HomeMy WebLinkAboutItem 5i. Award Construction Contract for Mitchell Park Revitalization Project (Spec. No. 2000188) Item 5i Department: Public Works Cost Center: 5002 For Agenda of: 1/9/2024 Placement: Consent Estimated Time: N/A FROM: Matt Horn, Public Works Director Prepared By: Hai Nguyen, Senior Civil Engineer SUBJECT: AWARD CONTRUCTION CONTRACT FOR THE MITCHELL PARK REVITALIZATION PROJECT, SPECIFICATION NO. 2000188 RECOMMENDATION 1. Award the Construction Contract to Quincon Inc. for the Mitchell Park Revitalization Project, Specification Number 2000188, in the amount of $397,808; and 2. Appropriate $225,000 in Park Improvement Fund to the Mitchell Park Revitalization Project; and 3. Adopt a Draft Resolution entitled, “A Resolution of the City Council of the City of San Luis Obispo, California, authorizing use of Park Improvement Fund (Fund #519) to support Mitchell Park Revitalization Project, Specification No. 2000188 ”. POLICY CONTEXT On May 17, 2022, Council approved a Purchasing Policy Update to the Financial Management Manual that required Council approval for Public Projects that cost over $200,000. The City’s Charter under Section 804 allows the City Council to amend or supplement the budget by motion adopted by majority vote of the Council. Partial funding for this project comes from the Park Improvement Fund (Fund #519), which is specifically reserved for improvement of new and existing community parks. DISCUSSION On October 17, 2023, the City Council authorized staff to advertise for construction bids for the Mitchell Park Revitalization Project and authorized the City Manager to award the contract if the lowest responsible bid was below the publicly disclosed funding amount of $211,000. The project bid documents included a Base Bid and an Additive Alternative. The project’s Base Bid includes the shade structure, benches, and bocce ball court. The project’s Additive Alternative A includes picnic tables and chess tables. Page 335 of 581 Item 5i On November 16, 2023, four bids were received and opened (Attachment B). Quincon, Inc. (Quincon) provided the lowest responsive bid for the Base Bid and Additive Alternative A in the total amount of $397,808. Since the lowest bid amount exceeds the delegated authority provided to the City Manager by $186,808, staff is returning to Council to request authorization to award the construction contract. Generally, the increase in costs above the Engineer’s estimate may be attributed to recent economic trends leading to overall cost increases in construction related to high demand for work with a limited pool of qualified contractors. Bid Summary Base Bid Additive Alternative A Total Bid 1 Engineer’s Estimate $211,000 $30,000 $241,000 2 Quincon, Inc. $333,534 $64,274 $397,808 3 RCH Construction $373,099 $61,384 $434,483 4 R. Burke Corporation $379,720 $69,816 $449,536 5 Brough Construction, Inc. $418,100 $75,352 $493,452 The Contractor’s references, license, and registration with the Department of Industrial Relations have been verified. Staff is recommending that the Total Project Bid (Base Bid and Additive Alternate A) be awarded to Quincon (Attachment C). The picnic tables and chess tables provided in Additive Alternate A provide additional seating to support play at the bocce ball court, complete the entire scope of the designed project, and include desired improvements for the community. Funding is available to support this work within the Park Improvement Fund; therefore, it is recommended for inclusion in the contract award. Previous Council or Advisory Body Action On October 20, 2020, Council authorized staff to submit a project proposal for Mitchell Park Pickleball Courts to State Parks and authorized the Assistant City Manager to execute the necessary grant documents and appropriate the grant amount into the Parks and Recreation Department’s budget upon grant award (Resolution No. 11179). On February 2, 2021, Council authorized staff to initiate project planning and design for pickleball courts at Mitchell Park and appropriated $32,048 from the Parkland-in-lieu (Quimby) Fund to support the project. On October 19, 2021, Council authorized staff to revise the proposed improvements at Mitchell Park and remove the proposed installation of the pickleball courts. On October 17, 2023, the City Council authorized staff to advertise for construction bids for the Mitchell Park Revitalization Project and appropriated an additional $50,000 from the Parkland-in-lieu (Quimby) Fund to support the project. Page 336 of 581 Item 5i Public Engagement Parks and Recreation staff conducted two public outreach events on May 19, 2021, and September 16, 2021, as well as an online survey. The majority of the public in attendance at the public engagement meetings were not in support of pickleball courts. The community has expressed a desire for passive recreational amenities and to maintain the integrity of the park for social gatherings, special events, open green areas, and community events both during the in-person forums, as well as at Parks and Recreation Commission meetings. The results of the workshops and survey demonstrated that the public is in support of the installation of chess/checker tables, bocce ball court, shade structure, and stage installation at the social gathering area. Improvements at Mitchell Park have been important for the Senior Center that is interested in having more outdoor and immediately adjacent recreational amenities. CONCURRENCE There is concurrence from the Community Development Department through the review and approval of the project for building permit issuance. This project also has concurrence from the Parks and Recreation Department as they have reviewed the project throughout the design process. ENVIRONMENTAL REVIEW The project is categorically exempt from environm ental review under Section 15301 Class 1 (Existing Facilities) of the California Environmental Quality Act (CEQA) Guidelines because the project proposes minor changes to existing park facilities. The project is consistent with the applicable general plan policies as well as with applicable City Regulations. A Notice of Exemption has been filed through the Community Development Department. FISCAL IMPACT Budgeted: Yes Budget Year: 2023-24 Funding Identified: Yes Fiscal Analysis: Funding Sources Total Budget Available Current Funding Request Remaining Balance Annual Ongoing Cost General Fund State $173,024 $0 $0 Federal Fees Parkland-in-lieu Fund $73,229 $0 $0 Park Improvement Fund (Fund #519) $554,907 $225,000 $329,907 Total $801,160 $225,000 $329,907 Page 337 of 581 Item 5i Mitchell Park Revitalization Project, Specification No. 2000188 Project Account (2000188) Fund #519 Total Parkland In-Lieu Fee (Fund 501) Capital Outlay Fund (Grant) Park Improvement Fund Construction (Base & Additive Alternate) $73,229 $173,024 $151,555 $397,808 Contingencies $0 $0 $68,000 $68,000 Material Testing $0 $0 $5,000 $5,000 Printing & Advertising $0 $0 $445 $445 Total Project Cost $73,229 $173,024 $225,000 $471,253 Available Unreserved Fund Balance $73,229 $173,024 $554,907 Remaining Balance $0 $0 $329,907 The project account 2000188 has a current balance of $246,253 including $73,229 from the Quimby Parkland-In-Lieu Fund, which includes $50,000 appropriated to the project by Council on October 17, 2023, and $173,024 from a State Parks Grant, which has a project completion deadline of March 2024. The available fund balance and expenditures in the project account 2000188 are shown in the below table. Parkland In-Lieu Fee (Fund 501) Capital Outlay Fund (Grant) Budgeted Fund $82,048 $177,952 Expended Fund (Survey and Subsurface Exploration) $8,819 $4,928 Available Unreserved Fund Balance $73,229 $173,024 An additional $225,000 is requested from the Park Improvement Fund (Fund #519) in order to allow project completion prior to the State Parks Grant deadline in March 2024. The available unreserved fund balance in Fund #519 is $554,907 as shown in the below table, which is sufficient to support the additional budget request. The remaining balance of $329,907 in Fund #519 will be utilized for other city park improvement priorities. Page 338 of 581 Item 5i Park Improvement Fund (Fund #519) Current Park Improvement Fund Balance $1,691,429 Orcutt Area Parks (Appropriated in FY22/23) ($300,000) Orcutt Area Parks (Budgeted for FY24/25)i ($836,522) Available Unreserved Fund Balance $554,907 Mitchell Additional Budget Request ($225,000) Remaining Balance $329,907 ALTERNATIVES 1. The City Council could deny the request to award the total project. Staff does not recommend this alternative as the Parks and Recreation Blueprint for the Future: 2021-2041 (General Element) highlighted Mitchell Park in the Near-Term improvements as needing updated social gathering and recreational amenities for activation, as well as support the adjacent Senior Center programming. Additionally, the State Parks Grant has a project completion deadline of March 2024 and the project has been a multi-year project that has strong support from the community. 2. The City Council could choose to only award the Base Bid and deny the request to award Additive Alternative A. Removal of Additive Alternative A from contract award will reduce the budget request by $64,274 to $160,726 and lower the construction contract to $333,534. Staff does not recommend this alternative as Additive Alternative A provide additional seating to support play at the bocce ball court, complete the entire scope of the designed project, and include desired improvements for the community. ATTACHMENTS A - Draft Resolution authorizing use of Park Improvement Fund (Fund #519) to support Mitchell Park Revitalization Project B - Bid Results C - Draft Construction Agreement with Quincon, Inc. Page 339 of 581 Page 340 of 581 R ______ RESOLUTION NO. _____ (2024 SERIES) A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN LUIS OBISPO, CALIFORNIA, AUTHORIZING USE OF PARK IMPROVEMENT FUND (FUND #519) TO SUPPORT MITCHELL PARK REVITALIZATION PROJECT, SPECIFICATION NO. 2000188 WHEREAS, on October 20, 2020, the City Council authorized staff to submit a grant application for Prop. 68 Per Capita Funds and authorize the Assistant City Manager to execute the necessary grant documents; and WHEREAS, staff received project approval from State Parks and has signed and executed a contract with State Parks for $177,952 in state funding for improvements at Mitchell Park; and WHEREAS, on February 2, 2021, Council authorized staff to initiate project planning and design for pickleball courts at Mitchell Park and appropriated $32,048 from the Parkland-in-lieu (Quimby) Fund to support the project; and WHEREAS, on October 19, 2021, Council authorized staff to update the proposed improvements at Mitchell Park to include bocce ball court and amenities; and WHEREAS, on October 17, 2023, Council authorized staff to advertise project for bids and appropriated $50,000 from the Parkland -in-lieu (Quimby) Fund to support the project; and WHEREAS, to provide sufficient funding to support construction of bocce ball court and all desired amenities, staff is recommending the City Council approve the use of an additional $225,000 from the Park Improvement Fund (Fund #519); and WHEREAS, the Park Improvement Fund (Fund #519) currently has a balance of $554,907and can support the additional funding request; and WHEREAS, the project is exempt from the California Environmental Quality Act because it consists of minor changes to existing park facilities. The project is consistent with the applicable general plan policies as well as with applicable City Regulations. NOW, THEREFORE, BE IT RESOLVED by the Council of the City of San Luis Obispo as follows: Page 341 of 581 Resolution No. _____ (2024 Series) Page 2 R ______ SECTION 1. The City Council authorizes allocating an additional $225,000 in Park Improvement Fund (Fund #519) for the Mitchell Park Revitalization Project. SECTION 2. The project is exempt under the California Environmental Quality Act (CEQA) under section 15301 because it consists of minor changes to existing park facilities and is consistent with the applicable general plan policies as well as with applicable City Regulations. Upon motion of Council Member ___________, seconded by Council Member ___________, and on the following roll call vote: AYES: NOES: ABSENT: The foregoing resolution was adopted this _____ day of _______________ 20 24. ___________________________ Mayor Erica A. Stewart ATTEST: ______________________ Teresa Purrington City Clerk APPROVED AS TO FORM: ______________________ J. Christine Dietrick City Attorney IN WITNESS WHEREOF, I have hereunto set my hand and aff ixed the official seal of the City of San Luis Obispo, California, on ______________________. ___________________________ Teresa Purrington City Clerk Page 342 of 581 MITCHELL PARK REVITALIZATION PROJECT, SPECIFICATION NO. 2000188 Bid Opening: 11/16/2023 UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL No. ITEM UNIT QUAN PRICE PRICE PRICE PRICE PRICE PRICE PRICE PRICE 1 COMPLY WITH BUILDING PERMIT REQUIREMENTS LS 1 $610.50 $610.50 $11,947.55 $11,947.55 $10,000.00 $10,000.00 $1,500.00 $1,500.00 2 DEMOLITION AND REMOVAL OF EXISTING IMPROVEMENT LS 1 $32,600.93 $32,600.93 $29,480.23 $29,480.23 $35,800.00 $35,800.00 $30,000.00 $30,000.00 3 EXCAVATION AND GRADING LS 1 $52,753.68 $52,753.68 $20,580.79 $20,580.79 $39,300.00 $39,300.00 $34,000.00 $34,000.00 4 TREE TRIMMING LS 1 $10,803.48 $10,803.48 $10,213.95 $10,213.95 $10,000.00 $10,000.00 $6,000.00 $6,000.00 5 INSTALL IRRIGATION PIPING AND SPRINKLER SYSTEM LS 1 $14,912.18 $14,912.18 $23,173.05 $23,173.05 $5,200.00 $5,200.00 $26,400.00 $26,400.00 6 TURF AREA SEEDING LS 1 $3,052.52 $3,052.52 $14,035.35 $14,035.35 $8,000.00 $8,000.00 $15,000.00 $15,000.00 7 30 DAY PLANT ESTABLISHMENT PERIOD LS 1 $4,424.94 $4,424.94 $7,133.95 $7,133.95 $4,000.00 $4,000.00 $5,500.00 $5,500.00 8 INSTALL (N) CONCRETE WALKWAY SQFT 2400 $18.69 $44,856.00 $20.31 $48,744.00 $34.00 $81,600.00 $27.00 $64,800.00 9 INSTALL (N) RAISED STAGE EA 1 $15,152.72 $15,152.72 $21,385.55 $21,385.55 $28,100.00 $28,100.00 $19,000.00 $19,000.00 10 INSTALL FENCE LF 80 $177.05 $14,164.00 $248.19 $19,855.20 $225.00 $18,000.00 $225.00 $18,000.00 11 INSTALL GATE EA 1 $1,831.51 $1,831.51 $6,135.15 $6,135.15 $3,400.00 $3,400.00 $2,500.00 $2,500.00 12 INSTALL LIGHT POST AND CONDUIT PER CITY STD. 7915 EA 4 $12,033.04 $48,132.16 $9,653.99 $38,615.96 $13,000.00 $52,000.00 $15,500.00 $62,000.00 13 INSTALL LIGHT PULL BOX PER CITY STD. 7915 EA 6 $2,743.20 $16,459.20 $4,162.66 $24,975.96 $720.00 $4,320.00 $900.00 $5,400.00 14 INSTALL BOCCE BALL COURT (8 FT X 45 FT)EA 1 $18,217.45 $18,217.45 $35,870.35 $35,870.35 $33,000.00 $33,000.00 $56,500.00 $56,500.00 15 INSTALL SHADE STRUCTURE (21 FT X 26 FT)EA 1 $51,709.72 $51,709.72 $53,575.95 $53,575.95 $42,500.00 $42,500.00 $67,000.00 $67,000.00 16 INSTALL 6 FT BENCH EA 1 $3,853.50 $3,853.50 $7,375.95 $7,375.95 $4,500.00 $4,500.00 $4,500.00 $4,500.00 $333,534.49 $373,098.94 $379,720.00 $418,100.00 17 INSTALL FENCE LF 142 $177.05 $25,141.10 $180.00 $25,560.00 $185.00 $26,270.00 $200.00 $28,400.00 18 REMOVE EXISTING FENCE LF 142 $28.55 $4,054.10 $29.00 $4,118.00 $23.00 $3,266.00 $56.00 $7,952.00 19 INSTALL PICNIC TABLE EA 3 $3,500.63 $10,501.89 $2,757.00 $8,271.00 $4,200.00 $12,600.00 $4,700.00 $14,100.00 20 INSTALL ADA PICNIC TABLE EA 1 $5,741.18 $5,741.18 $3,428.00 $3,428.00 $4,100.00 $4,100.00 $4,800.00 $4,800.00 21 INSTALL CHESS TABLE EA 3 $4,665.07 $13,995.21 $5,247.00 $15,741.00 $5,900.00 $17,700.00 $5,300.00 $15,900.00 22 INSTALL CHESS TABLE SEAT EA 6 $806.68 $4,840.08 $711.00 $4,266.00 $980.00 $5,880.00 $700.00 $4,200.00 $64,273.56 $61,384.00 $69,816.00 $75,352.00 $397,808.05 $434,482.94 $449,536.00 $493,452.00TOTAL PROJECT BID BASE BID Quincon, Inc. ADDITIVE ALTERNATE "A" BID TOTAL R. Burke Corporation Brough Construction, Inc BASE BID TOTAL RCH Construction Page 343 of 581 Page 344 of 581 AGREEMENT THIS AGREEMENT, made on _______________________, by and between the City of San Luis Obispo, a municipal corporation and charter city, San Luis Obispo County, California (hereinafter called the Owner) and QUINCON, INC. (hereinafter called the Contractor). WITNESSETH: That the Owner and the Contractor for the consideration stated herein agree as follows: ARTICLE 1, SCOPE OF WORK: The Contractor shall perform everything required to be performed, shall provide and furnish all of the labor, materials, necessary tools, expendable equipment, and all utility and transportation services required to complete all the work of construction of MITCHELL PARK REVITALIZATION PROJECT, SPECIFICATION NO. 2000188 in strict compliance with the plans and specifications therefor, including any and all Addenda, adopted by the Owner, in strict compliance with the Contract Documents hereinafter enumerated. It is agreed that said labor, materials, tools, equipment, and services shall be furnished and said work performed and completed under the direction and supervision and subject to the approval of the Owner or its authorized representatives. ARTICLE II, CONTRACT PRICE: The Owner shall pay the Contractor as full consideration for the faithful performance of this Contract, subject to any additions or deductions as provided in the Contract Documents, the contract prices as follows: Item Item Unit of Estimated Item Price Total No. Description Measure Quantity (in figures) (in figures) 1 COMPLY WITH BUILDING PERMIT REQUIREMENTS LS 1 $610.50 $610.50 2 DEMOLITION AND REMOVAL OF EXISTING IMPROVEMENT LS 1 $32,600.93 $32,600.93 3 EXCAVATION AND GRADING LS 1 $52,753.68 $52,753.68 4 TREE TRIMMING LS 1 $10,803.48 $10,803.48 5 INSTALL IRRIGATION PIPING AND SPRINKLER SYSTEM LS 1 $14,912.18 $14,912.18 6 TURF AREA SEEDING LS 1 $3,052.52 $3,052.52 7 30 DAY PLANT ESTABLISHMENT PERIOD LS 1 $4,424.94 $4,424.94 DocuSign Envelope ID: 228D0854-7667-48B5-B712-F41506511D67 Page 345 of 581 8 INSTALL (N) CONCRETE WALKWAY SQFT 2400 $18.69 $44,856.00 9 INSTALL (N) RAISED STAGE EA 1 $15,152.72 $15,152.72 10 INSTALL FENCE LF 80 $177.05 $14,164.00 11 INSTALL GATE EA 1 $1,831.51 $1,831.51 12 INSTALL LIGHT POST AND CONDUIT PER CITY STD. 7915 EA 4 $12,033.04 $48,132.16 13 INSTALL LIGHT PULL BOX PER CITY STD. 7915 EA 6 $2,743.20 $16,459.20 14 INSTALL BOCCE BALL COURT (8 FT X 45 FT) EA 1 $18,217.45 $18,217.45 15 INSTALL SHADE STRUCTURE (21 FT X 26 FT) EA 1 $51,709.72 $51,709.72 16 INSTALL 6 FT BENCH EA 1 $3,853.50 $3,853.50 Base Bid $333,534.49 17 INSTALL FENCE LF 142 $177.05 $25,141.10 18 REMOVE EXISTING FENCE LF 142 $28.55 $4,054.10 19 INSTALL PICNIC TABLE EA 3 $3,500.63 $10,501.89 20 INSTALL ADA PICNIC TABLE EA 1 $5,741.18 $5,741.18 21 INSTALL CHESS TABLE EA 3 $4,665.07 $13,995.21 22 INSTALL CHESS TABLE SEAT EA 6 $806.68 $4,840.08 Additive Alternative A $64,273.56 Total Project Bid = ( Base Bid + Additive Alternative A) $397,808.05 Payments are to be made to the Contractor in compliance with and subject to the provisions embodied in the documents made a part of this Contract. Should any dispute arise respecting the true value of any work omitted, or of any extra work which the Contractor may be required to do, or respecting the size of any payment to the Contractor, during the performance of this Contract, said dispute shall be decided by the Owner and its decision shall be final, and conclusive. ARTICLE III, COMPONENT PARTS OF THIS CONTRACT: The Contract consists of the following documents, all of which are as fully a part thereof as if herein set out in full, and if not attached, as if hereto attached: 1. Notice to Bidders and Information for Bidders 2. Standard Specifications and Engineering Standards 3. Special Provisions, any Addenda, Plans and Contract Change Orders 4. Caltrans Standard Specifications and Standard Plans 2015 5. Accepted Bid and Bid Bond DocuSign Envelope ID: 228D0854-7667-48B5-B712-F41506511D67 Page 346 of 581 6. List of Subcontractors 7. Public Contract Code Sections 10285.1 Statement 8. Public Contract Code Section 10162 Questionnaire 9. Public Contract Code Section 10232 Statement 10. Labor Code Section 1725.5 Statements 11. Bidder Acknowledgements 12. Qualifications 13. Non-collusion Declaration 14. Agreement and Bonds 15. Insurance Requirements and Forms ARTICLE IV INDEMNIFICATION: The Contractor shall indemnify, defend with legal counsel approved by City, and hold harmless City, its officers, officials, employees and volunteers from and against all liability, loss, damage, expense, cost (including without limitation reasonable legal counsel fees, expert fees and all other costs and fees of litigation) of every nature arising out of or in connection with the Contractor’s negligence, recklessness or willful misconduct in the performance of work hereunder or its failure to comply with any of its obligations contained in this Agreement, except such loss or damage which is caused by the sole or active negligence or willful misconduct of the City. Should conflict of interest principles preclude a single legal counsel from representing both the City and the Contractor, or should the City otherwise find the Contractor’s legal counsel unacceptable, then the Contractor shall reimburse the City its costs of defense, including without limitation reasonable legal counsel fees, expert fees and all other costs and fees of litigation. The Contractor shall promptly pay any final judgment rendered against the City (and its officers, officials, employees and volunteers) with respect to claims determined by a trier of fact to have been the result of the Contractor’s negligent, reckless or wrongful performance. It is expressly understood and agreed that the foregoing provisions are intended to be as broad and inclusive as is permitted by the law of the State of California and will survive termination of this Agreement. The Contractor obligations under this section apply regardless of whether such claim, charge, damage, demand, action, proceeding, loss, stop notice, cost, expense, judgment, civil fine or penalty, or liability was caused in part or contributed to by an Indemnitee. However, without affecting the rights of the City under any provision of this agreement, the Contractor shall not be required to indemnify and hold harmless the City for liability attributable to the active negligence of City, provided such active negligence is determined by agreement between the parties or by the findings of a court of competent jurisdiction. In instances where the City is shown to have been actively negligent and where the City’s active negligence accounts for only a percentage of the liability involved, the obligation of the Contractor will be for that entire portion or percentage of liability not attributable to the active negligence of the City. ARTICLE V. It is further expressly agreed by and between the parties hereto that should there be any conflict between the terms of this instrument and the bid of said Contractor, then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said bid conflicting herewith. DocuSign Envelope ID: 228D0854-7667-48B5-B712-F41506511D67 Page 347 of 581 IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands this year and date first above written. ATTEST: ___________________________________ Teresa Purrington, City Clerk CITY OF SAN LUIS OBISPO A Municipal Corporation ________________________________ Erica A. Stewart, Mayor APPROVED AS TO FORM ___________________________________ J. Christine Dietrick City Attorney CONTRACTOR: Quincon, Inc. ________________________________ Jose Quintana Chief Executive Officer & Secretary DocuSign Envelope ID: 228D0854-7667-48B5-B712-F41506511D67 Page 348 of 581