HomeMy WebLinkAbout2000578 Bid Results - Johnson Waterline Replacement - Iris to BishopBid Opening: 10/19/2023
Item #Item Description Unit of Measure Estimated Quanity Item price Total Item price Total
1 POTHOLING LS 1 ---$107,000.00 ---$383,000.00
2 16-INCH RESTRAINED JOINT D.I. CL 250
WATERLINE LF 3150 $535.00 $1,685,250.00 $658.00 $2,072,700.00
3 10-INCH PVC D.I. CL 350 WATERLINE LF 850 $270.00 $229,500.00 $532.00 $452,200.00
4 4-INCH HDPE DR17 DIPS TEMPORARY BYPASS
WATERLINE LF 715 $158.00 $112,970.00 $415.00 $296,725.00
5 TIE-IN ON JOHNSON AVE. (STA 10+00)LS 1 ---$18,000.00 ---$23,200.00
6 TIE-IN AT JOHNSON AVE. AND IRIS ST. (STA
10+31)LS 1 ---$40,000.00 ---$67,500.00
7 TIE-IN AT JOHNSON AVE.AND ELLA ST.WEST
OF JOHNSON (STA 14+11)LS 1 ---$70,000.00 ---$113,000.00
8 TIE-IN AT JOHNSON AVE. AND BISHOP ST. (STA
27+84)LS 1 ---$103,000.00 ---$165,000.00
9 TIE-IN AT BISHOP ST. AND SIERRA WAY (STA
31+43)LS 1 ---$36,000.00 ---$47,000.00
10 TIE-IN AT BISHOP ST. AND AUGUSTA ST. (STA
34+17)LS 1 ---$24,000.00 ---$28,000.00
11 CONNECTION AT JOHNSON AVE. AND PUMP
STATION EASEMENT (STA 51+91)LS 1 ---$18,000.00 ---$23,500.00
12 TIE-IN AT BISHOP ST. PUMP STATION (STA
64+08)LS 1 ---$49,000.00 ---$62,500.00
13 TIE-IN AT ELLA STREET AND SIERRA WAY (STA
78+99)LS 1 ---$25,000.00 ---$22,000.00
14 TIE-IN AT ELLA STREET AND BINNS COURT (STA
82+73)LS 1 ---$30,000.00 ---$29,000.00
15 COATING AT BISHOP ST. PUMP STATION LS 1 ---$30,000.00 ---$6,900.00
16 ABANDON EXISTING WATER FACILITIES LS 1 ---$106,000.00 ---$66,000.00
17 REMOVE EXISTING WATER MAIN LF 1500 $40.00 $60,000.00 $12.00 $18,000.00
18 12-INCH STORM DRAIN REPLACEMENT AT
JOHNSON AVENEUE AND ELLA STREET LF 90 $385.00 $34,650.00 $356.00 $32,040.00
19 18-INCH STORM DRAIN REPLACEMENT AT
JOHNSON AVENEUE AND BISHOP STREET LF 40 $681.00 $27,240.00 $764.00 $30,560.00
20 CONDUIT IN WATERLINE TRENCH TWO-2”
CONDUITS LF 3150 $44.00 $138,600.00 $44.00 $138,600.00
21 COMMUNICATIONS MANHOLES EA 9 $2,994.00 $26,946.00 $6,900.00 $62,100.00
22 REPLACE WATER SERVICE LATERALS (TYPE I –
SHORT)EA 6 $6,200.00 $37,200.00 $8,500.00 $51,000.00
23 REPLACE WATER SERVICE LATERALS (TYPE II –
LONG)EA 14 $7,221.00 $101,094.00 $8,200.00 $114,800.00
24 REPLACE WATER SERVICE LATERALS (TYPE III –
COMPLETE)EA 15 $18,000.00 $270,000.00 $11,000.00 $165,000.00
25 INSTALL FIRE HYDRANT, ASSEMBLY EA 2 $27,000.00 $54,000.00 $18,000.00 $36,000.00
26 RECONNECT 4” FIRE SERVICE LATERAL EA 1 ---$22,000.00 ---$11,000.00
27 AIR RELEASE VALVE EA 1 ---$25,000.00 ---$12,500.00
28 RECONNECT WATER SAMPLING STATION EA 1 ---$9,800.00 ---$12,500.00
29 PAVEMENT MARKINGS AND TRAFFIC STRIPING LS 1 ---$15,000.00 ---$15,200.00
30 TIE-IN CENTERLINE MONUMENT EA 3 $1,154.00 $3,462.00 $900.00 $2,700.00
31 RESET CENTERLINE MONUMENT EA 3 $3,242.00 $9,726.00 $1,150.00 $3,450.00
32 RESTORE LANDSCAPING AND LANDSCAPE
IRRIGATION LS 1 ---$16,000.00 ---$35,500.00
33 TRAFFIC LOOP REPLACEMENT LS 1 ---$6,924.00 ---$6,000.00
34 TRAFFIC CONTROL LS 1 ---$208,000.00 ---$773,000.00
35 OSHA COMPLIANCE INCLUDING SHORING AND
BRACING LS 1 ---$34,000.00 ---$19,000.00
36 TWO CHANGEABLE MESSAGE SIGNS LS 1 ---$21,000.00 ---$13,000.00
37 HARD ROCK EXCAVATION CY 400 $75.00 $30,000.00 $314.00 $125,600.00
38 CURB RAMP REMOVAL AND REPLACEMENT LS 1 ---$22,000.00 ---$22,500.00
39 CURB AND GUTTER REPLACEMENT LF 30 $171.00 $5,130.00 $128.00 $3,840.00
40 SIDEWALK REPLACEMENT SQFT 80 $43.00 $3,440.00 $58.00 $4,640.00
$3,864,932.00 $5,566,755.00Total Bid Amount
Souza Engineering Contracting, Inc.Specialty Construction, Inc
JOHNSON WATERLINE REPLACEMENT - IRIS TO BISHOP, SPECIFICATION NO. 2000578