiava unifora wofaturs content. Sr.:p_a•�,tio:i of Sub -Grade under Slabs: Subgrade of concrete slabs on greu_•sd, concrete driveway, plat. forms and steps shall be conpaoted to o ralativo acapaetion of 90 and left sufficieatly high to require removal of all loos* earth in 2insl grading for slab. All concrete slabs on earth shall 'nave a 303a course of A" of crushed rook tamped to a firs, level ourface. .:..- .. .. • ....=.1^Y33Lv taus ie �.a a.xcavat::on :� Cr�:di.ng FTC IiO aa^ is :..3 :i e?fl1: •. :`'y' ii - Any ezca:zs o rah naZ =ded for fSlli:ag or grcns... r, ;-.,U vc stook pi?.ea at the :: i.rc•s t::un of the ..raiii"ect aut within 100 'seat of the building. ALy e-rth required for filling or grading shall be furnished by Con:maa or. Suah earth shall he free from rooha or debris and of sane nai.nre as sail an site, eseept for fS,_a vu4,3- ejaba _..h bc: ..r.;ud and gr^eel av it cues fron the river b24. I (:o11tYCt.'� Page 1. Place all ccnorste footings, forudat_onm, rough and slabs, stops end pl�tforns as indicated on plena and ar. neeassc ..' for a complete Jab, wheth--r or not specifically indicated. Materiels: Portland ceziz4 shall conform to the requirements for Type 1 er,uen�o�'>te"s:?:�,.rd ;kk''saificatioas for Portland Cement,:larial vea.gnaties: C 13C-41) of the AST§:. Pl.aatie Portland fe•Mat sh.^.]l not be ucet fo::' t_­uotural coaorete unlesa it meats the roquire:.,r:�ts of the above specification. Type 11 cement will be acceptable pro- vided it meets the strength requirements of Type 1 cement. The limitation on trieals£nm silicate to itaived. The eemsat S"all not coataiu :::ore than sixty hv.ndradthe )0.60) percent total al%ali. Then ealeuiatad as sodium oxide. The card "al3ali" as used herein, e>.a.l? be taken as the sum of acdicm Oxide and pataBO1L$ owiAa cal- 0v7.e4.ed as sodium ox Ac. The A:aterainat{.on, for total alaali shn11 be made by the method as set forth in "Stcnde.rd Methods of Abcn sal ,ja=rlysia of Portland 0ecunt" (Serial. baoignaticn a 114-40) 01 the ASTM. Co�.are`a e. as ttms shall be Ukaa from stac5 piles appro To-. 'ad tests ay H e o'1 Of S£ghsays, Ss�.%U of California W /0r a?sa:e7. comply with the following apecUleantion: Pine�=6�reate shall oonsiet of natural send having hard, and dureblI 9,_ Se lEA sad Thieh does not ea xtsis r..ore the ono (3) percent by rolant Of s•xoh delctoriox:s substanoos as clay louts, shale, tohiats, mica -coated grains, o soft amS flcjt-$ part - gales. Tha gra.Aing of fine aggregate shell re.ny„e ;anifora7.7 frog acerae. to f'_ne, within the limits beloct ?acaivR Siev-c 20. Pe"ent by Wol7ytt 100 t4 a3-100 S"R 73- 90 116 59- ?S 130 30- 40 130 a- 20 1100 0- 7 Coerce a �rerate shall consist of Olean, hard, fine grained: ac-<nd, eruc:x rods or washed gravel which does not contain in excess of five (3) percent by weight of flat, ehiy-like, thin, elongated, friable or laminated places, A picse having a major ejasne'_on in excess of two and one-half (2i Limas the average thicisass and which will adversely affect the strength of the concrete shall La considered to be flat and/or elongated. Aggre- gate eh111 be caifor ly graded from one -quarter M inch to ®es- £sutm ciao in accordance with the following tables: I 0 DIVISION 3 rate 2 07640 " Co-,ree ° :flxe. c,te norraa?: seetiona -.1bve F'a i= 95-100 3!k' 70- 90 3f0" 4.5- 60 ! 0- 10 C,`zgdc et?one _wtieaa syer.itie6.... Peseesi' i?y-Ye.2 l" 7; - 90 3f4" 55- 70 :?/a„ a $ 0- 10 }'_:.sfi End coarse aggzegm.-';e shall be Stored and mansur�d s9*p-r- .'.tCIV, Go'%rS3 aggg'er'3te for Grade $ as :",bore ap"'fi'»'q t'`!'.. 1.1 L'e ator cl . 7atal�' iu two Crrdes, w" to 1/4" in use pile see /An tc+.m:'r u�.Wx: Asa no".3_er, 10," for e=ex ata roinforacaert shall coofora to 11Lc. "-Stan.. (—CM ,Spex3.fia Ao;�s for Billet steel Concrete P..oiurorcas Burr„r 1,3Y2% a`.g. ^�''sn ".35-39, intGrr,.esiic�.-Cx gradr., except.- si:sll cost -^L a E„cd Wad elongation teats for struotural grrPe Barn: B1'°,.1;. be asid i.Y an approved type which have trcn aeon billet,", c^ ::s;ariceu manufacture. All bars aholl b-ro Rrzm frO:k oil, c:cc=s:.:.five m Ill scale, pitted or looae neat, atxoa:, 0.VMI1 or o,.8'. „Sr. s:.t.S::,•. If rust is excesaive, it shall be rcc.:avas L•.th 'afire bruh. ai-,t ;'War gonorate reinforcaseat shall aaufosm to the for Cold Drawn Steel. 11" Car Conoeeata :53TH ea!Vnatlox AS2•-34. =seem t;iat the valacs Ts.� uitin--.t ntrozsg"'*..b may be reduced to 55,034? lba. p.s.i. Wire fe-aria shall 't: thoroughly galvmniaed prior to eloo:rie welding. a.I e• All Steel sbc.11 be raeeived exA atersd so me to T-ct. st It fron rust, oil, dtrt or splash. U-VrwaNegr.ireaenta for Conoretes Concrete shall not have a cheater 4uarotit7 of aCgragate or or rater per Peak of eeavvat than is called for is these epeaificattous ":udfar on the Crsoiu,Ls fear tyv various etrengtNo of concrete c_ted. Following table cizov€ maxim gasntiti2• of agu_,agato and rater Tar a^ak of a€-iont (94 younda)., Total 7: 'Ci. mte, V-stay IIuxiaux Lggra- Max 9oi. iggre- Water a«rents, mate Since Bate C4.7t. (Gal.) 2,000 1" ,-,500 1" 6.50 7.50 5.00 6.75 4aaorats Pat* 3 ur,r.us:c ai .cove donates a c,•a: ,-,f tha lao,se +: y 1111:^_.3 r +'is;.n re o a oY move g.redinge a ejod loo sly r.44 dsoz x,.a ba nz mixed. 1'2otat =a 3.ra7. 'ter aarfaoa water osntn3--:' In uggze�; Cancrate below gr.=de shall use ooarsc aggregate D. All oboe', coaerete iroArcing slabn ahall use coarse aggregate A. 1:1.-tar thn ,rle .;:.c eoarao ag;gragrts Las been appro'+ad �; ",._. a:i.'. ;A n:'. sr ale character of materials or the &.'t,,•zc of otvn,!y is 4_an7co, the Architect shall datamine and the ra.satire zncomtc of fins and coarse aggregates to be used us bania proportions of the mix for grade or gradea of concrete B•yo- 2 ied. The aurrace moisturs contained in the aggregate shall is teduoV.ad from tta meximum amount of water ihioh may be added %a the nix. .:ixi, and pl,a.ci of Ccnarete: All cggresatas :.'_,All bu measured bg weight or by an Ir . st aacwr€,te nat"_od trod tlia propnrtion of water to eenent ak:el aco-:zra",,Il eontr^110,d. She irg-_>,61,zutz shall 'or o:easurcd au; a.r2teip before "•:airs;. ...axed. Concrete mizora steal]. be equipped v:to .for tiiaing and for maturing or measuring 9e,ter, which apparatus s:)%"l. have _oaks that 'sill.!. prevent unauthorissd peraons r on itmngi W -Its zA ustkents thevaof. the oona7,te s'n.all be mired until tbeve is a uniform distri- ' butioa of the rt_t• erisla and the sass is uniform and hozoageuolte. 1n mcehln& mixing, o ..3. - bcte.a a:ixsre abali be ured. Each batc'.t cball be nixed mot lacy than one cad ens-Aa1P olnuten after cl:, the ivgrad+oath are in the mixer end must be coti2lataly disahaig—_d before -the miter is reaherged. At no time shall. the .a:zar be load-ed beyouA its e.xpaottr. The capacity o: VIC 123rsr 311al.l be coaaid- area to be thL v2ted capacity as gi^:en in th 1.at r quantity equal to the rrta�_' ea,)aoi-tf' e:.a f:a o az ;;•,17 MIZ04 In Vic prescribed tins peL iod aai :,a-ther' 1.: via.:d ,.hn.t V_tars it mo loss of ingredients during the miring. The oarr.a- lily of Us rsixer shall be such that it will handle one or sore full caC% IIn:,*Ms. Fa sack batches will be 0'h:r2l woad of aancr-te mixing drum shall be appro :mataly hu'cxiren �2^10i fees bar minute. Tho mixer shall to equiups-4 albs rh vitae;_.. tine lock on tha discharge aentrol arranged to t o ti1a el-ele on the down stroke of the materials *kip, or on ';._ loosing of the hopper gate. :transit ;Sixod 6cuare i.e: The Cantroetor rmy use Transit -Mix saacrete in lieu o =--,faeturea on the site, psovi.dod the materials of which it is manufactured corply with the requirements of these epseifioatio-.::, and provided the method of milnufacture conforms pith the intent of Asa specifications. Transit mixers shall be equipped sith auto- Vt devices for recording the number of revolution& of the flees ,..'.or to d la.,,,n Of O m,i.isd. T c sap 'J4rcrete shall mat be d:s 1. v u .- nca 1"ah s' :-%cuut o. ua•tl r sad Bs � . ;%o 'aAd v .3:,.f {^ g:; "Ous of cater ser cubic ya d she;, h, .it2'.15aA end rs^i,• bt inatnporw3ed in the rip; bP.tore the eonarc'�e '.a :?i:-c fsoM i e,-e .'zor trues, but u-nior tb:u ougsrvisici's of `uaa rope of . t?sc,v,'ebltzc t. lrane ,e ni=d Ocn. reto shall W mixed for a period of I.," kzsa that? to . (W xafir t ea. At leant three (9) .,Ja.utes of iho s!i.i_,g pea^iae rsLw!-t?. l;c prior to dia,):arg3sag at th;- aEz. . .:d con'4re°.e shall be rejcot d if !:at f Siie-! n,.r,uin fort, °-five (45) nlsut s ^faox vuv.:r 1 Ln r M a ' ';ai.. Ttt, concrete at time of p1paiag ahali L such t:u,L t can be. properly placed. on jobsite: •cr 3::d•vd fxwm the :airar fie tte p::...t,s ;'tz t:icrLle by nethods vbich of the ingredients, tinder ao o>> .. -.. r:'9. .r,- es :1.;+. •o li^a hartiai:iy hardansdE bo dapu. ' ',::•;. 7b._ .1 is rtapos i.ted isx tied forms as fie" ers 'Iioa to avoid " :",:• - is', shell be acxr'cd - •aiu.:-:r �e-r.tlon �!nta.l the 000't ion in aosploted bet:aeon E*) pia rho bs taoro:iyb lq ao,::pact•:^.d du_•ieg. the np arat`r�:. fi^" - e.' nt::.e;,<•t?; Are tIIaroughly 'corked around the reinforcement, sraznd iirt,.ix'ea, and into "U ocratra of tll: fc.rcv. rte) `"*:era C"oL(lltie'!S make pudd.l Sng d f1 c+ 7.?., o: r.:az" r ' .eT..-fov':,-^:g fc ac.;Iv Ud, batohee contsicir,a cU7:ac ic.t of card- :6 used in the aoaarate, plus a taa.:,fa,: % ot: r :C J; (50) pc aenl c.-t the ocarse aggregate, sha:.l be uaed. Thin mi.x aball b— d ;rro,:i:::d cL all liorisontal construction joists to tl+iclm3as of too (2) inches before prcoo�ding -_th xn,gu'ar-ly aheetfitd mix. (et No .: .s; ztz shc11 be placed until a:li In Ts .,zd �pernaorntly assured, nor until the fe ,vs h3:e _.. 1, tY.n .Architect, or his nor '4nt•.-, ch'-elhrd chasss, slots, :.lc Ever., ate. Generate a :u9l not be rlaeod at any time eaeept under the direct supervisicn cr ,; <a '.rc;a i-;e-.i P. or his ropreaentatsvo. Flaeinz of concrete nhal'. y:x•aeesd It, for any reczan. it at -ell tCOUQ •ueo- eu":Jarg to stop the plating of concrete, the placing and zenzcr rrxking 'Oe Joint shall be approved. She surface of the eonor+^t, shall be le-eal eheu^var a ^un o' concrete Is stopped, S};.rfece o old eonoretz shall be prepared as harass apeaifsed. Old concrete shall bo chipped and t:.orougbly classed of forellin mattar and fait. auto; old aggroge,to srposed and soiatened with vater. Before start- ing Lev pour, a uniform layer of groat 2" thic: shall be placed on top of hardened concrete. Mix for `rout shall be Se 1a (c) above. S`)IVI" 3:r0; , Concrete Page 5 potas uay be poured in trenchea in approved firm soil provided edges are protected from breaking off in pour. Studs and whalers shall ba 2" x ¢° minimum 155 o.e. for exposed concrete and 20" e.a. far acrfaees not to be left exposed. Use $ISIS ox rasawn bocrdiag Vith rengh side in for all surfaces to be plan eyed, or shiplap T & 0 or plywood if vibrators are used. No wood spreaders shall b:- p,eraa`-ttad. Metal sepsrators or wires shall ba maxi -.mum of 30-01 O.Q. both ways. Interior angles of forms shall have chamfered Worms to parmi.tt ready re-aoval of farina. In case foz's;ia are eract- al at aueh time an to permit excess drying, the forms chill be `:,!^OrougCly saa*,ecl at least twice each day for three days prior to Pow' q+eS Cleanv't_,t and Bend i�,',-fie Iatom* emeatt (a) Stec;l reinforeement, at the time concrete is placed =re,, n. it, &'wlil1 be free lrcm rest acala, loess mill scale, oil, Wait o. -.ny co,, i.ng that destroy or reduce the bond between steel and a ono:�a.a. (t) Stsel vainPoreesent shall not be bent or straight:^Eyed is ». c:amna:^ the: sill 9.;x„ura the me9,erial. bars with kinks or bends not sawn teal tie p7:n:-a shall not be used. Benda shall be ao+. less .,.sea 4 d eme.`.ara un;eas otherwise detailed. "3lnforoaSonta: reinforeaa:ant ahall be accurately placed, shall bt p0s- 9.tIvaly secured and supported by concrete blaaka, by metal ahsira or spnc3rs, or by metal hangers. The clear spceing between perall- .al ba-a aba.11 be not lees than one and one-half (12) times the d:i..*.meters for round bars, but in no sees shall the clear 5istenco be less than one and one-half (ID inches. Reinforcing s$ee`_ aball be in position before concreting is begun. Sa»4icL in Peinforceosat: Bars in sonars" members shall have a xinimam lap at splices as detailed on the drawings. Bars may be wired together at laps except at points of support of the seabar xhera they shall be separated as required by 4he above Scotism. Wberewer possible, cpl.iees of aa3cceut brzrs shall be staggered. Splices in wall bars ;se„ be either sepnratA ow rued together. Unl.eas stress lovarns, the splice of airs febri.o shall be at least one mesh sida. Proteetiva Conoreta Covering: y�(n) At those curfe:aas of footings art other principal strvo2- i-:el =u bera in which the concrete is deposited directly agclnas tY:e ground, steel reinforcement shall have a minimum covering of -irac (1) inches of concrete. At other surfaces where ecacrets may be exposed to the ground but Is placed in forms, the mot_! raiiefora<- i'e3E.0 '..E4 Page 6 .n rij(2) 3tchca of :[cast (i�; 'nr �:: Ye: provid¢d in s-shsectan (a) nf.' thin. aecticaa stsc:'s. w•a }asY'a::ce.^.snt, except atirrupa and tins chill be protacta:d st ieas than thrae-quartars Qi!d) inch of concrete in slabs, of lcw thr.11 one. (1 inch in malls rnd In Joists, not leas than oac at1: one haSf (sd) inches in tTs:ev, Eec; sots or, Opeutarn Cr�..:^rtcra.ta a.'.4:b other trades to provide ei.ots, oh:3es, rca- acrs or o.rrsi n i'ar others share required and ehera con lids •>;t ions. Pleeerasnt shall be by author--1 of t::o o; tL,z .;',r L;.Lnat or h'_s representeAlve, of foreas shall be carried out is enai: s S:-:zls•n to c.. ' 'ca��;13's e,:+£et3 of the structure. In no eaaz , be disturbed until the concrete bas h: .. �. .i: taelr removal With safaiy. Toe- retaov i only in aeeordanoa with the 1,41 1;' e rot :tc5r then five (S) days. ut-' no't lxsa than tea (10) days. ",a." e`c Plc+ Slc.bo: +_re caacreta £>.os?rz, lks, steps, eto., are laid o: &dM or fill, this Contr;ator shall ah3e;; that al.7. underground 1 ag s . .a:L lied, tcsteu and approved cad that exoavatioz e 1 b r pc.rly baakfilled. Tti'a Coc'r�ctor shall � . � c,e,. -aidi, c r.nd t:.up tc a iorf�_etly aclad bearing; ice. E, si r... r;. sha'. bo ac epac'..£ieed hereik.arter. :nubaee fader Stabs: ESat tw va unlar concra,Le slabs shall be sruahad root o£ Chic::- S.eaN .^•'.ara on the drmt^1•v$5. ^,aria. Canc':•� a;^nosz! x,.srfases of conereta shall be krpt not for a pariod (10) days after being deposited, aurfuoe of slabs shall be pratcotad by cr ¢•"..; �9.`c of at lc+ast seven (7) days. r f" L --on c h-- ina lud: all labor, -,pr qqip —nt 'r� viacuirc�l 'Q aom-, iet��, the masonry stork s,,own cr. Cr draw fnps :nnd :ere Ir 9reoif ed c�� lo� R o 3. 1 t,>' ligh L ve J eh' cow � --c t t 1 s o n L .en zhc,i" on the hetas ls.310ek shul' 7'le I c:I� h'.VO .tr, te).tlr.. app'v"-A t i—rotq;' a�!r-b,m mb, -1 be fa. frcn %i ^ Z3 .d Gr oL ior dei.e tdTin J4 sub, tunaoSt eh percent (6%) of alit 2.i — d percant of ,- zzd in a i -6 ,o-,farm to the utitl.Ye 5";L j", _tea 1 .,nry C144- I .d d frox zoa,,se to fine within t-Ie n,-7 a io,nte.r 8 aieve, no+ lees than 9,0% .1 :T I o �_,L' I De Ard Labe_ S�c ij.om as manufactured by Super :Cncr-t' 1, tA LG F Ang t I , s , , r equal. Re nt -i.g 3'pr i Shall meet the a- ni,, . if Cii..reto . 14at'. SP.11' '- .lean, free from alka, . --r , rganic matter. k.. Page 2 L r: Shall 'se *,»r v Portland cement, 4,'5 I-w, t I:' adr,.4xtura p:a r A'ec , +1' ce ::«. a't, and 3- parta asud se b,t to`.:+oe d of 1 tArt Portland cement, and3 _.. pars a1 ld. A: r,,jtjvja3s s:::1i:1 he accurately measured and shell be :sued :n suti iia dtc s `rh;cu ill protect then) rr:;1a a b:tO' :; o4 o ....:v •a.t nlrcll be mixed for •fir^ if ^equ'.red. to zesu a ,..nif: .:. $s }s .'shalt .. uael with' . 30 z,.n:It.s .-.. ., z�g ,e per:-'tted, No shovel . _, ss•.,.. n{ n..i -- _1i it :s a�, ~.::tchcs are prohibited. r b'o-L- bss been approved, Ill bi,ork.I r.-,ch .- -„c.1 3`..'.h vati_r by pima ing Ln irp-R_ Lae ".ter run f;.-id -.'r 11 be er C., avt: ic6 great, be.t, 10. a - tt - c.n . 9ict i.0n `rM occur end the Iio:., , ;n the szx ll.. in rU r!:Mz bone-. }. .„-. a-,vton hal aurfnee of block- -c .. ..Cra a 1+i ;r,,,a ali U be buttered to a derth. of I-, _.., r kv ?,n.. ] zn ). ,po£ats in b.lacl; cork ah ill. .ae zIa h-,'og a. 41=otar of ut. least 5/6". Inter" :outs ahall b`e s z'~.8" flush with .11 �c rtJa�1 Y..:�1.1 be bra,,ed to pr^aveut sad ac: ati f ' kxa..e I Oel. ' av c Ttv in'ru as, lep .t ;,^eat 5G tar dirma-ters *bud a f^'^ta :"`,^.7-1 be ,,c u.ralety ;,at and br:"ced :o olr:-a^TZ +•;.1 hrz. 2-; acd shall re:ae.in in plate until such ti. as es the ue-t7 'g 3b'I..' j -. iJ,e lor,.'2 t'%t*,ziuj to :.mpJeed llj5on it. Filling cei..e, F:•un;.eig cleanc%r and lnspect;cs holex ea requtred by ordin�n_e •lo R ns`r, from ^_s1.la to 't, •a filled. cos ars, calls sha 11 be fit.le9 crimple tR:.g sad cement Grout as heretofore speoified. Note thet all r ia..hell be filled to floor level. 1c,, towing unf iniahod wort, grJut :mint shall be left i- •' r.n top of �x=11 ro as to foss mechrnica;, her for n=Scr rock. sro-.1 e thoronghl:,, Ilea zed _rd 12xpen,-5 bvf^..". res...m'ag .. ,c.`,"i;. 4,'I grout in vertice 1. 9 Tuts shall be th tigeiy a.gi t.. :. N rod or other to )I %f ter po ur tug, III insure tilat _..r.ta era filled. d s� ^.o.nforn to the grading ruler;. of the West G'lost Lll'bn J(?:➢`s Unless otxiPre:.s,3 lniicv2ed on E'':+? draainu9 21 `. :>cdi _",wt steads, In n-ontfnt with con.. __. _ eset, ox o.•r' -: .; rancor toe .�...a or Arne ssed v. .:er" :,u t- steel' -. 4voF! ^.ny dt^feat whie;: impairs ft& Cnntr:ct.or �: 1.1 furni33 and set any 1.:1m.. bar- CC !:ind necessary .for tY.^ eonpletion of the a.`ic�kllly mentioned or not. v.niess otnerv..ae specified sh-11 oe 2 o_ 'hz :.';.._ for studs; derse NO. , D.F. for foists, aS' ::.1 n^mbera, and of the wise culled for or F _•+r the root nd °:o:: r ,..fkc of sdses and dep%.s lhe: -',all be p•:.at eros, sic^a yr solid at each 'bcei grit; nr". e'r ,.e > c data r ;ls on dravinge for partition oorecs 1 coo. avn u`,,. Yc S.d ox• 2 x 9 d`.egonr4 Gros&1irdg ing e'-3er^. ,ae CC t•. o.. ♦f..... e.ch 3'-0" of span. 8 '3 s:k S-1 b:t set tYvie anra pia o 16' o-n. .oa2:c 51 d o 'east 2-10d na1.7.r each side. s_,,dr, to be'.'S?,Sl r,:ei;n sur'zscina;, AJI, aornere ¢i+..` .n s.ej�c pip s rds Sa ap:_ro',sd menner. b., placed in al: stud wa;.:n midway :-ad s.=.... be 2' sel.d _occs sat a_:d o-, ,. cr:.g� ox- ._ 'r r..ttfc an located, in drawings - 1'' inri.a .'. roof 7:in,g sha1i be 1" r 6" as :n4lea Lod, laid d,e c-,,'. on a,,Cs mitred to centers of "bwaring and t: e., __ be.2rS11g pith 2-V nails. Anne's Har'Q;a,_re: ":srnlah end ir.at_il under this .ec 1'..or. ail rough hardware io ...cc ads na zls, boLa, Washers, :spikes, etc, as mmy bi to complete the bc6lding. 4Younds. around: sha),3. he installed for ail uJ.•S add Tindow trlw, mr-ieings, cases, cab,nets and for any o.har xcodnc.> or detallf of trim and finish to be built against the walls and/or partitiooa. Groutd shall be wet faro, absolutely Straight and to accurately fir the plaster finish. Furnish not &U6 later remove temporary grounds. r. ,.i`=, Page. 1 to th-_ ay.. :=. i. L., s.: a.1.;>e.. n9:ich form P. -;c to f -.• tei;in® only oa r, 7.1 s\ , .i:I `.+. o..': of «ve ury dsors and thbiri'r¢0as; [.�._",. ff it linet B, lnCillfie 3i SCtlil\1r :,..,;; itz-,,As ol hur6- rT. .,. .. Fll ',fio.e\. mentv,.Il d 7f c:l?. !texas it the .'1'-1. P.,oi rz. C.if i,:'?liY ca as ''or. ite!,.ation of th^ nillwor:: In ts4 bI.'. Lra.c 's 1 *<a. -:,. 'o.i.l`<nin, di.c;:c inn. -¢ it tna � ssed hero ia r,e chose de,a a;. J:•e? ' ..'an of chase npec iffell, le_i .. a . u:%3 •.U. _ o -+. r.:i -u:•: IS iei' a:1.i =ror: furn:,sk+e3 ender. :iris .u.fnrenr s,.a natc-r1e7:, rsachini.ng, nssembly ail or i1.!work" of the Voextrork Institute or .. ..:.9€c:t•n a -;Fot fo in tts.:publ:ieation 11cued 1953.. voodia rB ,,.a_p11,sd eor, ev,ary-exte r:'ur and inter- .. il, r ^vc r: znaz/ar se-e enad ventilating opening unlass other- ! r rtor�d specified. Framea.. shall be 3 n.nd .. rlrl-•a; r:'1a11 be 'assembled gi.the mill Sc, der the , corcrr::-', P-n:.;•inj;s. Yr%aey for openings not Epee- ' cnnPara. to the tY'%= dctr. ' i ive::, With c"..on for all d:erating °n<', 'r r r.. rdqutr •e and aFt±ei Vied fit th- p rr .r o cp'ny., ..1y il. l.nctr:atnd by till- t!F - torzar i..3/4'rabb cted for doors 1, t'- .. _.. .'s et", ...._...- .. za - the tyyr, .ite u.::: c d .`ta ,:. $1 th tt 1.rax., r, ... t.­ sna .6v--,do .nhed,.t\..9 ar.3 il lad. C\ for al -I a,,r- - r.%11 •:ra`on: C�*. .. _,. ,FL" ,:anrad v>Gra shall hr glazes :.t the kili. See Gass anJ Ulaz}n; atct+on �f t*.one-paxifs-a " r.. All fiuon doors shall be Pete'- °Tr aeeeare'l Ir equal. SKY of Vf in drI ed a a, r or p to I a rn 7 M,! Note Wn 17�" reaJst'lx-� COWUo not 'e,n thsn 4-11 11 wide, biiilE-i,.p. 7'' 'af T" Noma dpslgn. F rzal�orlal on both eider of doors threc on all doors sall. b- yas.i 7aI9i h .d N 11 be _i`16" thit,k before sandJ ng. D,nQrs be glued War pressure with water reriatant gin. 11 Und In pi., 3.9,,es not less thar. .12 hours. doorx b- guaranteed aFOirlrT or Zlo-ng sLopa for al'. elazed t'im"linp, ;j�d Miece.;.Sneouz eeqlzlremarts por .�I does. -.tr'.nd".ds' lnter'or Finieh; hell atarainL rl run-n`rg trio members, lue:i.6-ng, c 7 - gin: s c . 1� A o. .e� c xpos2d trim memb� � s, 3h � 1. as 0^% Fo� ""y co " �.ils 'a ith Vie 3rarine,3 -,,ad i,;, �Md 0, % Mcd. Y a aholl be backed out or rarpTng, ALI 0 and running trim member, NMI to P ir )N4drrUq1 M7 A or B r.r bcttc. J.c In Lpin&M, AM coui'arz to tli,� above Von' .3 to 7��,' ad amposed surf. ,ice, to aai. d B r b,�« Q-Oaply 110 drenurs anA! have too FML 02,YALv d NO:r.i o�i A'! d-,—erw 'M doers shall W V; 1,vnf. wMatunwortAnY of Mi'-'rov% W Millwork of tht woodwork 4, 1053 M the t:ne Wdel"ery to the job, ins cc. ot��, a) to 'rllljde 3rit^I of M; ai%d —%:vue t .._lacer l& anO finish hard- re a snbjeets of 31 4nnj Oud. of 0i:io section. tia 2'r is Is ! herein referred to conform to Y'n, x their several U.3. Gover=eut Httdroad Lunt - clan or C'.11f orria Redwocd ',.at :.on. CiklEh dunw7 shall be kiln drj.et! to 26r, aontaut. f lnl�a, 1 b>r czrept frames and lvort. ,;hali be "'ea t.,ntil plastering in stic protected Oog, tiL. C-ic. 071de ftj• x11," llart0u.4 uses ShQll be as Gperif'.ed uudaT 211%11- Zo be provided foe tlia iis x,t,c. Whercver cr,t @axis of P r Top> an,' botto-ms of drr ba Ir -Jtt:'ng. (3 ^.7 ; 1 t): at the mill e-aenever practicii) t - ,a 41. sh,!Ll t�, deli+e.ed tI the •!Cb ire a pro% .,-,v for cutting end 1711t;rte. T' ;C'eiV,'d fittm the. qill shall to h%`Cx- i L from d4zage until, used. a 7 a- b., rr,ct,.l I -n .j juLg pjaces 4aintz irr,rigee Lc be. a^ riuronapicuouv as podg:lj Lt angled and beveled. fill izz,rl, br :'ell rot:-Cd with 'l-e finish nails --nd rl%!i ,1 C Lot b one glar,q `aj3h wore SYher:-ter pest i'c le, m.g;oers b, rather tear. itred. Generally, wor$zilanehip shall at eq,i t, the beat tr&d,, pract- ice and standard. All pieces damaged to an extent not readily and p--mrertly repair", @bell be removed and replaced with undanagtid pieuey. All work shall be fitted and aribed and nailed elate to Attention is directed to the General Condit?ens which fox•m -a integral part of this division. Scope_ The furnishing, only of all steel sash and accessories thereto to inolude special hardware, screens, slips, uncles, sores, and all metal pork in connection with the windows. General; All steel shall be easement, project, projected or pivoted, (1-1/W ) sections as manufactured by the Soule Steel Co., Dru- vh1t Metal Pruduets Co. Truseon, or an approved equal, and sh-11 he of tDe typeo and sites shown and scheduled an the dra.r:inUe. s Pro,'otod vents (in or out) shall be provided with alidivg ahoy f?..c ,wrea pith pivoting area of spring steel and attached to both ventilators and frames with braes rivets. Sliding shoes shall be bronse with frame members when in closed position. r(orkmunxhip A11 cambers shall Le n.ude of new ballot steel, of hot r.11u6 steel shapes 1-1/6" deep especially des".gned and rolled for this purpose. All intersections of frame and sash shall be elestrieall; voided cad cleaned of erases metal oa exposed surfaaes. ?`Lad o•:r c- shall to given a dip coat of paint, baked on, as a shop coat. Hardware: All pertinent hardware, under soreen operators, fastensr st: ik+s, trcnsoa, catch and eye, *hall be farnished by the manufacturer of the such and ahftll be bronco. Hardware shall ba packed separately to avoid lose and damage. Dasigt of all hardware standard. Att^_oh hardware before glazing, and adjust ventilators, Sattin All steel sash shall be installed sa recommended by munufacturer cr his autharited representative and shall be sat plu:ab, square, level and true within their openings, without forcing. Caulking Is covered under another section of these epeeifisations. painting: All exposed surfacea of steel, iron and galvanised iron shall ba finish painted wader other comtraots. Screonsi Each and every vented sash shall be equipped with a 16 sash brooms wire scream in removable metal frames as supplied by the manufacturer. Attention is directed to the Speoial Ci-.pions whieh .. !.ntegral purl. o this aeotion. `29�.- York under this setting of all glass "Millwork". However, tain equr_lly to mill Glass Stendard- section shall include except that specified the standards herein glared work. the furnishing anti harainbefore uaad^r contained shall per -- All flat glass for glazing purposes in this work shall ccn:orr, to sterdarda sat up by the U.S. Government Master Speci£icat'on ',!a 123. Pol,'.ahad Plate Glass shall be i" thick "Glazing" grade. Cr,fstal Sheet 1es3 shall be 3/16" think "Closing" grade. bb"ure---- Chas, where scheduled, shall be 1/8" Mississippi. 0lasaZ`onpany "8evclite", Blue Ridge's Louvrex, or equal. Tiro Class shall be i" clean Polish Plata Class. irrore shall be "Second Silvering" grade, i" plate glr3s and silverra.q' s}iall consist of two coats nitrate of silver, pro�sotod by a coat of ehellea and a coat of waterproof mirror-baakirg paint. liirrors shall be of tho sized indicated and shall be set in abrore plated metal frames as detoilod tad mounted plumb and level at heights directed. Mount mirrors over felt or wooden washers to admit ventilation to the bask earfaeen a:d assure clearance fro7i banking. cla5ing_ All glees shall be cut slightly scant to prevent binding against the glass rebate. Glazing, whether "putty" set or "etop sat", shall be done co as to prevent shifting of the light. Putty fox glazing steel sash shall bc: sp•aaial steel s eh putt;, with materials so mixed ea to prevent hardoning. Class in steel Bash shall be set with clips. Unless "prineleas putty" is used all rebates shall be primed before glaring. Glass set with stops shall have the stops neatly mitred at each and and securely bradded in place. &11 brads on both exterio-_ and intari.or work a::all be countersunk. AL exterior saeh doors, regardless of the Lind of glaca, shall , have the glace set with wood stops and bedded in putty. Navas in sheet &lase shall run horizontally. Gonv•_x surfe.oes of glaze to the outside. Sehadcle: She drawings include a glasing ahedule and glass typos ere indieated cm the building elevations. All lights sot apsoifi:clly shown otherwise shall be glazed with clear sheets US "D" glass, or "heavy sheet" as provided above. $7."I. r..r.. s etai r, be !P.Sp.!C tell ny tl;e Con rac ZLr a i,'1n—'a3. „t - j , ry d3a if pm able berare se'tti"nL. en, , voVc or glass that does nat sai.i t�:' . r,jr: .z or S'.h--.t i raulty shall be reuovad ana 1 01-'c 1 TO) .l'.:1 glass shell be free from :raves, Wdbv-, as, t z� Jt: r defeats. All glass shall bs !.nally, 1.1:0I cl p - c...:A u, nnb�eet to .the Arab:. teatls r_ppi ., er.. ..; 93110 _At the coppletian or the building cell glass. +-na lad?'.f: -1'_^rc•:=, . c hd .. aemt trnt vlvdov cicane :• to be e. e-''c', ._.. t .,on 1 . Wr roi y,on"al work. Site P nwo ' c " ..__ a e a , �:' q v'.o;: vad Olean no gLiss hs may �. .11 sm ...d by atSmez 'W report s .xh gloss to t o .._.. _ l intent. of `finis sp,^aif cLt ion is 'ro oL t- n I.0 •or„h teh of f'. ,_n- r.d c• tc rproof i ngwhether or not epee ?f s ?_i.? �-.n.. a Ler"s. All '„rcee a: ry flash i. ng cruet b� dune ss cone i ... .fob ",%.,lire. -iorl, l�:c tcded: i, _inc ntractor and the heating contr.ci.or sb.a). _: `. 4'. fU: "]PCr O^A wOr'd. _ s .ht_r.g et 1.'adovs and doors L•L^c.11 be ec ._. e=.1,1y, sto°sn or mentioned in the w 1a Yet..l Vent Cas kji'. .,:',:cs, ei ogi.2s, ctc., az; fadicnt..d on. c fire t echcd ci co :;.n ter-t lashed aacord _xg to i.^e genera.Ll, 26 gzrge gc.lvam i.zze Zxhartss Da,t P-:rni.>:a and icetall ex-raulat uucts at cost wall of fp-)arnt°:s Ion -:, s7 O!Iu and detaiic4 of the dra Age. Duets shall. bc• 20 U; u lv,4. ,ad iron: to Q":: :.:,vm floor ro?rf:.rced at corners "nen-.=.;; ., ,,a 16 &cage guA+=_n3sed iron angles. From 6+_3" , aad above dustmay ba 24 gouge Cap a`.th West^rrn itz Ty -ompt :Zt Ia, or appro°red equal, 16' rotary vent c- F,. deu- '.gaca t, create n draft ri.thin the ducat at an outside wind is Lt?}i. _nd inetall %here, and of the eiae6 iodicvtrt :r, t'-e 'oltee, gutters and duwnsp Tuts. Hangers and six,.,:-. f.r gc;ct=,ems and eevnenout, Dhall be not lens ;. `�. >.e 2c, L;uge = 3g". zrv7a, .� -. <x _ uwd °-...•..�,,.�.' Sxuk'. 'Y ?tt:eation is acted to the Gen. _ ... Q tilt .c,n n ,^'r^ i,. P-af, of t 0 se ^-t'-.on. The Contractor for lathing and p!E t1-. i,3.'.. f,._.;:._.- materials, .l bor, 'too1a, trr;nsportation and to domplotaly finish th,.+ buSleiag in leanrd +' .. _-.1 is�:i ., of 3,.1e dSav '.21ES.ti and ..33Y. rpecirievtIon'. C.0 .. J. vo st..0 e vuers tint' is raqui eQ tio8 _ J2e A+ro The— alc.stering and lath:;.uS caner-ct^r " c _.+.• y o •: , , '. „ :ft =c.''.ntain for the duratior of h rra ".. . .. ., n.. o ,..t" ap•_ licrable laas an3 o„ Ti ?.a1'. .,e, Va toe work of others, a 't sea, v'f'a trAir.;, r ,. ece;:uary for the -aor4 of th' sec..-�-.�. ;'•:at < �. ,.; _;a4hing and n0c3arlrF, cant.rc Ln,• -r:' ..11 forms of rntac d.o- rx 9ery th n-t o'� otn'.r t .,_ free Fro! d 'g'e R"' t^ one _ +. c., ae .; e4 p2 :,. te: in5 n=z:, 17 ejacli:a-,-_ ,._ 7r. r)' ... ,, at"'". .0 ._-...,. every Inae,. J -, on o6.w: l,t il.: F-• Ok 'C'!u2a.. -ia shad report t'aat ,. . ,, to OncrA Qor% c,,,T feT eorreetiOn ? P. i lur 3 0,X, • e"a -•,w A445 1 be Sed _..' for r t-..3- ti;a"nz4S by, w;pentar. t;� r erai n .t.0 Others; .... ., `"� ar'd ritas$owng contro.:. tej.' __ .nzv 010 m,> nner all. mnr`s of `.t 'ai it , .:: ing : d ° _ .. Of, wMi, n.sd as required to conecal tha ;r .. .0 ;,, iSt a ... ,,. . n�ne.ral Contractor, k,crn,, c +. ... i "toper and required inspaet-.nnl ,, .,. e.. -.'Rent to avoid etc.,, &et "Or t1'u _.... ',:. en - . ANQ -..- v. d tot Athfug and ,:: R ;:. A 1 Olto 7 C lot% 1.iaa ;n :A waYc 'v! t., meet the rTqu-t._ ..., 1S t}le 3F err. •. , 4•.:C'.tr PriE. ,aa� a a lIh,k " I—," ix ,. .., a < i`d4'. `LA IM lot :Av� Page 2 Ij VAT T-a 10 V1 Oork of J�, rt lo T., it: vooti -)IUS n. ne,,'dOntnj.;Q a rod u an -nc nA apw 071rztlone r,1wA1tt',d in the dumvj^c-. Al r or i"g end oatt io) - *j_ Cyrroi 2 astw'og" :,.Q.1 VIM) Twofor t M tkip pxival 4ad t ave 00adwd9 ry AWAY !7POPa In f E.13 'rut J. 07 Mvwnq z a- 3 n:) a 1 :v 95 30 j0_ 310 1"? ye 1� 7 So. 100 a Land oiniph cost b^ .'_ce, Von Snul Minh 0"11 pa,35 TA No. ai,.. Z ae, fo: 1; ns I,. cement finish cost stli 1 -1 t glAdvo Cram t"t p2sving 0 ow. 30 %Q Nct 0 : 0 14, for nX%"oc pm,,,aox sh;.11 aorslqt of c� -n 714vi for sAn,! 4,� ?Jall ve well graded Or cuwsz !M z, c ,;fa to tha- following, pereentry Hl- 9-1 on 10, L. Potty Oh&IJ Ue a -OnfarnilaS to "'Standa"G Cor Mormal Finishing Hydratei Lime- ASTLI Designation CG 6-1,6T. Co ,,! t, L%tla: Corner rainforceaent of i.ntsl�:.. `^ s" i IT be r p_.sd-ad copper bee_ ino s -.CL leas thaxr 2.5 po::n@s per s;lv,^.:re yard a.xu4 shall be cut into 4" x 4" angl3a. Str i.la Strip rainforacmant ahe,ll be meta:. 1s2:, ifisd-for corners and shall be out in strips 4" side. Note: motn)! i<th she'd be one of the types o; weights '.'.-..:.1 :in ll uj�L,76T;a SC-`s..21. o£' tbo Uotal Lath Uanufacturer'a Ascoe-!:. `.. iaahnioal Data. O sum llaard: 4ypaun lath #'hall ec,nfozu to the "Standard Speoifioatiu:;:;. C oizn :;C'S" '..aTU Dczi.t'aation 0 37-12 and shall be 3/8" and 5/S" thick k, i.Ldic•itod in the drawings. Lath a^ sva•far.se to receive pBasier ehali be perforated, Leaving not leas *ban 1-3/4" disaster r ..:2tan far each 1e% square i_ehes. Lath base for other f=ta- _aTM. tit for fire protection purposes shall be plaJIz anperforated). ":5 e• i;ir°: V'e v3. a used to attaoib end tie r;• t.a1 i.atii sh=.l1 bra 3aivexniacrd so".'t ums.ial.ed steel "Tire and shall not be leas than #18 U.S. Steel. gauge. ...s...�............ Sleea.h iW, parer shall be a ztand.=rt@ br nd redera4 cpen .f:_ 3%t_c,na for Paper; Sheathing, b' t o<3f L'.0-,^ 3S. dated February 5,1935 and Lsaendmenta 1, dated Oatob�r 18,1943, Grada a, and shall weigh not leas than 14 pounds per 10S Cor.ar necdla and Sereeda: <<.r t nc-'a'.: beads for interior plastering ab'!l be 2. at::el, t%pandod flanga, galvanised. Plaster beads shall be 24 gauge steel, expanded flaaga, V,'.- vaniaed. h ata.l sorsada used for grouna,a shall be full dimension Iee to face of finished planter and shall be 26 gaiiffa atael, o+axxu,d potrt, ge.lvaniaed. Nails. All nails used to secure aetc.l lath to ucrisontal al slo�ir.W surfacoz ch+.0 be galvanised barbed roofinf aa£is set leas them 2 S.aa'^.os long r'..de of 12 aaga nieal tire, b+.ving a head i/C '.ucbcQ in dias:etor. i+ells zh:.I1 be fitted wStb ?Al' diau>ater steel washers. flails for exterior lath on walla shall be 1-1" galvanised furring nails having a shoulder to hold lath 3/P from aupport. Hails for gypsum lath ahail be 13 gauge galvanized 1-1/8" long, having a 3/8" diameter flat bead. Mails for interior metal lath 4h.e11 be 4d oowmon wire nails. i^.th Sn 8xt@r10T- ii0r130nta1 sUPiAeta:_ Lath all exterior horiaoa'.al surfc"3a to receive plaster with .%etal lath as hereinbe£ore specified. Start lath 6" below aeiling line and bend around corner a.ad.fasten with galvanised barbad roofing nails specified Above. Lap 1" r.t aides and ends of eaoh sheet. Space nails 6" n.e. maximum. Lath shall be planed long edge e.oross the support. Tie lath at least once between evpparts. Inror±.ar La hln,g (Oypsum hoard): Lath all interior stud walls or furring scheduled for planer £iuA. c ait'zi !';ypa,.a i::i,3: 3/3" thin'.. Lath shall be appl;.ed vile: long edges perpendicular to supports. Ends shall have bearing of not lase than 5/V on studs, joints, etc. Break joints at a:-ah board. Lath shall be nailed to support with 1-1/8" 13 gauge 3/8" i:ead galvaniseE! nails L" o.c. Reinforce all interior corners a d ru;en6,rs.nt LAC7ee wivh 2.3 axpaadad me2!i lath strips U" vide bant around eorn..r 6" Ca each wall. Task only sufficiently to hold d'.:r- ing plastering. laterio,' rathin, Mt:.s1 Lath Lath all interior %orizoutal surtacoc to receive plaster sa specified .above, for e--2Srior horisontal surfaces. The use of r-`re ties to stripping ire cu«i:ai lssed. If us^d, wire shall be not less than `to. 18 U.S. Steel and Wire gauge, soft annealed galvanised and spaced 6" O.C. Whan natal lath ;.o to bo unad on vAllr„ lath shall be secured to studs vi.h bd aoLaou wire nails driven into studs of furring nislaum 7/8" penetration. Bend remainder of nail to engage at least three atran@s of fabric. Lap 1" at all jo+.nts. ynd joints nt aar;ports only. :'io once between joints with #18 gauge wire. z=we e:� liti��ons for Flueterin f.11 gprsun and Portln_d cement planter application work shall bm SM atriet accordance with the American Stardards Assosiatios's .I.4a.rd Specifications for Gypsum Plastering" A 62.3 - 1946 in- sofar as they apply to this project and they are horsby made a part of :Lin spaoifieaticn to the name aztent as if zritten in full. Re plaster ah;ll be applied during periaSa of high vinda and plaster applied by not finally cured shell L^ -'vsn special ee.re duriz, such Deriods. In cold, daop or rainy weather, properly regulated heat shell be provided but precautions taken to prevent too rapid drying -out. G:pauss lath shall not be wet down. Caaareta surfaces to receive plaster chzll be cleaned by the ter genera'. vor% of all Saitanae, efflorescence, drat r.nd ota:.r foreign ratter by the can of stiff brush and a v,3h of SC¢ „vi!Iatie %aid follosed by a waah of *Isar water to remove ao'c. .iurfaAaa shall be rouCLaned to provide bond, If required, the cur- face shall be evenly wettedbut not saturated to provide proper suetion. After praparati..n of concrete surfaces by the General Contractor the plastering oontraoter "all drsi,-Gout file oouarets with a,"gc- 6 ?ortla.�r eemesa% grot�c uoaposed of 1 part cement to 1-1 parts fiat sand mixed to a mue:.y consictenoy and foroably dashed on the oon- e-. tv. w'th a stiff Y.r.rh. :his cost shall be kept moist two days erd then allo-;td to 6.q. PiaafLE1Et Cn$ }liYin Materials shall be proportioned by means of calibrated boxes or other mean;; of consistent and eeeurute moaauremcnt. The tngred- ienth shall be thoroughly mixed together and no more than can be uued •within one-half hour after miuiag sba11 bo prepared at any time. Curing. Sach coat shall be kept moist for at least 48 hours after application. Spray rith fine fog spray starting as soon as coat iv sufficiently hard to avoid damaga. Do not soak. Apply only enough water as can be abao.bed. this Contractor shall provide for water curing an Saturdays, Sundays and Holidays. Interior Plea�toring_on 6,ypaum Lath: Application shell be in accordance vitb daeri.o-+n Standcrds :Association's 'standard specifications for Gypeun Plastering" 42.1 insofar an they apply to this building. Plastering she.11 be bast two -coat back-up work. Scratch coat shall consist of 1-3/4 parts sand to 1 part gypsum neat plaster by weight or 100 pounds of gypsum neat planter to not more than 2 cubic feet U vermiculite or perlite. Apply scratch coat to never fully, work into Joints and corm - era. Before carataL coat is set and, without raking surface, double bask sad bring planter out to grounds. straighten out, provide screeds 8'-0^ o.e. and leave broosed off to receive finish coat. Plaster e^.all be carried full to rough floar or grounds. rh abF11 be applied when base e.. :ire set firm a:a-z cr;.t coats v .re cry colorsd =ark, MIX and k:r a'yn; Sat to the .u1v _...-. or ",thxse cz;zent P'-=``car is scheduled for interior finish, lath cll y.� crsucndad and plastering shall. be c s for exterior cost. of Keene's cement-tootlh, Interior KaBtering on cetal Lava (Gypsuai): Interior plaster on weta.l lath shall be t'aree eosts as follrwa: 3eratb coat: 1 3/4 parts sand, 1 part gypsum neat plaster to which has been adder, d pounde fiber per cubic yard of mortar. Hrovu coat: 2 parts sand, 1 part gypsum neat plaster> Finish coat: as for plaster on g!rpsun lath. nuterior pastor iar on Metal Lath Soffits of Cano `ies Exterior plastering shall ba as for interior cement plaster but shall have exterior colored stucco finish coat. G:.sanir The plastering contractor shall, st all times, keep the preL.ioes reasonably clean of loeas mortar and aubbirh reacltleg from his oparations. ':Lstal corner beads and other finish its" shall be wiped clean of plaster, while plaster is vet. Upon completion of plasterer's wort the entire buiA in3 and site shall be cleaned hp the plastering contractor and the debris rseulti.-1 from his work nh.l._ be removed from the building and site. Lttertion is directed to the Special Condition: of these F',>eoi.fieutfoua which form an integral part of this asation. Swope; This Contractor shall furnish all labor and materials to complete all roofing shown on drawings, or herein specified, or both, inspect conditions of roof, cheek locations of all cant strips, and see that vent pipes and other projectioaa in roof are in place, deport loom& boards, cracks, deprossiona, ate., to General Contractor for correction. Cover knot holes with cheat instal. Ccamenoement of work by this Contractor indicates his acceptance of the surfaces. Roof Dqc!¢ Preparatioai Roof sheathing shall be dry, smooth and well nailed. Leeco cracks or knot holes shall be metal covered. Roof shall be e_ brown alsan. All metal fittings shall be in place ready "or a.. ing Contractor to 34tach to his work. Cant Stripe: At intersection of roof deck cad all vertical calls or tcrae a cant strip with beveled magma shall be lastaiied in tile angle as shorn an plans. Top of cant strip shall not be less than above roof loyal. Su.. -nary of Vtlghts and latariala per 100 Square duet: One (1) layer ES rosin aimed insulating dry sheet. . .51 Two (2) layers 400 asphalt specification roofing felt. T-senty-five (25) lbs. per square asphalt between each sheet as in "A.pplication" below. . . . . . . . . . . . 25" Forty (40) lbs. per square flood coat. . . . 41 Three hundred (300) per square white limestone chips .;00„`_ Approzimate total weight . . . . . . . . . . . . ... —Z511 Application: Composition Built -D Root: Lay taauleting sheet dry, lapping 2". Ley uwo 2 epora roc felt into ho: asphalt having a tena- aratvra of 350 - 400 degrees F. Mop each sheet completely and evenly and following mopping by succeeding cheat at an .'interval of not ware than 3-5 feet. Expose each sheet 11-2/3 Blindnail uninp 7/8" large head galvanised roofing nails, i2"-15" o.c. Lap OD47 of rolls 4", nail 4" o.c. Over %be entire surface, aftir tea layers of felt are laid, pour from a hot dipper a uniform flood coat of hot asphalt, into which While hot, imbed 3000 per square, white limestons chips. .�>, e.:... lee Ua`. :I.Ii Page 2 Imbed flanges of flashing{, ve^.t caps, eta., i.ish_ct uy otltc,•a, in hot a-phalt 'between sheets, turn 'up felt to 6" at intersection with vertical walls. Completion: On completion of the work this Contractor shall remove all debris accumulated materials, eta., from the premises and leave same clean and satisfactory to the Architect. Guarantee: The roofing contractor muut deliver to the Owner his guarantee to maintain the roof in a watertight eondition for a period of two (2) yer.ra from date of completion. Pai lit>ing Page i 'zi a 14,d tM i;'uz fo:^;a a33 o"ve ...', p;1„rl t th_a aaction. Laaak`.!:.� This Contraotor shall furnish all labor and materials to aos,%ete tili pe.irtind' and decorating an show, or as implied by t%011 plans aad thcae specifieatiaae. The intent ox thia specific - is to p,eovIde r. durable fiulah on a13 stirs"sacs. sde�aafnature.•s: Whin no specific menufaetuvere of paints, vs,r4ishas, enamels, ata.ina, etc., are apaoified, such materials au^.,i bo the products oaf recodatsed naVonally known manufacturers and shall be tl,€ir bast Oradea of the severel typea. All materials shall conform to tba apsoif fee£»o.::e of the American Society far TostIng Mntex:.ala ^or their sevcr,-1 kinds. ':S,ter'als: 'lac a „<',.�a, z-'+hsr tbsn those specified sbnll be c<, All materiel shall be dslivsr:ad 20 the aP ra. sl,a a ':a:a p2ok�.�ea, with labcl intact and -male ui,tz oi' ready-mizrd materi.ala, all mixing nh_:t.'', b• drone at the A s .:az I'a �1.,a -M ted by t'sce C,eneral Conn A.tt•r ` _.- ,,:ri�.�.Ce of ;a *,:^% and tools, and all aatarials within this egaeo when not in use. Care shall be exoroil-A to p::ctoct the rough or finishod floor from.: paint spill. P:_iat :Fall ba kept ec-;c:ef, c le, ^li prear,uv.nas t.aten against firi7 lead : V11te lead shall conform to the Standard Specifications o! the 3,,STI1 D31, latest edition for "Basic Carbanmts of White Lead". Red lead shall conform to the Standard Specificetione of the P.S?La L83, latent edition for r'8ed Lsad". •mil: Raw linseed oil shall conform to the Stan4erd S,:eclfieetioms ri q!lm ', 9`?' 7`23$, latest odition for "Raw Linseed 911". ,Ic!lcad 7. useod oil shall oonfo�7m to the Stan -lard Specifioati.ono ?260, sates£ odition for '3oilo4 A;read Oil". ni1 shall be Sipes "Double A" Japan oil. 7'raeaessd oils or flattening oils for use with white lead :.ante, ab"! be manufactured by the makers of standar4 brands of white lead. Their use shall not require any driers or turpentine. uo'.�c for oi.l p:;i.gts z'hal', be cn'n;. it ;ave Muse-,'T oi.1, and of tL.e highest grade Shall be non-ia6i ..rg. Shellzc: cl•.r_,- b„ piy e white guQ eui in pure denotvrP6, .L&e 8holl "t be used, except to Cover lmL '.4:i u^ zgainou�� cr a-:v�-g v:oads. PnttV. b Lte Le;? ":'>>i'Sin:$> liraeed oil with litharge an9 col�v „- meat adde*6. Varnish:Fatericr. General Paint, Synthm ie Gelite; National Lead Com_rnny, 7:x• r,ati2e gppr; P:'Uphurg's Lerine Spar; Valentine°c Spar; Pratt Larbzz't, 61. Marinm Farnich• General Paint, Synthetic Super Marine Sp%r; rational Lsod liar Arse Spar; Pittsburg's Pltoinrn Marine Spa'; ;:r "M and .arshart Company Spar. Grr.de .- Caneral Paint sF5002 Spar Varnish; ;d r,$iona i. Lead Co., Dur�blr. Wood Ftnich; P18tabur$'a Spar; 'S,%tt r.ed. Lv-mhert, 61. Erin-atoas "finish: D,,^ch Cay; Fullsr's; Sillar's satin finish; Bowan iiati.r P1.4 :;,,atcl: Soy or an opgroved equal, aepable of passing "SeSnoi. hoard'" Lest. O loas Emir.-c1: Dutch Boylz ertcrfar glans; Fuller's; Siller's Glare gri�Aait'B. 7urpantine shall be pure gun epirIta of turpentine. Page 3 r v,9 -• ^.,7 11por : _....�l....:.a Three 1;0:t1_1 ttiixad an the job. Priming cost!IAT, oil and turpentine to good Trv:ihing con- sis,ency. Sa,:or.6 aoa.t: L7T, tur-nectine and l.ittlla oil to f1._t fln'.sh. ThirB coot: ?:2T, and Sipes "Double A" Japan oil. r.%i._ eri0- Iron and Steel: Al o.posed exterior cats iuterlor metal work, steel cash, pfpa co!utras, irca r;.;_d galvanized sheet taetal shall reaeive two can*,.a of iae.:..aa: ?.n addition tc red lead shop coat. Exterior wort- to receiva '.aa coma of synthetic exterior enamel paint; inter.:or :ark to reo::ivr,• two *oafs of Paint as the adjoining finish. Interior Pla.ster: i,27. plaacer to reoeise paint shall be washed with solution of 4 l-on. s.sx<i su'lp st.e to 1 gallon water, with sufficient Plcnol- pha.loin to »s, sv rol.or wcraing. Any walls showing burn shall be Marled -;,ith :. 1'! ..9a', Bafcr^ paint is applied. 1. l.o.«d and Gilt F.•'_.nlnr Banat- 100 lbs. •s:ite '_cad, 1,, gallons reducing or Mixtrz ail. 2"oaad oo=11; 100 ?.ta. white lead, i ga Sloes t.ead Vx so- tiue, ; gallon linseed ail. Third oos.t- 100 Ibs. white, lead, 3 gallons :te10 mixing nil, or reducing all. ... Ssr.'. r'Iass "T.sad is soft pasta): First tout-pigieated wall. see.ler.. S'.00nd coat- enamel andercc*ter mixad ctt =-. 7'w of enamel. Third coat-sexi-gloss paint no it camel from the conEai::cr. �. F',at Enamel: First coat-pignanted Mall sealer.. Scsord coat -enamel underooater laixeed with eq:!c:.? ;parts of enamel. Ta rd coat -flat onamel as It comes from the e0ut. it�cs. 4. .e_d. and Cil: (Lead i.s soft paste). .¢riming coat- 100 Ibs. white lead, 1-t to 2 gallons turpentine, ;-} to 4 gallons linseed oil, 1 pint drS�r. Saoond coat: -enamel undersoater tinted. Tire coat- semi. -gloss finish. S. Srcrei. : ?riming cost- same as for lead and. oil. Second *sit-, enamel undercoat tinted. Third eaat- eranal of shade desired. Sand lightly be- tween coats with 100 sandpaper and clean. 6. Natural S4ain:011 penetrating stain, selected oolo_, rubbed off, re -treat with stain, if required. Thin cost of ehellao sanded. Cost of wan 12 or more hours after first coat. Pan' C".ecv i.n +SEA il2a ng� before any painter's finish is applied to any surface, it shall ba sr.,00thad and cleaned at all dust, dirt, grease, mortar, paint, neale, lease paint, rust and stains. All surfaces of wood shall be thoroughly sandpapered with the grain of the wood, and all knots and sappy streaks in wood closed with alcohol orange shellac, and all iron and steel work scraped with wire brushes. Shop coats that are da_oag=d shall be, touched up with priming coat. Lashing, priming costs, sizing coats, and other paintea'e finish applied by others, or washing and aiming coats by this contractor shall not be donned to be one or more of the coots required by any provi.si.oa of this: section of the epee if its'.* ion. Paintor's finish, except cenent-avatar paint, shall not be applied on damp surface under any circumstances, and the Contractor shall notify the Architect in writing of any such damp surfaces he ffnda. Exterior oil paint shall be applied only when the our is ahinirg. A minimum of four days shall elapse betweea coats. 11L v, .n$: All nail holes, joints and crevices in wood sha?.1 be puttied after °'i11er or priming coat has been applied, and a7.1 joints, pits a,.d orevioes in metal shall be puttied. Putty shall not be applied ^s :'.ais3iad oodsork with a steal knii, : other impl¢ee11 Petty be colored if so directed and all puttying shell_ be flush. All voila botresa trim and other finish materials shall ao filled ,,r tl% patty or other approved mixture suitable for the materials anP irxpoze, and eheu dry shall be sandpapered to a smooth hard ever. s rf zee. 400dwork having an imperfection in linisb as a dent or a crack, shall be speckled to a smooth even surface before application of finish coats. p',.e,.e Pillar: 3.11 pcete filled surfaces shall be coated so that all pores and voids in the wood shall be filled flush with the surface. All su pina filling shall be ¢loaned off, and all molding and eagles thsro•_ghly cleaned out. In general, on wood and metal every coat of painter's finish shall ba sandp_per^d before another coat is applied therecn. Application of Coats: Exterior coats shall not be applied less than 4 dsys apart or Interior coats leas than 24 hours apart, nor shall a sucoseCing coat bo applied on the prseading coat until the latter is hard and dry. Not loco than seven days shall elapse between coats of varnish. Each coat axee?t varnishes and waxes, shall vary in color; every coat must be approved before the ouccceding coat is applied. taeb coat must be even and uniform, we17 brushed out for paint and well :lowed out for enamel and varnish. Every coat must be of the consistency to fully cover it. Brush marks, laps or stains shall not show at completion. 9 0 'I::f, t;,r::: �71 a�txv Page S Polater's finish, aaaopt cold water painting, shall be cpF?.Zrd by haari with brushes and only by skilled and ezperienoed jorrney=n n^:'_utera and in the meet morldaanlike mannar. cold water pn.'.nt sh:.11 ''e�.a_- lied +:, striat accordance with manufacturer's instruetions. This Coatractor shall be rewired to furnish samples of color, reture, and finish of all surfaces to be treated or painted sub- ject to the Arahiteat's approval. (Before prising Coats have bean p+at on printed surfsaas, and before filler is applied to the several sr -faces. ) a nterior die :onr�; All exposed interior masonry walls net otherwise specified hereinafter shall be given three coats as follows: PIvat coat-pigac:nted sealer. second Coat-enaaa 1. uadersoater Zlird coat- flat cnazol_ MAcrior RRaOpSra r; All exterior =scary a;sall receive teo coats of ailiaoaa taan :, ran-.s;;}x,'a pigne'ated, waterproxf Pain's. '=m.l,etee^ :u ,do a;; siown or. drer:'.nge shall be "Arld- paint.. wx,=&- .. o .ae kv. Iii_:Grad llolkara ( i2C!O.OG `, 5.'e'c• .._. .,-_: .;, 6.1vinFa to be ered£tad to Owner. rniah berdaero shall be selected by Owner., :Nut s}:rJJ be -cold for by this Contractor, Finish hardrare to include butts, loal.s, latch cote, dr Ter pulls., cabinet pulls, cabinet looks, door store, door cloaers,, and kialt plates. One and one-half pair butts per door. liuparatus Room front doors shall have power and counter- balamoot cectione.l overhead door equipped with hardware as manL- factured by t%e Overhead Door Corporation or s.n approved equal. Hrrdroro for ,',call c.a':s is excluded from this allowance. z Sra •.� u...,,r: tee, to the Spec is! . Cu 0" �.one C: e;. r -:.et of '(h4' G.:o'r.;.(>>, -'+.'.� v5. v:..4 0:, _•<c 1. adsz aeramie tale �md rel=:tad stews= rz- •a= r_:a �.c a.C.9 0::o�•'z irdicct�d on the dra+vings Find ae ��:ae:;•i�ae: `i? + r3+ .-darts grade in aa,orda%,e gttZi w ;c '.:� Px'ScI Rrnetta2 reaommondatSons SU 63.-E.C. F+. •-. += t`io;,tiaV executed certificate of grade in the stand^.::�6 ro--Im r ',,r r 0er%ii'_'.a3t.a. Rile shall be delivor®d �o tla work =ar:s +ano;;aned pao'sngoe sealed situ staada-rd grade ez.d a3::ll be branftd with or have-oo.l.od witi'c, the :-;-o;, rr .,e: .: d ....� Fer wnttinna earraauamS ing to the inforn- s ..y__. certificate of grade. V-.�>or ti�.sa e'-:.,:.. ' ±lcauo or oz'+aaaia" .:-3,�::b �guara nnturs;. :: Jxty t,a:. a. Wainscot the z6;all. be Cladding AzBean or "xosaia d,-} x d-t rl"%Z0 ri'�oova. Pear- dv InateMi)g tr1!a ae dot"143ed on the dr�'Vlncs. t .l R. sisal'. Le seioeted by Architset and Owner. t I l roc rant R m .Per a •.i eoxiFarra to s"aders Spacit- scat c:, PFI ? 4�'. C ri a or H`_S.!'-1CAa. Eci °a,:s.:a::•ea,=eat shall be a hexagonal pagltfy netting,:.l-J1 *r I ine'i e=;.', of set :was than 20 `e.uge wire, galvanixad after fabrication. (el), ftrtland as .^nt inalu'llag nhito ezr..ect, rolaral' t3paa f{ u$iona §-0-Z92. (e.} Y -d^a6nt 1•.g2a e1a11 conform to ASTM Speoifio*stIon .- .. y;A} Sand otaell conform to GSTH Specification shall coafQrM to Fadaral be *lawn and fray frog injurious r .. of ., rfda; aa: t, 's, =sits axed organic isapurities. «� no'Zb`-tg aOnPound ahcll conform to Federal Si ^s is Q03$eP+'L :?e IIireaanta• (0 VX,11atPln t,impG e`:"ro not .tesw th.�.n 60 Aegrea F. °,ia 'to ba ti'. ie8�. aic�-��s �.-.�•'�",���gnr of dc:vpte to seor% b; r^.lost -a iiy:. {b) Layout of tiia c_a the serious surfaoaa shall :E se.Rad rut to el'^ ss..a—anti a to nuah as possible. Tile shall b-, eare.• fully ou•$ to true Mete as required. Joints in vaicscot shall be a ,za•c-c iT+Z-2.a ly 1/32 tLo". Tde and join'.= in 01aa: shall rate",. (a) Mortar cettia-I beds for floors shall be aon;.oaod of one Part 1'ortleaB aaa� =iauu• parts said, to wbicb not =ors tban 10 _reraaat of hyd_hUd line by volume of the aeeant ma be added. The mortar for eottizag bad shall be thoroaghlT nixed gibs as little water as will produce a workable ai=. Setting bed shall be 1' mi=imu=. Page 42 (dO __tiaL_c - rx ;'or npli.a.nt'� r . o to � TM.." `_ ... St a_. r,nezd of per;. CW,snt to 2 px: '•% ar.d w t! ^;hr e$fi tf„n )f.. t:. parceat hydrated lime by volume of the aarent ua:-6_ 5cratak. -',o :i for als:plic,.tion to =aonry may nave the sand onn` n-It mores svd u0 9 perm , rho scratch coat shall be applied mot more than 48 txU).rs nor lees tiaam 24 hours before starting the setting of tile, (a) ?lent *Gat shall be composed of on" part eemsot .^.rd c,r:a Part 1e;7drjnd IT&e to 4 ;,onto shad.. (f) C� ut_7aix for joints ab,'Il be a thia's scary six of ter white teak^zt. .T.Y313'i131 �,�'G "1JU The Cc,ntrret3r for ceramic tile shall make a thorough anam- in, iaa•,; of ',he zurfaaes -to razeive tilo and notify the fresh`, -tic: of Pay c.:r.litinn that may adversely affect his work. Part;.c�'I".r ,--4aaVcx• s':aall 1%'a pa'S.d Vo present of appalls, ar,.a'.;:o a.r-, in masonry construction. All snrfeaee to s•eaeiva t.i.le shall be thoroughly zc-' o rvplteatiol of braa Goat. t, ly 3aj'k%' h cost and scratch 'well. Sc2atc!% eat,* s*,dC'L E:s iat mot laoa than 2, h¢SMr> nor Ecre then 48 hou:a Beta:: s.e4- '';::::. ucei in =spa lizd a;;i 'iilo set. satt'..aa shall L» Ira full aaoardaa¢a cith thl s;yaaitio+.a z:Pa.�: outlined in 31m, f;, d Practice ReeannoaHrtieas SS-61-44. .'•o4.xria af the shall be w::ishad with o7.er...n rsr:ter and three to eras.:b -t a ?.x�e„ding avid b^oaab ng the grout over th•:+ 'vile uatil t .4 .i,a a s arc the ct C"aly fill•sH. nxaess grout shall be removed and tnn the thoroughly Gleaned. Leave tile work aosplate and frme Prom crec)ced, broken or chipped tile. dt<;enticn 'v d meted to the Geueral Con:litions :rh.lt-lz £•ri--:-. Sr -one i fug" a 9+.a the f..,.x.niahing or all labor, isaterials, a •i,-_¢, ,-to., to eom :-.eta the ley'.n: of asphalt tile flooring, base, lir.o- ?.+o-vA , i'n >., a, c,o e:aRc is all area. irdicc4,ad and a;;sGu_ed to rece"ve such floox.L... a.i5 Cnunter tone ,hall be covered with a laminated plastle sheet $Bi.e$, SY:aet -hall be aom;osed of multiple layer core of \raft i.,.per impregnated with pheno£orm3 ldehyde resin, have a protcotiva top sheet saturated with r_elamine resin. A_^ter tusiag unfer 1.4.gb pressure, aheet a?sall be i:nperviors to alachal, boil- :.:ag wat^r and Orgi.nar" household aoids end —,,Al zl*:cst::a:'. ha%L t.o 2'75 degrees P a:ad shall. be rr:s'.atce+t to WereY..:i:- I.ng. Sh.,e, Lhn'll ba es esru^eoiturad `y the faa-a .rr. ` ie,.i.,,"'Testol.lte". sheet eh;::.i be ba--r'e-H o ..1.^^ead •Sal c-z' crsac---ei@ an resoreinal adhesive setting at room tenparct.ure.. Ca_,ztcr t^,t+s and *plush -backs and junct o." therc of zh 9 t, s.3 re:s eRrome or alu;rill.4ed alure:.nra mct.- a3.. ._; cow-.. far 15hi purpose. Llnolcum zbvll be standnrd gauge narbelised o a:':*ufTi;f ec. b+; Armztrong, Pabco or on approved e^u!i. Ca'or 1-1" tad by Prohiteot and Owner. Llaoleun cave base. Linoleum floor shall bx cove:: _..:. ,.,51et or.� Inolcum flooring is indlca'tad on finiv eac' leovide rand 2'.'.1et 1." radius at junetloi of floor:: and vert:e:�: ,rs7.1. Pro-vld^ octal edging strip at top of all linoleum beae. Tile rhnl.l be 9 s S" cc mar.c,faotured by 8entile, Til_x or an arprrc " ca, �. nationally known m_nuraetu.. �-.G;;-3: c,-!.1 b,a ^e" jrade ,,^'L,i! and 1J18" thick, color as selectee by e.rchitact and Owner. Mastia shall be that supplied by the manufacurer of the sel- wete€I'i'a1a sztd linolelva.a EeF.e ec'.era nxrica;.t the floor is indicated, ahall be 4" toy :-a cu pil.ad i+y the Lila nnnuf act arer cad shall be :pane:, 1p ThY Contractor for asphalt tile end ]. `.:solsua 411n11 2xamiue all ... �s ':o rcocire his work and report to thm GenerLl Contrsetar all co;:d121ona which tray ffeat his work. Ffole&, chip- and other irreg- ularities &hall be repaired before any tile is laid. The laying t Asphalt i t-. ,..... ,. Page i alf tea 'loorinz ccnst.t:stem acceptance of the floor e�o.:di v:oa and reepons:.b;lity. Concrete fluor lnd wood floors u`.a l.. b:! swept clean b.r this contractor just aboad of floor layer to ensure the abscr.co of gritty par Li.elsa, alavi.ngs and other extraneous material under the finished flooring. Tile shall be laid from center of rooms both ways with overage taken at the wa11s. Upan completion of the 'work, asphalt tile and linoleua floors u1:9.1?- ba olesned vitb a aleaavr as resommeoded by the a;n.nxfactarer ant then Siren two corms of an approved vas and uachine polishad. i Page�1 ".t ''aat:on is directed to the Spsoial Conditions and Contracts T,biokt form an inteurrtl part of this diviaion. Work lncladed: All sanitary coil, waste end vent piping and water service pipi::g aad gas piping within the building and to the point or points, shown on the drawings. This eontraotor shall make connections to all city lines hereir.be.ore nertionod. F..li plumbing fixtures, fittings and connections in the build- . Ina un'_tss otherwiae shown or specified. Excavation required for ell work ineluded in the contract. Painting, oleabing, testing, adjusting, ete., of all work and fixtures installed under this contract. 4ork Not lreludod: The vent nipas Bill be flashed by another. Pasmita sad Reulatione: All work shall bo in strict conformity with the Or4inar.:2a5 of tila City of San Luis Obispo and mnst pass all inspections by :authorities having jurisdiation. Certificates or approval and acceptance of the work from the authorities having jurisdiction must accompany the demand for the ecceptanoe payment at the completion of the: contract. Locations' l.;�aations of apparatua and/or equipment ind.'.cated on the plans ara ca aeeurata as can be determined at the present time but shall be subject to a variation of 3 feet in any direction 61111, within these limits shall be changed to suit changes in the building or arrangeme¢ita of furniture and fixtures without additional coat, unless sues aaparetus and/or equipment has been already set end connected before :he change sae ordered, and than only upon rri.ttem authorization of the Architect. Norkra nshi.Ye all materials end equipment shell be installed and work eom- p'.a'sed is a first-class workmanlike manner by compataut vorka:acn. The Architect reserves the right to direct the removal aid repiecoment of any item which does not present an orderly and proper appearance when properly installed. All expense of such rov.ovni and ranlaoGuont shall be paid by tais contractor. Previsions for <orl;: 2uis Contractor shall make necessary and proper provisions throughout the building to receive this work, and proper booking supports and anther bolts shall be installed for hangiug of plumbing fixtures. v '': _i) Plumbing Page 2 . ahis uontracsor must cooperate with the General Contractor In nro�, -'ding openings required through walls, floor ulabs and f�oti:�,a :7crr pipe lines, etc.; the General Contractor will inst,.11 ashy :: ar.eningc as Lay be included in the General Coatract, z%nc, this meat me�.c necessary arrangements for all other o r.irZ;R that are required. Waste and Sewer Pipe cad rittings: Cast iron pipe shall be of the hub and spigot type, sound, frog from defects, and of iron that will out well. It m.:at be ce:st in S foot lengths, smooth inside, and with the outer and lna,zr edges concentric and boated inside and outsido with hot asphaltum or coal tar v,rnish while pipe and fittings are hot. rittirgs shall be cast iron, hub or tell and spigot ends, enr1 shall correspond pith the pipe used. gent Vent piping sh�3.1 be east iron or galvanized steel as per tAe Qalf*Tm Plerabing Cede, ..Y'.ce Pi�iAN- T,.,er Service piping shall be hard copper, Type "II" stern iurird 31, i.n the slab. Type ^b" where above floor. All gas service piping shall be black iron. Provide swing joints rherever prac£iecble ehere buried lines ante- slab or structure. toiata: Oust iron DiDe. All joints in any cast iron piping, or between test iron pipe and galvanized steel, or between a oast trot pipe and Fittings, shall be made by means of a tell or hub and sp.'.got wi`�ln sp:`.gct shoved firr:ly against the bottom of the bell and Joint ti,yntly caulked with pure oakt•.m until. the bell Is 1/3 full sad the rene.talz! depth of the bell shall by run full of pura soft load, at one pouring. Caulking shall be carried all around the pipe so as to mars a durable, rigid and watertight joint. bead shall be c.rimmad smooth and flash with bell. and ,aint�ing of jo( nts: All screwed pipes shall is tare::^cc. -o ,_•:. }.ng %* d-r g3—ga Stand nrG. Threads shall be paintat ,.'t'^ rl I.i end :wiled linseed oil on male threads only. Tho +,•�,; .'„i..^- :;s:-.r.,csiocs and fittings shall be painted with red Lead *d bo!l>e linseed Oil at least 2 inches each side of the fittings. r,,.vsea as zoaa sa ''-is b,4"i :.: shall Le ao:�:pl.ete and teat -s.dy iOr lath:..-ag• Pro:ido and inatall all pirlug for all work isas'uded ip this oo;atrao.f swssp15— ka4a with all flttiags, bs, „4 e N lamb ind Page 3 bards, Y's, shapes, conneetiona, valves and devices aeceasary to properly eomp.-ieta the work. Piping shall be installed in straight lines, shall be arranged for full exparusion vith proper means and devices furnished there- fore when and as necessary shall give a clean and unobstructed flow free from water hammer, pinging, and/or other noises, without air looks or traps and avoiding angles, whenever possible. All verti- etl lines shell he set perfectly plumb, and horizontal waste znd sever lines shall be laid at a pitch of at least ';" per foot of. run. All lines shall- be laid to drain and kept straight vithout sagging. .o bushing shall be used in any piping; =11 changes in pipe rises to be made with reducer. The ends of all pipes shall be closed with a suitable galv- anised iron cap, secured in place immediately upon installation. This provision applies to all piping at all times. Clean -outs shall be L.A. Pattern iron body with standard threads and shall be placed at all bands or angles and ends of all casts and sews_ lines. inside and outside of the building. These must be accessible from above the floor, and ehail he with S" a V chromi.,.ua plated brass flush frames and cc•:ar p_:.:.t.s r'aere adposed within th= building. In the mein sewer irslda tr, outai.de of the building, provide clean -outs placed not• over i0' apa t„ Cler.n.-outs outside the building shall be brought up lavei with finished grade and ere to be provided with brass screw cap, An "':! and flush €craw ?plug clean -out she'll be placed in all oink rioars batwean t—ap and flood line. Bain supply lines shall be of ei.xaa as shown on Mechanical Plan included in the drawings. Plambiag Firtures: Unless otherwise specified or noted on drawings, this Contractor aball provide and Install all plumbing fixtures, ecmplete with all trimmings, supplies, traps, stops, eta., and all connections to Supply, waste and vent piping. Finish on metal parts and equipment trimmings en such as fau- cets, flanges, traps, eta., shall be full Chromium plated. All brass traps shall be cast L.A. pattern. Enamel on all test iron f'.xt'lres shal.lbe acid restating. Zbere follows a list of fixtures and fixture trim as shall be furnished and installed where fixtures are indicated and/or spea- tried. Lavctorlas: Standard lioragan P3867 B 20 a 18 C.I. AR enameled rith F-1010 £e.aoeta, B767 cop -up drain and B-960-11" P trap. All exposed metal to be chrome finished. Cloaet Combinations: Standard P-2205 VS Afton closet combination with Stasc_ Y-357 seats, flange, bolt&, washers and China bolt covers; exp. valve Moral. 110-Fil Style Q. Shower Valves and Heade: Standard 8-170 Built-in Tao-Valre Sharers with "ReNu" oampress- ion Valves, union ^.aup71ng for }" Y.P. bent aryl escutchson end Boyd ball Joint head, All exposed metal Chromard. Urinal: Standard "uashol" :62000 exposed valve Sloan Rayal. 136. sc:-Vice Sintm: Standard Argo P-77008 18" x 22", cast iron AR enameled serv- la:; e.i.nus w18h P- 0198 trap with clean -out, SIM }" faucet". lit^ben Sink: traadard P-7/15 D 42" r 20" oast iron enameled sink and laun- cro7 o&mbinatlou with 8-009 svinging spout fe spe'4. 2-B-989 sup A'nL: atrainer. Hot 1%ter Heater: day aa3 right, or equal, 40-gallon capacity not hater heater. P/oar Drain: Josam Cleo- Aram 1183. or agsa'_, shall be installed in rear floor sa ahoMn on plans. E.-_. "dial Valve: One 14" ;ones valve shall be installed outside caster ^tua room ooluma, as sho'n an plans. 11s sed Water Well. AgParatua Room: Furnish and install Cox air and water well Model No. C-20, 10-11 feet deep as located an dravirgs. Well shall be constructed of 16 aaugo galvanised iron and shall be equipped with 2-1" rubber air and v.tar hose, 17-1 feet long, complete with Cos union coupl- in,T on one and and }" male insert at the other and. Hose shall be '..ved with rubber ebc.ek belle and brass collars. Air hosa s a'_1 h:°.va automatic truck gauge Snf:Later as marafrotored by 1:91son Co. of San Leandro, California. Cater hose Shall have spring type tension shut-off valve. Cleanin a1 meat and Materials: 9L_12me t and M This Contractor shall "Orougbly clean all p.rto of the appar- atus and equipmant. Srpossd parts whioh are to be painted shall be thoroughly cleaned of cement, plaster, etc. Such surfaces shall by • • lT1S "zOSd :4 7. umb iaaC Page S thozottghly >,ped aa4 all ei•Ae ka aAd co_nere soraped out. Exposed metal work shall be carefully br+.:shed dr,wn with a steel brush to re:aove rnat any other spots and left elcah and ell exposed work shall be left is proper condition to receive painters finish. kty dirt, rubbish, paint spots or grease on sells, floor*, or fixtures for which this contractor is responsible must be removad by him and t^.a premises left in first class condition in evary eanpact ane. to the complete satiefaetion of the Architect. ParYor xtee 'Tests: This Contractor shall teat and make tight all perts of the corn ender .Obis speoifiaatlon. ,11 underground eowave and drainage piping sbelt be properly plugged at outlets before being eovared, and shall be tested to 10 pounds hydrostatic pressure and made tight. All water lines shall be properly plugged at outlets before being oonnacted to fixtures, and shall be tested to 40 pounds pressure asd nade tight. Tte gas pipir, aLd oonneetfon shalA be tested and made t g t by su79aotir.;• the .rti.'.`e ayatem to an air test of 10 pounds gaage preaaueo, ar_3 shal'. o:acforn with standard tasting practices of t" £2o+athern Co .t:Zaa Gem Company. This Contractor ehall perform all the above tests and any others that, nay be requirad by the Arehitoet. in an; test if any pert of the work is found to leak, it shalt. be n:.dc tight and test repeated until all work teats properly. The eo8-, of t;.1 testa and the raplaoing and repairing of any dauagr. ror.ult 3"ng fro; theca, and other pork not In aecordcnce wlth teetaspecifications and the accompanying drawings, shall be borne by the Contractor. Should This Contractor refuse or neglect to make any tests -,:e essary to aatlafy the Owner and the :srabiteot or +hair repras- ont*-t1ve that he has carried out the true intent and zeaai..g . of these specifiaations, the Ovaer may make such teats and *barge tbo expense thereof to this Contractor to be retained out o: full final payment as provided in the dereral Conditions of the contrast. i 0 Page I Genera:. Conditions: This section of the specifications shall be governad by aii. she coznlitiors as set forth in the General Conditions at the bngBanlLg of tLese specifications, just as though they were incur - posted into this section. The specific and datailed requirements for perforring the work covered by the heating specifications in act for^;h i.n addition to th•� General Conditions aforementioned and is coaplssantary thereto. Seopo of York. (a) The work to be performed under this section shall incl- ude all labor, material, equipment, tools scaffolding nd appirt- enanees required to install a forced warm air system as shown ou the drawings end specified hereinafter or logically required to secure a cotTplota operable job of its kind. (b) FurniaP and install a new heating system, including gas -fired furnace, a gas fire ceiling mount projection unit heater, ducts, grilles and ceiling outlets, sheet metal work, fans, motors +end drives, filt,3rs and Hampers. (c) Furnishing and installing of a complete system of electric texipora°.ure control for forced air system and projection heater. (d) All necessary outtinf of floors, ceilings and walls .for pipe.. IFar'e HGt included: (_?) All electric vi,-ing and connect ons. (t) Painting and finish patching ++nd repairing. (41 All openings far ducts, flues, grilles, air intakes and outlets. (e) Plumbing work. (a) 111 screened louvers. Lraviaga sna Approvals: All drawings accompanying this specification show in a dtag- ramnatie form the arrangements desired for the prinaipal appa:^atus, equip:ac,:t, s''eet metal vork, ate., and shall be followed as closely as possible. Proper judgement must be exercised in carryire gut the wars to secure the beat poeaible headroom and apace conditi.onm throughout, to set'.ire neat Errangcment of furnace, ductwork, etas., arA to overcome local difficulties and interferenee of dtruetursl oonditions wherever encountered. Heating contractor shall take all measurements for his work at the budding, verify all sub -contractors drawings and be respoa- cible for the p.opa installation within the available space of the appera:us apecified and shown on the drawings and mus: ssouru tto epp:oecl of the Architect for any variation before making anir ehnagea. ,111 Mork specified and not clearly defined by the drawings shall be installed and arranged as directed and in a manner satisfactory to the Architect. Contractor for the heating work shall oo-operate with the contractors for other Darts Of the work as a whole. Contractor shall call to the attention of the Architect any point of conflict between his mark and thab of other trades, so that adjuntl,,':t c:ay be made. Wor% installed by heating contractor which interferes with the work of other trades must be removed and replaced at Contractor's expenae ti ac ®heated by the Owner. P®r'�tlnnd Ins sow tioass R_o2l-. :nd pay for all permits for the installation or eonat- ruatlon of the heating work required by any laV I1y constitutes pv.b.*.c authorities having juriedietion. Arrange and pay fcr arr inspeationa no required, end deliver the certificates of P.11 insp- oetione to the Owner. Ordinaaoee and Regulations: ':Iaterisls, apparatus, end equipment for the heating we:k shall be designed to comply :with, and shall be installed in aoao_danoe with all of the requirements of all State and County Ordiasnees, all Safety Orders of the State Industrial Aeaideat Complesion and the .":ales and Regulations of the Board of Fire Underwriters. Nothing in -heso plans or specifications to be eoastruod to per;xit not conforming to these codes. Rxiw,inat,iou of Premises: Before 'bidding an this work, Contractor shall makes a careful ca:n7inaE:iMz. or tLa premises and shall thoroueLly fr.m:iliarias the...- aslzaa w1.tt .`_a requirements of the contract. By the act of rub- . ;.i'sang a proposal for the work inelulzd in this ecutraot, the C�++at.: sct0r shall be deemed to have rade sash study and exF,minatioa ant -sat he is familiar with and eeoepts all conditions at the site as ;". finds them. c.lec'cria nl Gonnea:iona: The djectriosl contractor will make all oanneetioi:s ,o XOtc'rs and fired appliances. She heating oontractor shall furnish all azotera, starters aad controls and deliver name to electrical con- tractor for mounting except where ouch starters and controls are an intaCral part of the naohine. Detail Draniggs: Provide the A-rehitaet, and all contractors and sub -contractors with any prequired detailed dimensioned drawings of the heating apparatus or equipment. Provide the Architect with detailed, dim- ensioned dr^.w.`.n;e of ray- equipment which may be different from t-;:at indi.ontad an tha draAirua or specified. Before installing any co'Wip- s:an„ subrit 'aa th� Arzbitoet for approval, detailed drawiays s.. - ins he sp=ae ooeupied and the exact locations of the equipment wit:i reference to the building. Opcaings: Provi6a openings not indicated or specified if required through wells, floors, footia8s, etc.. and provide linials and euppnrts Page 3 a s--? for'tce correet sizes end locations of all c,nr a the .job, so that no outtinse of ar, r s 7 *e; *c - r •i 3r sand has bean poured. t �sca;,.t,. lriala: 'sc vici,^ Sox '�Lc safety and good condition of all ^.sd egi%1T=e-at v: til. final acceptance by the Arehiteet cud 0, .er. a_.1 <-�,. n.ls and equipment from damage from vy an,-, a e, re side adequaie materiels c.6 storage i '.! I��. ;:.;. 'Le of Vra acrk, end replace all damaZed a f p sor to f_:.irg appl.lcatioss for final acceptance In gena?ftl, the heating contractor shall protect all of Y • norkand caterial that is liable to injury and he trill be hale rea- f.oasible for said rv&t 'pay for ea;; soiling of w•^-lls acd/or earsehe tj* ::, b; -:cS/oa 'Es +,mplc;7eea. drq dawao shall be repaired th;: o_ih:5..:e„ c=Citions rortored tq the entire s�:•?�.'si-. :.<rz ass �a' t^s. Architect. *+r t kwe :•.:i ld ing and aremieea Eras frcxa _ T"rte rr=terials or rubbish caused bi wr,, _roeie aalations from premises then sod -U r' ere indicated cm draw!ngs ore 12:.000 '?.:a.y^s o^ .yq-ovsd equal; foroc:d.-.air Nr ;qc ,. :Ll T"e epn7.10 of z;plging BTU outpu•'u. C - ' e ao p10 c-ith saat iron or mul I,.". .L.e.•_,., t tc'c a' exolenr,�:, bu::sars, blower and aoZ,i,, t , o ..',;'ev pilct.,. etegnet Sa valve, sea treasure rs ulatox •l., es1^$ah. All flues shall be transits as shown an pla,.:.s c. _. ida+r it'h :e:1e caps. ;coating contractor will fur s:.�� _ tooing coatr:actor with all root Sacks and flashing. This Gontrrator shall cake the final gas acacectiozs ... ^.`tr:D=• ea Crow the is. ee provided by the plumbing coatrr:ct*r. Unit i3e3'aer: -rovidc z. id 1rata11 in :Apparetus Roos! ona 40,000 BTU ver pn7.fn_gt'1's un".t hv^ter rith louvered aoae diffusers +aes- Ec'.r Traac or approved equal. beet Metal Tor`c: uwni.ch •,tic i etc:11 all sheet metal ducts as iadioctee or. s. .:-Jaet cis:^1 3%, 11 be ksystone ar egvss1, first qualit;7 :sill stall. fletal gatgas shall be as folloaa: '%eta la" or lezo. .No. 26 gauge w 1911 to 371.. . . . . . . .. 24 gauge D (t a dimension greater than 7.2" shall ::t not Mrs than 4S" � n C� n,lera > > 1• _>'+ h ).l. be nx.i=_e:,1ed. Duets having dinansiors of 12" or t ss r, __ e c .'..•a rli,s ai: not morn than 44" on aeutera. ivaro albo•as a?.all have turning van.'S elmiln_r a;.d ec7.•.sl to BavIser-Colman "Uni-F10" air turns securely rivated to tha of the ell to prevent rattling. Raund alboaa shall have inside or thxoat r4eiva e,f Ulan I Via duct width. i'leui'blla Connections: All ducts shall be aonneated to furnaoes through Pl�,wi�'•--^ ac MO,22'c',..:: (^zsda o: asbe,^tom sloth) as Mnufartured .ry Cr�:.r•'.- 7ilzon, Lac. o':^ approved equal. Cloth shall be folded '.+.to atal. _":_'C -.a ,:_v aiil:Q:: olt-dd° to n,.:ne nsd 4,1CU in an GBnner. c ..., shall. be Mounted in duets rhR r•e,l irec'. to oonplotoly balana+^ a d to specified. „•.i ._st^.11 fire d:;:tapern of a;lprcr::zi 11 _.•.d/or hereinafter sp aelfi.e:i, t _ •. a ^.6''a?y' l lr Uy a:np a tarature oamtrol manufaatur A M•T.d ," -... bcd 'to * a hee in;: contractor who will met t'h-z 41 n>,r blladrs si,4 A, 0! o? 16 gauge sbe;>A ^..,a.l. bai.-t in ,F 2 s"tee+ Pre;,ti tpoa', rel.ded sad brReed to ±arev-:rt in %''s d.:wt. D,--,Ara are to be rigidly tied 't€ae8.;ar s:u'7 FIVO %I beeasy operation. Da +^ee motczra ab::l.1 a >.:a^, the dampers gradually and i+.o1d t-1f: is l.uaermne, .ate position. Dcaaper bearings shall be bz e• ball btirizgi S'*nid Trapa: Shc l '1a sirail•zr and aO,ual to Tr ^:;ce-L.n�.villa Earaa ous.1 _.. ,. thick, ra.oteaed to interior of metal Feats with sheet t:l. c1rewm OP bOltx u i.:,u - s R,nq•,,d disba to increase tha becrinE car:'' Crix1a: • aha.11 be Barber-Coluene es and ai{QE indiea2ed an drec°*_3n. shall be stamped frog it, u e - ,. Opanings and I" area: ba.s shall not be lees than 601;..` .ts behind the return air grilles + .' c... - blank paint. All pOint'..�1. ,. .. b— *.�a b7 ^h �aati.ng contractor. 111 s .bpi. Paid ratur>a duets oubaido rf ?Pa ar bea6^: t „ be covered with C,wona-Carving 77-316 Fiberglass insulation c £'� ?Woof quality to a thief less of 1". Insulation &hall be seaure.ly tied or sealed in place. Sera<.Llre control: Furainh and install an electrical uyatau of automatic tamper -- a „ura control on parr. air furnace and unit hos.er. $pea iel Nate^ z;-..e attention of the beating contractor is oalled to all work c�,.as ad by notsa on the drawings. Bork covered by notai :aur7t be furnished aid installed abether or not same is specifically rant- icnedin specification. Taste, All fare, motors, oontrols, heakera and other equipmart of the t.oating sya.em shall be tested after erection to conform to :aaaufae4 urer's Suaranteas end the requirements of these speeif:ic- ations. If neceseery, Contractor shall change pulleys and/or belt drive to obtain the correct amount of air, such ehan s bein,- made by the contrector without eatre, cost. A11 systems sba11 be asaenbled, erected rrA adjus'`ed in a mariner a- will tnr,.zre n minimum of noise and vibration in tea upax%tion of t.ie aqu;p%ent, and shall be subject to thn final approval of tie architect. Any adjustments and/or changes r,.quired to produce satiefe, story quietness shall be made by the Contractor 7, bi.s c-rpo:t. -a before the -;ork is acaep:a::. Suah adjua'Gmen'cs h .azas+./or changes shall rot result in a reduction in the output quart.- titic; of any equip_`ent as called for on the druwinge. P-'reornmaee Guarantee: The Contractor shall guarantee the complete heating system be "reo from defe:ta of workmanship and material 'or a period of o:as year from the date of a^eeptaaea of the sock, and shall repstr and make -ood, at his exp_ano, any defeat developing within that period of timon not due to improper or careless operation. Hn shall also guarantea all parts of the system to be noiseless. The Sreeial Conditions and the Contract Agreement are a port Of this division of the specifications. Howls lnoludedt Thin part of the work shall Include all labor, materials, fixtures, lamps, applianeas, equipment and services necessary for and rea3onablg Ireldcntal to the proper installation and Co2p3.e:ion of the electrical vor:c JuQludima all wiring, connections, cabinets, aub-switches, fittings and minor items necessary to complete the aQ:jtrr.st in &ouform.=ty with the beat standards of electrical Sratal.l- aticrs whether or not indicated and/or spaoified, unless ouch items ere definitely exaluded from the eontraot. Permits and Resolution&. .R .ill ;cork shall ba in strict conformity with the State Safcty oxCirs a..d all San Luis Obispo City ordinances, rules and reyul- aticns is effect at the time the work is done and muat naaa all -l"apacti.on by authorities having jurisdiction. Locations: Locations of apparatus and/or cquipr3et indivatel on the plena nre as aeourate cc san be determined at the present tuna, bu' shall be sobjatt Ca a variation of 3 Coat In any direction and, within tieeso lin ' s, shall be che;nged to suit changes in the building or arreagorents of fcruiture and fixtures additional cost, on- loms s.:sb apparstus and/or equipment ban already been set mad son- noCtad before tha change is ordered, and then only upo= 7rittes anthorisation of the Arabitect. orewin ss Zleatvieal drawings are diagramoctic but shall be follovad as alasel; .•a actual construction of the buildira sad the rock of etvcr tradas still permit. All ahanaeo from ilex dravic38 to make 4ha verit eohform to the building as constructed and to ft the work of the other trades, shall be made by this contractor ct his own espenae. the Contractor shall take all measurements for his own sort; verify all out-coatraotor`s drawings, and be reeponaibla for tho proper installation in the a7ailable Was of ap»i.c,tea-naaa s,paci- Pied and shown on the dr earings and before eakiag oi'sanJ03 which rn be neee3jary Oust seou�e the approval of the Arehite&t for all s,ah verietiona. All work speaifiod but not clearly defined by the draw'.nga ahal:i be executed in also dnnea with accepted standards for high class t>�rk. 'iorkmanab1n_ All materials and equlpmRut shall he installed and work com- pleted in a first-class aerkmanllke moaner by eompatent work -men. The Architect reserves the right to direct the removal and replacement of any its= ::hich 4003 not proaeat an orderly end proper o pearatice, provi'ad such item can and will present such orderly and proper appearanaa d'hon properly installed. All expense of such removal and replacement shall be paid by this Coatraeto-. Cleanin�ilnterisl�s and Eauipmont: Thia Contractor ch-ell thoroughly alean all parts of the app- aratua and equipment. Exposed parts which are to be painted shall be thoroughly cleaned of cement, plaster, etc. Such surfaces shell be carefully wiped and all cracks and corners scraped out. Exposed natal cork shall be carefully brushed dawn with atoel brushes to rcaove rust and other spots and left srooth Red clean, and all ex- posed work shall be left in proper condition to receive ^aluterr finish. Any dirt rubbish, paint spots or grease on walls, floors, or fixtures for which this Contractor is responsible, must be removed by him and the premises left in first-class *audition in every respect, to the setieraeti.on of tLe Architect. Performance Tests: Thia Ccntra.otcrshall mete all testa as required by 't'..s oritlee having Jurisdiction. The Architect and the Owner shall, have the right to ".i e u as %.ny ma t�:r Sala or completed work, both aloetr ie- "- +..:d meehai:tz::; 11T. ;,.ay d.:na;e rcrulting from these testa if the uox: faiT.a *1 ..£:. ztha £u u.;.t :,:'. .Liis Conn't.actor, and any work not in aceardauct, with these nper.'..f iCationa and the accompanying drawinga, shall ;;ood ty the "ontrcctar at his own expense. Testa c;i.tall be mala in the presQuee of the Architect or bi+s rm reeentative. 'ttsis Coatraator rafuso or neglect +lo ^sake qa t:5`c axeeae:_:ryy to satisfy the Owner and the Architect or their outativs, that he has carried out the true intent and mosni.?g Of thaspeoifi.catfons, the Owner may make such tests &a charge the 'sxpanso thav*of to this Contractor, to he rotain¢d out os^ full final puymenta as provided in th.e Ga,ieral Conditiomo of the conia.:.a'a. Materials anfl Eo ulaaent: All materials and equipment provided and installed in the work hareinarter spooified shall be of the following m&kea or of as spproved equal or acbjeot to such nodificationa and additAana as may be epaciflcally epeaified haroafter. Conduit: fi3eatrio Cc "Greenfielduct"; Co:itral Tube Cc "C^ntr=.'. .. .,tara;! Metal's "Sherareuct": Youn�,a o:a Stee Talker SrotLers "Ealko:rdc •;.,w d t c-:i. 4Y �r :i. B. Austin Cc; Crouse -Hinds Co; Appleton 'ilec'.rio Co: National electric Products Corp. Also as lir 7ct ii i!e . "113PIng meviccs" • SIVISION 21 :lead !cal Page J 7.re3 end Cableu: Okonite Cc; General Cable 00; U.S. Rubber Cc; Colyer Inaulatrd Hire Cc; Anaconda Wire & Cable Cc; P.meriean Steel and Wire Co; General cleatri.o Cc; Simplex Wire and Cable Cc; Eoebling Sons Cc; National Electric Prod. Corp; Habershaw Cable and W'.ro Co. !Aim DOILI ae: Ar—O-a-Hart and Hegaman Electric Cc; Bryant Ell ctri.o Cc; Harvoy ?iubble, Ina;. hart =9 Co; Pass and Seymors. SvtLohboerday Paaelboards and 10 —Switches- if required: Square D Mfg. Cc; General Electric Cc; Westinghouse Electric red Mfg Cc; W. A. Benjamin Electric Cc; Tr•Wwbull Electric Vfg. Cc All materials shall be new, of the beat quality, amdt in pare teat eondition and approved by the Underwriters. Each tZrpe of material shall be of the same make csd quality throughout the nark. Conduit: $aah leagth of conduit shall boar the mcaufseturer's >rc u•. lark or stamp and the t3.-Idervrit0r6 label. Except as hire4"C r specified, all eon&?;it :,hall be eleatrio metallic tubing, hot dilp.",! galvanised or saerardieed. Conduit which is exposed or under the concrete floor slab shell be rigid steel, not flipped galiraniaed or All jcints shall be made with standard couplings and )roparly tightened go the ends of the conduit will butt together ;in the aonter of tha eouplinsa. All Conduits installed, where in the i,.rchitect's opinion, it is liable to be exposed to moisture shall have the throada on each Conduit eoated with litharge and glycerine before making the joint. Elbows, couplings, loeknute, brushings, ate, shall be hot dipped Zalrsaised a. aherardined and equal in all respects to the aopduits aizove speaift.od. Conduit FittiM; Cutlet boxes shall be steeped steel, knaiXOut type, hot dipped galvanised or sherardised, and shall be flash mounted unless other- wise apeoiftcd or noted on drawings. 3xeept:a otherwise spec'fied or noted on drewinga, provide outlet box, not less then {^ square by 1-J, deep, at each out?.et shown oa dras fogs and/or required by these apxe ifieaticns. Box oo-era except sa otherwise specified #hall be rslssi ec €rr an harein<fter specified, finishing flush with blaster f'nieh. Corvanienoe outlet boxes unless otherwise apaaifisJ or u cn draaangs shall be installed 1:" to Coster above floor, or e" to canter above drain board. Wall switch outlet boxes for ganged assembly or throe or =ore switches shall be solid One piece gang "coxes with solid 1 pitoe g:�Ag *over. Install outlet boxes 4'-0' to Center above floor. Pull boxes shall Ce sods gouge, galvaniser steel, ei4L 0 Slcatrieal Page 4 oovere. No spiiaew shall be made in any pull bar except with t1-.s permisalon of the A: ahAteat'a superinnzdeat, in which event the size of the box shall tiaaform to code rsquirenents for splice boxes. Hors —and Axe rtat Ail conduits thrci4, haut the aupported and £asteaed into place »a all cases there shall be threw feet from any outlet. Conductors: wart shall be securely and ri£,htl;r with approved hangers. a er,pport furnished not yore tk.c. Except as otherwise specified all conductors shall be 600 volt rating and in strict conformity with the N.E.C. staudardo of current, d&te, the classificaticn required by wirisig plans being strictly adhered to. All conduatoru not otherwise speoified or marse4 on plans, shall be rubber severed N.S.C. claseiflaation R. A13 eonduetora shall he deliwez"4 an the work in uabro?ten original packages, pleialy marked or tagged as follows: 1. 13uximuc roltage for which the wire was cpprovsd. 2. 21ational Electrical Code StanCard. j. N,:me of the manufacturing company and trads u%re of sire. ¢, Beath and year when manufactured. This Ante sha;.1 cot exceed air months prior to the date of deliverinf to the work. f. The gaper classification letter. Unless otherwise Specified, all onndnetors shall be installs<t in oleetrio motallia tubing and no donduoiors shall be pulled f- until the ooaduit cystem is complete and then only with the vurer- intendents pgrniosion. rhers conduit is exposed it shall be ri;;i.d steel; same to be ueod under the Slab. Light Siring:. Provide and install all light wiring as required by wirtnu plans. All conductors shall be continuous frow eutlst to outlet or Ciatribution panel or pull box, and no $plies# shall be Wade aaeept at outlets or in pull borne. Xires shall be of sufficient lcneth nt outlets to yaks sonneations to apparatus without strai.a- ing connections. A11 connections e d splices ahall be m#obeniohlly and elsstria- e11y ptrfsct, and all work shall be in strict accordance with all ocdt reruiremeuts. No block and Tackle shall be used for pulling in wire, exespt ^uzzlcaicn from and under the supervision of the Architect, or rc,resentati-€e; crte sire pulled in with Block and Tackle zith- o--t u�oh go:mlealon and curerviaion will have to be puller} out for i•zrection and rapulled. Powdered soapstone will be the only Lub- r'ciwt paraitted if ass is necessary for draining in conductors, ax- ce;rt load sheathed cables which shall be well sowtsd with hear'" 1r"�Tloatiag 2roaS#. aC: . s i.-�i. s'.•: c-•::a.M,. �,.! creept is othervIra ipcoifjed- all wall are, rl Other exposed metal parts shall have a Duo* or enamel finish, of color to match the surrounding finish hardware or plaster finish as selected by the Architect. Ceiling Outlets: Sae Fixtures Bracket Outlata: Soo Fixtures Wall switches, except as otherwise specified, shall be of one of the following makes: Arrow, Brant, H & H, R.S., Hubble or equal. COnven.anee outlets, except as otherwise specified, shall be Dupler and of one of the following mates: AProw, Bryant, H & H, C.S., Hubble, or equal. Lishtiaa Fixtures: T`,:s Contractor stall provide and install all lighting fixtures, corplata from and attached to each and every light outlet shown ::a the dra.wingn, unlees otherwise specified or noted on dravings. 7lrins: k'll fixtaver *e li be sired from outlet to aockat with Ha. /.: B. r1,4i S. maugc Hype AS or Cr Undarsritor's Code fixture wir-,, with all oonnections both electrical and naohnnieal, properly ,_de in atriet eonformii:y V_'.th all code requireaents. Leamt Eaab fixture ahall Le provided with a Uecerai Electric lamp Of the wattage indieated on the drawings. Electrical Picture Sahodule: Type Discsiption Wattar A - S=Qt-Holman, RIIi, Classtail Diffusers, Cat. No. "620, Ceiling mount 30i- 8- "Pry-lito", Recessed, snap -on front, ahrome finish, moulded glass C - moot -Holman "Rocket" Concentric Ringspattern as Oboe; Cat. EX-S 00-S 300 silvered boa: D - Smoot -Holman, "Rocket" Concentric Rings Cat. R%-203-C 200 silvered bowl g - Smoot -Holman Ceiling-lite. Opal glass luminaire, coiling mount Cct. No. LS-111 as voted - Smoot -Holman 010-Brite. Vapor Proof, frosted glass Cat. No. VS-18 10C. 0 - Suspended Pull Chain as noted H - Smoot -Holman Vapor -Proof with wire guard, angle hood ae notoe Note: Fixtures taken from Smoot -Holman and Pry-lite Catalogues for typo. Other makes of fixtures will be considered, providing equal quality aad purpose fo; approval. Mia division inclades caulking and relayed items req,..ired to acmu"Ote work ladiastal on the drawiaga and apacifi.ed. Conpletoj.y seal, with caulking compound, joints around frames of doors, win - dove, or other openings is exterior walls joints where masonry abuts other exterior surface finish, and other joints indicated or sneoi- tied to be oaulked. :Tatevials; a. Caulting compound shall conform to Federal Specifications T?-C-593, Gradel, and be delivered to the lob in the mwiufaeturer's unop3aed r ck>ges. Color shll be ma.;afacturer's standard as selected by the Architect. b. Yarn shall be a vegetable fiber free from any material that will stain wood or plaster. e. Affidavit. Turaish affidavit from ranuractcrer, cerV. '..ng t lh It „ter m,ls Oeli-rarsd to the job conform to the rogc%-o �-ks ,f '— ;o ap3a iPio r/t loos. a. C.T.�'au joiDta end spaces to be caulked free from dcwt, Lod G.at7P esn. Qo not c ulk until they are substantially -in oz�- o .axk-se :ri'%d0taila indicates on the drawing■ aaC the .. P+:.ak joi.-,ta over 3/4" deep with yarn to 'within 3/4 ineb of the surface. o. Ap".y caul?tiug compound with a pressure gun having -:zs¢lee t0 fit `_nto t.a ,'pinta. Pill joints solidly and smoothly cithuut t11a edges, raalovc a::a:ss ao�pouad, and leave adjoining surfaaxs clean. Joints ahzll be water -tight. d. Complete eeulking before final coat of paint is applied. S le;a:f T:La Wansral Gontraeto,- shall "s all timez bu reepossibie far kec� x;i the building Olean of all debris. Vu shall require .•A sub-contreators to ksap the building reasonably clean during the performance of their contracts and that, upon complotion of their portion of the work, shall Olean all dirt, paint, plaster, etc., aeusad by their worit. At 'ba oompletioc of the, balldiag, tba Contractor for feacral Toro shall renove from the building and proporty, all rubbish, excess Material, scaffolding eta., and shall leave the building and site as clean as is usually expected of Janitors. The General Contractor shall also, at the aompl¢tion of the building employ and pay for the services of a prate::,,ional vindoz el.eauar rho shall Olean all glees and mirrors. The viudoa cleaner shall inaleat all giant and report any that way have been scratched or Otharriae damaged to the Caneral Contractor for his ocrreation. �l":�^ra4ua Room. Doors Type 1, on the schedule included in c c :. . tt ca rhn—' l be as m::icu-facti;xud L•y the G*: <:rho-.:d Don, �rati�.:a of Glgndala, Calirorniu, compl.ite with hardware arm cuppii.ec by the door manutcoturer. Doors shall be panelled, otilas and rail& 1 V4" thick with glazing only as shown on the dravingo. N .^.