Loading...
HomeMy WebLinkAbout07-01-2014 ph2 PPP Completed CIP Projects Funded by Measure Y.pdfCompleted CIP Projects funded by Measure Y Johnson Playground Replacement of play equipment, installation of shock-absorbing wood fibers, drainage system and access ramps Measure Y Funds: $144,500 Completion Date: 2/12/2014 AFTER BEFORE DURING Sinsheimer Pool Heater Replacement of aging, deteriorating boiler heaters with new high-efficiency ones, new piping and monitoring systems Measure Y Funds: $169,250 Completion Date: 10/21/2013 Emerson Playground Replacement of play equipment, installation of shock-absorbing wood fibers, drainage system and access ramps Measure Y Funds: $110,000 Completion Date: 7/12/2013 DURING AFTER Warden Bridge Deck Repair Removal of intrusive tree, replacement of approaches and guardrails Measure Y Funds: $92,805 Completion Date: 4/11/2013 BEFORE AFTER Fire Station 3 Engine Bay Slab Demolition of deteriorated slab, soil removal and replacement, installation of steel-reinforced concrete slab and driveway Measure Y Funds: $105,298 Completion Date: 10/19/2012 OLD NEW Downtown Maintenance & Beautification 12 new energy efficient pedestrian lights, Mission sidewalk, tree grates and sign posts Measure Y Funds: $740,000 Completion Date: 6/21/2012 BEFORE AFTER Bob Jones Bike Bridge at Prado Safe access for cyclists and pedestrians via 120-foot bridge Measure Y Funds: $300,000 Completion Date: 12/23/2011 Higuera Storm Drain Replacement Removed 85 feet of dilapidated metal pipe and installed new PVC pipe Measure Y Funds: $84,000 Completion Date: 11/23/2011 OLD PIPE REPLACEMENT PVC Curb Ramps Recurring projects upgrading curb ramps to current ADA standards Area 5 in 2011 Measure Y Funds: $214,800 Completion Date: 11/7/2011 Street Paving & Microsurfacing Projects every year as needed In 2010 Measure Y Funds: $1,248,000 Completion Date: 2010 Emergency Rockview Storm Drain Replacement Removal and replacement of old, metal pipe after appearance of sinkholes Measure Y Funds: $ 70,000 Completion Date: 4/26/2010 Downtown Street Trees Tree installation and sidewalk work Measure Y Funds: $49,000 Completion Date: 10/30/2009 BEFORE AFTER Bill Roalman Bike Boulevard New intersection bulb-outs and traffic diverters, replaced traffic striping and pavement markings, improvements to curb ramps Measure Y Funds: $52,000 Completion Date: 8/1/2009 Senior Center Kitchen Remodel Wall and cabinet relocation, new commercial-grade appliances, mechanical and electrical equipment Measure Y Funds: $138,000 Completion Date: 3/1/2009 DURING AFTER Mission Stairs Replaced the existing concrete stairs and handrails Measure Y Funds: $61,000 Completion Date: 11/10/2008