Loading...
HomeMy WebLinkAboutI&I & Sanitary Sewer Flow Monitoring Study (2012)SANITARY SEWER FLOW MONITORING AND INFLOW / INFILTRATION STUDY City of San Luis ObispoCity of San Luis Obispo March 2012 SANITARY SEWER FLOW MONITORING AND INFLOW / INFILTRATION STUDY City of San Luis Obispo Prepared for Prepared by March 2012 City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx TOC - i TABLE OF CONTENTS ABBREVIATIONS, TERMS and DEFINITIONS ..................................................................................... iv EXECUTIVE SUMMARY ........................................................................................................................ 1  Scope and Purpose ............................................................................................................................ 1  System Limitations Criterion ............................................................................................................... 1  Estimated 10-Year, 24-Hour Storm Event Peak Flows: System ........................................................ 1  Collection System Inflow Results ........................................................................................................ 2  Flow Monitoring Capacity Results ...................................................................................................... 3  INTRODUCTION .................................................................................................................................... 7  Scope and Purpose ............................................................................................................................ 7  System and Plant Limitations .............................................................................................................. 8  Flow Monitoring Sites and Basins ....................................................................................................... 8  Rain Gauges ..................................................................................................................................... 13  METHODS AND PROCEDURES ......................................................................................................... 14  Confined Space Entry ....................................................................................................................... 14  Flow Meter Installation ...................................................................................................................... 15  Flow Calculation ............................................................................................................................ 16  RESULTS AND ANALYSIS .................................................................................................................. 17  Rainfall: Rain Gauge Data ................................................................................................................ 17  Rainfall: Rain Gauge Triangulation ................................................................................................... 17  Method........................................................................................................................................... 17  Flow Monitoring: Average Dry Weather Flows ................................................................................. 20  Flow Monitoring: Peak Measured Flows and Pipeline Capacity Analysis ........................................ 22  Inflow / Infiltration Analysis: Definitions and Identification ................................................................ 26  Inflow Definition ............................................................................................................................. 26  Infiltration Definition ....................................................................................................................... 26  Infiltration Components ................................................................................................................. 27  Inflow / Infiltration: Analysis Methods ................................................................................................ 29  Inflow / Infiltration: Analysis Plan and Strategy ................................................................................. 31  Inflow / Infiltration: Synthetic Hydrographs ....................................................................................... 32  Design Storm Development .......................................................................................................... 33  Design Storm Response Summary ............................................................................................... 34  Attenuation .................................................................................................................................... 36  Inflow Results Summary ................................................................................................................ 37  RDI (Infiltration) Results Summary ................................................................................................ 39  Combined I/I Results Summary .................................................................................................... 41  CONCLUSIONS ................................................................................................................................... 43  RECOMMENDATIONS ........................................................................................................................ 43  City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx TOC - ii TABLES Table 1. List of Flow Monitoring Sites..................................................................................................... 9  Table 2. Flow Monitoring Basin Information ......................................................................................... 11  Table 3. Rainfall Events used for I/I Analysis ....................................................................................... 17  Table 4. Rain Gauge Distribution by Basin .......................................................................................... 19  Table 5. Dry Weather Flow Summary .................................................................................................. 20  Table 6. Capacity Analysis Summary ................................................................................................... 22  Table 7. Design Storm I/I Estimated Response, per Site ..................................................................... 34  Table 8. Inflow Analysis Summary, per Basin ...................................................................................... 37  Table 9. RDI Analysis Summary, per Basin ......................................................................................... 39  Table 10. Combined I/I Analysis Summary, per Basin ......................................................................... 41  FIGURES Figure 1. Inflow Temperature Map (by Rank) ........................................................................................ 2  Figure 2. Bar Graph: d/D Ratios ............................................................................................................ 3  Figure 3. Peak Flow Schematic ............................................................................................................. 4  Figure 4. Flow Monitoring Site Map ..................................................................................................... 10  Figure 5. Flow Monitoring Basins Map ................................................................................................ 12  Figure 6. Rain Gauge Locations .......................................................................................................... 13  Figure 7. Typical Isco 2150 Flow Meter Installation ............................................................................ 15  Figure 8. Typical Marsh-McBirney Flo-Dar Installation ....................................................................... 15  Figure 9. Rainfall Inverse Distance Weighting Method ....................................................................... 18  Figure 10. Average Dry Weather Flow (Flow Schematic) ................................................................... 21  Figure 11. Bar Graph: Peaking Factors ............................................................................................... 24  Figure 12. Bar Graph: d/D Ratios ........................................................................................................ 24  Figure 13. Peak Flow Schematic ......................................................................................................... 25  Figure 14. Inflow / Infiltration Graphical Response Patterns ............................................................... 27  Figure 15. Typical Sources of Infiltration and Inflow ............................................................................ 28  Figure 16. Sample Infiltration / Inflow Isolation Graph......................................................................... 30  Figure 17. Site D.1: Synthetic Hydrograph .......................................................................................... 32  Figure 18. 10-Year, 24-Hour Design Storm Values and Profile .......................................................... 33  Figure 19. 10-Year, 24-Hour Design Storm Estimated I/I Response (Site D.2) .................................. 34  Figure 20. Attenuation Illustration ........................................................................................................ 36  Figure 21. Inflow Temperature Map (by Rank) .................................................................................... 38  Figure 22. RDI Temperature Map (by Rank) ....................................................................................... 40  Figure 23. Combined I/I Temperature Map (by Rank)......................................................................... 42  Figure 24. Temperature Map: Inflow Normalized by ACRE .............................................................. A-1  Figure 25. Temperature Map: Inflow Normalized by ADWF ............................................................. A-2  Figure 26. Temperature Map: RDI Normalized by ACRE ................................................................. A-3  Figure 27. Temperature Map: RDI Normalized by ADWF ................................................................. A-4  Figure 28. Temperature Map: Combined I/I Normalized by ACRE (R-Value) .................................. A-5  Figure 29. Temperature Map: Combined I/I Normalized by ADWF .................................................. A-6  City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx TOC - iii APPENDICES Appendix A: Infiltration and Inflow Analysis: Temperature Maps by Analysis Component Appendix B: Flow Monitoring Sites: Data, Graphs, Information Appendix C: Sample Sewer Lateral Grant Programs 1. Castro Valley Sanitary District 2. West County Wastewater District 3. Leucadia Wastewater District 4. City of Pacifica 5. Ross Valley Sanitary District 6. City of Sausalito Appendix D: Sample Sewer Lateral Testing Ordinances 1. City of Burlingame 2. City of Richmond 3. City of Alameda 4. City of Oakland – Public Outreach Appendix E: Sample I/I Rehabilitation Effectiveness Study City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx TOC - iv ABBREVIATIONS, TERMS AND DEFINITIONS USED IN THIS REPORT Table i. Abbreviations Abbreviation Term ADWF average dry weather flow CCTV closed-circuit television CIP capital improvement plan CO carbon monoxide d/D depth/diameter ratio FM flow monitor gpd gallons per day mgd gallons per minute GWI groundwater infiltration H2S hydrogen sulfide I/I inflow and infiltration IDM inch-diameter-mile, miles of pipeline multiplied by the diameter of the pipeline in inches. IDW inverse distance weighting LEL lower explosive limit mgd million gallons per day NOAA National Oceanic and Atmospheric Administration Q flow rate RDI rainfall dependent infiltration RRI rainfall responsive infiltration RG rain gauge SSO sanitary sewer overflow WEF Water Environment Federation WRCC Western Regional Climate Center City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx TOC - v Table ii. Terms and Definitions Term Definition Average dry weather flow (ADWF) Average flow rate or pattern from days without noticeable inflow or infiltration response. ADWF usage patterns for weekdays and weekends differ and must be computed separately. ADWF can be expressed as a numeric average or as a curve showing the variation in flow over a day. ADWF includes the influence of normal (non-rain event) groundwater infiltration. Basin Sanitary sewer collection system upstream of a given location (often a flow meter), including all pipelines, inlets, and appurtenances. Also refers to the ground surface area near and enclosed by the pipelines. A basin may refer to the entire collection system upstream from a flow meter, or if flow meters are aligned in series (flowing into each other), a basin may exclude separately monitored basins upstream. Depth/diameter (d/D) ratio Depth of water in a pipe as a fraction of the pipe’s diameter. A measure of fullness of the pipe. This term is used as a part of Capacity Analysis. Design storm A theoretical storm event of a given duration and intensity that aligns with historical frequency records of rainfall events. For example, a 10-year, 24-hour design storm is a storm event wherein the volume of rain that falls in a 24-hour period would historically occur once every 10 years. Design storm events are used to predict I/I response and are useful for modeling – to approximate how a collection system will react to a given set of storm event scenarios. Infiltration and Inflow Infiltration and inflow (I/I) rates are calculated by subtracting the ADWF flow curve from the instantaneous flow measurements taken during and after a storm event. Flow in excess of the baseline consists of inflow, rainfall-responsive infiltration, and rainfall-dependent infiltration. Total I/I is the total sum in gallons of additional flow attributable to a storm event. This is calculated by subtracting the expected ADWF totalized flow from the measured real-time totalized flow across the limits of the storm event. Infiltration, Groundwater Groundwater infiltration (GWI) is groundwater that enters the collection system through pipe defects. GWI depends on the depth of the groundwater table above the pipelines as well as the percentage of the system submerged. The variation on groundwater levels and subsequent groundwater infiltration rates are seasonal by nature. On a day-to-day basis, groundwater infiltration rates are relatively steady and will not fluctuate greatly. Infiltration, Rainfall Dependent Rainfall Dependent Infiltration (RDI) is similar to groundwater infiltration but occurs as a result of storm water. The storm water percolates into the soil, submerges more of the pipe system, and enters through pipe defects. RDI is the slowest component of storm-related infiltration and inflow, beginning gradually and often lasting 24 hours or longer. The response time depends on the soil permeability and saturation levels. Infiltration, Rainfall Responsive Rainfall Responsive Infiltration (RRI) is storm water which enters the collection system through pipe defects, but normally in sewers constructed close to the ground surface such as private laterals. RRI is independent of the groundwater table and reaches defective sewers via the pipe trench in which the sewer is constructed, particularly if the pipe is placed in impermeable soil and bedded and backfilled with a granular material. In this case, the pipe trench serves as a conduit similar to a French drain, conveying storm drainage to defective joints and other openings in the system. Inflow Inflow is defined as water discharged into the sewer system, including private sewer laterals, from direct connections such as downspouts, yard and area City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx TOC - vi Term Definition drains, holes in manhole covers, cross-connections from storm drains, or catch basins. Inflow creates a peak flow problem in the sewer system and often dictates the required capacity of downstream pipes and transport facilities to carry these peak instantaneous flows. SSOs are often attributable to high inflow rates. Normalization To run an “apples-to-apples” comparison amongst different basins, calculated metrics must be normalized. Each basin will have different runoff areas, pipe lengths and sanitary flows. Normalization is typically completed in three different methods. Depending on the information available, one or all methods can be applied to a given project: ™ Pipe Length: The metric is divided by the length of pipe in the upstream basin expressed in units of inch-diameter-mile (IDM). ™ Basin Area: The metric is divided by the estimated drainage area of the basin in acres. ™ ADWF: The metric is divided by the average dry weather sanitary flow (ADWF). Normalization, Inflow The peak I/I flow rate is used to quantify inflow. Although the instantaneous flow monitoring data will typically show an inflow peak, the inflow response is measured from the I/I flow rate (in excess of baseline flow). This removes the effect of sanitary flow variations and measures only the I/I response: ™ Pipe Length: The peak I/I flow rate is divided by the length of pipe (IDM) in the upstream basin. The result is expressed in gallons per day (gpd) per IDM (gpd/IDM). ™ Basin Area: The peak I/I flow rate is divided by the geographic area of the upstream basin. The result is expressed in gpd per acre. ™ ADWF: The peak I/I flow rate is divided by the average dry weather flow (ADWF). This is a ratio and is expressed without units. Normalization, GWI The estimated GWI rates above typical accepted GWI rates as defined by the Water Environment Federation is used to identify basins with high GWI: ™ Pipe Length: The GWI flow rate is divided by the length of pipe (IDM) in the upstream basin. The result is expressed in gallons per day (gpd) per IDM (gpd/IDM). ™ Basin Area: The GWI flow rate is divided by the geographic area of the upstream basin. The result is expressed in gpd per acre. ™ ADWF: The GWI flow rate is divided by the average dry weather flow (ADWF). This is a ratio and is expressed without units. Normalization, RDI The estimated RDI rates at a period 24 hours or more after the conclusion of a storm event are used to identify basins with high RDI: ™ Pipe Length: The RDI flow rate is divided by the length of pipe (IDM) in the upstream basin. The result is expressed in gallons per day (gpd) per IDM (gpd/IDM). ™ Basin Area: The RDI flow rate is divided by the geographic area of the City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx TOC - vii Term Definition upstream basin. The result is expressed in gpd per acre. ™ ADWF: The RDI flow rate is divided by the average dry weather flow (ADWF). This is a ratio and is expressed without units. Normalization, Total I/I The estimated totalized I/I in gallons attributable to a particular storm event are used to identify basins with high total I/I. Because this is a totalized value rather than a rate and can be attributable solely to an individual storm event, the volume of the storm event is also taken into consideration. This allows for a comparison not only basin-to-basin, but also storm event-to-storm event: ™ Pipe Length: Total gallons of I/I are divided by the length of pipe (IDM) in the upstream basin and the inches of rain of the storm event. The result is expressed in gallons per IDM per inch-rain. ™ Basin Area (R-Value): Total gallons of I/I are divided by total gallons of rainfall water that fell within the acreage of the basin area. This is a ratio and expressed as a percentage. R-Value is described as “the percentage of rain that falls that enters the collection system.” Systems with R-Values less than 5%1 are often considered to be performing well. ™ ADWF: Total gallons of I/I are divided by the ADWF and the inches of rain of the storm event. The result is expressed in gallons (x 106)per MGD of ADWF per inch-rain. Peaking factor Ratio of peak measured flow to average dry weather flow. This ratio expresses the degree of fluctuation in flow rate over the monitoring period. This is used for Capacity Analysis. Surcharge When the flow level is higher than the crown of the pipe, then the pipeline is said to be in a surcharged condition. The pipeline is surcharged when the d/D ratio is greater than 1.0. Synthetic hydrograph A set of algorithms developed to approximate the actual I/I hydrograph. The synthetic hydrograph is developed strictly using rainfall data and response parameters representing response time, recession coefficient and soil saturation. Weekend/weekday ratio The ratio of weekend ADWFs to weekday ADWFs. In residential areas, it is typical that this ratio would be slightly higher than 1.0. In business districts, depending on type of service, this ratio can be significantly less than 1.0. 1 Keefe, P.N. “Test Basins for I/I Reduction and SSO Elimination”, 1998, WEF Wet Weather Specialty Conference, Cleveland. City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx Page 1 of 44 EXECUTIVE SUMMARY Scope and Purpose V&A completed sanitary sewer flow monitoring, rainfall monitoring and inflow/infiltration (I/I) analysis within the City of San Luis Obispo, California (City). Flow and rainfall monitoring occurred over two wet weather seasons and one dry weather season as follows: ™ Year 1 Wet Weather Flow Monitoring: January 29, 2010 to March 31, 2010 at 19 open channel flow monitoring sites, seven pump stations and four rainfall monitoring sites. ™ Year 2 Wet Weather Flow Monitoring: January 18 to March 8, 2011 at 18 open channel flow monitoring sites (flow locations different from Year 1). ™ Dry Weather Flow Monitoring: average dry weather flows were established by conducting flow monitoring from October 20 to November 9, 2010. The purpose of this study was to measure sanitary sewer flows at the flow monitoring sites and conduct analyses pertaining to capacity and I/I occurring in the basins upstream from the flow monitoring sites. Year 1 flow monitoring concentrated on the larger basins within the City to get an aggregate idea of how the system was performing in terms of I/I. Analysis of Year 1 flow monitoring results was applied to the Year 2 flow metering locations, placed strategically to better isolate basins with I/I issues. System Limitations Criterion Per City experience, when peak hourly wet weather flows to the City's Water Reclamation Facility (WRF) approaches or exceeds 25 million gallons per day (mgd), the City is at greater risk of a sanitary sewer overflow within the collection system, as well as at greater risk of an overflow within the WRF itself. The plant is allowed under the current permit to utilize an equalization basin and “blend” peak flows. There are concerns that future permits may not allow blended flows. Inflow directly relates to peak flows. Rain dependent infiltration (RDI) results more typically in sustained elevated flows. Because the City owns and operates its own treatment facility, there is less direct cost impact for treatment of sustained RDI flows. The following important decision criterions are identified: ™ Reduction of inflow is identified as more critical to the City than reduction of RDI. ™ 25 mgd at the WRF was used as the threshold value for peak wet weather flow Estimated 10-Year, 24-Hour Storm Event Peak Flows: System V&A conducted synthetic I/I hydrograph modeling of the collection system at the flow monitoring sites to estimate the peak flow response for a 10-year, 24-hour storm event, with the following key results: ™ The peak wet weather flows to the WRF were estimated at between 31 mgd and 35 mgd. This exceeds the 25 mgd threshold established by the City. ™ Conclusion: I/I reduction projects are required to identify and mitigate I/I, and specifically inflow, within the collection system. City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx Page 2 of 44 Collection System Inflow Results Figure 1 summarizes the inflow results for the 19 flow monitoring basins and sub-basins that were isolated during this study2. With the assumption that 50% inflow reduction could be achieved with a dedicated I/I rehabilitation CIP program, the reduction in peak flows is estimated as follows: ™ I/I Rehabilitation, Top 9 Basins: 3.96 mgd reduction in peak flow (Basins A.2, B.1, D.1, E.2, F.2, H.3, J.2, Q.1, R.1) ™ I/I Rehabilitation, Top 12 Basins: 4.97 mgd reduction in peak flow (Basins A.2, B.1, D.1, D.2, E.2, F.2, H.2, H.3, I.2, J.2, Q.1, R.1) Figure 1. Inflow Temperature Map (by Rank) 2 V&A utilized synthetic I/I hydrograph development methods to compare early-season rainfall events to late-season rainfall events amongst all of the basins and sub-basins. Rankings shown were from the “per-IDM” normalization method. Legend Inflow Ranking 1 – 3 4 – 6 7 – 9 10 – 12 13 – 16 17 – 20 21 – 24 25 – 28 29 – 33 34 - 37 Basin Inflow Ranking A.1 18 A.2 1 A.3 13 A.4 19 B.1 2 B.2 16 B.3 20 C.1 21 C.2 14 D.1 3 D.2 10 E.1 27 E.2 7 F.1 32 F.2 3 G.1 22 H.1 25 H.2 12 H.3 6 I.1 37 I.2 10 J.1 23 J.2 5 L.1 31 L.2 35 M.1 34 M.2 33 N.1 29 N.2 36 O.1 27 O.2 30 P.1 26 P.2 24 Q.1 8 Q.2 14 R.1 8 R.2 16 Inflow rankings are shown such that 1 = highest inflow contribution, to 19 = least inflow contribution. Additional temperature maps for all analysis methods are shown in Appendix A. City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx Page 3 of 44 Flow Monitoring Capacity Results Peak measured flows and the flow levels (elevations) are important to understand the capacity of the flow monitoring system. Figure 2 shows a bar graph of the d/D ratios for the flow monitoring locations. Peak flows and flow levels are illustrated in Figure 3; results reported were from the peak measurements as taken across the entirety of the flow monitoring period3. Capacity analysis data is presented on a site-by-site basis and represent the hydraulic conditions only at the point site location. Hydraulic conditions in other areas of the collection system will differ; a collection system model would be required to properly predict capacity deficiencies within an entire collection system. The following results are noted: ™ Sites H.1, M.1 and Q.1 surcharged above the pipe crown during this study, and Site A.1 was very close to surcharging above the pipe crown. ™ I/I reduction efforts in the basins upstream from Sites A.1, H.1 and Q.1 may help alleviate stress on the capacity through these sites. It is unlikely that I/I reduction efforts upstream from Site M.1 will alleviate capacity issues. Figure 2. Bar Graph: d/D Ratios 3 These may or may not correspond to a rainfall event. It did not appear that there were any elevated flow levels due to blockages, grease or roots during the flow monitoring study. 0.0 0.5 1.0 1.5 2.0 2.5 Site A.1Site A.2Site A.3Site A.4Site B.1Site B.2Site B.3Site C.1Site C.2Site D.1Site D.2Site E.1Site E.2Site F.1Site F.2Site G.1Site H.1Site H.2Site H.3Site I.1Site I.2Site J.1Site J.2Site L.1Site L.2Site M.1Site M.2Site N.1Site N.2Site O.1Site O.2Site P.1Site P.2Site Q.1Site Q.2Site R.1Site R.2d/D RatioSurcharge Threshold3.2 feet above pipe crown5.8 1.8 feet above pipe crown City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx Page 4 of 44 Figure 3. Peak Flow Schematic 1.597 0.039 0.104 0.102 0.071 0.124 2.696 2.475 0.318 0.083 0.280 0.711 0.382 0.331 0.234 0.132 0.206 0.274 0.073 0.4980.565 0.1950.806 0.214 0.375 0.759 0.201 1.743 0.613 1.416 0.128 0.131 0.159 0.3700.022 0.337 1.269 TP 2.696 Legend Water level at Peak Flow Peak Flow in mgd Site Name City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx Page 5 of 44 Conclusions ™ The peak wet weather flows to the WRF are estimated at between 31 mgd and 35 mgd for a 10-year, 24-hour storm event. This exceeds the 25 mgd threshold established by the City. ™ To reduce peak wet weather flows to acceptable levels for a 10-year, 24-hour storm event, the City needs to reduce peak flows by 6 to 10 mgd. ™ Reduction of peak flows are achieved by a focused I/I reduction CIP program; this program should be focused on reduction of the inflow component of I/I. ™ Assuming 50% reduction in peak I/I flows with a focused I/I reduction program, peak flows are estimated to be reduced by the following flow rates: ♦ I/I Rehabilitation to Basins A.2, B.1, D.1, E.2, F.2, H.3, J.2, Q.1, R.1 (Top 9 Inflow Basins): approximately 4 mgd reduction in peak flow ♦ I/I Rehabilitation to Basins A.2, B.1, D.1, D.2, E.2, F.2, H.2, H.3, I.2, J.2, Q.1, R.1 (Top 12 Inflow Basins): approximately 5 mgd reduction in peak flow ♦ Note: the entire City collection system was not evaluated as a part of this study. Additional effective inflow reduction may be possible in the unmonitored areas of the collection system, including the downtown areas of the City. Recommendations Preface: Typical recommendations for identifying and locating sources of inflow would include smoke testing and possible CCTV work. However, it is understood that the City has undertaken smoke testing and CCTV efforts in the past with minimal success, and that the City is interested in exploring other options of I/I Reduction. The programs recommended as follows are listed in this regard: ™ Lower Lateral Replacement Program: The City should budget and plan for a lower lateral replacement program for the highest inflow basins, including the following items: ♦ Pilot Project(s): Pilot studies should be conducted for the initial rehabilitation work to evaluate the effectiveness of lower lateral replacement and rehabilitation. Pilot replacement projects should be scheduled in smaller neighborhoods that can be effectively isolated for accurate flow monitoring (next bullet). ♦ I/I Effectiveness Study: Before and after construction flow monitoring should be performed to determine the effectiveness of the I/I rehabilitation and replacement projects. A sample I/I Effectiveness Study is shown in Appendix E. ♦ Alternatives: The City can plan for both lower and upper lateral replacement CIP projects, including pilot projects with I/I effectiveness studies. This would be more effective and more definitive in reducing inflow, but likely more difficult due to lateral ownership issues. ™ Sewer Lateral Grant Program: the City should institute a sewer lateral grant program to encourage residents to replace upper laterals. This program involves partial subsidization of lateral replacement. The property owner would apply for a grant from the City to partially pay for the lateral replacement. To be approved for this program, the lateral would have to be replaced according to standards and specifications set by the District. This program has been City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx Page 6 of 44 utilized within several municipalities with success. Several sample Lateral Grant Programs are shown in Appendix C. ™ Sewer Lateral Testing Ordinances: the City should pass a City ordinance requiring the testing of sewer laterals upon property sale or upon property construction upgrade requiring a re-evaluation of the property. Private laterals would have to pass a pressure test prior to the final sale of a property. The costs of lateral replacement can be planned for in escrow. This program is similar to requiring a termite inspection. Several sample Lateral Testing Ordinances are shown in Appendix D. In the event that inflow sources not related to sewer laterals are located via other means, or by reconsidered CCTV or smoke testing work, the following recommendations are made: ™ Storm Drain Connections: Perform closed-circuit television (CCTV) and/or dye tracing to determine the mode and path of the identified storm drain cross-connections. Upon confirmation of cross-connection of the storm sewer system to the sanitary sewer system, consider removing the cross-connection and repairing the affected pipelines. ™ Area Drain Connections: Perform closed-circuit television (CCTV) and/or dye tracing to determine the mode and path of the area drain cross-connections. Work with the property owner to confirm the illicit connection. Upon confirmation of a connection, coordinate with the property owner to remove the connection. ™ Roof Leader Connections: Work with the property owner to confirm the illicit connection. Upon confirmation of a connection, coordinate with the property owner to remove the connection. ™ Faulty Cleanouts: Consider ways to ensure that homeowners maintain cleanouts on their property. At a minimum, missing or broken cleanout caps should be replaced. City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx Page 7 of 44 INTRODUCTION Scope and Purpose V&A has completed sanitary sewer flow monitoring, rainfall monitoring and inflow/infiltration (I/I) analysis within the City of San Luis Obispo, California (City). Flow and rainfall monitoring occurred over two wet weather seasons and one dry weather season as follows: ™ Year 1 Wet Weather Flow Monitoring: January 29, 2010 to March 31, 2010 at 19 open channel flow monitoring sites, seven pump stations and four rainfall monitoring sites. ™ Year 2 Wet Weather Flow Monitoring: January 18 to March 8, 2011 at 18 open channel flow monitoring sites (flow locations different than Year 1). ™ Dry Weather Flow Monitoring: average dry weather flows were established by conducting flow monitoring from October 20 to November 9, 2010. The purpose of this study was to measure sanitary sewer flows at the flow monitoring sites and conduct analyses pertaining to capacity and infiltration and inflow (I/I) occurring in the basins upstream from the flow monitoring sites. Year 1 flow monitoring concentrated on the larger basins within the City to get an aggregate idea of how the system was performing in terms of I/I. Analysis of Year 1 flow monitoring results was applied to the Year 2 flow metering locations, to be placed strategically to better isolate basins with I/I issues. Relocation of flow meters results in different data and different storm events for the newly defined basins and sub-basins. An “apples-to-apples” comparison of basins to each other is made by applying synthetic I/I hydrograph methodology (this section of the report starts on Page 32). The general strategy for capturing as much relevant data as possible and applying I/I analysis techniques to best isolate and optimize I/I analysis within the entirely of the collection system is shown as follows: 1. Season 1 a. The City selects basins for flow monitoring with 19 flow meters. Additionally, pump station monitoring was conducted at seven pump stations. b. V&A conducts preliminary analysis of the flow monitoring and I/I data. I/I analysis utilized baseline flows established from Season 1 data. (Note: Dry weather flow data would be obtained during dry weather flow monitoring to be conducted later in the year. Refined I/I analysis would be conducted as a part of the Season 2 study utilizing the dry weather flow data.) c. Basins with higher infiltration and inflow rates were considered for either additional flow monitoring and sub-basin isolations. Basins with lower I/I rates may not be considered for sub-basin monitoring. 2. Dry Weather Monitoring: Dry weather monitoring to take place to establish baseline flow rates though Season 1 (past) and Season 2 (future) flow monitoring sites. 3. Season 2 a. The City selects additional basins for flow monitoring with 18 flow meters. City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx Page 8 of 44 b. I/I analysis is conducted on Season 2 flow monitoring results. 4. Final Analysis a. Synthetic hydrograph analysis methods are used for normalization of Season 1 and Season 2 flows amongst the different basins and sub-basins. b. A 10-year, 24-hour design storm event is used for final estimation of basin and sub-basin response and basin and sub-basin normalization of flows. c. Both Year 1 and Year 2 flow monitoring results are summarized in a final report. System and Plant Limitations Per City experience, when peak wet weather flows to the City's Water Reclamation Facility (WRF) approaches or exceeds 25 mgd, the City is at greater risk of a sanitary sewer overflow within the collection system, as well as at greater risk of an overflow within the WRF itself. These excessive flows also put the City at greater risk of a permit violation (specifically, turbidity levels). The WRF relies on the ability to “blend” flows during periods of excessive flow. There is concern that “blended” flows will not be allowed under future permits. For the purposes of this study, 25 mgd at the WRF will be used as the threshold value for peak wet weather flow. Flow Monitoring Sites and Basins Flow Monitoring Sites: Flow monitoring sites are the locations where the flow monitors were placed. Flow monitoring site data may include the flows of one or many drainage basins. To isolate a flow monitoring basin, an addition or subtraction of monitored flows may be required4. Capacity and flow rate information is presented on a site-by-site basis. Flow Monitoring Basins: Flow monitoring basins are localized areas of a sanitary sewer collection system upstream of a given location (often a flow meter), including all pipelines, inlets, and appurtenances. The basin refers to the ground surface area near and enclosed by the pipelines5. A basin may refer to the entire collection system upstream from a flow meter, or if flow meters are aligned in series (flowing into each other), a basin may exclude separately monitored basins upstream. I/I analysis in this report will be conducted on a basin-by-basin basis. The flow monitoring sites and rain gauge sites are listed in Table 1 and illustrated in Figure 4. The flow monitoring basins are described in Table 2 and illustrated in Figure 5. Detailed descriptions of the individual flow monitoring sites, including photographs, are included in Appendix B. 4 There is error inherent in flow monitoring. Adding and subtracting flows increases error on an additive basis. For example, if Site A has error ±10% and Site B has error ±10%, then the resulting flow when subtracting Site A from Site B would be ±20%. 5 Data for the basin areas (in acres) were estimated by V&A based on sewer maps provided by the City. City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx Page 9 of 44 Table 1. List of Flow Monitoring Sites Site Dia. (in) Location A.1 10 Manhole I06-39: Albertson's Parking Lot (near Foothill Boulevard) A.2 6 Manhole H06-5: 269 Craig Way A.3 6 Manhole H05-38: 124 Highland Drive A.4 8 Manhole H04-37: 268 Westmont Avenue B.1 15 Manhole J08-33: Chorro Street south of Lincoln Street B.2 10 Manhole J07-8: 81 Broad Street B.3 8 Manhole I06-46: 489 Ramona Drive C.1 21 Manhole J07-91: 265 Lincoln Street C.2 10 Manhole K07-21: 533 Hathaway Avenue D.1 12 Manhole J08-38: 865 Walnut Street D.2 10 Manhole K08-6: 1144 Walnut Street E.1 15 Manhole L08-31: Monterey Street and Pepper Street E.2 15 Manhole L07-26: 681 Grand Avenue F.1 8 Manhole K09-49: Osos Street and Pacific Street F.2 8 Manhole L07-47: 1890 San Luis Drive G.1 8 Manhole J09-47: Higuera Street southwest of Broad Street H.1 6 Manhole J10-52: Carmel Street and Pismo Street H.2 12 Manhole J11-45: 254 Branch Street H.3 8 Manhole K11-56: 531 Branch Street I.1 18 Manhole M13-3: South of Scheimer Park I.2 10 Manhole N13-54: 1300 Orcutt Road J.1 18 Manhole J12-10: Bridge Street east of Beebee Street J.2 8 Manhole L12-35: 2401 Broad Street L.1 10 Manhole H17-16: Calle Joaquin (Hojo Pump Station) L.2 12 Manhole H18-4: Stream southwest of Los Osos Valley Road M.1 15 Manhole H15-5: 1954 Oceanaire Drive (behind house) M.2 12 Manhole G13-15: 1248 Oceanaire Drive N.1 12 Manhole I16-13: Creekside Mobile Home Park N.2 8 Manhole H18-1: 1775 Calle Joaquin O.1 18 Manhole J17-5: Tank Farm Road O.2 10 Manhole O17-22: 1392 Purple Sage Lane P.1 10 Manhole K09-57: Morro Street and Pacific Street P.2 8 Manhole L09-23: 1242 Buchon Street Q.1 8 Manhole K10-28: Morron Street and Islay Street Q.2 6 Manhole L10-17: 1236 George Street R.1 8 Manhole L12-49: West of Scheimer Park R.2 6 Manhole M11-85: 2410 Helena Street City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx Page 10 of 44 B.2 A.1 B.3 A.4 E.2A.3 A.2 F.2 O.1 C.1 E.1 M.1 H.1 P.2 L.2 G.1 L.1 Q.1 R.1 I.1 I.2 M.2 C.2 N.1 R.2 J.2 D.2 B.1 H.3 H.2 J.1 Q.2 D.1 P.1 F.1 O.2 N.2 Figure 4. Flow Monitoring Site Map City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx Page 11 of 44 Table 2. Flow Monitoring Basin Information Basin Acres Basin Flow Calculation A.1 272.5 QA.1(Basin)= QA.1(Site)–QA.2(Site)–QA.4(Site) A.2 24.0 QA.2(Basin)= QA.2(Site)–QA.3(Site) A.3 21.2 QA.3(Basin)= QA.3(Site) A.4 78.0 QA.4(Basin)= QA.4(Site) B.1 64.4 QB.1(Basin)= QB.1(Site)–QB.2(Site)–QA.1(Site) B.2 27.9 QB.2(Basin)= QB.2(Site)–QB.3(Site) B.3 47.1 QB.3(Basin)= QB.3(Site) C.1 171.1 QC.1(Basin)= QC.1(Site)–QC.2(Site) C.2 67.8 QC.2(Basin)= QC.2(Site) D.1 52.2 QD.1(Basin)= QD.1(Site)–QD.2(Site) D.2 31.7 QD.2(Basin)= QD.2(Site) E.1 82.6 QE.1(Basin)= QE.1(Site)–QE.2(Site) E.2 83.9 QE.2(Basin)= QE.2(Site) F.1 64.5 QF.1(Basin)= QF.1(Site)–QF.2(Site) F.2 53.2 QF.2(Basin)= QF.2(Site) G.1 19.9 QG.1(Basin)= QG.1(Site) H.1 25.8 QH.1(Basin)= QH.1(Site)–QQ.1(Site) H.2 175.3 QH.2(Basin)= QH.2(Site)–QH.3(Site) H.3 32.1 QH.3(Basin)= QH.3(Site) I.1 211.6 QI.1(Basin)= QI.1(Site)–QI.2(Site) I.2 131.2 QI.2(Basin)= QI.2(Site) J.1 171.4 QJ.1(Basin)= QJ.1(Site)–QJ.2(Site)–QI.1(Site)–QR.1(Site) J.2 76.6 QJ.2(Basin)= QJ.2(Site) L.1 91.3 QL.1(Basin)= QL.1(Site) L.2 153.8 QL.2(Basin)= QL.2(Site) M.1 344.8 QM.1(Basin)= QM.1(Site)–QM.2(Site) M.2 298.8 QM.2(Basin)= QM.2(Site) N.1 170.8 QN.1(Basin)= QN.1(Site) N.2 12.0 QN.2(Basin)= QN.2(Site) O.1 408.0 QO.1(Basin)= QO.1(Site)–QO.2(Site) O.2 107.9 QO.2(Basin)= QO.2(Site) P.1 28.2 QP.1(Basin)= QP.1(Site)–QP.2(Site) P.2 99.1 QP.2(Basin)= QP.2(Site) Q.1 65.0 QQ.1(Basin)= QQ.1(Site)–QQ.2(Site) Q.2 31.6 QQ.2(Basin)= QQ.2(Site) R.1 25.1 QR.1(Basin)= QR.1(Site)–QR.2(Site) R.2 80.7 QR.2(Basin)= QR.2(Site) City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx Page 12 of 44 Figure 5. Flow Monitoring Basins Map City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx Page 13 of 44 Rain Gauges V&A captured rainfall data from nine different rain gauges scattered across the City. San Luis Obispo has varying topography and the volume and intensity of rainfall can vary across terrain. Figure 6 shows the rain gauge locations utilized for this study. Figure 6. Rain Gauge Locations City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx Page 14 of 44 METHODS AND PROCEDURES Confined Space Entry A confined space (Photo 1) is defined as any space that is large enough and so configured that a person can bodily enter and perform assigned work, has limited or restricted means for entry or exit and is not designed for continuous employee occupancy. In general, the atmosphere must be constantly monitored for sufficient levels of oxygen (19.5 to 23.0%), and the absence of hydrogen sulfide (H2S) gas, carbon monoxide (CO) gas and lower explosive limit (LEL) levels. A typical confined space entry crew has members with OSHA-defined responsibilities of: Entrant, Attendant and Supervisor. The Entrant is the individual performing the work. He or she is equipped with the necessary personal protective equipment needed to perform the job safely, including a personal four- gas monitor (Photo 2). If it is not possible to maintain line-of-sight with the Entrant, then more Entrants are required until line-of-sight can be maintained. The Attendant is responsible for maintaining contact with the Entrant(s) to monitor the atmosphere on another four-gas monitor and maintaining records of all Entrants, if there are more than one. The Supervisor develops the safe work plan for the job at hand prior to entering. Photo 1. Confined Space Entry Photo 2. Typical Personal Four-Gas Monitor City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx Page 15 of 44 Flow Meter Installation Two different types of flow meters were used on this project. The mounting and installation techniques utilized are described below. Isco 2150 meters use submerged sensors with a pressure transducer to collect depth readings and an ultrasonic Doppler sensor to determine the average fluid velocity. The ultrasonic sensor emits high-frequency (500 kHz) sound waves, which are reflected by air bubbles and suspended particles in the flow. The sensor receives the reflected signal and determines the Doppler frequency shift, which indicates the estimated average flow velocity. The sensor is typically mounted at a manhole inlet to take advantage of smoother upstream flow conditions. The sensor may be offset to one side to lessen the chances of fouling and sedimentation where these problems are expected to occur. Figure 7 shows a typical flow meter installation. A Flo-Dar flow meter is a non-contact flow meter that uses radar to measure velocity and a down- looking ultrasonic sensor to measure depth. Figure 8 shows a sketch of a typical Flo-Dar installation. Figure 7. Typical Isco 2150 Flow Meter Installation Figure 8. Typical Marsh-McBirney Flo-Dar Installation City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx Page 16 of 44 Manual level and velocity measurements were taken during installation of the flow meters and again when they were removed. These manual measurements were compared to simultaneous level and velocity readings from the flow meters to ensure proper calibration and accuracy. The pipe diameter was also verified in order to use the correct geometry in calculating flows. The continuous depth and velocity readings were recorded by the flow meters on a 5-minute interval. Flow Calculation Data retrieved from the flow meters was placed into a spreadsheet program for analysis. Data analysis includes data comparison to field calibration measurements, as well as necessary geometric adjustments as required for sediment (sediment reduces the pipe’s wetted cross-sectional area available to carry flow). Based on site hydraulic conditions, data was analyzed for velocity outliers and level drift. In cases of velocity sensor failure due to fouling, gaps were filled using the correlation between level and velocity in the remaining data. The adjustments made were based on best engineering practices in reducing systematic error in the measurements. Area-velocity flow metering uses the continuity equation, AVQ⋅=, where Q is the volume flow rate, V is the average velocity as determined by the ultrasonic sensor, and A is the cross-sectional area of flow as determined from the depth of flow. In a circular pipe, the following formula is used to calculate the cross-sectional area: ⎥⎥⎦ ⎤ ⎢⎢⎣ ⎡ ⎟⎟ ⎠ ⎞ ⎜⎜ ⎝ ⎛⎟⎠ ⎞⎜⎝ ⎛−⎟⎠ ⎞⎜⎝ ⎛⎟⎠ ⎞⎜⎝ ⎛−−⎥⎦ ⎤⎢⎣ ⎡⎟⎠ ⎞⎜⎝ ⎛−=−− D dDdD D dDA 21cossin22 21cos4 11 2 , where D is the pipe diameter and d is the depth of flow. City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx Page 17 of 44 RESULTS AND ANALYSIS Rainfall: Rain Gauge Data There were two rainfall events in Year 1 and two rainfall events in Year 2 that yielded sufficient I/I response to conduct I/I analyses, summarized in Table 3. Table 3. Rainfall Events used for I/I Analysis Rainfall Event Average Rainfall6 (in) Year 1 – Event 1: February 5 – 6, 2010 1.77 Year 1 – Event 2: February 25 – 26, 2010 2.19 Year 2 – Event 1: February 16 through 21, 2011 2.76 Year 2 – Event 2: February 26 through 27, 2011 0.93 Rainfall: Rain Gauge Triangulation Method The rainfall affecting the sanitary sewer collection system basins must be calculated based on the proximity to the rain gauge locations. The mean precipitation for each site was calculated by taking data from three local rain gauges and using the inverse distance weighting (IDW) method. IDW is an interpolation method that assumes the influence of each rain gauge location diminishes with distance. The approximate geographic coordinates of each site were determined and a weighted average was taken of the precipitation data from nearby rain gauge locations. In the IDW function, ∑= p p d dw1 1 the weight w depends on the distance d and a user-defined power p (p > 0). The most common choice for hydrological studies of watershed areas is p = 2. Figure 9 illustrates the IDW method with sample data. The IDW method was applied to the sewerage basins for San Luis Obispo and the weighting distribution per rain gauge per basin is shown in Table 4. 6 Average of rain gauges. City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx Page 18 of 44 Figure 9. Rainfall Inverse Distance Weighting Method Basin Boundary Rain Gauge A Rain Gauge B Basin Centroid 2.17 miles 1.75 miles Rain Gauge Distance (miles) Weight (%) Rain Gauge A 2.17 0.2124 39.4% Rain Gauge B 1.75 0.3265 60.6% Totals 0.5389 100%   21d City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx Page 19 of 44 Table 4. Rain Gauge Distribution by Basin Basin RG 1 RG 2 RG 3 RG 4 RG North RG Central RG SW RG South RG SE A.1 11% 6% 77% 6% - - - - - A.2 - - - - 75% 25% - - - A.3 - - - - 76% 24% - - - A.4 - - - - 84% 16% - - - B.1 28% 16% 46% 11% - - - - - B.2 - - - - 71% 29% - - - B.3 - - - - 71% 29% - - - C.1 52% 16% 25% 7% - - - - - C.2 - - - - 78% 22% - - - D.1 73% 14% 9% 4% - - - - - D.2 - - - - 52% 48% - - - E.1 85% 10% 3% 2% - - - - - E.2 - - - - 71% 29% - - - F.1 52% 40% 4% 3% - - - - - F.2 - - - - 49% 51% - - - G.1 36% 45% 11% 8% - - - - - H.1 14% 70% 6% 9% - - - - - H.2 7% 87% 2% 3% - - - - - H.3 - - - - - 70%- 20% 10% I.1 11% 82% 3% 4% - - I.2 - - - - - 62%- 9% 29% J.1 3% 94% 1% 2% - - - - - J.2 - - - - - 59%- 23% 18% L.1 7% 18% 7% 68% - - - - - L.2 10% 25% 8% 57% - - - - - M.1 1% 3% 2% 95% - - - - - M.2 - - - - - - 90% 10% - N.1 10% 29% 8% 53% - - - - - N.2 - - - - - - 23% 77% - O.1 17% 59% 8% 15% - - - - - O.2 - - - - - - - - 100% P.1 17% 78% 3% 3% - - - - - P.2 - - - - 4% 96% - - - Q.1 9% 87% 2% 2% - - - Q.2 - - - - - 100%- - - R.1 1% 98% - - - - - - R.2 - - - - - 98%- 1% 1% City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx Page 20 of 44 Flow Monitoring: Average Dry Weather Flows Weekday and weekend flow patterns differ and must be separated when determining average dry weather flows. Average dry weather flows were established during the dry season flow monitoring that took place from October 20 to November 9, 2010. Table 5 lists the average dry weather flow (ADWF) recorded during this study for the flow monitoring sites. Figure 10 shows a schematic diagram of the average dry weather flows and flow levels. Detailed graphs of the flow monitoring data on a site-by-site basis are included in Appendix B. Table 5. Dry Weather Flow Summary Site Weekday ADWF (mgd) Weekend ADWF (mgd) Overall ADWF (mgd) Weekend/ Weekday Ratio A.1 0.190 0.206 0.195 1.09 A.2 0.009 0.009 0.009 1.05 A.3 0.003 0.003 0.003 0.98 A.4 0.032 0.034 0.032 1.08 B.1 0.297 0.313 0.302 1.06 B.2 0.024 0.024 0.024 1.02 B.3 0.017 0.017 0.017 1.01 C.1 0.858 0.722 0.819 0.84 C.2 0.103 0.092 0.100 0.90 D.1 0.032 0.031 0.032 0.98 D.2 0.018 0.019 0.018 1.07 E.1 0.148 0.166 0.153 1.12 E.2 0.098 0.110 0.101 1.13 F.1 0.052 0.052 0.052 1.00 F.2 0.030 0.033 0.031 1.12 G.1 0.044 0.049 0.046 1.12 H.1 0.068 0.070 0.069 1.04 H.2 0.098 0.089 0.095 0.91 H.3 0.027 0.030 0.028 1.11 I.1 0.244 0.244 0.244 1.00 I.2 0.035 0.037 0.035 1.05 J.1 0.341 0.348 0.343 1.02 J.2 0.045 0.045 0.045 1.00 L.1 0.062 0.066 0.063 1.07 L.2 0.171 0.151 0.165 0.88 M.1 0.474 0.497 0.480 1.05 M.2 0.084 0.094 0.086 1.12 N.1 0.042 0.023 0.036 0.55 N.2 0.007 0.008 0.007 1.03 O.1 0.258 0.251 0.256 0.97 O.2 0.025 0.027 0.026 1.07 City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx Page 21 of 44 Site Weekday ADWF (mgd) Weekend ADWF (mgd) Overall ADWF (mgd) Weekend/ Weekday Ratio P.1 0.066 0.066 0.066 1.00 P.2 0.044 0.044 0.044 0.99 Q.1 0.037 0.035 0.036 0.95 Q.2 0.019 0.013 0.017 0.72 R.1 0.032 0.035 0.033 1.09 R.2 0.022 0.024 0.022 1.13 Figure 10. Average Dry Weather Flow (Flow Schematic) 0.195 0.003 0.009 0.032 0.017 0.024 0.302 0.819 0.100 0.018 0.032 0.153 0.101 0.052 0.031 0.046 0.066 0.044 TP 0.017 0.0360.069 0.0280.095 0.022 0.033 0.244 0.035 0.343 0.045 0.063 0.165 0.480 0.086 0.256 0.026 0.036 0.007 0.302 Legend Water level at ADWF ADWF in mgd Site Name City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx Page 22 of 44 Flow Monitoring: Peak Measured Flows and Pipeline Capacity Analysis Peak measured flows and the flow level (elevation) at the peak flow is important to understand the capacity of the flow monitoring system. The peak flows and flow levels reported are from the peak measurements as taken across the entirety of the flow monitoring period. These may or may not correspond to a rainfall event. It did not appear that there were any elevated flow levels due to blockages, grease or roots during the flow monitoring study. The following capacity analysis terms are defined as follows: ™ Peaking Factor: Peaking factor is defined as the peak measured flow divided by the average dry weather flow (ADWF). A peaking factor threshold value of 3.0 is commonly used for sanitary sewer design. ™ d/D Ratio: The d/D ratio is the peak measured depth of flow divided by the pipe diameter. A d/D ratio less than 0.75 is a common threshold value used for pipe design. The d/D ratio for each site was computed based on the maximum depth of flow for the flow monitoring study. Table 6 summarizes the peak recorded flows, levels, d/D ratios and peaking factors per site during the flow monitoring period. The following items are noted: ™ Capacity analysis data is presented on a site-by-site basis and represents the hydraulic conditions only at the point site location. Hydraulic conditions in other areas of the collection system will differ. ™ Due to different flow data capture periods, the peak flows and peak levels should not necessarily be directly compared to each other. Table 6. Capacity Analysis Summary Site ADWF (mgd) Peak Measured Flow (mgd) Peaking Factor Diameter (in) Peak Level (in) d/D Ratio Level Surcharged above Crown (ft) A.1 0.195 1.60 8.2 10 9.9 0.99 - A.2 0.009 0.10 11.4 6 2.3 0.38 - A.3 0.003 0.04 11.5 6 3.0 0.50 - A.4 0.032 0.10 3.2 8 1.6 0.20 - B.1 0.302 2.70 8.9 15 6.0 0.40 - B.2 0.024 0.12 5.2 10 2.8 0.28 - B.3 0.017 0.07 4.1 8 3.2 0.41 - C.1 0.819 2.48 3.0 21 9.3 0.44 - C.2 0.100 0.32 3.2 10 3.3 0.33 - D.1 0.032 0.28 8.8 12 3.8 0.31 - D.2 0.018 0.08 4.6 10 3.7 0.37 - E.1 0.153 0.71 4.6 15 2.1 0.14 - City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx Page 23 of 44 Site ADWF (mgd) Peak Measured Flow (mgd) Peaking Factor Diameter (in) Peak Level (in) d/D Ratio Level Surcharged above Crown (ft) E.2 0.101 0.38 3.8 15 2.0 0.13 - F.1 0.052 0.33 6.4 8 3.8 0.48 - F.2 0.031 0.23 7.7 8 2.2 0.28 - G.1 0.046 0.13 2.9 8 2.8 0.35 - H.1 0.069 0.56 8.2 6 6.5 1.09 0.1 H.2 0.095 0.81 8.5 12 3.8 0.32 - H.3 0.028 0.19 7.0 8 4.5 0.57 - I.1 0.244 0.76 3.1 18 7.1 0.40 - I.2 0.035 0.20 5.7 10 2.8 0.28 - J.1 0.343 1.74 5.1 18 8.6 0.48 - J.2 0.045 0.61 13.6 8 6.9 0.86 - L.1 0.063 0.16 2.5 10 2.8 0.28 - L.2 0.165 0.37 2.2 12 8.2 0.69 - M.1 0.480 1.27 2.6 15 36.1 2.40 1.8 M.2 0.086 0.34 3.9 12 3.4 0.28 - N.1 0.036 0.13 3.6 12 2.7 0.23 - N.2 0.007 0.02 3.1 8 1.3 0.17 - O.1 0.256 1.42 5.5 18 5.2 0.29 - O.2 0.026 0.13 5.0 10 6.8 0.68 - P.1 0.066 0.21 3.1 10 4.1 0.41 - P.2 0.044 0.27 6.2 8 3.8 0.47 - Q.1 0.036 0.50 13.7 8 46.3 5.78 3.2 Q.2 0.017 0.07 4.2 6 2.2 0.37 - R.1 0.033 0.37 11.4 8 2.9 0.37 - R.2 0.022 0.21 9.6 6 2.2 0.36 - The following capacity analysis results are noted: ™ Peaking Factor: All sites had peaking factors above typical design threshold with the exception of: G.1, L.1, L.2 and M.1. ™ d/D Ratio: Sites A.1, H.1, J.2, M.1 and Q.1 had d/D ratios that exceeded common threshold values for d/D ratio. Sites H.1, M.1 and Q.1 surcharged above the pipe crown during this study. Figure 11 and Figure 12 show bar graphs of the capacity results. Figure 13 shows a schematic diagram of the peak measured flows with peak flow levels. City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx Page 24 of 44 Figure 11. Bar Graph: Peaking Factors Figure 12. Bar Graph: d/D Ratios 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Site A.1Site A.2Site A.3Site A.4Site B.1Site B.2Site B.3Site C.1Site C.2Site D.1Site D.2Site E.1Site E.2Site F.1Site F.2Site G.1Site H.1Site H.2Site H.3Site I.1Site I.2Site J.1Site J.2Site L.1Site L.2Site M.1Site M.2Site N.1Site N.2Site O.1Site O.2Site P.1Site P.2Site Q.1Site Q.2Site R.1Site R.2Peaking Factor0.0 0.5 1.0 1.5 2.0 2.5 Site A.1Site A.2Site A.3Site A.4Site B.1Site B.2Site B.3Site C.1Site C.2Site D.1Site D.2Site E.1Site E.2Site F.1Site F.2Site G.1Site H.1Site H.2Site H.3Site I.1Site I.2Site J.1Site J.2Site L.1Site L.2Site M.1Site M.2Site N.1Site N.2Site O.1Site O.2Site P.1Site P.2Site Q.1Site Q.2Site R.1Site R.2d/D RatioSurcharge Threshold Typical Design Threshold Typ. Design Threshold 3.2 feet above pipe crown5.8 1.8 feet above pipe crown City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx Page 25 of 44 Figure 13. Peak Flow Schematic 1.597 0.039 0.104 0.102 0.071 0.124 2.696 2.475 0.318 0.083 0.280 0.711 0.382 0.331 0.234 0.132 0.206 0.274 0.073 0.4980.565 0.1950.806 0.214 0.375 0.759 0.201 1.743 0.613 1.416 0.128 0.131 0.159 0.3700.022 0.337 1.269 TP 2.696 Legend Water level at Peak Flow Peak Flow in mgd Site Name City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx Page 26 of 44 Inflow / Infiltration Analysis: Definitions and Identification Inflow / Infiltration (I/I) consists of storm water and groundwater which enters the sewer system through pipe defects and improper storm drainage connections, defined as follows: Inflow Definition ™ Definition: Storm water inflow is defined as water discharged into the sewer system, including private sewer laterals, from direct connections such as downspouts, yard and area drains, holes in manhole covers, cross connections from storm drains, or catch basins. ™ Impact: This component of I/I creates a peak flow problem in the sewer system and often dictates the required capacity of downstream pipes and transport facilities to carry these peak instantaneous flows. Because the response and magnitude of inflow is tied closely to the intensity of the storm event, the short-term peak instantaneous flows may result in surcharging and overflows within a collection system. Severe inflow may result in sewage dilution, resulting in upsetting the biological treatment (secondary treatment) at the treatment facility. ™ Cost of Source Identification and Removal: Inflow locations are usually less difficult to find and less expensive to correct. These sources include direct and indirect cross connections with storm drainage systems, roof downspouts, and various types of surface drains. Generally, the costs to identify and remove sources of inflow are low compared to potential benefits to public health and safety, or the costs of building new facilities to convey and treat the resulting peak flows. ™ Graphical Identification: Inflow is usually recognized graphically by large magnitude, short duration spikes immediately following a rain event. Infiltration Definition ™ Definition: Infiltration is defined as water entering the sanitary sewer system through defective pipes, pipe joints, and manhole walls, and may include cracks, offset joints, root intrusion points, and broken pipes. ™ Impact: Infiltration typically creates long-term annual volumetric problems. The major impact is the cost of pumping and treating the additional volume of water, and of paying for treatment (for municipalities that are billed strictly on flow volume). ™ Cost of Source Detection and Removal: Infiltration sources are usually harder to find and more expensive to correct than inflow sources. Infiltration sources include defects in deteriorated sewer pipes and/or manholes, and may include cracks, offset joints, root intrusion points, and broken pipes. The sources may be wide-spread throughout a sanitary sewer system. ™ Graphical Identification: Infiltration is often recognized graphically by a gradual increase in flow after a wet weather event. The increased flow typically sustains for a period after rainfall has stopped and then gradually drops off as soils become less saturated, and as groundwater levels recede to normal levels. Figure 14 shows sample graphs indicating the typical graphical response patterns for inflow/ infiltration. City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx Page 27 of 44 Figure 14. Inflow / Infiltration Graphical Response Patterns Infiltration Components Infiltration can be further subdivided into components as follows: ™ Groundwater Infiltration – Groundwater infiltration depends on the depth of the groundwater table above the pipelines as well as the percentage of the system submerged. The variation on groundwater levels and subsequent groundwater infiltration rates are seasonal by nature. On a day-to-day basis, groundwater infiltration rates are relatively steady and will not fluctuate greatly. ™ Rainfall Dependent Infiltration – This component occurs as a result of storm water and enters the sewer system through pipe defects similar to groundwater infiltration. The storm water first percolates directly into the soil and then migrates to an infiltration point. Typically, the time of concentration for rainfall related infiltration may be 24 hours or longer, but depends on the soil permeability and saturation levels. ™ Rainfall Responsive Infiltration is storm water which enters the collection system indirectly through pipe defects, but normally in sewers constructed close to the ground surface such as private laterals. Rainfall responsive infiltration is independent of the groundwater table, and reaches defective sewers via the pipe trench in which the sewer is constructed, particularly if the pipe is placed in impermeable soil and bedded and backfilled with a granular material. In this case, the pipe trench serves as a conduit similar to a French drain, conveying storm drainage to defective joints and other openings in the system. Note: this type of infiltration can have a quick response and graphically can look very similar to inflow. 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 Flow (MGD)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 Rain (in/hr)0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.50 4-Jun 5-JunI/I (MGD)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 Rain (in/hr)0 5 10 15 20 25 30 Flow (gpm)0.0 0.1 0.2 0.3 0.4 0.5 0.6 Rain (in/hr)0 2 4 6 8 10 12 14 16 18 22-Feb 23-FebFlow (gpm)0.0 0.1 0.2 0.3 0.4 0.5 0.6 Rain (in/hr)0.00 0.10 0.20 0.30 0.40 0.50 Flow (MGD)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 Rain (in/hr)0.00 0.05 0.10 0.15 0.20 0.25 17-Dec 18-Dec 19-Dec 20-DecFlow (MGD)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 Rain (in/hr)Inflow Combination I/IInfiltration Rainfall ADWF Flow Realtime Flow I/I Flow Rate Response Pattern Sharp Spike Short Duration Response Pattern Gradual Increase Gradual Recession Response Pattern Combination of Inflow and Infiltration City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx Page 28 of 44 Figure 15 illustrates the possible locations and components of I/I. .. . Downspout connected  to Lateral Manhole Cover  with Holes Cross‐connection from  Storm Catch Basin Area Drain  connected  to Lateral Deteriorated  Manhole Cracked or  Damaged Pipe Faulty Lateral Connection to Sanitary Sewer Exfiltration from   Storm Sewer Deteriorated Lateral Roof Vent Tree Root  Penetration Figure 15. Typical Sources of Infiltration and Inflow City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx Page 29 of 44 Inflow / Infiltration: Analysis Methods After differentiating I/I flows from ADWF flows, various calculations can be made to determine which I/I component (inflow or infiltration) is more prevalent at a particular site, and to compare the relative magnitude of the I/I components between drainage basins and between storm events. Inflow Indicators Peak I/I Flow Rate: Inflow is characterized by sharp, direct spikes occurring during a rainfall event. Peak I/I rates are isolated for inflow analysis7. After determining the peak I/I flow rate for a given site, and for a given storm event, there are three ways to normalize the peak I/I rates for an “apples-to- apples” comparison amongst the different drainage basins: ™ Peak I/I Flow Rate per IDM: Peak measured I/I rate divided by length of pipe within the drainage basin, expressed in units of inch-diameter-mile (IDM) (miles of pipeline multiplied by the diameter of the pipeline in inches). Final units are gallons per day (gpd) per IDM. ™ Peak I/I Flow Rate per Acre: Peak measured I/I rate divided by the basin size of the drainage basin, basin units expressed in acres. Units are gpd per acre. ™ Peak I/I Flow Rate to ADWF Ratio: Peak measured I/I rate divided by average dry weather flow (ADWF). This is a ratio and is expressed without units. The inflow indicators were normalized by all methods in this report; rankings were determined by the per-IDM method. Infiltration Indicators Dry Weather Groundwater Infiltration: GWI analysis is conducted by looking at minimum dry weather flow to average dry weather flow ratios and comparing them to established standards, which may result in quantifying the rate of excess ground water infiltration. Similar to the discussion on inflow, GWI infiltration rates can be normalized by means of pipe length (IDM), basin area (acres) and/or dry weather flow rates (ADWF). These methods are discussed in further detail in the Groundwater Analysis section later in this report. Rainfall Dependent Infiltration: Infiltration occurring after the conclusion of a storm event is classified as rainfall dependent infiltration. Analysis is conducted by looking at the infiltration rates at set periods after the conclusion of a storm event. Depending on the system and the time required for flows to return to ADWF levels, different set periods may be examined to determine the basins with the greatest or most sustained rainfall dependent infiltration rates. The infiltration indicators were normalized by all methods in this report; rankings were determined by the per-IDM method. 7 I/I flow rate is the realtime flow less the estimated average dry weather flow rate. It is an estimate of only flows attributable to rainfall. By using peak flow rates (inclusive of ADWF) The I/I flow rate can be skewed higher or lower depending on whether the storm event I/I response occurs during low flow or high flow hours. City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx Page 30 of 44 Combined I/I Indicators Total Infiltration: The total inflow and infiltration is measured in gallons per site and per storm event. Because it is based on total I/I volume, it is an indicator of combined inflow/infiltration and is used to identify the overall volumetric influence of I/I within the monitoring basin. As with inflow, pipe length, basin area and dry weather flow are used to normalize combined I/I for basin comparison: ™ Combined I/I Flow Rate per IDM: Total infiltration (gallons) divided by length of pipe (IDM) and divided by storm event rainfall (inches of rain). Final units are gallons per day (gpd) per IDM per inch-rain. ™ R-Value: Total infiltration (gallons) divided by the total rainfall that fell within the acreage of that basin (gallons of rainfall). This is expressed as a percentage and is explained as “the percent of rain that falls that enters the sanitary sewer collection system.” Systems with R- Values less than 5%8 are often considered to be performing well. ™ Combined I/I Flow Rate per ADWF: Total infiltration (gallons) divided by the ADWF (gpd) and divided by storm event rainfall (inches of rain). Final units are gallons (x 106) per MGD of ADWF per inch-rain. The combined I/I flow indicators were normalized by all methods in this report; rankings were determined by the per-IDM method. Realtime flows were plotted against ADWF flows to analyze the I/I response to rainfall events. Figure 16 illustrates a sample of how this analysis is conducted and some of the measurements that are used to distinguish infiltration and inflow. Similar graphs were generated for the flow monitoring sites and can be found in Appendix B. Figure 16. Sample Infiltration / Inflow Isolation Graph 8 Keefe, P.N. “Test Basins for I/I Reduction and SSO Elimination”, 1998, WEF Wet Weather Specialty Conference, Cleveland. Total I/I – all I/I attributable to rainfall (shaded orange)RDI Infiltration: sustained response 24+ hours after rainfall ends Inflow: Sharp spike response to rainfall Peak I/I: inflow indicator and used to compare and rank basins City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx Page 31 of 44 Inflow / Infiltration: Analysis Plan and Strategy There were different flow metering sites for the Year 1 and Year 2 data sets. Year 1 flow monitoring concentrated on the larger basins within the City to get an aggregate idea of how the system was performing in terms of I/I. Analysis of Year 1 flow monitoring results was applied to the Year 2 flow metering locations, to be placed strategically to better isolate basins with I/I issues. Relocation of flow meters results in different data and different storm events for the newly defined basins and sub-basins. An “apples-to-apples” comparison of basins to each other is made by applying synthetic I/I hydrograph methodology (next section). The general strategy for capturing as much relevant data as possible and applying I/I analysis techniques to best isolate and optimize I/I analysis within the entirely of the collection system is shown as follows: 1. Season 1 a. The City selects basins for flow monitoring with 19 flow meters. Additionally, pump station monitoring was conducted at seven pump stations. b. V&A conducts preliminary analysis of the flow monitoring and I/I data. I/I analysis utilized baseline flows established from Season 1 data. (Note: Dry weather flow data would be obtained during dry weather flow monitoring to be conducted later in the year. Refined I/I analysis would be conducted as a part of the Season 2 study utilizing the dry weather flow data.) c. Basins with higher infiltration and inflow rates were considered for additional flow monitoring and sub-basin isolations. Basins with lower I/I rates may not be considered for sub-basin monitoring. 2. Dry Weather Monitoring: Dry weather monitoring to take place to establish baseline flow rates though Season 1 (past) and Season 2 (future) flow monitoring sites. 3. Season 2 a. The City selects additional basins for flow monitoring with 18 flow meters. b. I/I analysis is conducted on Season 2 flow monitoring results. 4. Final Analysis a. Synthetic hydrograph analysis methods are used for normalization of Season 1 and Season 2 flows amongst the different basins and sub-basins. b. A 10-year, 24-hour design storm event is used for final estimation of basin and sub-basin response and basin and sub-basin normalization of flows. c. Both Year 1 and Year 2 flow monitoring results are summarized in a final report. City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx Page 32 of 44 Inflow / Infiltration: Synthetic Hydrographs In order to model design storms, synthetic hydrographs were developed to approximate the actual RDI/I hydrograph shape in terms of parameters representing time to the peak and the recession coefficient. The actual RDI/I hydrograph was best matched with a synthetic hydrograph by separating the synthetic hydrograph into seven volume components (R1, R2, R3, R4, R5, R6, R7). The seven components represent different response times to the rainfall event and, therefore, different infiltration or inflow paths into the sewer system. R1 is characterized by a short response time and is assumed to consist of mainly inflow. R7 represents slower response and longer recession times and consists of mostly infiltration. Levels of soil saturation are also considered. Using synthetic hydrograph analysis, appropriate time and recession parameters were estimated by a iterative procedure until a good match was obtained. For example, the hydrograph and its component hydrographs for the period of February 1 to March 2, 2010 for Site D.1 is shown in Figure 17. Figure 17. Site D.1: Synthetic Hydrograph Rain Realtime I/I Hydrograph Synthetic Hydrograph R1 Component R2 Component R3 Component R4 Component R5 Component R6 Component R7 Component 0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.00.00 0.05 0.10 0.15 0.20 0.25 0.30 1-Feb 3-Feb 5-Feb 7-Feb 9-Feb 11-Feb 13-Feb 15-Feb 17-Feb 19-Feb 21-Feb 23-Feb 25-Feb 27-Feb 1-Mar Rain (in/hr)I&I Flow (mgd) City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx Page 33 of 44 Design Storm Development With the I/I response modeled by a synthetic hydrograph, design storms can be applied. This serves two functions: (a) predicted flows are based on one like storm event and are hence normalized to each other, making for easier and better comparisons, and (b) the resulting I/I flows can be predicted for a design storm event. This helps to calibrate modeling efforts that will determine if the collection system has adequate capacity to handle very large storm events. V&A used a 10-year, 24-hour design storm for this analysis. Storm events were taken from the NOAA Precipitation-Frequency Atlas of the Western United States. Figure 18 summarizes the design storm magnitude and profile. This particular profile distribution also fits the NOAA criterion for 2-hour and 6-hour durations, in addition to the 24-hour duration. 10-Year, 24-hour Design Storm Hour Inches of Rain 1 0.01 2 0.03 3 0.32 4 0.19 5 0.06 6 0.02 7 0.26 8 0.15 9 0.20 10 0.07 11 0.04 12 0.01 13 0.14 14 0.38 15 0.05 16 0.30 17 0.30 18 0.57 19 1.05 20 0.60 21 0.30 22 0.11 23 0.18 24 0.05 Total: 5.39 Figure 18. 10-Year, 24-Hour Design Storm Values and Profile 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24Rainfall (in/hr)Hour City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx Page 34 of 44 Design Storm Response Summary The 10-year, 24-hour storm event was applied to the synthetic I/I hydrograph components developed specific to each flow monitoring site. This method effectively models and extrapolates the best estimated response to the design storm events. These results assume full ground saturation, and the peak I/I flows from the design storm coincide with peak dry weather flows to get a “worst-case” scenario of peak wet weather flows. Figure 19 shows the synthetic hydrograph response for the design storm event at Site D.2. Table 7 summarizes the final results for each design storm on a site- by-site basis. 0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 1.1 1.2 1.3 1.4 1.5 1.60.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 Day 1 Day 2 Day 3 Day 4 Day 5 Rain (in/hr)Flow (mgd) Figure 19. 10-Year, 24-Hour Design Storm Estimated I/I Response (Site D.2) Table 7. Design Storm I/I Estimated Response, per Site Site Peak Dry Weather Flow (mgd) Peak I/I Rate (mgd) Peak Flow (mgd) Total I/I9 (gallons) RDI Rate10 (mgd) A.1 0.321 2.360 2.682 3,698,000 0.458 A.2 0.017 0.575 0.592 378,000 0.027 A.3 0.007 0.082 0.089 166,000 0.024 A.4 0.061 0.356 0.417 419,000 0.049 B.1 0.535 4.300 4.836 7,178,000 1.012 B.2 0.045 0.289 0.334 267,000 0.026 9 Total I/I was measured through Day 12 for this study (only through Day 5 shown on above graph). 10 For this analysis, the RDI rate was is the average rate of I/I during Day 4 of the design storm. This is over 24 hours after the conclusion of rainfall and all I/I can be considered rain dependent infiltration with no influence from inflow. The RDI rates shown in the above table is not a component of the peak I/I or peak flow rates. City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx Page 35 of 44 Site Peak Dry Weather Flow (mgd) Peak I/I Rate (mgd) Peak Flow (mgd) Total I/I9 (gallons) RDI Rate10 (mgd) B.3 0.034 0.211 0.245 243,000 0.026 C.1 1.504 3.342 4.846 5,259,000 0.629 C.2 0.192 0.881 1.073 1,083,000 0.110 D.1 0.051 1.170 1.221 889,000 0.058 D.2 0.037 0.279 0.316 149,000 0.005 E.1 0.241 1.446 1.686 1,399,000 0.110 E.2 0.171 1.395 1.566 795,000 0.054 F.1 0.115 0.909 1.024 705,000 0.049 F.2 0.083 0.968 1.051 645,000 0.036 G.1 0.090 0.177 0.268 79,000 0.003 H.1 0.132 0.600 0.732 1,129,000 0.083 H.2 0.161 1.517 1.678 1,099,000 0.067 H.3 0.060 0.516 0.577 536,000 0.045 I.1 0.415 0.730 1.145 1,396,000 0.156 I.2 0.073 0.661 0.734 902,000 0.092 J.1 0.615 2.210 2.825 3,898,000 0.413 J.2 0.095 1.008 1.102 727,000 0.065 L.1 0.103 0.243 0.346 90,000 0.002 L.2 0.263 0.254 0.517 110,000 0.003 M.1 0.770 1.109 1.878 1,629,000 0.157 M.2 0.199 0.395 0.595 280,000 0.020 N.1 0.083 0.235 0.319 80,000 0.001 N.2 0.008 0.014 0.022 5,000 0.000 O.1 0.463 1.358 1.821 725,000 0.016 O.2 0.077 0.143 0.221 49,000 0.002 P.1 0.094 0.387 0.481 483,000 0.040 P.2 0.079 0.329 0.408 437,000 0.038 Q.1 0.071 0.553 0.624 934,000 0.077 Q.2 0.041 0.213 0.254 259,000 0.025 R.1 0.074 0.477 0.551 1,098,000 0.164 R.2 0.041 0.362 0.403 268,000 0.019 Notes: A decent percentage of the collection system, including basins within the downtown area, was not monitored as a part of this study. Using a system average dry weather flow of 4.6 mgd, the extrapolated peak flow at the treatment facility for a 10-year, 24-hour design storm event would measure between 31 and 35 mgd. City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx Page 36 of 44 Attenuation Flow attenuation in a sewer collection system is the natural process of the reduction of the peak flow rate through redistribution of the same volume of flow over a longer period of time. This functions as a result of friction (resistance), internal storage and diffusion along the sewer pipes. Fluids are constantly working towards equilibrium. For example, a volume of fluid poured into a static vessel with no outside turbulence will eventually stabilize to a static state, with a smooth fluid surface without peaks and valleys. Attenuation within a sanitary sewer collection system is based upon this concept. A flow profile with a strong peak will tend to stabilize towards equilibrium, shown in Figure 20. TimeFlow TimeFlowTime Vol. X Volume Y Volume X = Volume Y Figure 20. Attenuation Illustration Within a sanitary sewer collection system, each individual basin will have a specific flow profile. As the flows from the basins combine within the trunk sewer lines, the peaks from each basin will (a) not necessary coincide at the same time, and (b) due to the length and time of travel through the trunk sewers, peak flows will attenuate prior to reaching the treatment facility. The sum of the peak flows of the individual basins within a collection system will be greater than the peak flows observed at the treatment facility. For this project, an attenuation factor11 of 0.85 was applied to upstream basins. 11 The attenuation factor of 0.85 is an estimated system-wide number used and applied based on V&A’s experience in flow monitoring and observation of peak flow reduction. Actual attenuation will differ on a site-by-site basis and would need to be measured individually between basins using advanced flow monitoring techniques beyond the scope of this study. City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx Page 37 of 44 Inflow Results Summary Table 8 summarizes the peak measured I/I flows and inflow analysis results for the design storm event (refer to the I/I Methods section for more information on inflow analysis methods). Inflow rates were normalized by the “per-ADWF” and the “per-ACRE” methods. Temperature maps of both methods are shown in Appendix A. A temperature map by overall ranking is shown in Figure 21. Table 8. Inflow Analysis Summary, per Basin Basin ADWF (mgd) Peak I/I Rate (mgd) Peak I/I per ACRE (GPAD) Peak I/I to ADWF Ratio Inflow Ranking A.1 0.153 1.569 5,760 10.2 18 A.2 0.006 0.505 21,050 87.3 1 A.3 0.003 0.082 3,860 24.3 13 A.4 0.032 0.356 4,570 11.0 19 B.1 0.083 2.048 31,820 24.7 2 B.2 0.007 0.110 3,930 16.6 16 B.3 0.017 0.211 4,480 12.3 20 C.1 0.719 2.593 15,160 3.6 21 C.2 0.100 0.881 13,000 8.8 14 D.1 0.014 0.933 17,860 67.0 3 D.2 0.018 0.279 8,810 15.5 10 E.1 0.052 0.260 3,150 5.0 27 E.2 0.101 1.395 16,630 13.8 7 F.1 0.021 0.086 1,340 4.0 32 F.2 0.031 0.968 18,190 31.7 3 G.1 0.046 0.177 8,940 3.9 22 H.1 0.032 0.129 5,020 4.0 25 H.2 0.067 1.078 6,150 16.0 12 H.3 0.028 0.516 16,110 18.6 6 I.1 0.209 0.168 800 0.8 37 I.2 0.035 0.661 5,040 18.7 10 J.1 0.022 0.327 1,910 15.1 23 J.2 0.045 1.008 13,150 22.4 5 L.1 0.063 0.243 2,660 3.9 31 L.2 0.165 0.254 1,650 1.5 35 M.1 0.394 0.772 2,240 2.0 34 M.2 0.086 0.395 1,320 4.6 33 N.1 0.036 0.235 1,380 6.5 29 N.2 0.007 0.014 1,170 2.0 36 O.1 0.231 1.236 3,030 5.4 27 O.2 0.026 0.143 1,330 5.6 30 City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx Page 38 of 44 Basin ADWF (mgd) Peak I/I Rate (mgd) Peak I/I per ACRE (GPAD) Peak I/I to ADWF Ratio Inflow Ranking P.1 0.022 0.107 3,810 4.9 26 P.2 0.044 0.329 3,320 7.5 24 Q.1 0.019 0.372 5,730 19.6 8 Q.2 0.017 0.213 6,730 12.3 14 R.1 0.010 0.169 6,730 16.4 8 R.2 0.022 0.362 4,490 16.2 16 Rankings: 1 = most inflow after normalization. Ties broken by using the “per-Acre” method Figure 21. Inflow Temperature Map (by Rank) Legend Inflow Ranking 1 – 3 4 – 6 7 – 9 10 – 12 13 – 16 17 – 20 21 – 24 25 – 28 29 – 33 34 - 37 City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx Page 39 of 44 RDI (Infiltration) Results Summary Table 9 summarizes the calculated RDI flow rates for the design storm event (refer to the I/I Methods section for more information on RDI analysis methods). RDI rates were normalized by the “per- ADWF” and the “per-ACRE” methods. Temperature maps of both methods are shown in Appendix A. A temperature map by overall ranking is shown in Figure 22. . Table 9. RDI Analysis Summary, per Basin Basin ADWF (mgd) RDI Rate (mgd) RDI per ACRE (GPAD) RDI to ADWF Ratio RDI Ranking A.1 0.153 0.382 1,400 2.5 5 A.2 0.006 0.003 150 0.6 24 A.3 0.003 0.024 1,110 7.0 3 A.4 0.032 0.049 630 1.5 13 B.1 0.083 0.528 8,200 6.4 2 B.2 0.007 0.000 0 0.0 36 B.3 0.017 0.026 550 1.5 14 C.1 0.719 0.519 3,030 0.7 12 C.2 0.100 0.110 1,620 1.1 9 D.1 0.014 0.053 1,010 3.8 4 D.2 0.018 0.005 170 0.3 25 E.1 0.052 0.057 690 1.1 16 E.2 0.101 0.054 640 0.5 18 F.1 0.021 0.013 210 0.6 22 F.2 0.031 0.036 670 1.2 15 G.1 0.046 0.003 150 0.1 29 H.1 0.032 0.006 220 0.2 25 H.2 0.067 0.021 120 0.3 27 H.3 0.028 0.045 1,420 1.6 5 I.1 0.209 0.064 300 0.3 23 I.2 0.035 0.092 700 2.6 8 J.1 0.022 0.028 160 1.3 19 J.2 0.045 0.065 850 1.5 10 L.1 0.063 0.002 20 0.0 33 L.2 0.165 0.003 20 0.0 34 M.1 0.394 0.137 400 0.3 21 M.2 0.086 0.020 70 0.2 28 N.1 0.036 0.001 10 0.0 34 N.2 0.007 0.000 0 0.0 36 O.1 0.231 0.015 40 0.1 31 O.2 0.026 0.002 20 0.1 32 P.1 0.022 0.002 50 0.1 30 City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx Page 40 of 44 Basin ADWF (mgd) RDI Rate (mgd) RDI per ACRE (GPAD) RDI to ADWF Ratio RDI Ranking P.2 0.044 0.038 390 0.9 17 Q.1 0.019 0.052 800 2.7 7 Q.2 0.017 0.025 800 1.5 10 R.1 0.010 0.145 5,790 14.1 1 R.2 0.022 0.019 230 0.8 20 Rankings: 1 = most RDI after normalization. Ties broken by using the “per-Acre” method. Figure 22. RDI Temperature Map (by Rank) Legend RDI Ranking 1 – 3 4 – 6 7 – 9 10 – 12 13 – 16 17 – 20 21 – 24 25 – 28 29 – 33 34 - 37 City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx Page 41 of 44 Combined I/I Results Summary Table 10 summarizes the combined I/I flow results for the design storm event (refer to the I/I Methods section for more information on inflow analysis methods). Combined I/I flows were normalized by the “per-ADWF” and the “per-ACRE” methods. Temperature maps of both methods are shown in Appendix A. A temperature map by overall ranking is shown in Figure 23. . Table 10. Combined I/I Analysis Summary, per Basin Basin ADWF (mgd) Total I/I (gallons) R-Value (%) Total I/I to ADWF Factor Combined I/I Ranking A.1 0.153 2,901,000 7.9% 3.8 9 A.2 0.006 212,000 6.2% 7.0 7 A.3 0.003 166,000 5.5% 9.3 7 A.4 0.032 419,000 3.7% 2.4 18 B.1 0.083 3,213,000 36.7% 7.7 2 B.2 0.007 24,000 0.6% 0.7 30 B.3 0.017 243,000 3.6% 2.7 16 C.1 0.719 4,176,000 17.5% 1.1 14 C.2 0.100 1,083,000 11.1% 2.1 12 D.1 0.014 740,000 10.0% 10.2 3 D.2 0.018 149,000 3.4% 1.6 23 E.1 0.052 604,000 5.1% 2.2 18 E.2 0.101 795,000 6.7% 1.5 16 F.1 0.021 60,000 0.7% 0.5 31 F.2 0.031 645,000 8.8% 4.2 6 G.1 0.046 79,000 2.9% 0.3 29 H.1 0.032 195,000 5.7% 1.2 20 H.2 0.067 563,000 2.4% 1.7 24 H.3 0.028 536,000 13.6% 4.3 4 I.1 0.209 494,000 1.8% 0.5 27 I.2 0.035 902,000 5.6% 5.6 11 J.1 0.022 677,000 3.0% 6.5 15 J.2 0.045 727,000 7.8% 3.6 10 L.1 0.063 90,000 0.8% 0.3 33 L.2 0.165 110,000 0.6% 0.1 36 M.1 0.394 1,349,000 3.3% 0.8 25 M.2 0.086 280,000 0.8% 0.7 27 N.1 0.036 80,000 0.4% 0.5 34 N.2 0.007 5,000 0.4% 0.2 37 O.1 0.231 676,000 1.3% 0.6 26 O.2 0.026 49,000 0.4% 0.4 34 City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx Page 42 of 44 Basin ADWF (mgd) Total I/I (gallons) R-Value (%) Total I/I to ADWF Factor Combined I/I Ranking P.1 0.022 46,000 1.2% 0.4 32 P.2 0.044 437,000 3.5% 2.1 21 Q.1 0.019 675,000 7.9% 7.3 4 Q.2 0.017 259,000 6.5% 3.2 13 R.1 0.010 830,000 25.2% 16.6 1 R.2 0.022 268,000 2.6% 2.6 22 Rankings: 1 = most combined I/I after normalization. Ties broken by using the “per-Acre” method. Figure 23. Combined I/I Temperature Map (by Rank) Legend Combined I&I Ranking 1 – 3 4 – 6 7 – 9 10 – 12 13 – 16 17 – 20 21 – 24 25 – 28 29 – 33 34 - 37 City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx Page 43 of 44 CONCLUSIONS ™ The peak wet weather flows to the WRF are estimated at between 31 mgd and 35 mgd for a 10-year, 24-hour storm event. This exceeds the 25 mgd threshold established by the City. ™ To reduce peak wet weather flows to acceptable levels for a 10-year, 24-hour storm event, the City needs to reduce peak flows by 6 to 10 mgd. ™ Reduction of peak flows are achieved by a focused I/I reduction CIP program; this program should be focused on reduction the inflow component of I/I. ™ Assuming 50% reduction in peak I/I flows with a focused I/I reduction program, peak flows are estimated to be reduced by the following flow rates: ♦ I/I Rehabilitation to Basins A.2, B.1, D.1, E.2, F.2, H.3, J.2, Q.1, R.1 (Top 9 Inflow Basins): approximately 4 mgd reduction in peak flow ♦ I/I Rehabilitation to Basins A.2, B.1, D.1, D.2, E.2, F.2, H.2, H.3, I.2, J.2, Q.1, R.1 (Top 12 Inflow Basins): approximately 5 mgd reduction in peak flow ♦ Note: the entire City collection system was not evaluated as a part of this study. Additional effective inflow reduction may be possible in the unmonitored areas of the collection system, including the downtown areas of the City. RECOMMENDATIONS Preface: Typical recommendations for identifying and locating sources of inflow would include smoke testing and possible CCTV work. However, it is understood that the City has undertaken smoke testing and CCTV efforts in the past with minimal success, and that the City is interested in exploring other options of I/I Reduction. The programs recommended as follows are listed in this regard: ™ Lower Lateral Replacement Program: The City should budget and plan for a lower lateral replacement program for the highest inflow basins, including the following items: ♦ Pilot Project(s): Pilot studies should be conducted for the initial rehabilitation work to evaluate the effectiveness of lower lateral replacement and rehabilitation. Pilot replacement projects should be scheduled in smaller neighborhoods that can be effectively isolated for accurate flow monitoring (next bullet). ♦ I/I Effectiveness Study: Before and after construction flow monitoring should be performed to determine the effectiveness of the I/I rehabilitation and replacement projects. A sample I/I Effectiveness Study is shown in Appendix E. ♦ Alternatives: The City to plan for both lower and upper lateral replacement CIP projects, including pilot projects with I/I effectiveness studies. This would be more effective and more definitive in reducing inflow, but likely more difficult due to lateral ownership issues. ™ Sewer Lateral Grant Program: the City should institute a sewer lateral grant program to encourage residents to replace upper laterals. This program involves partial subsidization of lateral replacement. The property owner would apply for a grant from the City to partially pay for the lateral replacement. To be approved for this program, the lateral would have to be replaced according to standards and specifications set by the District. This program has been utilized within several municipalities with success. Several sample Lateral Grant Programs are shown in Appendix C. City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx Page 44 of 44 ™ Sewer Lateral Testing Ordinances: the City should pass a City ordinance requiring the testing of sewer laterals upon property sale or upon property construction upgrade requiring a re-evaluation of the property. Private laterals would have to pass a pressure test prior to the final sale of a property. The costs of lateral replacement can be planned for in escrow. This program is similar to requiring a termite inspection. Several sample Lateral Testing Ordinances are shown in Appendix D. In the event that inflow sources not related to sewer laterals are located via other means, or by reconsidered CCTV or smoke testing work, the following recommendations are made: ™ Storm Drain Connections: Perform closed-circuit television (CCTV) and/or dye tracing to determine the mode and path of the identified storm drain cross-connections. Upon confirmation of cross-connection of the storm sewer system to the sanitary sewer system, consider removing the cross-connection and repairing the affected pipelines. ™ Area Drain Connections: Perform closed-circuit television (CCTV) and/or dye tracing to determine the mode and path of the area drain cross-connections. Work with the property owner to confirm the illicit connection. Upon confirmation of a connection, coordinate with the property owner to remove the connection. ™ Roof Leader Connections: Work with the property owner to confirm the illicit connection. Upon confirmation of a connection, coordinate with the property owner to remove the connection. ™ Faulty Cleanouts: Consider ways to ensure that homeowners maintain cleanouts on their property. At a minimum, missing or broken cleanout caps should be replaced. City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx Appendix A APPENDIX A INFILTRATION AND INFLOW ANALYSIS: TEMPERATURE MAPS City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx Page A-1 Figure 24. Temperature Map: Inflow Normalized by ACRE Legend Peak I&I per ACRE 0 – 2,000 GPAD 2,000 – 4,000 4,000 – 6,000 6,000 – 8,000 8,000 – 10,000 10,000 – 12,000 12,000 – 14,000 14,000 – 16,000 16,000 – 18,000 > 18,000 GPAD City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx Page A-2 Figure 25. Temperature Map: Inflow Normalized by ADWF Legend Peak I&I per ADWF 0.0 – 3.0 3.0 – 6.0 6.0 – 9.0 9.0 – 12.0 12.0 – 15.0 15.0 – 18.0 18.0 – 21.0 21.0 – 24.0 24.0 – 27.0 > 27.0 City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx Page A-3 Figure 26. Temperature Map: RDI Normalized by ACRE Legend RDI per ACRE 0 – 150 GPAD 150– 300 300– 450 450– 600 600– 750 750– 900 900– 1,050 1,050– 1,200 1,200– 1,350 > 1,350 GPAD City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx Page A-4 Figure 27. Temperature Map: RDI Normalized by ADWF Legend RDI per ADWF 0.0 – 0.25 0.25 – 0.5 0.5 – 0.75 0.75 – 1.0 1.0 – 1.25 1.25 – 1.5 1.5 – 1.75 1.75 – 2.0 2.0 – 2.25 > 2.25 City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx Page A-5 Figure 28. Temperature Map: Combined I/I Normalized by ACRE (R-Value) Legend R-Value (per acre) 0% – 1% 1% – 2% 2% – 3% 3% – 4% 4% – 5% 5% – 6% 6% – 7% 7% – 8% 8% – 9% > 9% City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx Page A-6 Figure 29. Temperature Map: Combined I/I Normalized by ADWF Legend Combined I&I per ADWF 0.0 – 1.0 1.0 – 2.0 2.0 – 3.0 3.0 – 4.0 4.0 – 5.0 5.0 – 6.0 6.0 – 7.0 7.0 – 8.0 8.0 – 9.0 > 9.0 City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx Appendix B APPENDIX B FLOW MONITORING SITES: DATA, GRAPHS, INFORMATION Monitoring Site: Location: Size/Type Line: Site A.1 Manhole I06-39: Albertson's Parking Lot (near Foothill Boulevard) 10-inch Sanitary Sewer Pipe Temporary Flow Monitoring Study Sanitary Sewer Collection System Data Summary Report Site A.1 Location:Manhole I06-39: Albertson's Parking Lot (near Foothill Boulevard) Diameter:10 Monitoring Site:Site Information Report Average Dry Weather Flow:0.195 Peak Measured Flow:1.597 mgd mgd Sanitary Map Latitude: 35.2932° Longitude:-120.6727° Rim Elevation:240 feet above sea level inches Flow Diagram Satellite Map Plan View Photo Site A.1Monitoring Site:Average Dry Weather Flow0.17Average Dry Weather Flow:mgd0.1950.000.050.100.150.200.250.300.350:001:002:003:004:005:006:007:008:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:0023:00Flow (mgd)WeekdayWeekend Site A.1 Monitoring Site:Level, Velocity and Flow From 10/18/2010 to 10/25/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 10/18 10/19 10/20 10/21 10/22 10/23 10/24Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.91 inches Avg Level: 1.9 in. Peak Level: 2.64 in. Min Level: 1.15 in.4 Avg Velocity: 5.17 fps Peak Velocity: 6.71 fps Min Velocity: 2.74 fps4 Avg Flow: 0.252 mgd Peak Flow: 0.465 mgd Min Flow: 0.068 mgd4 Site A.1 Monitoring Site:Level, Velocity and Flow From 10/25/2010 to 11/1/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 10/25 10/26 10/27 10/28 10/29 10/30 10/31Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.48 inches Avg Level: 1.83 in. Peak Level: 2.42 in. Min Level: 0.93 in.4 Avg Velocity: 5.34 fps Peak Velocity: 6.62 fps Min Velocity: 2.76 fps4 Avg Flow: 0.246 mgd Peak Flow: 0.434 mgd Min Flow: 0.065 mgd42 Site A.1 Monitoring Site:Level, Velocity and Flow From 11/1/2010 to 11/8/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 11/1 11/2 11/3 11/4 11/5 11/6 11/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.4 inches Avg Level: 1.62 in. Peak Level: 2.31 in. Min Level: 1.01 in.4 Avg Velocity: 5.34 fps Peak Velocity: 6.64 fps Min Velocity: 2.84 fps4 Avg Flow: 0.208 mgd Peak Flow: 0.394 mgd Min Flow: 0.055 mgd43 0.000.200.400.600.801.001.201.401.601.802.0030-JanSat31-JanSun1-FebMon2-FebTue3-FebWed4-FebThu5-FebFri6-FebSat7-FebSun8-FebMon9-FebTue10-FebWed11-FebThu12-FebFri13-FebSat14-FebSun15-FebMon16-FebTue17-FebWed18-FebThu19-FebFri20-FebSat21-FebSun22-FebMon23-FebTue24-FebWed25-FebThu26-FebFri27-FebSat28-FebSunFlow (mgd)0.00.10.20.30.40.50.60.70.8Rainfall (in/hr)RainFlowBLFlowSite A.1Monitoring Site:Period Flow Summary0.3940.3830.3630.3500.7060.5580.7030.6110.5360.4800.3770.3540.3470.3440.3430.3320.4340.3920.5280.6130.6010.7140.8310.6490.4950.4600.4400.4160.4060.3720.3610.3500.3480.3230.2680.2560.2520.2420.2360.000.200.400.600.801.001.201/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/28Flow (MGal)0.00.40.81.21.62.02.42.8Rainfall (in/day)0.000.200.400.600.801.001.201.401.601.802.0028-FebSun1-MarMon2-MarTue3-MarWed4-MarThu5-MarFri6-MarSat7-MarSun8-MarMon9-MarTue10-MarWed11-MarThu12-MarFri13-MarSat14-MarSun15-MarMon16-MarTue17-MarWed18-MarThu19-MarFri20-MarSat21-MarSun22-MarMon23-MarTue24-MarWed25-MarThu26-MarFri27-MarSat28-MarSunFlow (mgd)0.00.10.20.30.40.50.60.70.8Rainfall (in/hr)0.4680.4430.7520.6620.4270.3940.3420.3641.0400.7550.5910.5750.4130.3920.2940.2750.2490.000.200.400.600.801.001.201/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/280.00.40.81.21.62.02.42.80.4000.000.200.400.600.801.001.201/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/280.00.40.81.21.62.02.42.8January 30 to March 28, 2010Total Period Rainfall: 6.36 inchesAvg Flow: 0.456 mgd Peak Flow: 1.597 mgd Min Flow: 0.09 mgd Diameter0.02.04.06.08.010.012.002/0202/0302/0402/0502/0602/0702/0802/0902/1002/1102/1202/1302/1402/1502/1602/1702/1802/1902/2002/2102/2202/2302/2402/2502/2602/2702/2803/0103/0203/0303/0403/0503/0603/0703/0803/0903/1003/1103/1203/1303/1403/15Level (inches)Site A.1Monitoring Site:Site Capacity / Surcharge SummaryRealtime Flow Levels with Rainfall Data over Monitoring Period Peak Measured Level:9.85Peak d/D Ratio:0.99Pipe Diameter:10inchesinches Site A.1 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 02/0402/0502/0602/0702/0802/09Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)1.29 0.99 4.37 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 6.64 5.10 d/D Ratio:0.44 1,901,000 5.36Total I/I per ADWF:per in-rain 9.9%R-Value: 193% mgd RDI (% of BL): 0.38 Event 1 Event 1 Detail Graph (2/8/2010) RDI:Acre:971 PkI/I:Acre:2,565 Storm Event I/I Analysis (Rain = 1.82 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: 13,014Total I/I per IDM:per in-rainPkI/I:IDM:12,397 gpd/IDM RDI:IDM:4,694 gpd/IDM Site A.1 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 02/2602/2702/2803/0103/02Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)1.60 1.35 9.85 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 8.20 6.95 d/D Ratio:0.99 2,147,000 5.45Total I/I per ADWF:per in-rain 10.1%R-Value: 223% mgd RDI (% of BL): 0.43 Event 2 Event 2 Detail Graph (3/1/2010) RDI:Acre:1,119 PkI/I:Acre:3,494 Storm Event I/I Analysis (Rain = 2.02 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: 13,233Total I/I per IDM:per in-rainPkI/I:IDM:16,886 gpd/IDM RDI:IDM:5,409 gpd/IDM Site A.1 Monitoring Site:Level, Velocity and Flow From 1/25/2010 to 2/1/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 1/25 1/26 1/27 1/28 1/29 1/30 1/31Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.08 inches Avg Level: 2.47 in. Peak Level: 3.22 in. Min Level: 1.67 in.21 1 Avg Velocity: 6.61 fps Peak Velocity: 7.4 fps Min Velocity: 5.35 fps211 Avg Flow: 0.46 mgd Peak Flow: 0.712 mgd Min Flow: 0.208 mgd211 Site A.1 Monitoring Site:Level, Velocity and Flow From 2/1/2010 to 2/8/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2/1 2/2 2/3 2/4 2/5 2/6 2/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 1.83 inches Avg Level: 2.56 in. Peak Level: 4.37 in. Min Level: 1.39 in.21 2 Avg Velocity: 6.83 fps Peak Velocity: 8.77 fps Min Velocity: 4.74 fps212 Avg Flow: 0.516 mgd Peak Flow: 1.293 mgd Min Flow: 0.142 mgd212 Site A.1 Monitoring Site:Level, Velocity and Flow From 2/8/2010 to 2/15/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2/8 2/9 2/10 2/11 2/12 2/13 2/14Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.61 inches Avg Level: 2.65 in. Peak Level: 3.78 in. Min Level: 1.69 in.21 3 Avg Velocity: 6.86 fps Peak Velocity: 8.3 fps Min Velocity: 5.29 fps213 Avg Flow: 0.53 mgd Peak Flow: 1.011 mgd Min Flow: 0.211 mgd213 Site A.1 Monitoring Site:Level, Velocity and Flow From 2/15/2010 to 2/22/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2/15 2/16 2/17 2/18 2/19 2/20 2/21Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.22 inches Avg Level: 2.17 in. Peak Level: 2.96 in. Min Level: 1.36 in.21 4 Avg Velocity: 6.15 fps Peak Velocity: 7.3 fps Min Velocity: 4.53 fps214 Avg Flow: 0.361 mgd Peak Flow: 0.636 mgd Min Flow: 0.131 mgd214 Site A.1 Monitoring Site:Level, Velocity and Flow From 2/22/2010 to 3/1/2010 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2/22 2/23 2/24 2/25 2/26 2/27 2/28Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 2.47 inches Avg Level: 2.83 in. Peak Level: 9.85 in. Min Level: 1.34 in.21 5 Avg Velocity: 6.62 fps Peak Velocity: 8.79 fps Min Velocity: 3.36 fps215 Avg Flow: 0.546 mgd Peak Flow: 1.597 mgd Min Flow: 0.129 mgd215 Site A.1 Monitoring Site:Level, Velocity and Flow From 3/1/2010 to 3/8/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 3/1 3/2 3/3 3/4 3/5 3/6 3/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 1.03 inches Avg Level: 3.01 in. Peak Level: 3.85 in. Min Level: 2.06 in.21 6 Avg Velocity: 7.19 fps Peak Velocity: 8.27 fps Min Velocity: 5.97 fps216 Avg Flow: 0.653 mgd Peak Flow: 1.025 mgd Min Flow: 0.318 mgd216 Site A.1 Monitoring Site:Level, Velocity and Flow From 3/8/2010 to 3/15/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 3/8 3/9 3/10 3/11 3/12 3/13 3/14Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.16 inches Avg Level: 2.41 in. Peak Level: 3.35 in. Min Level: 1.56 in.21 7 Avg Velocity: 6.4 fps Peak Velocity: 7.49 fps Min Velocity: 4.94 fps217 Avg Flow: 0.432 mgd Peak Flow: 0.766 mgd Min Flow: 0.173 mgd217 Site A.1 Monitoring Site:Level, Velocity and Flow From 3/15/2010 to 3/22/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 3/15 3/16 3/17 3/18 3/19 3/20 3/21Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 2.09 in. Peak Level: 2.93 in. Min Level: 1.32 in.21 8 Avg Velocity: 5.94 fps Peak Velocity: 7.18 fps Min Velocity: 4.17 fps218 Avg Flow: 0.332 mgd Peak Flow: 0.618 mgd Min Flow: 0.115 mgd218 Site A.1 Monitoring Site:Level, Velocity and Flow From 3/22/2010 to 3/29/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 3/22 3/23 3/24 3/25 3/26 3/27 3/28Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 1.81 in. Peak Level: 2.39 in. Min Level: 1.17 in.21 9 Avg Velocity: 5.5 fps Peak Velocity: 6.61 fps Min Velocity: 3.88 fps219 Avg Flow: 0.25 mgd Peak Flow: 0.427 mgd Min Flow: 0.09 mgd219 Monitoring Site: Location: Size/Type Line: Site A.2 Manhole H06-5: 269 Craig Way 6-inch Sanitary Sewer Pipe Temporary Flow Monitoring Study Sanitary Sewer Collection System Data Summary Report Site A.2 Location:Manhole H06-5: 269 Craig Way Diameter:6 Monitoring Site:Site Information Report Average Dry Weather Flow:0.009 Peak Measured Flow:0.104 mgd mgd Sewer Map Satellite View Latitude: 35.2959° Longitude:-120.6817° Rim Elevation:281 feet inches Flow Diagram Street View Site A.2Monitoring Site:Average Dry Weather Flow0.13Average Dry Weather Flow:mgd0.0090.0000.0020.0040.0060.0080.0100.0120.0140.0160.0180:001:002:003:004:005:006:007:008:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:0023:00Flow (mgd)WeekdayWeekend Site A.2 Monitoring Site:Level, Velocity and Flow From 10/18/2010 to 10/25/2010 0.0 0.5 1.0 1.5 2.0 2.5 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 Velocity (fps)Vel 0.000 0.005 0.010 0.015 0.020 0.025 0.030 0.035 0.040 0.045 0.050 10/18 10/19 10/20 10/21 10/22 10/23 10/24Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.91 inches Avg Level: 0.85 in. Peak Level: 1.33 in. Min Level: 0.46 in.3 Avg Velocity: 0.92 fps Peak Velocity: 1.86 fps Min Velocity: 0.49 fps3 Avg Flow: 0.011 mgd Peak Flow: 0.029 mgd Min Flow: 0.002 mgd3 Site A.2 Monitoring Site:Level, Velocity and Flow From 10/25/2010 to 11/1/2010 0.0 0.5 1.0 1.5 2.0 2.5 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 Velocity (fps)Vel 0.000 0.005 0.010 0.015 0.020 0.025 0.030 0.035 0.040 0.045 0.050 10/25 10/26 10/27 10/28 10/29 10/30 10/31Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.48 inches Avg Level: 0.84 in. Peak Level: 1.36 in. Min Level: 0.48 in.3 Avg Velocity: 0.96 fps Peak Velocity: 1.79 fps Min Velocity: 0.53 fps3 Avg Flow: 0.011 mgd Peak Flow: 0.027 mgd Min Flow: 0.003 mgd32 Site A.2 Monitoring Site:Level, Velocity and Flow From 11/1/2010 to 11/8/2010 0.0 0.5 1.0 1.5 2.0 2.5 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 Velocity (fps)Vel 0.000 0.005 0.010 0.015 0.020 0.025 0.030 0.035 0.040 0.045 0.050 11/1 11/2 11/3 11/4 11/5 11/6 11/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.4 inches Avg Level: 0.78 in. Peak Level: 1.21 in. Min Level: 0.42 in.3 Avg Velocity: 0.9 fps Peak Velocity: 1.82 fps Min Velocity: 0.53 fps3 Avg Flow: 0.009 mgd Peak Flow: 0.029 mgd Min Flow: 0.002 mgd33 0.000.020.040.060.080.100.120.140.160.1820-Jan Thu21-Jan Fri22-Jan Sat23-Jan Sun24-Jan Mon25-Jan Tue26-Jan Wed27-Jan Thu28-Jan Fri29-Jan Sat30-Jan Sun31-Jan Mon1-Feb Tue2-Feb Wed3-Feb Thu4-Feb Fri5-Feb Sat6-Feb Sun7-Feb Mon8-Feb Tue9-Feb Wed10-Feb Thu11-Feb Fri12-Feb Sat13-Feb SunFlow (mgd)0.000.050.100.150.200.250.300.350.40Rainfall (in/hr)RainFlowBLFlowSite A.2Monitoring Site:Period Flow Summary0.0150.0160.0090.0080.0080.0090.0090.0100.0110.0100.0110.0110.0110.0100.0090.0080.0100.0110.0110.0310.0220.0380.0220.0180.0190.0310.0180.0150.0120.0130.0130.000.010.020.030.040.050.061/201/211/221/231/241/251/261/271/281/291/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/6Flow (MGal)0.00.40.81.21.62.02.42.8Rainfall (in/day)0.000.020.040.060.080.100.120.140.160.1813-FebSun14-FebMon15-FebTue16-FebWed17-FebThu18-FebFri19-FebSat20-FebSun21-FebMon22-FebTue23-FebWed24-FebThu25-FebFri26-FebSat27-FebSun28-FebMon1-Mar Tue2-Mar Wed3-Mar Thu4-Mar Fri5-Mar Sat6-Mar Sun7-Mar MonFlow (mgd)0.000.050.100.150.200.250.300.350.40Rainfall (in/hr)0.0150.0100.0080.0090.0090.0100.0110.0120.0500.0360.0280.0220.0120.0110.000.010.020.030.040.050.061/201/211/221/231/241/251/261/271/281/291/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/60.00.40.81.21.62.02.42.80.0280.000.010.020.030.040.050.061/201/211/221/231/241/251/261/271/281/291/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/60.00.40.81.21.62.02.42.8January 20 to March 7, 2011 Diameter0.01.02.03.04.05.06.07.002/1402/1502/1602/1702/1802/1902/2002/2102/2202/2302/2402/2502/2602/2702/2803/0103/02Level (inches)Site A.2Monitoring Site:Site Capacity / Surcharge SummaryRealtime Flow Levels with Rainfall Data over Monitoring Period Peak Measured Level:2.25Peak d/D Ratio:0.38Pipe Diameter:6inchesinches Site A.2 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.02 0.04 0.06 0.08 0.10 0.12 02/1402/1502/1602/1702/1802/1902/2002/2102/2202/2302/2402/25Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.104 0.090 2.25 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 11.38 9.81 d/D Ratio:0.38 186,000 6.82Total I/I per ADWF:per in-rain 5.1%R-Value: 196% mgd RDI (% of BL): 0.018 Event 1 Event 1 Detail Graph (2/21/2011) RDI:Acre:396 PkI/I:Acre:1,988 Storm Event I/I Analysis (Rain = 2.97 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: Site A.2 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.01 0.02 0.03 0.04 0.05 0.06 0.07 0.08 0.09 0.10 02/2502/2602/2702/2803/0103/02Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.086 0.076 1.88 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 9.41 8.31 d/D Ratio:0.31 68,000 9.39Total I/I per ADWF:per in-rain 7.0%R-Value: 132% mgd RDI (% of BL): 0.012 Event 2 Event 2 Detail Graph (2/27/2011) RDI:Acre:267 PkI/I:Acre:1,683 Storm Event I/I Analysis (Rain = 0.79 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: Site A.2 Monitoring Site:Level, Velocity and Flow From 1/17/2011 to 1/24/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 1/17 1/18 1/19 1/20 1/21 1/22 1/23Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 0.93 in. Peak Level: 1.25 in. Min Level: 0.56 in.105 1 Avg Velocity: 1.12 fps Peak Velocity: 1.72 fps Min Velocity: 0.53 fps1051 Avg Flow: 0.015 mgd Peak Flow: 0.032 mgd Min Flow: 0.003 mgd1051 Site A.2 Monitoring Site:Level, Velocity and Flow From 1/24/2011 to 1/31/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 1/24 1/25 1/26 1/27 1/28 1/29 1/30Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.23 inches Avg Level: 0.8 in. Peak Level: 1.36 in. Min Level: 0.48 in.105 2 Avg Velocity: 0.82 fps Peak Velocity: 1.42 fps Min Velocity: 0.52 fps1052 Avg Flow: 0.009 mgd Peak Flow: 0.03 mgd Min Flow: 0.003 mgd1052 Site A.2 Monitoring Site:Level, Velocity and Flow From 1/31/2011 to 2/7/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 1/31 2/1 2/2 2/3 2/4 2/5 2/6Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 0.81 in. Peak Level: 1.67 in. Min Level: 0.42 in.105 3 Avg Velocity: 0.94 fps Peak Velocity: 1.72 fps Min Velocity: 0.59 fps1053 Avg Flow: 0.01 mgd Peak Flow: 0.049 mgd Min Flow: 0.002 mgd1053 Site A.2 Monitoring Site:Level, Velocity and Flow From 2/7/2011 to 2/14/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 2/7 2/8 2/9 2/10 2/11 2/12 2/13Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 0.74 in. Peak Level: 1.5 in. Min Level: 0.35 in.105 4 Avg Velocity: 1.03 fps Peak Velocity: 1.83 fps Min Velocity: 0.48 fps1054 Avg Flow: 0.01 mgd Peak Flow: 0.038 mgd Min Flow: 0.002 mgd1054 Site A.2 Monitoring Site:Level, Velocity and Flow From 2/14/2011 to 2/21/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 2/14 2/15 2/16 2/17 2/18 2/19 2/20Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 2.97 inches Avg Level: 1.12 in. Peak Level: 2.25 in. Min Level: 0.46 in.105 5 Avg Velocity: 1.51 fps Peak Velocity: 2.52 fps Min Velocity: 0.35 fps1055 Avg Flow: 0.029 mgd Peak Flow: 0.104 mgd Min Flow: 0.002 mgd1055 Site A.2 Monitoring Site:Level, Velocity and Flow From 2/21/2011 to 2/28/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 2/21 2/22 2/23 2/24 2/25 2/26 2/27Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.79 inches Avg Level: 1.1 in. Peak Level: 1.88 in. Min Level: 0.69 in.105 6 Avg Velocity: 1.44 fps Peak Velocity: 2.55 fps Min Velocity: 0.89 fps1056 Avg Flow: 0.024 mgd Peak Flow: 0.086 mgd Min Flow: 0.008 mgd1056 Site A.2 Monitoring Site:Level, Velocity and Flow From 2/28/2011 to 3/7/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 2/28 3/1 3/2 3/3 3/4 3/5 3/6Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.22 inches Avg Level: 0.87 in. Peak Level: 1.38 in. Min Level: 0.54 in.105 7 Avg Velocity: 1.15 fps Peak Velocity: 1.83 fps Min Velocity: 0.81 fps1057 Avg Flow: 0.014 mgd Peak Flow: 0.039 mgd Min Flow: 0.005 mgd1057 Site A.2 Monitoring Site:Level, Velocity and Flow From 3/7/2011 to 3/14/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 3/7 3/8 3/9 3/10 3/11 3/12 3/13Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.04 inches Avg Level: 0.83 in. Peak Level: 1.23 in. Min Level: 0.59 in.105 8 Avg Velocity: 1.19 fps Peak Velocity: 1.64 fps Min Velocity: 0.81 fps1058 Avg Flow: 0.013 mgd Peak Flow: 0.031 mgd Min Flow: 0.005 mgd1058 Monitoring Site: Location: Size/Type Line: Site A.3 Manhole H05-38: 124 Highland Drive 6-inch Sanitary Sewer Pipe Temporary Flow Monitoring Study Sanitary Sewer Collection System Data Summary Report Site A.3 Location:Manhole H05-38: 124 Highland Drive Diameter:6 Monitoring Site:Site Information Report Average Dry Weather Flow:0.003 Peak Measured Flow:0.039 mgd mgd Sewer Map Satellite View Latitude: 35.2981° Longitude:-120.6852° Rim Elevation:350 feet inches Flow Diagram Street View Site A.3Monitoring Site:Average Dry Weather Flow0.22Average Dry Weather Flow:mgd0.0030.0000.0010.0020.0030.0040.0050.0060.0070.0080:001:002:003:004:005:006:007:008:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:0023:00Flow (mgd)WeekdayWeekend Site A.3 Monitoring Site:Level, Velocity and Flow From 10/18/2010 to 10/25/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Velocity (fps)Vel 0.000 0.005 0.010 0.015 0.020 0.025 0.030 0.035 10/18 10/19 10/20 10/21 10/22 10/23 10/24Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.91 inches Avg Level: 1.38 in. Peak Level: 2.08 in. Min Level: 1 in.2 Avg Velocity: 0.17 fps Peak Velocity: 0.35 fps Min Velocity: 0.03 fps2 Avg Flow: 0.004 mgd Peak Flow: 0.013 mgd Min Flow: 0 mgd2 Site A.3 Monitoring Site:Level, Velocity and Flow From 10/25/2010 to 11/1/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Velocity (fps)Vel 0.000 0.005 0.010 0.015 0.020 0.025 0.030 0.035 10/25 10/26 10/27 10/28 10/29 10/30 10/31Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.48 inches Avg Level: 1.34 in. Peak Level: 2.26 in. Min Level: 0.98 in.2 Avg Velocity: 0.17 fps Peak Velocity: 0.42 fps Min Velocity: 0.06 fps2 Avg Flow: 0.004 mgd Peak Flow: 0.019 mgd Min Flow: 0.001 mgd22 Site A.3 Monitoring Site:Level, Velocity and Flow From 11/1/2010 to 11/8/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Velocity (fps)Vel 0.000 0.005 0.010 0.015 0.020 0.025 0.030 0.035 11/1 11/2 11/3 11/4 11/5 11/6 11/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.4 inches Avg Level: 1.3 in. Peak Level: 1.92 in. Min Level: 0.96 in.2 Avg Velocity: 0.16 fps Peak Velocity: 0.38 fps Min Velocity: 0.04 fps2 Avg Flow: 0.004 mgd Peak Flow: 0.012 mgd Min Flow: 0.001 mgd23 0.000.010.020.030.040.050.060.0720-Jan Thu21-Jan Fri22-Jan Sat23-Jan Sun24-Jan Mon25-Jan Tue26-Jan Wed27-Jan Thu28-Jan Fri29-Jan Sat30-Jan Sun31-Jan Mon1-Feb Tue2-Feb Wed3-Feb Thu4-Feb Fri5-Feb Sat6-Feb Sun7-Feb Mon8-Feb Tue9-Feb Wed10-Feb Thu11-Feb Fri12-Feb Sat13-Feb SunFlow (mgd)0.000.050.100.150.200.250.300.350.40Rainfall (in/hr)RainFlowBLFlowSite A.3Monitoring Site:Period Flow Summary0.0100.0090.0090.0090.0090.0090.0070.0080.0060.0070.0070.0060.0070.0070.0070.0060.0070.0060.0070.0120.0110.0140.0150.0120.0130.0160.0140.0130.0130.0120.0130.000.010.010.020.020.031/201/211/221/231/241/251/261/271/281/291/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/6Flow (MGal)0.00.40.81.21.62.02.42.8Rainfall (in/day)0.000.010.020.030.040.050.060.0713-FebSun14-FebMon15-FebTue16-FebWed17-FebThu18-FebFri19-FebSat20-FebSun21-FebMon22-FebTue23-FebWed24-FebThu25-FebFri26-FebSat27-FebSun28-FebMon1-Mar Tue2-Mar Wed3-Mar Thu4-Mar Fri5-Mar Sat6-Mar Sun7-Mar MonFlow (mgd)0.000.050.100.150.200.250.300.350.40Rainfall (in/hr)0.0100.0100.0070.0070.0070.0080.0070.0060.0210.0180.0170.0150.0140.0120.000.010.010.020.020.031/201/211/221/231/241/251/261/271/281/291/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/60.00.40.81.21.62.02.42.80.0160.000.010.010.020.020.031/201/211/221/231/241/251/261/271/281/291/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/60.00.40.81.21.62.02.42.8January 20 to March 7, 2011 Diameter0.01.02.03.04.05.06.07.002/1402/1502/1602/1702/1802/1902/2002/2102/2202/2302/2402/2502/2602/2702/2803/0103/02Level (inches)Site A.3Monitoring Site:Site Capacity / Surcharge SummaryRealtime Flow Levels with Rainfall Data over Monitoring Period Peak Measured Level:2.62Peak d/D Ratio:0.44Pipe Diameter:6inchesinches Site A.3 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.01 0.01 0.02 0.02 0.03 0.03 02/1402/1502/1602/1702/1802/1902/2002/2102/2202/2302/2402/25Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.029 0.025 2.51 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 8.46 7.33 d/D Ratio:0.42 108,000 10.82Total I/I per ADWF:per in-rain 6.3%R-Value: 368% mgd RDI (% of BL): 0.012 Event 1 Event 1 Detail Graph (2/21/2011) RDI:Acre:584 PkI/I:Acre:1,164 Storm Event I/I Analysis (Rain = 2.97 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: Site A.3 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.01 0.01 0.02 0.02 0.03 0.03 0.04 02/2502/2602/2702/2803/0103/02Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.029 0.025 2.62 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 8.55 7.51 d/D Ratio:0.44 58,000 21.71Total I/I per ADWF:per in-rain 12.7%R-Value: 356% mgd RDI (% of BL): 0.012 Event 2 Event 2 Detail Graph (2/27/2011) RDI:Acre:565 PkI/I:Acre:1,192 Storm Event I/I Analysis (Rain = 0.79 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: Site A.3 Monitoring Site:Level, Velocity and Flow From 1/17/2011 to 1/24/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.2 0.4 0.6 0.8 1.0 1.2 Velocity (fps)Vel 0.00 0.01 0.02 0.03 0.04 0.05 0.06 0.07 1/17 1/18 1/19 1/20 1/21 1/22 1/23Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 1.82 in. Peak Level: 2.27 in. Min Level: 1.61 in.104 1 Avg Velocity: 0.31 fps Peak Velocity: 0.44 fps Min Velocity: 0.21 fps1041 Avg Flow: 0.01 mgd Peak Flow: 0.019 mgd Min Flow: 0.006 mgd1041 Site A.3 Monitoring Site:Level, Velocity and Flow From 1/24/2011 to 1/31/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.2 0.4 0.6 0.8 1.0 1.2 Velocity (fps)Vel 0.00 0.01 0.02 0.03 0.04 0.05 0.06 0.07 1/24 1/25 1/26 1/27 1/28 1/29 1/30Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.23 inches Avg Level: 1.7 in. Peak Level: 2.97 in. Min Level: 1.35 in.104 2 Avg Velocity: 0.27 fps Peak Velocity: 0.62 fps Min Velocity: 0.14 fps1042 Avg Flow: 0.008 mgd Peak Flow: 0.039 mgd Min Flow: 0.003 mgd1042 Site A.3 Monitoring Site:Level, Velocity and Flow From 1/31/2011 to 2/7/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.2 0.4 0.6 0.8 1.0 1.2 Velocity (fps)Vel 0.00 0.01 0.02 0.03 0.04 0.05 0.06 0.07 1/31 2/1 2/2 2/3 2/4 2/5 2/6Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 1.62 in. Peak Level: 2.66 in. Min Level: 1.41 in.104 3 Avg Velocity: 0.25 fps Peak Velocity: 0.56 fps Min Velocity: 0.15 fps1043 Avg Flow: 0.007 mgd Peak Flow: 0.03 mgd Min Flow: 0.003 mgd1043 Site A.3 Monitoring Site:Level, Velocity and Flow From 2/7/2011 to 2/14/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.2 0.4 0.6 0.8 1.0 1.2 Velocity (fps)Vel 0.00 0.01 0.02 0.03 0.04 0.05 0.06 0.07 2/7 2/8 2/9 2/10 2/11 2/12 2/13Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 1.6 in. Peak Level: 2.1 in. Min Level: 1.39 in.104 4 Avg Velocity: 0.24 fps Peak Velocity: 0.4 fps Min Velocity: 0.14 fps1044 Avg Flow: 0.007 mgd Peak Flow: 0.016 mgd Min Flow: 0.003 mgd1044 Site A.3 Monitoring Site:Level, Velocity and Flow From 2/14/2011 to 2/21/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.2 0.4 0.6 0.8 1.0 1.2 Velocity (fps)Vel 0.00 0.01 0.02 0.03 0.04 0.05 0.06 0.07 2/14 2/15 2/16 2/17 2/18 2/19 2/20Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 2.97 inches Avg Level: 1.93 in. Peak Level: 2.51 in. Min Level: 1.38 in.104 5 Avg Velocity: 0.34 fps Peak Velocity: 0.57 fps Min Velocity: 0.12 fps1045 Avg Flow: 0.013 mgd Peak Flow: 0.028 mgd Min Flow: 0.003 mgd1045 Site A.3 Monitoring Site:Level, Velocity and Flow From 2/21/2011 to 2/28/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.2 0.4 0.6 0.8 1.0 1.2 Velocity (fps)Vel 0.00 0.01 0.02 0.03 0.04 0.05 0.06 0.07 2/21 2/22 2/23 2/24 2/25 2/26 2/27Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.79 inches Avg Level: 2.07 in. Peak Level: 2.62 in. Min Level: 1.76 in.104 6 Avg Velocity: 0.38 fps Peak Velocity: 0.54 fps Min Velocity: 0.24 fps1046 Avg Flow: 0.015 mgd Peak Flow: 0.029 mgd Min Flow: 0.008 mgd1046 Site A.3 Monitoring Site:Level, Velocity and Flow From 2/28/2011 to 3/7/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.2 0.4 0.6 0.8 1.0 1.2 Velocity (fps)Vel 0.00 0.01 0.02 0.03 0.04 0.05 0.06 0.07 2/28 3/1 3/2 3/3 3/4 3/5 3/6Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.22 inches Avg Level: 2.02 in. Peak Level: 2.48 in. Min Level: 1.85 in.104 7 Avg Velocity: 0.34 fps Peak Velocity: 0.54 fps Min Velocity: 0.25 fps1047 Avg Flow: 0.013 mgd Peak Flow: 0.027 mgd Min Flow: 0.009 mgd1047 Site A.3 Monitoring Site:Level, Velocity and Flow From 3/7/2011 to 3/14/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.2 0.4 0.6 0.8 1.0 1.2 Velocity (fps)Vel 0.00 0.01 0.02 0.03 0.04 0.05 0.06 0.07 3/7 3/8 3/9 3/10 3/11 3/12 3/13Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.04 inches Avg Level: 2.02 in. Peak Level: 2.47 in. Min Level: 1.84 in.104 8 Avg Velocity: 0.33 fps Peak Velocity: 0.45 fps Min Velocity: 0.27 fps1048 Avg Flow: 0.013 mgd Peak Flow: 0.022 mgd Min Flow: 0.009 mgd1048 Monitoring Site: Location: Size/Type Line: Site A.4 Manhole H04-37: 268 Westmont Avenue 8-inch Sanitary Sewer Pipe Temporary Flow Monitoring Study Sanitary Sewer Collection System Data Summary Report Site A.4 Location:Manhole H04-37: 268 Westmont Avenue Diameter:8 Monitoring Site:Site Information Report Average Dry Weather Flow:0.032 Peak Measured Flow:0.102 mgd mgd Sewer Map Satellite View Latitude: 35.3014° Longitude:-120.6818° Rim Elevation:296 feet inches Flow Diagram Street View Site A.4Monitoring Site:Average Dry Weather Flow0.14Average Dry Weather Flow:mgd0.0320.000.010.020.030.040.050.060.070:001:002:003:004:005:006:007:008:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:0023:00Flow (mgd)WeekdayWeekend Site A.4 Monitoring Site:Level, Velocity and Flow From 10/18/2010 to 10/25/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 0.20 10/18 10/19 10/20 10/21 10/22 10/23 10/24Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.91 inches Avg Level: 1.29 in. Peak Level: 2.5 in. Min Level: 0.68 in. Avg Velocity: 1.53 fps Peak Velocity: 3.37 fps Min Velocity: 0.19 fps Avg Flow: 0.039 mgd Peak Flow: 0.112 mgd Min Flow: 0.002 mgd Site A.4 Monitoring Site:Level, Velocity and Flow From 10/25/2010 to 11/1/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 0.20 10/25 10/26 10/27 10/28 10/29 10/30 10/31Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.48 inches Avg Level: 1.22 in. Peak Level: 1.87 in. Min Level: 0.74 in. Avg Velocity: 1.84 fps Peak Velocity: 3.55 fps Min Velocity: 0.31 fps Avg Flow: 0.042 mgd Peak Flow: 0.106 mgd Min Flow: 0.004 mgd2 Site A.4 Monitoring Site:Level, Velocity and Flow From 11/1/2010 to 11/8/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 0.20 11/1 11/2 11/3 11/4 11/5 11/6 11/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.4 inches Avg Level: 1.14 in. Peak Level: 1.99 in. Min Level: 0.44 in. Avg Velocity: 1.53 fps Peak Velocity: 3.36 fps Min Velocity: 0.17 fps Avg Flow: 0.033 mgd Peak Flow: 0.088 mgd Min Flow: 0.001 mgd3 0.000.020.040.060.080.100.120.140.160.1820-Jan Thu21-Jan Fri22-Jan Sat23-Jan Sun24-Jan Mon25-Jan Tue26-Jan Wed27-Jan Thu28-Jan Fri29-Jan Sat30-Jan Sun31-Jan Mon1-Feb Tue2-Feb Wed3-Feb Thu4-Feb Fri5-Feb Sat6-Feb Sun7-Feb Mon8-Feb Tue9-Feb Wed10-Feb Thu11-Feb Fri12-Feb Sat13-Feb SunFlow (mgd)0.000.050.100.150.200.250.300.350.40Rainfall (in/hr)RainFlowBLFlowSite A.4Monitoring Site:Period Flow Summary0.0320.0350.0300.0350.0350.0350.0330.0340.0330.0360.0340.0290.0340.0340.0390.0360.0340.0340.0330.0440.0420.0510.0440.0410.0380.0470.0380.0340.0350.0400.0360.000.010.020.030.040.050.061/201/211/221/231/241/251/261/271/281/291/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/6Flow (MGal)0.00.40.81.21.62.02.42.8Rainfall (in/day)0.000.020.040.060.080.100.120.140.160.1813-FebSun14-FebMon15-FebTue16-FebWed17-FebThu18-FebFri19-FebSat20-FebSun21-FebMon22-FebTue23-FebWed24-FebThu25-FebFri26-FebSat27-FebSun28-FebMon1-Mar Tue2-Mar Wed3-Mar Thu4-Mar Fri5-Mar Sat6-Mar Sun7-Mar MonFlow (mgd)0.000.050.100.150.200.250.300.350.40Rainfall (in/hr)0.0380.0330.0340.0360.0330.0370.0330.0360.0550.0560.0510.0460.0380.0350.000.010.020.030.040.050.061/201/211/221/231/241/251/261/271/281/291/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/60.00.40.81.21.62.02.42.80.0540.000.010.020.030.040.050.061/201/211/221/231/241/251/261/271/281/291/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/60.00.40.81.21.62.02.42.8January 20 to March 7, 2011 Diameter0.01.02.03.04.05.06.07.08.09.002/1402/1502/1602/1702/1802/1902/2002/2102/2202/2302/2402/2502/2602/2702/2803/0103/02Level (inches)Site A.4Monitoring Site:Site Capacity / Surcharge SummaryRealtime Flow Levels with Rainfall Data over Monitoring Period Peak Measured Level:1.5Peak d/D Ratio:0.19Pipe Diameter:8inchesinches Site A.4 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.02 0.04 0.06 0.08 0.10 0.12 02/1402/1502/1602/1702/1802/1902/2002/2102/2202/2302/2402/25Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.102 0.057 1.36 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 3.15 1.78 d/D Ratio:0.17 137,000 1.43Total I/I per ADWF:per in-rain 2.2%R-Value: 60% mgd RDI (% of BL): 0.019 Event 1 Event 1 Detail Graph (2/21/2011) RDI:Acre:247 PkI/I:Acre:736 Storm Event I/I Analysis (Rain = 2.98 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: Site A.4 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.01 0.02 0.03 0.04 0.05 0.06 0.07 0.08 0.09 0.10 02/2502/2602/2702/2803/0103/02Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.086 0.040 1.50 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 2.66 1.25 d/D Ratio:0.19 53,000 2.13Total I/I per ADWF:per in-rain 3.2%R-Value: 34% mgd RDI (% of BL): 0.011 Event 2 Event 2 Detail Graph (2/27/2011) RDI:Acre:141 PkI/I:Acre:518 Storm Event I/I Analysis (Rain = 0.77 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: Site A.4 Monitoring Site:Level, Velocity and Flow From 1/17/2011 to 1/24/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 1/17 1/18 1/19 1/20 1/21 1/22 1/23Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 0.94 in. Peak Level: 1.31 in. Min Level: 0.43 in.103 1 Avg Velocity: 2.1 fps Peak Velocity: 3.81 fps Min Velocity: 0.37 fps1031 Avg Flow: 0.034 mgd Peak Flow: 0.089 mgd Min Flow: 0.002 mgd1031 Site A.4 Monitoring Site:Level, Velocity and Flow From 1/24/2011 to 1/31/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 1/24 1/25 1/26 1/27 1/28 1/29 1/30Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.21 inches Avg Level: 0.95 in. Peak Level: 1.26 in. Min Level: 0.41 in.103 2 Avg Velocity: 2.03 fps Peak Velocity: 3.77 fps Min Velocity: 0.4 fps1032 Avg Flow: 0.034 mgd Peak Flow: 0.082 mgd Min Flow: 0.002 mgd1032 Site A.4 Monitoring Site:Level, Velocity and Flow From 1/31/2011 to 2/7/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 1/31 2/1 2/2 2/3 2/4 2/5 2/6Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 0.95 in. Peak Level: 1.32 in. Min Level: 0.31 in.103 3 Avg Velocity: 2.01 fps Peak Velocity: 3.77 fps Min Velocity: 0.18 fps1033 Avg Flow: 0.034 mgd Peak Flow: 0.079 mgd Min Flow: 0.002 mgd1033 Site A.4 Monitoring Site:Level, Velocity and Flow From 2/7/2011 to 2/14/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 2/7 2/8 2/9 2/10 2/11 2/12 2/13Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 0.96 in. Peak Level: 1.57 in. Min Level: 0.45 in.103 4 Avg Velocity: 2.06 fps Peak Velocity: 3.81 fps Min Velocity: 0.26 fps1034 Avg Flow: 0.035 mgd Peak Flow: 0.083 mgd Min Flow: 0.001 mgd1034 Site A.4 Monitoring Site:Level, Velocity and Flow From 2/14/2011 to 2/21/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 2/14 2/15 2/16 2/17 2/18 2/19 2/20Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 2.98 inches Avg Level: 1.02 in. Peak Level: 1.36 in. Min Level: 0.47 in.103 5 Avg Velocity: 2.5 fps Peak Velocity: 4.1 fps Min Velocity: 0.49 fps1035 Avg Flow: 0.045 mgd Peak Flow: 0.102 mgd Min Flow: 0.003 mgd1035 Site A.4 Monitoring Site:Level, Velocity and Flow From 2/21/2011 to 2/28/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 2/21 2/22 2/23 2/24 2/25 2/26 2/27Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.77 inches Avg Level: 1.06 in. Peak Level: 1.36 in. Min Level: 0.8 in.103 6 Avg Velocity: 2.54 fps Peak Velocity: 3.92 fps Min Velocity: 0.69 fps1036 Avg Flow: 0.046 mgd Peak Flow: 0.086 mgd Min Flow: 0.009 mgd1036 Site A.4 Monitoring Site:Level, Velocity and Flow From 2/28/2011 to 3/7/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 2/28 3/1 3/2 3/3 3/4 3/5 3/6Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.22 inches Avg Level: 1 in. Peak Level: 1.5 in. Min Level: 0.6 in.103 7 Avg Velocity: 2.14 fps Peak Velocity: 3.86 fps Min Velocity: 0.39 fps1037 Avg Flow: 0.036 mgd Peak Flow: 0.079 mgd Min Flow: 0.004 mgd1037 Site A.4 Monitoring Site:Level, Velocity and Flow From 3/7/2011 to 3/14/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 3/7 3/8 3/9 3/10 3/11 3/12 3/13Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.04 inches Avg Level: 0.94 in. Peak Level: 1.21 in. Min Level: 0.61 in.103 8 Avg Velocity: 2.15 fps Peak Velocity: 3.84 fps Min Velocity: 0.45 fps1038 Avg Flow: 0.034 mgd Peak Flow: 0.074 mgd Min Flow: 0.004 mgd1038 Monitoring Site: Location: Size/Type Line: Site B.1 Manhole J08-33: Chorro Street south of Lincoln Street 15-inch Sanitary Sewer Pipe Temporary Flow Monitoring Study Sanitary Sewer Collection System Data Summary Report Site B.1 Location:Manhole J08-33: Chorro Street south of Lincoln Street Diameter:15 Monitoring Site:Site Information Report Average Dry Weather Flow:0.302 Peak Measured Flow:2.696 mgd mgd Sanitary Map Latitude: 35.2846° Longitude:-120.6671° Rim Elevation:189 feet above sea level inches Flow Diagram Satellite Map Street View Photo Site B.1Monitoring Site:Average Dry Weather Flow0.12Average Dry Weather Flow:mgd0.3020.000.100.200.300.400.500.600:001:002:003:004:005:006:007:008:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:0023:00Flow (mgd)WeekdayWeekend Site B.1 Monitoring Site:Level, Velocity and Flow From 10/18/2010 to 10/25/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 10/18 10/19 10/20 10/21 10/22 10/23 10/24Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.91 inches Avg Level: 1.73 in. Peak Level: 3.24 in. Min Level: 0.37 in.7 Avg Velocity: 6.19 fps Peak Velocity: 7.53 fps Min Velocity: 4 fps7 Avg Flow: 0.347 mgd Peak Flow: 0.945 mgd Min Flow: 0.021 mgd7 Site B.1 Monitoring Site:Level, Velocity and Flow From 10/25/2010 to 11/1/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 10/25 10/26 10/27 10/28 10/29 10/30 10/31Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.48 inches Avg Level: 1.9 in. Peak Level: 2.98 in. Min Level: 0.84 in.7 Avg Velocity: 6.34 fps Peak Velocity: 7.39 fps Min Velocity: 4.44 fps7 Avg Flow: 0.38 mgd Peak Flow: 0.799 mgd Min Flow: 0.079 mgd72 Site B.1 Monitoring Site:Level, Velocity and Flow From 11/1/2010 to 11/8/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 11/1 11/2 11/3 11/4 11/5 11/6 11/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.4 inches Avg Level: 1.78 in. Peak Level: 2.5 in. Min Level: 0.9 in.7 Avg Velocity: 6.23 fps Peak Velocity: 7.3 fps Min Velocity: 4.26 fps7 Avg Flow: 0.343 mgd Peak Flow: 0.619 mgd Min Flow: 0.092 mgd73 0.000.501.001.502.002.503.0030-JanSat31-JanSun1-FebMon2-FebTue3-FebWed4-FebThu5-FebFri6-FebSat7-FebSun8-FebMon9-FebTue10-FebWed11-FebThu12-FebFri13-FebSat14-FebSun15-FebMon16-FebTue17-FebWed18-FebThu19-FebFri20-FebSat21-FebSun22-FebMon23-FebTue24-FebWed25-FebThu26-FebFri27-FebSat28-FebSunFlow (mgd)0.00.10.20.30.40.50.60.70.8Rainfall (in/hr)RainFlowBLFlowSite B.1Monitoring Site:Period Flow Summary0.5760.5530.5260.5311.1780.8981.1910.9910.8440.7150.5910.5320.4920.4820.5290.5050.6180.5720.9171.0100.8921.1261.4210.9640.7270.6520.6270.6150.5880.5910.5880.5510.5630.5330.3920.3780.4080.4050.3940.000.501.001.502.001/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/28Flow (MGal)0.00.40.81.21.62.02.42.8Rainfall (in/day)0.000.501.001.502.002.5028-FebSun1-MarMon2-MarTue3-MarWed4-MarThu5-MarFri6-MarSat7-MarSun8-MarMon9-MarTue10-MarWed11-MarThu12-MarFri13-MarSat14-MarSun15-MarMon16-MarTue17-MarWed18-MarThu19-MarFri20-MarSat21-MarSun22-MarMon23-MarTue24-MarWed25-MarThu26-MarFri27-MarSat28-MarSunFlow (mgd)0.00.10.20.30.40.50.60.70.8Rainfall (in/hr)0.6580.6841.3441.1880.5480.5060.5460.5881.8691.3190.8870.8820.6280.6140.4900.4330.4240.4350.000.501.001.502.001/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/280.00.40.81.21.62.02.42.80.5330.000.501.001.502.001/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/280.00.40.81.21.62.02.42.8January 30 to March 28, 2010Total Period Rainfall: 6.29 inchesAvg Flow: 0.711 mgd Peak Flow: 2.696 mgd Min Flow: 0.152 mgd Diameter0.02.04.06.08.010.012.014.016.002/0202/0302/0402/0502/0602/0702/0802/0902/1002/1102/1202/1302/1402/1502/1602/1702/1802/1902/2002/2102/2202/2302/2402/2502/2602/2702/2803/0103/0203/0303/0403/0503/0603/0703/0803/0903/1003/1103/1203/1303/1403/15Level (inches)Site B.1Monitoring Site:Site Capacity / Surcharge SummaryRealtime Flow Levels with Rainfall Data over Monitoring Period Peak Measured Level:5.98Peak d/D Ratio:0.40Pipe Diameter:15inchesinches Site B.1 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.50 1.00 1.50 2.00 2.50 02/0402/0502/0602/0702/0802/09Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)2.14 1.69 5.20 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 7.10 5.59 d/D Ratio:0.35 3,415,000 6.44Total I/I per ADWF:per in-rain 38.4%R-Value: 202% mgd RDI (% of BL): 0.61 Event 1 Event 1 Detail Graph (2/8/2010) RDI:Acre:3,272 PkI/I:Acre:9,055 Storm Event I/I Analysis (Rain = 1.76 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: 48,686Total I/I per IDM:per in-rainPkI/I:IDM:42,253 gpd/IDM RDI:IDM:15,269 gpd/IDM Site B.1 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.50 1.00 1.50 2.00 2.50 3.00 02/2602/2702/2803/0103/02Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)2.70 2.29 5.98 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 8.94 7.61 d/D Ratio:0.40 3,900,000 6.33Total I/I per ADWF:per in-rain 37.8%R-Value: 240% mgd RDI (% of BL): 0.72 Event 2 Event 2 Detail Graph (3/1/2010) RDI:Acre:3,889 PkI/I:Acre:12,324 Storm Event I/I Analysis (Rain = 2.04 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: 47,851Total I/I per IDM:per in-rainPkI/I:IDM:57,506 gpd/IDM RDI:IDM:18,146 gpd/IDM Site B.1 Monitoring Site:Level, Velocity and Flow From 1/25/2010 to 2/1/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 Velocity (fps)Vel 0.00 0.50 1.00 1.50 2.00 2.50 1/25 1/26 1/27 1/28 1/29 1/30 1/31Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.08 inches Avg Level: 2.65 in. Peak Level: 3.61 in. Min Level: 1.83 in.51 1 Avg Velocity: 7.04 fps Peak Velocity: 7.99 fps Min Velocity: 5.46 fps511 Avg Flow: 0.68 mgd Peak Flow: 1.173 mgd Min Flow: 0.304 mgd511 Site B.1 Monitoring Site:Level, Velocity and Flow From 2/1/2010 to 2/8/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 Velocity (fps)Vel 0.00 0.50 1.00 1.50 2.00 2.50 2/1 2/2 2/3 2/4 2/5 2/6 2/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 1.76 inches Avg Level: 2.94 in. Peak Level: 5.2 in. Min Level: 1.38 in.51 2 Avg Velocity: 7.17 fps Peak Velocity: 8.77 fps Min Velocity: 4.84 fps512 Avg Flow: 0.842 mgd Peak Flow: 2.14 mgd Min Flow: 0.177 mgd512 Site B.1 Monitoring Site:Level, Velocity and Flow From 2/8/2010 to 2/15/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 Velocity (fps)Vel 0.00 0.50 1.00 1.50 2.00 2.50 2/8 2/9 2/10 2/11 2/12 2/13 2/14Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.57 inches Avg Level: 2.9 in. Peak Level: 4.87 in. Min Level: 1.72 in.51 3 Avg Velocity: 7.26 fps Peak Velocity: 8.64 fps Min Velocity: 5.38 fps513 Avg Flow: 0.814 mgd Peak Flow: 1.925 mgd Min Flow: 0.275 mgd513 Site B.1 Monitoring Site:Level, Velocity and Flow From 2/15/2010 to 2/22/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 Velocity (fps)Vel 0.00 0.50 1.00 1.50 2.00 2.50 2/15 2/16 2/17 2/18 2/19 2/20 2/21Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.23 inches Avg Level: 2.32 in. Peak Level: 3.58 in. Min Level: 1.52 in.51 4 Avg Velocity: 6.66 fps Peak Velocity: 7.98 fps Min Velocity: 4.83 fps514 Avg Flow: 0.538 mgd Peak Flow: 1.161 mgd Min Flow: 0.208 mgd514 Site B.1 Monitoring Site:Level, Velocity and Flow From 2/22/2010 to 3/1/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 Velocity (fps)Vel 0.00 0.50 1.00 1.50 2.00 2.50 3.00 2/22 2/23 2/24 2/25 2/26 2/27 2/28Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 2.5 inches Avg Level: 3.02 in. Peak Level: 5.98 in. Min Level: 1.48 in.51 5 Avg Velocity: 7.26 fps Peak Velocity: 9.14 fps Min Velocity: 4.78 fps515 Avg Flow: 0.904 mgd Peak Flow: 2.696 mgd Min Flow: 0.202 mgd515 Site B.1 Monitoring Site:Level, Velocity and Flow From 3/1/2010 to 3/8/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 Velocity (fps)Vel 0.00 0.50 1.00 1.50 2.00 2.50 3/1 3/2 3/3 3/4 3/5 3/6 3/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 1.03 inches Avg Level: 3.31 in. Peak Level: 4.67 in. Min Level: 2.23 in.51 6 Avg Velocity: 7.76 fps Peak Velocity: 8.67 fps Min Velocity: 6.33 fps516 Avg Flow: 1.026 mgd Peak Flow: 1.824 mgd Min Flow: 0.466 mgd516 Site B.1 Monitoring Site:Level, Velocity and Flow From 3/8/2010 to 3/15/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 Velocity (fps)Vel 0.00 0.50 1.00 1.50 2.00 2.50 3/8 3/9 3/10 3/11 3/12 3/13 3/14Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.16 inches Avg Level: 2.54 in. Peak Level: 3.45 in. Min Level: 1.8 in.51 7 Avg Velocity: 6.98 fps Peak Velocity: 8.13 fps Min Velocity: 5.38 fps517 Avg Flow: 0.636 mgd Peak Flow: 1.121 mgd Min Flow: 0.301 mgd517 Site B.1 Monitoring Site:Level, Velocity and Flow From 3/15/2010 to 3/22/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 Velocity (fps)Vel 0.00 0.50 1.00 1.50 2.00 2.50 3/15 3/16 3/17 3/18 3/19 3/20 3/21Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 2.32 in. Peak Level: 3.23 in. Min Level: 1.47 in.51 8 Avg Velocity: 6.63 fps Peak Velocity: 7.76 fps Min Velocity: 4.63 fps518 Avg Flow: 0.536 mgd Peak Flow: 0.965 mgd Min Flow: 0.189 mgd518 Site B.1 Monitoring Site:Level, Velocity and Flow From 3/22/2010 to 3/29/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 Velocity (fps)Vel 0.00 0.50 1.00 1.50 2.00 2.50 3/22 3/23 3/24 3/25 3/26 3/27 3/28Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 2.02 in. Peak Level: 2.8 in. Min Level: 1.3 in.51 9 Avg Velocity: 6.11 fps Peak Velocity: 7.45 fps Min Velocity: 4.37 fps519 Avg Flow: 0.405 mgd Peak Flow: 0.735 mgd Min Flow: 0.152 mgd519 Monitoring Site: Location: Size/Type Line: Site B.2 Manhole J07-8: 81 Broad Street 10-inch Sanitary Sewer Pipe Temporary Flow Monitoring Study Sanitary Sewer Collection System Data Summary Report Site B.2 Location:Manhole J07-8: 81 Broad Street Diameter:10 Monitoring Site:Site Information Report Average Dry Weather Flow:0.024 Peak Measured Flow:0.124 mgd mgd Sewer Map Satellite View Latitude: 35.2912° Longitude:-120.6717° Rim Elevation:227 feet inches Flow Diagram Street View Site B.2Monitoring Site:Average Dry Weather Flow0.12Average Dry Weather Flow:mgd0.0240.0000.0050.0100.0150.0200.0250.0300.0350.0400.0450.0500:001:002:003:004:005:006:007:008:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:0023:00Flow (mgd)WeekdayWeekend Site B.2 Monitoring Site:Level, Velocity and Flow From 10/18/2010 to 10/25/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.000 0.020 0.040 0.060 0.080 0.100 0.120 10/18 10/19 10/20 10/21 10/22 10/23 10/24Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.91 inches Avg Level: 1.23 in. Peak Level: 1.81 in. Min Level: 0.63 in.6 Avg Velocity: 0.98 fps Peak Velocity: 1.55 fps Min Velocity: 0.4 fps6 Avg Flow: 0.026 mgd Peak Flow: 0.063 mgd Min Flow: 0.004 mgd6 Site B.2 Monitoring Site:Level, Velocity and Flow From 10/25/2010 to 11/1/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.000 0.020 0.040 0.060 0.080 0.100 0.120 10/25 10/26 10/27 10/28 10/29 10/30 10/31Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.48 inches Avg Level: 1.23 in. Peak Level: 1.86 in. Min Level: 0.67 in.6 Avg Velocity: 1.08 fps Peak Velocity: 1.47 fps Min Velocity: 0.59 fps6 Avg Flow: 0.028 mgd Peak Flow: 0.062 mgd Min Flow: 0.007 mgd62 Site B.2 Monitoring Site:Level, Velocity and Flow From 11/1/2010 to 11/8/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.000 0.020 0.040 0.060 0.080 0.100 0.120 11/1 11/2 11/3 11/4 11/5 11/6 11/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.4 inches Avg Level: 1.19 in. Peak Level: 1.9 in. Min Level: 0.63 in.6 Avg Velocity: 1.03 fps Peak Velocity: 1.51 fps Min Velocity: 0.44 fps6 Avg Flow: 0.026 mgd Peak Flow: 0.063 mgd Min Flow: 0.005 mgd63 0.000.050.100.150.200.2520-Jan Thu21-Jan Fri22-Jan Sat23-Jan Sun24-Jan Mon25-Jan Tue26-Jan Wed27-Jan Thu28-Jan Fri29-Jan Sat30-Jan Sun31-Jan Mon1-Feb Tue2-Feb Wed3-Feb Thu4-Feb Fri5-Feb Sat6-Feb Sun7-Feb Mon8-Feb Tue9-Feb Wed10-Feb Thu11-Feb Fri12-Feb Sat13-Feb SunFlow (mgd)0.000.050.100.150.200.250.300.350.40Rainfall (in/hr)RainFlowBLFlowSite B.2Monitoring Site:Period Flow Summary0.0570.0460.0340.0270.0280.0370.0400.0470.0440.0420.0390.0400.0220.0220.0200.0240.0230.0320.0270.0330.0300.0400.0350.0280.0320.0470.0290.0340.0490.0460.0400.000.010.020.030.040.050.060.070.080.091/201/211/221/231/241/251/261/271/281/291/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/6Flow (MGal)0.00.40.81.21.62.02.42.8Rainfall (in/day)0.000.050.100.150.200.2513-FebSun14-FebMon15-FebTue16-FebWed17-FebThu18-FebFri19-FebSat20-FebSun21-FebMon22-FebTue23-FebWed24-FebThu25-FebFri26-FebSat27-FebSun28-FebMon1-Mar Tue2-Mar Wed3-Mar Thu4-Mar Fri5-Mar Sat6-Mar Sun7-Mar MonFlow (mgd)0.000.050.100.150.200.250.300.350.40Rainfall (in/hr)0.0520.0480.0360.0430.0350.0380.0280.0310.0420.0370.0410.0350.0470.0510.000.010.020.030.040.050.060.070.080.091/201/211/221/231/241/251/261/271/281/291/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/60.00.40.81.21.62.02.42.80.0400.000.010.020.030.040.050.060.070.080.091/201/211/221/231/241/251/261/271/281/291/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/60.00.40.81.21.62.02.42.8January 20 to March 7, 2011 Diameter0.02.04.06.08.010.012.002/1402/1502/1602/1702/1802/1902/2002/2102/2202/2302/2402/2502/2602/2702/2803/0103/02Level (inches)Site B.2Monitoring Site:Site Capacity / Surcharge SummaryRealtime Flow Levels with Rainfall Data over Monitoring Period Peak Measured Level:2.26Peak d/D Ratio:0.23Pipe Diameter:10inchesinches Site B.2 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.01 0.02 0.03 0.04 0.05 0.06 0.07 0.08 0.09 02/1402/1502/1602/1702/1802/1902/2002/2102/2202/2302/2402/25Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.081 0.044 2.21 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 3.41 1.85 d/D Ratio:0.22 116,000 1.64Total I/I per ADWF:per in-rain 1.9%R-Value: 66% mgd RDI (% of BL): 0.016 Event 1 Event 1 Detail Graph (2/21/2011) RDI:Acre:209 PkI/I:Acre:584 Storm Event I/I Analysis (Rain = 2.96 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: Site B.2 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.01 0.02 0.03 0.04 0.05 0.06 0.07 0.08 0.09 02/2502/2602/2702/2803/0103/02Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.083 0.052 2.26 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 3.50 2.17 d/D Ratio:0.23 66,000 3.43Total I/I per ADWF:per in-rain 4.0%R-Value: 43% mgd RDI (% of BL): 0.010 Event 2 Event 2 Detail Graph (2/27/2011) RDI:Acre:136 PkI/I:Acre:688 Storm Event I/I Analysis (Rain = 0.81 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: Site B.2 Monitoring Site:Level, Velocity and Flow From 1/17/2011 to 1/24/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 1/17 1/18 1/19 1/20 1/21 1/22 1/23Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 1.84 in. Peak Level: 2.84 in. Min Level: 1.15 in.107 1 Avg Velocity: 1.17 fps Peak Velocity: 1.67 fps Min Velocity: 0.59 fps1071 Avg Flow: 0.054 mgd Peak Flow: 0.124 mgd Min Flow: 0.015 mgd1071 Site B.2 Monitoring Site:Level, Velocity and Flow From 1/24/2011 to 1/31/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 1/24 1/25 1/26 1/27 1/28 1/29 1/30Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.24 inches Avg Level: 1.49 in. Peak Level: 2.21 in. Min Level: 0.89 in.107 2 Avg Velocity: 1 fps Peak Velocity: 1.67 fps Min Velocity: 0.47 fps1072 Avg Flow: 0.035 mgd Peak Flow: 0.088 mgd Min Flow: 0.007 mgd1072 Site B.2 Monitoring Site:Level, Velocity and Flow From 1/31/2011 to 2/7/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 1/31 2/1 2/2 2/3 2/4 2/5 2/6Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 1.49 in. Peak Level: 2.17 in. Min Level: 1.02 in.107 3 Avg Velocity: 1.2 fps Peak Velocity: 1.62 fps Min Velocity: 0.75 fps1073 Avg Flow: 0.041 mgd Peak Flow: 0.082 mgd Min Flow: 0.017 mgd1073 Site B.2 Monitoring Site:Level, Velocity and Flow From 2/7/2011 to 2/14/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 2/7 2/8 2/9 2/10 2/11 2/12 2/13Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 1.29 in. Peak Level: 1.98 in. Min Level: 0.85 in.107 4 Avg Velocity: 0.87 fps Peak Velocity: 1.64 fps Min Velocity: 0.35 fps1074 Avg Flow: 0.024 mgd Peak Flow: 0.062 mgd Min Flow: 0.006 mgd1074 Site B.2 Monitoring Site:Level, Velocity and Flow From 2/14/2011 to 2/21/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 2/14 2/15 2/16 2/17 2/18 2/19 2/20Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 2.96 inches Avg Level: 1.39 in. Peak Level: 2.08 in. Min Level: 0.93 in.107 5 Avg Velocity: 1.12 fps Peak Velocity: 1.53 fps Min Velocity: 0.66 fps1075 Avg Flow: 0.035 mgd Peak Flow: 0.081 mgd Min Flow: 0.011 mgd1075 Site B.2 Monitoring Site:Level, Velocity and Flow From 2/21/2011 to 2/28/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 2/21 2/22 2/23 2/24 2/25 2/26 2/27Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.81 inches Avg Level: 1.44 in. Peak Level: 2.26 in. Min Level: 0.95 in.107 6 Avg Velocity: 1.13 fps Peak Velocity: 1.59 fps Min Velocity: 0.79 fps1076 Avg Flow: 0.037 mgd Peak Flow: 0.083 mgd Min Flow: 0.014 mgd1076 Site B.2 Monitoring Site:Level, Velocity and Flow From 2/28/2011 to 3/7/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 2/28 3/1 3/2 3/3 3/4 3/5 3/6Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.23 inches Avg Level: 1.46 in. Peak Level: 2.4 in. Min Level: 0.97 in.107 7 Avg Velocity: 1.27 fps Peak Velocity: 1.6 fps Min Velocity: 0.78 fps1077 Avg Flow: 0.042 mgd Peak Flow: 0.103 mgd Min Flow: 0.014 mgd1077 Site B.2 Monitoring Site:Level, Velocity and Flow From 3/7/2011 to 3/14/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 3/7 3/8 3/9 3/10 3/11 3/12 3/13Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.04 inches Avg Level: 1.4 in. Peak Level: 2.18 in. Min Level: 0.95 in.107 8 Avg Velocity: 0.84 fps Peak Velocity: 1.29 fps Min Velocity: 0.48 fps1078 Avg Flow: 0.027 mgd Peak Flow: 0.064 mgd Min Flow: 0.008 mgd1078 Monitoring Site: Location: Size/Type Line: Site B.3 Manhole I06-46: 489 Ramona Drive 8-inch Sanitary Sewer Pipe Temporary Flow Monitoring Study Sanitary Sewer Collection System Data Summary Report Site B.3 Location:Manhole I06-46: 489 Ramona Drive Diameter:10 Monitoring Site:Site Information Report Average Dry Weather Flow:0.017 Peak Measured Flow:0.071 mgd mgd Sewer Map Satellite View Latitude: 35.2929° Longitude:-120.6764° Rim Elevation:256 feet inches Flow Diagram Street View Site B.3Monitoring Site:Average Dry Weather Flow0.20Average Dry Weather Flow:mgd0.0170.0000.0050.0100.0150.0200.0250.0300.0350.0400:001:002:003:004:005:006:007:008:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:0023:00Flow (mgd)WeekdayWeekend Site B.3 Monitoring Site:Level, Velocity and Flow From 10/18/2010 to 10/25/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 Velocity (fps)Vel 0.000 0.010 0.020 0.030 0.040 0.050 0.060 0.070 0.080 0.090 0.100 10/18 10/19 10/20 10/21 10/22 10/23 10/24Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.91 inches Avg Level: 1.57 in. Peak Level: 2.49 in. Min Level: 0.53 in.5 Avg Velocity: 0.54 fps Peak Velocity: 0.96 fps Min Velocity: 0.15 fps5 Avg Flow: 0.019 mgd Peak Flow: 0.056 mgd Min Flow: 0.001 mgd5 Site B.3 Monitoring Site:Level, Velocity and Flow From 10/25/2010 to 11/1/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 Velocity (fps)Vel 0.000 0.010 0.020 0.030 0.040 0.050 0.060 0.070 0.080 0.090 0.100 10/25 10/26 10/27 10/28 10/29 10/30 10/31Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.48 inches Avg Level: 1.58 in. Peak Level: 2.47 in. Min Level: 0.66 in.5 Avg Velocity: 0.59 fps Peak Velocity: 0.99 fps Min Velocity: 0.17 fps5 Avg Flow: 0.02 mgd Peak Flow: 0.054 mgd Min Flow: 0.002 mgd52 Site B.3 Monitoring Site:Level, Velocity and Flow From 11/1/2010 to 11/8/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 Velocity (fps)Vel 0.000 0.010 0.020 0.030 0.040 0.050 0.060 0.070 0.080 0.090 0.100 11/1 11/2 11/3 11/4 11/5 11/6 11/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.4 inches Avg Level: 1.64 in. Peak Level: 2.56 in. Min Level: 0.66 in.5 Avg Velocity: 0.56 fps Peak Velocity: 0.88 fps Min Velocity: 0.18 fps5 Avg Flow: 0.021 mgd Peak Flow: 0.047 mgd Min Flow: 0.002 mgd53 0.000.020.040.060.080.100.1220-Jan Thu21-Jan Fri22-Jan Sat23-Jan Sun24-Jan Mon25-Jan Tue26-Jan Wed27-Jan Thu28-Jan Fri29-Jan Sat30-Jan Sun31-Jan Mon1-Feb Tue2-Feb Wed3-Feb Thu4-Feb Fri5-Feb Sat6-Feb Sun7-Feb Mon8-Feb Tue9-Feb Wed10-Feb Thu11-Feb Fri12-Feb Sat13-Feb SunFlow (mgd)0.000.050.100.150.200.250.300.350.40Rainfall (in/hr)RainFlowBLFlowSite B.3Monitoring Site:Period Flow Summary0.0360.0390.0350.0330.0360.0300.0300.0270.0260.0280.0230.0260.0190.0210.0200.0240.0210.0200.0200.0300.0280.0370.0350.0340.0300.0330.0330.0300.0260.0250.0240.000.010.020.030.040.050.061/201/211/221/231/241/251/261/271/281/291/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/6Flow (MGal)0.00.40.81.21.62.02.42.8Rainfall (in/day)0.000.020.040.060.080.100.1213-FebSun14-FebMon15-FebTue16-FebWed17-FebThu18-FebFri19-FebSat20-FebSun21-FebMon22-FebTue23-FebWed24-FebThu25-FebFri26-FebSat27-FebSun28-FebMon1-Mar Tue2-Mar Wed3-Mar Thu4-Mar Fri5-Mar Sat6-Mar Sun7-Mar MonFlow (mgd)0.000.050.100.150.200.250.300.350.40Rainfall (in/hr)0.0370.0360.0310.0310.0270.0230.0200.0210.0490.0410.0380.0390.0230.0240.000.010.020.030.040.050.061/201/211/221/231/241/251/261/271/281/291/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/60.00.40.81.21.62.02.42.80.0380.000.010.020.030.040.050.061/201/211/221/231/241/251/261/271/281/291/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/60.00.40.81.21.62.02.42.8January 20 to March 7, 2011 Diameter0.02.04.06.08.010.012.002/1402/1502/1602/1702/1802/1902/2002/2102/2202/2302/2402/2502/2602/2702/2803/0103/02Level (inches)Site B.3Monitoring Site:Site Capacity / Surcharge SummaryRealtime Flow Levels with Rainfall Data over Monitoring Period Peak Measured Level:3.24Peak d/D Ratio:0.32Pipe Diameter:10inchesinches Site B.3 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.01 0.02 0.03 0.04 0.05 0.06 0.07 0.08 02/1402/1502/1602/1702/1802/1902/2002/2102/2202/2302/2402/25Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.071 0.046 3.24 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 4.13 2.66 d/D Ratio:0.32 175,000 3.44Total I/I per ADWF:per in-rain 4.6%R-Value: 120% mgd RDI (% of BL): 0.021 Event 1 Event 1 Detail Graph (2/21/2011) RDI:Acre:436 PkI/I:Acre:965 Storm Event I/I Analysis (Rain = 2.96 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: Site B.3 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.01 0.02 0.03 0.04 0.05 0.06 0.07 02/2502/2602/2702/2803/0103/02Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.059 0.035 2.92 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 3.45 2.03 d/D Ratio:0.29 88,000 6.36Total I/I per ADWF:per in-rain 8.5%R-Value: 123% mgd RDI (% of BL): 0.021 Event 2 Event 2 Detail Graph (2/27/2011) RDI:Acre:449 PkI/I:Acre:736 Storm Event I/I Analysis (Rain = 0.81 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: Site B.3 Monitoring Site:Level, Velocity and Flow From 1/17/2011 to 1/24/2011 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 2.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 1/17 1/18 1/19 1/20 1/21 1/22 1/23Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 2.22 in. Peak Level: 3.04 in. Min Level: 1.5 in.106 1 Avg Velocity: 0.73 fps Peak Velocity: 0.89 fps Min Velocity: 0.56 fps1061 Avg Flow: 0.037 mgd Peak Flow: 0.06 mgd Min Flow: 0.019 mgd1061 Site B.3 Monitoring Site:Level, Velocity and Flow From 1/24/2011 to 1/31/2011 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 2.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 1/24 1/25 1/26 1/27 1/28 1/29 1/30Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.24 inches Avg Level: 1.97 in. Peak Level: 2.99 in. Min Level: 1.28 in.106 2 Avg Velocity: 0.74 fps Peak Velocity: 1.19 fps Min Velocity: 0.46 fps1062 Avg Flow: 0.032 mgd Peak Flow: 0.06 mgd Min Flow: 0.012 mgd1062 Site B.3 Monitoring Site:Level, Velocity and Flow From 1/31/2011 to 2/7/2011 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 2.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 1/31 2/1 2/2 2/3 2/4 2/5 2/6Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 1.76 in. Peak Level: 2.63 in. Min Level: 1.09 in.106 3 Avg Velocity: 0.68 fps Peak Velocity: 0.88 fps Min Velocity: 0.28 fps1063 Avg Flow: 0.026 mgd Peak Flow: 0.051 mgd Min Flow: 0.005 mgd1063 Site B.3 Monitoring Site:Level, Velocity and Flow From 2/7/2011 to 2/14/2011 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 2.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 2/7 2/8 2/9 2/10 2/11 2/12 2/13Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 1.52 in. Peak Level: 2.67 in. Min Level: 0.78 in.106 4 Avg Velocity: 0.65 fps Peak Velocity: 0.88 fps Min Velocity: 0.03 fps1064 Avg Flow: 0.021 mgd Peak Flow: 0.054 mgd Min Flow: 0 mgd1064 Site B.3 Monitoring Site:Level, Velocity and Flow From 2/14/2011 to 2/21/2011 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 2.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 2/14 2/15 2/16 2/17 2/18 2/19 2/20Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 2.96 inches Avg Level: 1.91 in. Peak Level: 3.24 in. Min Level: 0.76 in.106 5 Avg Velocity: 0.73 fps Peak Velocity: 1.07 fps Min Velocity: 0.13 fps1065 Avg Flow: 0.032 mgd Peak Flow: 0.071 mgd Min Flow: 0.001 mgd1065 Site B.3 Monitoring Site:Level, Velocity and Flow From 2/21/2011 to 2/28/2011 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 2.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 2/21 2/22 2/23 2/24 2/25 2/26 2/27Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.81 inches Avg Level: 2.05 in. Peak Level: 2.92 in. Min Level: 1.36 in.106 6 Avg Velocity: 0.78 fps Peak Velocity: 1.01 fps Min Velocity: 0.49 fps1066 Avg Flow: 0.036 mgd Peak Flow: 0.059 mgd Min Flow: 0.014 mgd1066 Site B.3 Monitoring Site:Level, Velocity and Flow From 2/28/2011 to 3/7/2011 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 2.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 2/28 3/1 3/2 3/3 3/4 3/5 3/6Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.23 inches Avg Level: 1.71 in. Peak Level: 2.51 in. Min Level: 1.28 in.106 7 Avg Velocity: 0.74 fps Peak Velocity: 0.9 fps Min Velocity: 0.51 fps1067 Avg Flow: 0.026 mgd Peak Flow: 0.051 mgd Min Flow: 0.012 mgd1067 Site B.3 Monitoring Site:Level, Velocity and Flow From 3/7/2011 to 3/14/2011 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 2.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 3/7 3/8 3/9 3/10 3/11 3/12 3/13Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.04 inches Avg Level: 1.57 in. Peak Level: 2.24 in. Min Level: 1.28 in.106 8 Avg Velocity: 0.72 fps Peak Velocity: 0.87 fps Min Velocity: 0.44 fps1068 Avg Flow: 0.023 mgd Peak Flow: 0.041 mgd Min Flow: 0.01 mgd1068 Monitoring Site: Location: Size/Type Line: Site C.1 Manhole J07-91: 265 Lincoln Street 21-inch Sanitary Sewer Pipe Temporary Flow Monitoring Study Sanitary Sewer Collection System Data Summary Report Site C.1 Location:Manhole J07-91: 265 Lincoln Street Diameter:21 Monitoring Site:Site Information Report Average Dry Weather Flow:0.819 Peak Measured Flow:2.475 mgd mgd Flow Diagram Satellite Map Latitude: 35.2878° Longitude:-120.6670° Rim Elevation:214 feet above sea level inches Street View Photo Sanitary Map Plan View Photo Site C.1Monitoring Site:Average Dry Weather Flow0.21Average Dry Weather Flow:mgd0.8190.000.200.400.600.801.001.201.401.600:001:002:003:004:005:006:007:008:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:0023:00Flow (mgd)WeekdayWeekend Site C.1 Monitoring Site:Level, Velocity and Flow From 10/18/2010 to 10/25/2010 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 10/18 10/19 10/20 10/21 10/22 10/23 10/24Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.91 inches Avg Level: 4.22 in. Peak Level: 6.78 in. Min Level: 1.45 in.8 Avg Velocity: 3.36 fps Peak Velocity: 3.98 fps Min Velocity: 1.76 fps8 Avg Flow: 0.822 mgd Peak Flow: 1.634 mgd Min Flow: 0.082 mgd8 Site C.1 Monitoring Site:Level, Velocity and Flow From 10/25/2010 to 11/1/2010 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 10/25 10/26 10/27 10/28 10/29 10/30 10/31Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.48 inches Avg Level: 4.38 in. Peak Level: 7.53 in. Min Level: 1.61 in.8 Avg Velocity: 3.57 fps Peak Velocity: 4.11 fps Min Velocity: 1.81 fps8 Avg Flow: 0.902 mgd Peak Flow: 1.936 mgd Min Flow: 0.099 mgd82 Site C.1 Monitoring Site:Level, Velocity and Flow From 11/1/2010 to 11/8/2010 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 11/1 11/2 11/3 11/4 11/5 11/6 11/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.4 inches Avg Level: 4.64 in. Peak Level: 7.72 in. Min Level: 1.9 in.8 Avg Velocity: 3.38 fps Peak Velocity: 4.13 fps Min Velocity: 1.66 fps8 Avg Flow: 0.943 mgd Peak Flow: 2.042 mgd Min Flow: 0.124 mgd83 0.000.501.001.502.002.503.003.504.0030-JanSat31-JanSun1-FebMon2-FebTue3-FebWed4-FebThu5-FebFri6-FebSat7-FebSun8-FebMon9-FebTue10-FebWed11-FebThu12-FebFri13-FebSat14-FebSun15-FebMon16-FebTue17-FebWed18-FebThu19-FebFri20-FebSat21-FebSun22-FebMon23-FebTue24-FebWed25-FebThu26-FebFri27-FebSat28-FebSunFlow (mgd)0.00.10.20.30.40.50.60.70.8Rainfall (in/hr)RainFlowBLFlowSite C.1Monitoring Site:Period Flow Summary1.2411.2351.2151.2051.3471.3031.4261.3231.2711.1251.1431.1721.1341.0671.0901.0841.1431.1601.3681.5911.6001.7211.8531.6621.5811.5621.4871.4801.4121.3591.3181.2931.2681.1580.6880.6760.6680.6520.6650.000.501.001.502.001/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/28Flow (MGal)0.00.40.81.21.62.02.42.8Rainfall (in/day)0.000.501.001.502.002.503.003.504.0028-FebSun1-MarMon2-MarTue3-MarWed4-MarThu5-MarFri6-MarSat7-MarSun8-MarMon9-MarTue10-MarWed11-MarThu12-MarFri13-MarSat14-MarSun15-MarMon16-MarTue17-MarWed18-MarThu19-MarFri20-MarSat21-MarSun22-MarMon23-MarTue24-MarWed25-MarThu26-MarFri27-MarSat28-MarSunFlow (mgd)0.00.10.20.30.40.50.60.70.8Rainfall (in/hr)1.1011.0851.2781.1910.8310.7790.9160.9261.7461.4931.5361.5211.2461.2060.7530.6120.6060.8210.000.501.001.502.001/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/280.00.40.81.21.62.02.42.80.9200.000.501.001.502.001/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/280.00.40.81.21.62.02.42.8January 30 to March 28, 2010Total Period Rainfall: 5.97 inchesAvg Flow: 1.195 mgd Peak Flow: 2.475 mgd Min Flow: 0.229 mgd Diameter0.05.010.015.020.025.002/0202/0302/0402/0502/0602/0702/0802/0902/1002/1102/1202/1302/1402/1502/1602/1702/1802/1902/2002/2102/2202/2302/2402/2502/2602/2702/2803/0103/0203/0303/0403/0503/0603/0703/0803/0903/1003/1103/1203/1303/1403/15Level (inches)Site C.1Monitoring Site:Site Capacity / Surcharge SummaryRealtime Flow Levels with Rainfall Data over Monitoring Period Peak Measured Level:9.06Peak d/D Ratio:0.43Pipe Diameter:21inchesinches Site C.1 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.50 1.00 1.50 2.00 2.50 02/0402/0502/0602/0702/0802/09Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)2.01 1.04 8.77 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 2.46 1.27 d/D Ratio:0.42 1,989,000 1.46Total I/I per ADWF:per in-rain 2.8%R-Value: 52% mgd RDI (% of BL): 0.43 Event 1 Event 1 Detail Graph (2/8/2010) RDI:Acre:275 PkI/I:Acre:668 Storm Event I/I Analysis (Rain = 1.67 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: 3,981Total I/I per IDM:per in-rainPkI/I:IDM:3,467 gpd/IDM RDI:IDM:1,425 gpd/IDM Site C.1 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.50 1.00 1.50 2.00 2.50 3.00 02/2602/2702/2803/0103/02Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)2.40 1.61 9.06 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 2.93 1.96 d/D Ratio:0.43 3,050,000 1.92Total I/I per ADWF:per in-rain 3.7%R-Value: 86% mgd RDI (% of BL): 0.70 Event 2 Event 2 Detail Graph (3/1/2010) RDI:Acre:452 PkI/I:Acre:1,035 Storm Event I/I Analysis (Rain = 1.94 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: 5,251Total I/I per IDM:per in-rainPkI/I:IDM:5,369 gpd/IDM RDI:IDM:2,346 gpd/IDM Site C.1 Monitoring Site:Level, Velocity and Flow From 1/25/2010 to 2/1/2010 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Velocity (fps)Vel 0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 1/25 1/26 1/27 1/28 1/29 1/30 1/31Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.08 inches Avg Level: 5.19 in. Peak Level: 7.69 in. Min Level: 2.64 in.22 1 Avg Velocity: 3.8 fps Peak Velocity: 4.2 fps Min Velocity: 3.02 fps221 Avg Flow: 1.161 mgd Peak Flow: 1.987 mgd Min Flow: 0.363 mgd221 Site C.1 Monitoring Site:Level, Velocity and Flow From 2/1/2010 to 2/8/2010 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Velocity (fps)Vel 0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 2/1 2/2 2/3 2/4 2/5 2/6 2/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 1.67 inches Avg Level: 5.53 in. Peak Level: 8.77 in. Min Level: 2.13 in.22 2 Avg Velocity: 3.74 fps Peak Velocity: 4.13 fps Min Velocity: 2.79 fps222 Avg Flow: 1.245 mgd Peak Flow: 2.01 mgd Min Flow: 0.253 mgd222 Site C.1 Monitoring Site:Level, Velocity and Flow From 2/8/2010 to 2/15/2010 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Velocity (fps)Vel 0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 2/8 2/9 2/10 2/11 2/12 2/13 2/14Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.51 inches Avg Level: 5.14 in. Peak Level: 8.67 in. Min Level: 2.16 in.22 3 Avg Velocity: 3.81 fps Peak Velocity: 4.11 fps Min Velocity: 3.14 fps223 Avg Flow: 1.151 mgd Peak Flow: 2.143 mgd Min Flow: 0.282 mgd223 Site C.1 Monitoring Site:Level, Velocity and Flow From 2/15/2010 to 2/22/2010 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Velocity (fps)Vel 0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 2/15 2/16 2/17 2/18 2/19 2/20 2/21Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.23 inches Avg Level: 4.72 in. Peak Level: 7.77 in. Min Level: 2.07 in.22 4 Avg Velocity: 3.84 fps Peak Velocity: 4.25 fps Min Velocity: 3.09 fps224 Avg Flow: 1.04 mgd Peak Flow: 1.987 mgd Min Flow: 0.266 mgd224 Site C.1 Monitoring Site:Level, Velocity and Flow From 2/22/2010 to 3/1/2010 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Velocity (fps)Vel 0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 2/22 2/23 2/24 2/25 2/26 2/27 2/28Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 2.37 inches Avg Level: 5.47 in. Peak Level: 9.06 in. Min Level: 1.75 in.22 5 Avg Velocity: 3.93 fps Peak Velocity: 4.33 fps Min Velocity: 3.07 fps225 Avg Flow: 1.298 mgd Peak Flow: 2.333 mgd Min Flow: 0.229 mgd225 Site C.1 Monitoring Site:Level, Velocity and Flow From 3/1/2010 to 3/8/2010 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Velocity (fps)Vel 0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 3/1 3/2 3/3 3/4 3/5 3/6 3/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.98 inches Avg Level: 6.53 in. Peak Level: 9.33 in. Min Level: 3.33 in.22 6 Avg Velocity: 3.94 fps Peak Velocity: 4.27 fps Min Velocity: 3.5 fps226 Avg Flow: 1.641 mgd Peak Flow: 2.475 mgd Min Flow: 0.59 mgd226 Site C.1 Monitoring Site:Level, Velocity and Flow From 3/8/2010 to 3/15/2010 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Velocity (fps)Vel 0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 3/8 3/9 3/10 3/11 3/12 3/13 3/14Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.16 inches Avg Level: 5.93 in. Peak Level: 8.79 in. Min Level: 2.68 in.22 7 Avg Velocity: 3.89 fps Peak Velocity: 4.49 fps Min Velocity: 3.25 fps227 Avg Flow: 1.425 mgd Peak Flow: 2.387 mgd Min Flow: 0.391 mgd227 Site C.1 Monitoring Site:Level, Velocity and Flow From 3/15/2010 to 3/22/2010 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Velocity (fps)Vel 0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 3/15 3/16 3/17 3/18 3/19 3/20 3/21Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 4.97 in. Peak Level: 8.6 in. Min Level: 2.68 in.22 8 Avg Velocity: 3.8 fps Peak Velocity: 4.24 fps Min Velocity: 2.77 fps228 Avg Flow: 1.109 mgd Peak Flow: 2.187 mgd Min Flow: 0.322 mgd228 Site C.1 Monitoring Site:Level, Velocity and Flow From 3/22/2010 to 3/29/2010 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Velocity (fps)Vel 0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 3/22 3/23 3/24 3/25 3/26 3/27 3/28Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 3.72 in. Peak Level: 6.38 in. Min Level: 2.32 in.22 9 Avg Velocity: 3.56 fps Peak Velocity: 3.99 fps Min Velocity: 2.79 fps229 Avg Flow: 0.682 mgd Peak Flow: 1.558 mgd Min Flow: 0.276 mgd229 Monitoring Site: Location: Size/Type Line: Site C.2 Manhole K07-21: 533 Hathaway Avenue 10-inch Sanitary Sewer Pipe Temporary Flow Monitoring Study Sanitary Sewer Collection System Data Summary Report Site C.2 Location:Manhole K07-21: 533 Hathaway Avenue Diameter:10 Monitoring Site:Site Information Report Average Dry Weather Flow:0.100 Peak Measured Flow:0.318 mgd mgd Sewer Map Satellite View Latitude: 35.2897° Longitude:-120.6615° Rim Elevation:238 feet inches Flow Diagram Street View Site C.2Monitoring Site:Average Dry Weather Flow0.24Average Dry Weather Flow:mgd0.1000.000.050.100.150.200.250:001:002:003:004:005:006:007:008:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:0023:00Flow (mgd)WeekdayWeekend Site C.2 Monitoring Site:Level, Velocity and Flow From 10/18/2010 to 10/25/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 10/18 10/19 10/20 10/21 10/22 10/23 10/24Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.91 inches Avg Level: 2.42 in. Peak Level: 3.12 in. Min Level: 1.39 in.9 Avg Velocity: 1.58 fps Peak Velocity: 3.17 fps Min Velocity: 0.49 fps9 Avg Flow: 0.114 mgd Peak Flow: 0.275 mgd Min Flow: 0.015 mgd9 Site C.2 Monitoring Site:Level, Velocity and Flow From 10/25/2010 to 11/1/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 10/25 10/26 10/27 10/28 10/29 10/30 10/31Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.48 inches Avg Level: 2.4 in. Peak Level: 3.35 in. Min Level: 1.17 in.9 Avg Velocity: 1.67 fps Peak Velocity: 2.88 fps Min Velocity: 0.56 fps9 Avg Flow: 0.118 mgd Peak Flow: 0.299 mgd Min Flow: 0.013 mgd92 Site C.2 Monitoring Site:Level, Velocity and Flow From 11/1/2010 to 11/8/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 11/1 11/2 11/3 11/4 11/5 11/6 11/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.4 inches Avg Level: 2.21 in. Peak Level: 3.13 in. Min Level: 0.88 in.9 Avg Velocity: 1.48 fps Peak Velocity: 2.7 fps Min Velocity: 0.66 fps9 Avg Flow: 0.093 mgd Peak Flow: 0.238 mgd Min Flow: 0.01 mgd93 0.000.100.200.300.400.500.6020-Jan Thu21-Jan Fri22-Jan Sat23-Jan Sun24-Jan Mon25-Jan Tue26-Jan Wed27-Jan Thu28-Jan Fri29-Jan Sat30-Jan Sun31-Jan Mon1-Feb Tue2-Feb Wed3-Feb Thu4-Feb Fri5-Feb Sat6-Feb Sun7-Feb Mon8-Feb Tue9-Feb Wed10-Feb Thu11-Feb Fri12-Feb Sat13-Feb SunFlow (mgd)0.000.050.100.150.200.250.300.350.40Rainfall (in/hr)RainFlowBLFlowSite C.2Monitoring Site:Period Flow Summary0.1490.1500.1470.1430.1400.1490.1570.1500.1520.1360.1360.1340.1330.1320.1350.1300.1340.1380.1320.1600.1510.1790.1750.1670.1580.1760.1700.1720.1690.1610.1550.000.050.100.150.200.251/201/211/221/231/241/251/261/271/281/291/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/6Flow (MGal)0.00.40.81.21.62.02.42.8Rainfall (in/day)0.000.100.200.300.400.500.6013-FebSun14-FebMon15-FebTue16-FebWed17-FebThu18-FebFri19-FebSat20-FebSun21-FebMon22-FebTue23-FebWed24-FebThu25-FebFri26-FebSat27-FebSun28-FebMon1-Mar Tue2-Mar Wed3-Mar Thu4-Mar Fri5-Mar Sat6-Mar Sun7-Mar MonFlow (mgd)0.000.050.100.150.200.250.300.350.40Rainfall (in/hr)0.1480.1510.1360.1500.1330.1300.1390.1340.2220.2110.2150.1870.1500.1490.000.050.100.150.200.251/201/211/221/231/241/251/261/271/281/291/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/60.00.40.81.21.62.02.42.80.1860.000.050.100.150.200.251/201/211/221/231/241/251/261/271/281/291/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/60.00.40.81.21.62.02.42.8January 20 to March 7, 2011 Diameter0.02.04.06.08.010.012.002/1402/1502/1602/1702/1802/1902/2002/2102/2202/2302/2402/2502/2602/2702/2803/0103/02Level (inches)Site C.2Monitoring Site:Site Capacity / Surcharge SummaryRealtime Flow Levels with Rainfall Data over Monitoring Period Peak Measured Level:2.71Peak d/D Ratio:0.27Pipe Diameter:10inchesinches Site C.2 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 02/1402/1502/1602/1702/1802/1902/2002/2102/2202/2302/2402/25Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.304 0.174 2.71 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 3.05 1.74 d/D Ratio:0.27 780,000 2.63Total I/I per ADWF:per in-rain 14.2%R-Value: 97% mgd RDI (% of BL): 0.097 Event 1 Event 1 Detail Graph (2/21/2011) RDI:Acre:1,429 PkI/I:Acre:2,561 Storm Event I/I Analysis (Rain = 2.98 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: Site C.2 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.05 0.10 0.15 0.20 0.25 0.30 02/2502/2602/2702/2803/0103/02Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.282 0.191 2.66 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 2.83 1.91 d/D Ratio:0.27 429,000 5.48Total I/I per ADWF:per in-rain 29.7%R-Value: 103% mgd RDI (% of BL): 0.103 Event 2 Event 2 Detail Graph (2/27/2011) RDI:Acre:1,521 PkI/I:Acre:2,812 Storm Event I/I Analysis (Rain = 0.78 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: Site C.2 Monitoring Site:Level, Velocity and Flow From 1/17/2011 to 1/24/2011 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 1/17 1/18 1/19 1/20 1/21 1/22 1/23Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 2.08 in. Peak Level: 2.54 in. Min Level: 1.4 in.108 1 Avg Velocity: 2.76 fps Peak Velocity: 3.79 fps Min Velocity: 1.14 fps1081 Avg Flow: 0.153 mgd Peak Flow: 0.258 mgd Min Flow: 0.035 mgd1081 Site C.2 Monitoring Site:Level, Velocity and Flow From 1/24/2011 to 1/31/2011 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 1/24 1/25 1/26 1/27 1/28 1/29 1/30Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.22 inches Avg Level: 2.04 in. Peak Level: 2.52 in. Min Level: 1.16 in.108 2 Avg Velocity: 2.67 fps Peak Velocity: 3.91 fps Min Velocity: 0.6 fps1082 Avg Flow: 0.146 mgd Peak Flow: 0.265 mgd Min Flow: 0.015 mgd1082 Site C.2 Monitoring Site:Level, Velocity and Flow From 1/31/2011 to 2/7/2011 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 1/31 2/1 2/2 2/3 2/4 2/5 2/6Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 1.98 in. Peak Level: 3.25 in. Min Level: 1.11 in.108 3 Avg Velocity: 2.64 fps Peak Velocity: 3.79 fps Min Velocity: 0.72 fps1083 Avg Flow: 0.139 mgd Peak Flow: 0.318 mgd Min Flow: 0.015 mgd1083 Site C.2 Monitoring Site:Level, Velocity and Flow From 2/7/2011 to 2/14/2011 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 2/7 2/8 2/9 2/10 2/11 2/12 2/13Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 1.94 in. Peak Level: 2.45 in. Min Level: 1.08 in.108 4 Avg Velocity: 2.6 fps Peak Velocity: 3.79 fps Min Velocity: 0.5 fps1084 Avg Flow: 0.134 mgd Peak Flow: 0.249 mgd Min Flow: 0.011 mgd1084 Site C.2 Monitoring Site:Level, Velocity and Flow From 2/14/2011 to 2/21/2011 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 2/14 2/15 2/16 2/17 2/18 2/19 2/20Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 2.98 inches Avg Level: 2.12 in. Peak Level: 2.71 in. Min Level: 1.21 in.108 5 Avg Velocity: 2.98 fps Peak Velocity: 4.05 fps Min Velocity: 0.92 fps1085 Avg Flow: 0.171 mgd Peak Flow: 0.304 mgd Min Flow: 0.023 mgd1085 Site C.2 Monitoring Site:Level, Velocity and Flow From 2/21/2011 to 2/28/2011 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 2/21 2/22 2/23 2/24 2/25 2/26 2/27Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.78 inches Avg Level: 2.18 in. Peak Level: 2.66 in. Min Level: 1.69 in.108 6 Avg Velocity: 3.13 fps Peak Velocity: 4.07 fps Min Velocity: 1.29 fps1086 Avg Flow: 0.181 mgd Peak Flow: 0.282 mgd Min Flow: 0.06 mgd1086 Site C.2 Monitoring Site:Level, Velocity and Flow From 2/28/2011 to 3/7/2011 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 2/28 3/1 3/2 3/3 3/4 3/5 3/6Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.22 inches Avg Level: 2.09 in. Peak Level: 2.54 in. Min Level: 1.67 in.108 7 Avg Velocity: 2.97 fps Peak Velocity: 4.04 fps Min Velocity: 1.08 fps1087 Avg Flow: 0.161 mgd Peak Flow: 0.251 mgd Min Flow: 0.042 mgd1087 Site C.2 Monitoring Site:Level, Velocity and Flow From 3/7/2011 to 3/14/2011 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 3/7 3/8 3/9 3/10 3/11 3/12 3/13Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.04 inches Avg Level: 1.93 in. Peak Level: 2.34 in. Min Level: 1.63 in.108 8 Avg Velocity: 2.83 fps Peak Velocity: 3.96 fps Min Velocity: 1.56 fps1088 Avg Flow: 0.137 mgd Peak Flow: 0.221 mgd Min Flow: 0.064 mgd1088 Monitoring Site: Location: Size/Type Line: Site D.1 Manhole J08-38: 865 Walnut Street 12-inch Sanitary Sewer Pipe Temporary Flow Monitoring Study Sanitary Sewer Collection System Data Summary Report Site D.1 Location:Manhole J08-38: 865 Walnut Street Diameter:12 Monitoring Site:Site Information Report Average Dry Weather Flow:0.032 Peak Measured Flow:0.280 mgd mgd Flow Diagram Satellite Map Latitude: 35.2842° Longitude:-120.6658° Rim Elevation:201 feet above sea level inches Street View Photo Sanitary Map Plan View Photo Site D.1Monitoring Site:Average Dry Weather Flow0.11Average Dry Weather Flow:mgd0.0320.000.010.020.030.040.050.060:001:002:003:004:005:006:007:008:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:0023:00Flow (mgd)WeekdayWeekend Site D.1 Monitoring Site:Level, Velocity and Flow From 10/18/2010 to 10/25/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 10/18 10/19 10/20 10/21 10/22 10/23 10/24Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.91 inches Avg Level: 1.18 in. Peak Level: 1.75 in. Min Level: 0.48 in.0 Avg Velocity: 0.99 fps Peak Velocity: 1.41 fps Min Velocity: 0.41 fps0 Avg Flow: 0.028 mgd Peak Flow: 0.063 mgd Min Flow: 0.003 mgd0 Site D.1 Monitoring Site:Level, Velocity and Flow From 10/25/2010 to 11/1/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 10/25 10/26 10/27 10/28 10/29 10/30 10/31Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.48 inches Avg Level: 1.39 in. Peak Level: 2.04 in. Min Level: 0.66 in.0 Avg Velocity: 1.15 fps Peak Velocity: 1.6 fps Min Velocity: 0.62 fps0 Avg Flow: 0.04 mgd Peak Flow: 0.09 mgd Min Flow: 0.007 mgd02 Site D.1 Monitoring Site:Level, Velocity and Flow From 11/1/2010 to 11/8/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 11/1 11/2 11/3 11/4 11/5 11/6 11/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.4 inches Avg Level: 1.37 in. Peak Level: 2.11 in. Min Level: 0.67 in.0 Avg Velocity: 1.12 fps Peak Velocity: 1.5 fps Min Velocity: 0.57 fps0 Avg Flow: 0.037 mgd Peak Flow: 0.09 mgd Min Flow: 0.007 mgd03 0.000.050.100.150.200.250.3030-JanSat31-JanSun1-FebMon2-FebTue3-FebWed4-FebThu5-FebFri6-FebSat7-FebSun8-FebMon9-FebTue10-FebWed11-FebThu12-FebFri13-FebSat14-FebSun15-FebMon16-FebTue17-FebWed18-FebThu19-FebFri20-FebSat21-FebSun22-FebMon23-FebTue24-FebWed25-FebThu26-FebFri27-FebSat28-FebSunFlow (mgd)0.00.10.20.30.40.50.60.70.8Rainfall (in/hr)RainFlowBLFlowSite D.1Monitoring Site:Period Flow Summary0.0460.0450.0420.0430.0880.0710.0920.0730.0620.0560.0420.0410.0380.0420.0430.0410.0560.0450.0650.0660.0660.0770.0850.0700.0620.0530.0510.0480.0500.0480.0470.0430.0390.0380.0380.0360.0360.0350.0360.000.020.040.060.080.100.120.140.160.181/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/28Flow (MGal)0.00.40.81.21.62.02.42.8Rainfall (in/day)0.000.050.100.150.200.2528-FebSun1-MarMon2-MarTue3-MarWed4-MarThu5-MarFri6-MarSat7-MarSun8-MarMon9-MarTue10-MarWed11-MarThu12-MarFri13-MarSat14-MarSun15-MarMon16-MarTue17-MarWed18-MarThu19-MarFri20-MarSat21-MarSun22-MarMon23-MarTue24-MarWed25-MarThu26-MarFri27-MarSat28-MarSunFlow (mgd)0.00.10.20.30.40.50.60.70.8Rainfall (in/hr)0.0600.0490.1180.0930.0570.0540.0430.0450.1540.0820.0720.0700.0530.0500.0380.0410.0360.0400.000.020.040.060.080.100.120.140.160.181/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/280.00.40.81.21.62.02.42.80.0480.000.020.040.060.080.100.120.140.160.181/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/280.00.40.81.21.62.02.42.8January 30 to March 28, 2010Total Period Rainfall: 5.69 inchesAvg Flow: 0.056 mgd Peak Flow: 0.28 mgd Min Flow: 0.015 mgd Diameter0.02.04.06.08.010.012.014.002/0202/0302/0402/0502/0602/0702/0802/0902/1002/1102/1202/1302/1402/1502/1602/1702/1802/1902/2002/2102/2202/2302/2402/2502/2602/2702/2803/0103/0203/0303/0403/0503/0603/0703/0803/0903/1003/1103/1203/1303/1403/15Level (inches)Site D.1Monitoring Site:Site Capacity / Surcharge SummaryRealtime Flow Levels with Rainfall Data over Monitoring Period Peak Measured Level:3.76Peak d/D Ratio:0.31Pipe Diameter:12inchesinches Site D.1 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.05 0.10 0.15 0.20 0.25 02/0402/0502/0602/0702/0802/09Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.22 0.17 3.57 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 6.87 5.37 d/D Ratio:0.30 244,000 4.80Total I/I per ADWF:per in-rain 4.2%R-Value: 120% mgd RDI (% of BL): 0.04 Event 1 Event 1 Detail Graph (2/8/2010) RDI:Acre:283 PkI/I:Acre:1,270 Storm Event I/I Analysis (Rain = 1.59 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: 7,407Total I/I per IDM:per in-rainPkI/I:IDM:8,292 gpd/IDM RDI:IDM:1,850 gpd/IDM Site D.1 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.05 0.10 0.15 0.20 0.25 0.30 02/2602/2702/2803/0103/02Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.28 0.24 3.76 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 8.79 7.61 d/D Ratio:0.31 240,000 4.08Total I/I per ADWF:per in-rain 3.6%R-Value: 104% mgd RDI (% of BL): 0.03 Event 2 Event 2 Detail Graph (3/1/2010) RDI:Acre:246 PkI/I:Acre:1,800 Storm Event I/I Analysis (Rain = 1.84 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: 6,302Total I/I per IDM:per in-rainPkI/I:IDM:11,746 gpd/IDM RDI:IDM:1,606 gpd/IDM Site D.1 Monitoring Site:Level, Velocity and Flow From 1/25/2010 to 2/1/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 1/25 1/26 1/27 1/28 1/29 1/30 1/31Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.07 inches Avg Level: 1.9 in. Peak Level: 2.43 in. Min Level: 1.36 in.23 1 Avg Velocity: 1.08 fps Peak Velocity: 1.3 fps Min Velocity: 0.76 fps231 Avg Flow: 0.057 mgd Peak Flow: 0.093 mgd Min Flow: 0.024 mgd231 Site D.1 Monitoring Site:Level, Velocity and Flow From 2/1/2010 to 2/8/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 2/1 2/2 2/3 2/4 2/5 2/6 2/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 1.6 inches Avg Level: 1.96 in. Peak Level: 3.57 in. Min Level: 1.18 in.23 2 Avg Velocity: 1.16 fps Peak Velocity: 1.76 fps Min Velocity: 0.66 fps232 Avg Flow: 0.068 mgd Peak Flow: 0.219 mgd Min Flow: 0.017 mgd232 Site D.1 Monitoring Site:Level, Velocity and Flow From 2/8/2010 to 2/15/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 2/8 2/9 2/10 2/11 2/12 2/13 2/14Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.46 inches Avg Level: 1.95 in. Peak Level: 3.13 in. Min Level: 1.32 in.23 3 Avg Velocity: 1.19 fps Peak Velocity: 1.63 fps Min Velocity: 0.87 fps233 Avg Flow: 0.066 mgd Peak Flow: 0.169 mgd Min Flow: 0.026 mgd233 Site D.1 Monitoring Site:Level, Velocity and Flow From 2/15/2010 to 2/22/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 2/15 2/16 2/17 2/18 2/19 2/20 2/21Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.23 inches Avg Level: 1.59 in. Peak Level: 2.18 in. Min Level: 1.12 in.23 4 Avg Velocity: 1.03 fps Peak Velocity: 1.36 fps Min Velocity: 0.63 fps234 Avg Flow: 0.043 mgd Peak Flow: 0.084 mgd Min Flow: 0.016 mgd234 Site D.1 Monitoring Site:Level, Velocity and Flow From 2/22/2010 to 3/1/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 2/22 2/23 2/24 2/25 2/26 2/27 2/28Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 2.25 inches Avg Level: 1.9 in. Peak Level: 3.76 in. Min Level: 1.19 in.23 5 Avg Velocity: 1.2 fps Peak Velocity: 2.06 fps Min Velocity: 0.67 fps235 Avg Flow: 0.069 mgd Peak Flow: 0.28 mgd Min Flow: 0.017 mgd235 Site D.1 Monitoring Site:Level, Velocity and Flow From 3/1/2010 to 3/8/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 3/1 3/2 3/3 3/4 3/5 3/6 3/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.94 inches Avg Level: 1.97 in. Peak Level: 2.54 in. Min Level: 1.47 in.23 6 Avg Velocity: 1.3 fps Peak Velocity: 1.6 fps Min Velocity: 0.94 fps236 Avg Flow: 0.072 mgd Peak Flow: 0.125 mgd Min Flow: 0.033 mgd236 Site D.1 Monitoring Site:Level, Velocity and Flow From 3/8/2010 to 3/15/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 3/8 3/9 3/10 3/11 3/12 3/13 3/14Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.16 inches Avg Level: 1.7 in. Peak Level: 2.2 in. Min Level: 1.23 in.23 7 Avg Velocity: 1.16 fps Peak Velocity: 1.52 fps Min Velocity: 0.77 fps237 Avg Flow: 0.052 mgd Peak Flow: 0.097 mgd Min Flow: 0.021 mgd237 Site D.1 Monitoring Site:Level, Velocity and Flow From 3/15/2010 to 3/22/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 3/15 3/16 3/17 3/18 3/19 3/20 3/21Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 1.57 in. Peak Level: 2.01 in. Min Level: 1.09 in.23 8 Avg Velocity: 1.05 fps Peak Velocity: 1.41 fps Min Velocity: 0.66 fps238 Avg Flow: 0.042 mgd Peak Flow: 0.079 mgd Min Flow: 0.015 mgd238 Site D.1 Monitoring Site:Level, Velocity and Flow From 3/22/2010 to 3/29/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 3/22 3/23 3/24 3/25 3/26 3/27 3/28Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 1.49 in. Peak Level: 1.89 in. Min Level: 1.07 in.23 9 Avg Velocity: 0.98 fps Peak Velocity: 1.37 fps Min Velocity: 0.65 fps239 Avg Flow: 0.037 mgd Peak Flow: 0.067 mgd Min Flow: 0.015 mgd239 Monitoring Site: Location: Size/Type Line: Site D.2 Manhole K08-6: 1144 Walnut Street 10-inch Sanitary Sewer Pipe Temporary Flow Monitoring Study Sanitary Sewer Collection System Data Summary Report Site D.2 Location:Manhole K08-6: 1144 Walnut Street Diameter:10 Monitoring Site:Site Information Report Average Dry Weather Flow:0.018 Peak Measured Flow:0.083 mgd mgd Sewer Map Satellite View Latitude: 35.2869° Longitude:-120.6628° Rim Elevation:227 feet inches Flow Diagram Street View Site D.2Monitoring Site:Average Dry Weather Flow0.25Average Dry Weather Flow:mgd0.0180.0000.0050.0100.0150.0200.0250.0300.0350.0400:001:002:003:004:005:006:007:008:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:0023:00Flow (mgd)WeekdayWeekend Site D.2 Monitoring Site:Level, Velocity and Flow From 10/18/2010 to 10/25/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 Velocity (fps)Vel 0.000 0.020 0.040 0.060 0.080 0.100 0.120 0.140 10/18 10/19 10/20 10/21 10/22 10/23 10/24Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.91 inches Avg Level: 2.53 in. Peak Level: 3.33 in. Min Level: 1.81 in. Avg Velocity: 0.56 fps Peak Velocity: 1.22 fps Min Velocity: 0.08 fps Avg Flow: 0.023 mgd Peak Flow: 0.076 mgd Min Flow: 0.001 mgd Site D.2 Monitoring Site:Level, Velocity and Flow From 10/25/2010 to 11/1/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 Velocity (fps)Vel 0.000 0.020 0.040 0.060 0.080 0.100 0.120 0.140 10/25 10/26 10/27 10/28 10/29 10/30 10/31Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.48 inches Avg Level: 2.49 in. Peak Level: 3.72 in. Min Level: 1.54 in. Avg Velocity: 0.45 fps Peak Velocity: 1.12 fps Min Velocity: 0.1 fps Avg Flow: 0.017 mgd Peak Flow: 0.068 mgd Min Flow: 0.001 mgd2 Site D.2 Monitoring Site:Level, Velocity and Flow From 11/1/2010 to 11/8/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 Velocity (fps)Vel 0.000 0.020 0.040 0.060 0.080 0.100 0.120 0.140 11/1 11/2 11/3 11/4 11/5 11/6 11/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.4 inches Avg Level: 2.57 in. Peak Level: 3.39 in. Min Level: 2.05 in. Avg Velocity: 0.49 fps Peak Velocity: 0.86 fps Min Velocity: 0.09 fps Avg Flow: 0.02 mgd Peak Flow: 0.052 mgd Min Flow: 0.002 mgd3 0.000.020.040.060.080.100.120.1420-Jan Thu21-Jan Fri22-Jan Sat23-Jan Sun24-Jan Mon25-Jan Tue26-Jan Wed27-Jan Thu28-Jan Fri29-Jan Sat30-Jan Sun31-Jan Mon1-Feb Tue2-Feb Wed3-Feb Thu4-Feb Fri5-Feb Sat6-Feb Sun7-Feb Mon8-Feb Tue9-Feb Wed10-Feb Thu11-Feb Fri12-Feb Sat13-Feb SunFlow (mgd)0.000.050.100.150.200.250.300.350.40Rainfall (in/hr)RainFlowBLFlowSite D.2Monitoring Site:Period Flow Summary0.0350.0310.0280.0250.0240.0190.0170.0240.0190.0180.0160.0180.0200.0170.0170.0190.0180.0200.0210.0330.0170.0220.0180.0100.0070.0090.0070.0130.0130.0240.0220.000.010.020.030.040.050.061/201/211/221/231/241/251/261/271/281/291/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/6Flow (MGal)0.00.40.81.21.62.02.42.8Rainfall (in/day)0.000.020.040.060.080.100.120.1413-FebSun14-FebMon15-FebTue16-FebWed17-FebThu18-FebFri19-FebSat20-FebSun21-FebMon22-FebTue23-FebWed24-FebThu25-FebFri26-FebSat27-FebSun28-FebMon1-Mar Tue2-Mar Wed3-Mar Thu4-Mar Fri5-Mar Sat6-Mar Sun7-Mar MonFlow (mgd)0.000.050.100.150.200.250.300.350.40Rainfall (in/hr)0.0300.0280.0150.0220.0180.0200.0130.0190.0310.0200.0070.0050.0170.0030.000.010.020.030.040.050.061/201/211/221/231/241/251/261/271/281/291/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/60.00.40.81.21.62.02.42.80.0180.000.010.020.030.040.050.061/201/211/221/231/241/251/261/271/281/291/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/60.00.40.81.21.62.02.42.8January 20 to March 7, 2011 Diameter0.02.04.06.08.010.012.002/1402/1502/1602/1702/1802/1902/2002/2102/2202/2302/2402/2502/2602/2702/2803/0103/02Level (inches)Site D.2Monitoring Site:Site Capacity / Surcharge SummaryRealtime Flow Levels with Rainfall Data over Monitoring Period Peak Measured Level:3.7Peak d/D Ratio:0.37Pipe Diameter:10inchesinches Site D.2 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.01 0.02 0.03 0.04 0.05 0.06 0.07 0.08 0.09 02/1402/1502/1602/1702/1802/1902/2002/2102/2202/2302/2402/25Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.083 0.064 3.70 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 4.62 3.54 d/D Ratio:0.37 19,000 0.36Total I/I per ADWF:per in-rain 0.8%R-Value: 0% mgd RDI (% of BL): 0.000 Event 1 Event 1 Detail Graph (2/21/2011) RDI:Acre:0 PkI/I:Acre:2,008 Storm Event I/I Analysis (Rain = 2.93 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: Site D.2 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.01 0.01 0.02 0.02 0.03 0.03 0.04 0.04 02/2502/2602/2702/2803/0103/02Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.026 0.010 2.67 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 1.46 0.53 d/D Ratio:0.27 -50,000 -3.22Total I/I per ADWF:per in-rain -6.7%R-Value: 0% mgd RDI (% of BL): 0.000 Event 2 Event 2 Detail Graph (2/27/2011) RDI:Acre:0 PkI/I:Acre:300 Storm Event I/I Analysis (Rain = 0.87 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: Site D.2 Monitoring Site:Level, Velocity and Flow From 1/17/2011 to 1/24/2011 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 1/17 1/18 1/19 1/20 1/21 1/22 1/23Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 2.81 in. Peak Level: 3.55 in. Min Level: 2.14 in.109 1 Avg Velocity: 0.65 fps Peak Velocity: 0.99 fps Min Velocity: 0.28 fps1091 Avg Flow: 0.033 mgd Peak Flow: 0.074 mgd Min Flow: 0.007 mgd1091 Site D.2 Monitoring Site:Level, Velocity and Flow From 1/24/2011 to 1/31/2011 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 1/24 1/25 1/26 1/27 1/28 1/29 1/30Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.29 inches Avg Level: 2.55 in. Peak Level: 3.32 in. Min Level: 1.91 in.109 2 Avg Velocity: 0.53 fps Peak Velocity: 0.88 fps Min Velocity: 0.1 fps1092 Avg Flow: 0.021 mgd Peak Flow: 0.061 mgd Min Flow: 0.002 mgd1092 Site D.2 Monitoring Site:Level, Velocity and Flow From 1/31/2011 to 2/7/2011 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 1/31 2/1 2/2 2/3 2/4 2/5 2/6Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 2.48 in. Peak Level: 3.41 in. Min Level: 1.89 in.109 3 Avg Velocity: 0.51 fps Peak Velocity: 0.87 fps Min Velocity: 0.12 fps1093 Avg Flow: 0.019 mgd Peak Flow: 0.063 mgd Min Flow: 0.002 mgd1093 Site D.2 Monitoring Site:Level, Velocity and Flow From 2/7/2011 to 2/14/2011 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 2/7 2/8 2/9 2/10 2/11 2/12 2/13Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 2.43 in. Peak Level: 3.09 in. Min Level: 1.76 in.109 4 Avg Velocity: 0.49 fps Peak Velocity: 0.83 fps Min Velocity: 0.12 fps1094 Avg Flow: 0.018 mgd Peak Flow: 0.048 mgd Min Flow: 0.001 mgd1094 Site D.2 Monitoring Site:Level, Velocity and Flow From 2/14/2011 to 2/21/2011 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 2/14 2/15 2/16 2/17 2/18 2/19 2/20Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 2.93 inches Avg Level: 2.57 in. Peak Level: 3.7 in. Min Level: 1.87 in.109 5 Avg Velocity: 0.56 fps Peak Velocity: 1.02 fps Min Velocity: 0.19 fps1095 Avg Flow: 0.023 mgd Peak Flow: 0.083 mgd Min Flow: 0.002 mgd1095 Site D.2 Monitoring Site:Level, Velocity and Flow From 2/21/2011 to 2/28/2011 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 2/21 2/22 2/23 2/24 2/25 2/26 2/27Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.87 inches Avg Level: 2.25 in. Peak Level: 3.11 in. Min Level: 1.74 in.109 6 Avg Velocity: 0.37 fps Peak Velocity: 0.8 fps Min Velocity: 0.13 fps1096 Avg Flow: 0.01 mgd Peak Flow: 0.045 mgd Min Flow: 0.001 mgd1096 Site D.2 Monitoring Site:Level, Velocity and Flow From 2/28/2011 to 3/7/2011 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 2/28 3/1 3/2 3/3 3/4 3/5 3/6Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.24 inches Avg Level: 2.35 in. Peak Level: 3.25 in. Min Level: 1.51 in.109 7 Avg Velocity: 0.42 fps Peak Velocity: 0.84 fps Min Velocity: 0.08 fps1097 Avg Flow: 0.014 mgd Peak Flow: 0.056 mgd Min Flow: 0 mgd1097 Site D.2 Monitoring Site:Level, Velocity and Flow From 3/7/2011 to 3/14/2011 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 3/7 3/8 3/9 3/10 3/11 3/12 3/13Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.04 inches Avg Level: 1.91 in. Peak Level: 2.57 in. Min Level: 1.52 in.109 8 Avg Velocity: 0.26 fps Peak Velocity: 0.63 fps Min Velocity: 0.04 fps1098 Avg Flow: 0.004 mgd Peak Flow: 0.024 mgd Min Flow: 0 mgd1098 Monitoring Site: Location: Size/Type Line: Site E.1 Manhole L08-31: Monterey Street and Pepper Street 15-inch Sanitary Sewer Pipe Temporary Flow Monitoring Study Sanitary Sewer Collection System Data Summary Report Site E.1 Location:Manhole L08-31: Monterey Street and Pepper Street Diameter:15 Monitoring Site:Site Information Report Average Dry Weather Flow:0.153 Peak Measured Flow:0.711 mgd mgd Flow Diagram Satellite Map Latitude: 35.2851° Longitude:-120.6559° Rim Elevation:241 feet above sea level inches Street View Photo Sanitary Map Plan View Photo Site E.1Monitoring Site:Average Dry Weather Flow0.09Average Dry Weather Flow:mgd0.1530.000.050.100.150.200.250.300:001:002:003:004:005:006:007:008:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:0023:00Flow (mgd)WeekdayWeekend Site E.1 Monitoring Site:Level, Velocity and Flow From 10/18/2010 to 10/25/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 10/18 10/19 10/20 10/21 10/22 10/23 10/24Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.91 inches Avg Level: 1.22 in. Peak Level: 1.78 in. Min Level: 0.77 in.3 Avg Velocity: 4.52 fps Peak Velocity: 5.62 fps Min Velocity: 3.16 fps3 Avg Flow: 0.144 mgd Peak Flow: 0.298 mgd Min Flow: 0.053 mgd3 Site E.1 Monitoring Site:Level, Velocity and Flow From 10/25/2010 to 11/1/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 10/25 10/26 10/27 10/28 10/29 10/30 10/31Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.48 inches Avg Level: 1.24 in. Peak Level: 1.61 in. Min Level: 0.86 in.3 Avg Velocity: 4.52 fps Peak Velocity: 5.68 fps Min Velocity: 3.23 fps3 Avg Flow: 0.145 mgd Peak Flow: 0.26 mgd Min Flow: 0.062 mgd32 Site E.1 Monitoring Site:Level, Velocity and Flow From 11/1/2010 to 11/8/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 11/1 11/2 11/3 11/4 11/5 11/6 11/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.4 inches Avg Level: 1.26 in. Peak Level: 1.84 in. Min Level: 0.75 in.3 Avg Velocity: 4.48 fps Peak Velocity: 6.63 fps Min Velocity: 3.15 fps3 Avg Flow: 0.148 mgd Peak Flow: 0.357 mgd Min Flow: 0.048 mgd33 0.000.100.200.300.400.500.600.700.800.9030-JanSat31-JanSun1-FebMon2-FebTue3-FebWed4-FebThu5-FebFri6-FebSat7-FebSun8-FebMon9-FebTue10-FebWed11-FebThu12-FebFri13-FebSat14-FebSun15-FebMon16-FebTue17-FebWed18-FebThu19-FebFri20-FebSat21-FebSun22-FebMon23-FebTue24-FebWed25-FebThu26-FebFri27-FebSat28-FebSunFlow (mgd)0.00.10.20.30.40.50.60.70.8Rainfall (in/hr)RainFlowBLFlowSite E.1Monitoring Site:Period Flow Summary0.1860.1810.1750.1770.2770.2210.2610.2320.2280.2240.1950.1840.1980.1890.1840.1860.2120.2010.2610.2340.2420.2720.2960.2510.2180.2210.2060.2080.2160.1990.1880.1800.1700.1820.1600.1560.1550.1590.1570.000.100.200.300.400.501/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/28Flow (MGal)0.00.40.81.21.62.02.42.8Rainfall (in/day)0.000.100.200.300.400.500.600.700.800.9028-FebSun1-MarMon2-MarTue3-MarWed4-MarThu5-MarFri6-MarSat7-MarSun8-MarMon9-MarTue10-MarWed11-MarThu12-MarFri13-MarSat14-MarSun15-MarMon16-MarTue17-MarWed18-MarThu19-MarFri20-MarSat21-MarSun22-MarMon23-MarTue24-MarWed25-MarThu26-MarFri27-MarSat28-MarSunFlow (mgd)0.00.10.20.30.40.50.60.70.8Rainfall (in/hr)0.2020.2030.3300.2650.2160.2130.2170.2100.4400.3170.2510.2430.2220.2050.1910.1650.1680.1790.000.100.200.300.400.501/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/280.00.40.81.21.62.02.42.80.2120.000.100.200.300.400.501/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/280.00.40.81.21.62.02.42.8January 30 to March 28, 2010Total Period Rainfall: 5.5 inchesAvg Flow: 0.215 mgd Peak Flow: 0.711 mgd Min Flow: 0.071 mgd Diameter0.02.04.06.08.010.012.014.016.002/0202/0302/0402/0502/0602/0702/0802/0902/1002/1102/1202/1302/1402/1502/1602/1702/1802/1902/2002/2102/2202/2302/2402/2502/2602/2702/2803/0103/0203/0303/0403/0503/0603/0703/0803/0903/1003/1103/1203/1303/1403/15Level (inches)Site E.1Monitoring Site:Site Capacity / Surcharge SummaryRealtime Flow Levels with Rainfall Data over Monitoring Period Peak Measured Level:2.14Peak d/D Ratio:0.14Pipe Diameter:15inchesinches Site E.1 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 02/0402/0502/0602/0702/0802/09Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.61 0.40 2.04 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 4.00 2.59 d/D Ratio:0.14 467,000 1.96Total I/I per ADWF:per in-rain 6.3%R-Value: 49% mgd RDI (% of BL): 0.08 Event 1 Event 1 Detail Graph (2/8/2010) RDI:Acre:430 PkI/I:Acre:2,268 Storm Event I/I Analysis (Rain = 1.55 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: 7,908Total I/I per IDM:per in-rainPkI/I:IDM:10,462 gpd/IDM RDI:IDM:1,986 gpd/IDM Site E.1 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 02/2602/2702/2803/0103/02Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.71 0.50 2.14 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 4.64 3.26 d/D Ratio:0.14 624,000 2.29Total I/I per ADWF:per in-rain 7.4%R-Value: 58% mgd RDI (% of BL): 0.09 Event 2 Event 2 Detail Graph (3/1/2010) RDI:Acre:506 PkI/I:Acre:2,853 Storm Event I/I Analysis (Rain = 1.78 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: 9,229Total I/I per IDM:per in-rainPkI/I:IDM:13,163 gpd/IDM RDI:IDM:2,336 gpd/IDM Site E.1 Monitoring Site:Level, Velocity and Flow From 1/25/2010 to 2/1/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1/25 1/26 1/27 1/28 1/29 1/30 1/31Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.07 inches Avg Level: 1.17 in. Peak Level: 1.59 in. Min Level: 0.9 in.24 1 Avg Velocity: 5.02 fps Peak Velocity: 5.84 fps Min Velocity: 4.09 fps241 Avg Flow: 0.208 mgd Peak Flow: 0.371 mgd Min Flow: 0.122 mgd241 Site E.1 Monitoring Site:Level, Velocity and Flow From 2/1/2010 to 2/8/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 2/1 2/2 2/3 2/4 2/5 2/6 2/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 1.56 inches Avg Level: 1.22 in. Peak Level: 2.04 in. Min Level: 0.83 in.24 2 Avg Velocity: 5.09 fps Peak Velocity: 6.83 fps Min Velocity: 3.19 fps242 Avg Flow: 0.227 mgd Peak Flow: 0.614 mgd Min Flow: 0.081 mgd242 Site E.1 Monitoring Site:Level, Velocity and Flow From 2/8/2010 to 2/15/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 2/8 2/9 2/10 2/11 2/12 2/13 2/14Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.43 inches Avg Level: 1.23 in. Peak Level: 1.71 in. Min Level: 0.88 in.24 3 Avg Velocity: 5.2 fps Peak Velocity: 6.07 fps Min Velocity: 3.8 fps243 Avg Flow: 0.228 mgd Peak Flow: 0.436 mgd Min Flow: 0.106 mgd243 Site E.1 Monitoring Site:Level, Velocity and Flow From 2/15/2010 to 2/22/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 2/15 2/16 2/17 2/18 2/19 2/20 2/21Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.22 inches Avg Level: 1.16 in. Peak Level: 1.64 in. Min Level: 0.85 in.24 4 Avg Velocity: 4.98 fps Peak Velocity: 6.13 fps Min Velocity: 3.52 fps244 Avg Flow: 0.201 mgd Peak Flow: 0.388 mgd Min Flow: 0.09 mgd244 Site E.1 Monitoring Site:Level, Velocity and Flow From 2/22/2010 to 3/1/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 2/22 2/23 2/24 2/25 2/26 2/27 2/28Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 2.17 inches Avg Level: 1.29 in. Peak Level: 2.14 in. Min Level: 0.84 in.24 5 Avg Velocity: 5.27 fps Peak Velocity: 7.04 fps Min Velocity: 3.19 fps245 Avg Flow: 0.257 mgd Peak Flow: 0.711 mgd Min Flow: 0.075 mgd245 Site E.1 Monitoring Site:Level, Velocity and Flow From 3/1/2010 to 3/8/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 3/1 3/2 3/3 3/4 3/5 3/6 3/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.9 inches Avg Level: 1.3 in. Peak Level: 1.71 in. Min Level: 0.92 in.24 6 Avg Velocity: 5.39 fps Peak Velocity: 6.12 fps Min Velocity: 4.31 fps246 Avg Flow: 0.256 mgd Peak Flow: 0.437 mgd Min Flow: 0.129 mgd246 Site E.1 Monitoring Site:Level, Velocity and Flow From 3/8/2010 to 3/15/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 3/8 3/9 3/10 3/11 3/12 3/13 3/14Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.16 inches Avg Level: 1.2 in. Peak Level: 1.66 in. Min Level: 0.86 in.24 7 Avg Velocity: 5.08 fps Peak Velocity: 6.09 fps Min Velocity: 3.53 fps247 Avg Flow: 0.214 mgd Peak Flow: 0.43 mgd Min Flow: 0.095 mgd247 Site E.1 Monitoring Site:Level, Velocity and Flow From 3/15/2010 to 3/22/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 3/15 3/16 3/17 3/18 3/19 3/20 3/21Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 1.11 in. Peak Level: 1.56 in. Min Level: 0.8 in.24 8 Avg Velocity: 4.82 fps Peak Velocity: 5.87 fps Min Velocity: 3.34 fps248 Avg Flow: 0.182 mgd Peak Flow: 0.337 mgd Min Flow: 0.08 mgd248 Site E.1 Monitoring Site:Level, Velocity and Flow From 3/22/2010 to 3/29/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 3/22 3/23 3/24 3/25 3/26 3/27 3/28Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 1.06 in. Peak Level: 1.37 in. Min Level: 0.81 in.24 9 Avg Velocity: 4.62 fps Peak Velocity: 5.71 fps Min Velocity: 3.04 fps249 Avg Flow: 0.162 mgd Peak Flow: 0.299 mgd Min Flow: 0.071 mgd249 Monitoring Site: Location: Size/Type Line: Site E.2 Manhole L07-26: 681 Grand Avenue 15-inch Sanitary Sewer Pipe Temporary Flow Monitoring Study Sanitary Sewer Collection System Data Summary Report Site E.2 Location:Manhole L07-26: 681 Grand Avenue Diameter:15 Monitoring Site:Site Information Report Average Dry Weather Flow:0.101 Peak Measured Flow:0.382 mgd mgd Sewer Map Satellite View Latitude: 35.2903° Longitude:-120.6532° Rim Elevation:302 feet inches Flow Diagram Street View Site E.2Monitoring Site:Average Dry Weather Flow0.07Average Dry Weather Flow:mgd0.1010.000.020.040.060.080.100.120.140.160.180:001:002:003:004:005:006:007:008:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:0023:00Flow (mgd)WeekdayWeekend Site E.2 Monitoring Site:Level, Velocity and Flow From 10/18/2010 to 10/25/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 10/18 10/19 10/20 10/21 10/22 10/23 10/24Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.91 inches Avg Level: 1.09 in. Peak Level: 1.64 in. Min Level: 0.55 in.2 Avg Velocity: 3.98 fps Peak Velocity: 5.66 fps Min Velocity: 0.98 fps2 Avg Flow: 0.114 mgd Peak Flow: 0.237 mgd Min Flow: 0.012 mgd2 Site E.2 Monitoring Site:Level, Velocity and Flow From 10/25/2010 to 11/1/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 10/25 10/26 10/27 10/28 10/29 10/30 10/31Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.48 inches Avg Level: 1.12 in. Peak Level: 1.74 in. Min Level: 0.58 in.2 Avg Velocity: 3.9 fps Peak Velocity: 5.68 fps Min Velocity: 0.62 fps2 Avg Flow: 0.112 mgd Peak Flow: 0.258 mgd Min Flow: 0.011 mgd22 Site E.2 Monitoring Site:Level, Velocity and Flow From 11/1/2010 to 11/8/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 11/1 11/2 11/3 11/4 11/5 11/6 11/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.4 inches Avg Level: 1.08 in. Peak Level: 1.54 in. Min Level: 0.58 in.2 Avg Velocity: 3.8 fps Peak Velocity: 5.58 fps Min Velocity: 0.58 fps2 Avg Flow: 0.106 mgd Peak Flow: 0.21 mgd Min Flow: 0.01 mgd23 0.000.100.200.300.400.500.600.7020-Jan Thu21-Jan Fri22-Jan Sat23-Jan Sun24-Jan Mon25-Jan Tue26-Jan Wed27-Jan Thu28-Jan Fri29-Jan Sat30-Jan Sun31-Jan Mon1-Feb Tue2-Feb Wed3-Feb Thu4-Feb Fri5-Feb Sat6-Feb Sun7-Feb Mon8-Feb Tue9-Feb Wed10-Feb Thu11-Feb Fri12-Feb Sat13-Feb SunFlow (mgd)0.000.050.100.150.200.250.300.350.40Rainfall (in/hr)RainFlowBLFlowSite E.2Monitoring Site:Period Flow Summary0.1200.1480.1050.1040.1020.1000.0950.1000.0910.0910.0940.1000.0990.0950.1320.1150.1050.0960.0990.1090.1030.1340.1300.1200.1140.1440.1250.1250.1210.1180.1190.000.050.100.150.201/201/211/221/231/241/251/261/271/281/291/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/6Flow (MGal)0.00.40.81.21.62.02.42.8Rainfall (in/day)0.000.100.200.300.400.500.600.7013-FebSun14-FebMon15-FebTue16-FebWed17-FebThu18-FebFri19-FebSat20-FebSun21-FebMon22-FebTue23-FebWed24-FebThu25-FebFri26-FebSat27-FebSun28-FebMon1-Mar Tue2-Mar Wed3-Mar Thu4-Mar Fri5-Mar Sat6-Mar Sun7-Mar MonFlow (mgd)0.000.050.100.150.200.250.300.350.40Rainfall (in/hr)0.1030.1320.0910.1120.1040.0930.1100.1350.1760.1570.1430.1250.1160.1120.000.050.100.150.201/201/211/221/231/241/251/261/271/281/291/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/60.00.40.81.21.62.02.42.80.1390.000.050.100.150.201/201/211/221/231/241/251/261/271/281/291/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/60.00.40.81.21.62.02.42.8January 20 to March 7, 2011 Diameter0.02.04.06.08.010.012.014.016.002/1402/1502/1602/1702/1802/1902/2002/2102/2202/2302/2402/2502/2602/2702/2803/0103/02Level (inches)Site E.2Monitoring Site:Site Capacity / Surcharge SummaryRealtime Flow Levels with Rainfall Data over Monitoring Period Peak Measured Level:1.87Peak d/D Ratio:0.12Pipe Diameter:15inchesinches Site E.2 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 02/1402/1502/1602/1702/1802/1902/2002/2102/2202/2302/2402/25Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.382 0.258 1.87 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 3.78 2.55 d/D Ratio:0.12 268,000 0.89Total I/I per ADWF:per in-rain 4.0%R-Value: 30% mgd RDI (% of BL): 0.030 Event 1 Event 1 Detail Graph (2/21/2011) RDI:Acre:362 PkI/I:Acre:3,071 Storm Event I/I Analysis (Rain = 2.96 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: Site E.2 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.05 0.10 0.15 0.20 0.25 02/2502/2602/2702/2803/0103/02Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.221 0.120 1.32 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 2.19 1.19 d/D Ratio:0.09 150,000 1.84Total I/I per ADWF:per in-rain 8.2%R-Value: 14% mgd RDI (% of BL): 0.014 Event 2 Event 2 Detail Graph (2/27/2011) RDI:Acre:164 PkI/I:Acre:1,434 Storm Event I/I Analysis (Rain = 0.81 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: Site E.2 Monitoring Site:Level, Velocity and Flow From 1/17/2011 to 1/24/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 1/17 1/18 1/19 1/20 1/21 1/22 1/23Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 1.15 in. Peak Level: 1.98 in. Min Level: 0.58 in.110 1 Avg Velocity: 4.29 fps Peak Velocity: 5.73 fps Min Velocity: 1.06 fps1101 Avg Flow: 0.127 mgd Peak Flow: 0.34 mgd Min Flow: 0.021 mgd1101 Site E.2 Monitoring Site:Level, Velocity and Flow From 1/24/2011 to 1/31/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 1/24 1/25 1/26 1/27 1/28 1/29 1/30Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.24 inches Avg Level: 1.01 in. Peak Level: 1.43 in. Min Level: 0.6 in.110 2 Avg Velocity: 4.13 fps Peak Velocity: 5.85 fps Min Velocity: 1.02 fps1102 Avg Flow: 0.101 mgd Peak Flow: 0.204 mgd Min Flow: 0.014 mgd1102 Site E.2 Monitoring Site:Level, Velocity and Flow From 1/31/2011 to 2/7/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 1/31 2/1 2/2 2/3 2/4 2/5 2/6Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 0.99 in. Peak Level: 1.36 in. Min Level: 0.75 in.110 3 Avg Velocity: 4.12 fps Peak Velocity: 5.74 fps Min Velocity: 0.96 fps1103 Avg Flow: 0.096 mgd Peak Flow: 0.183 mgd Min Flow: 0.015 mgd1103 Site E.2 Monitoring Site:Level, Velocity and Flow From 2/7/2011 to 2/14/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 2/7 2/8 2/9 2/10 2/11 2/12 2/13Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 1.09 in. Peak Level: 1.88 in. Min Level: 0.74 in.110 4 Avg Velocity: 4.15 fps Peak Velocity: 5.82 fps Min Velocity: 0.8 fps1104 Avg Flow: 0.113 mgd Peak Flow: 0.328 mgd Min Flow: 0.013 mgd1104 Site E.2 Monitoring Site:Level, Velocity and Flow From 2/14/2011 to 2/21/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 2/14 2/15 2/16 2/17 2/18 2/19 2/20Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 2.96 inches Avg Level: 1.06 in. Peak Level: 1.87 in. Min Level: 0.72 in.110 5 Avg Velocity: 4.8 fps Peak Velocity: 6.7 fps Min Velocity: 0.82 fps1105 Avg Flow: 0.125 mgd Peak Flow: 0.382 mgd Min Flow: 0.014 mgd1105 Site E.2 Monitoring Site:Level, Velocity and Flow From 2/21/2011 to 2/28/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 2/21 2/22 2/23 2/24 2/25 2/26 2/27Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.81 inches Avg Level: 1.07 in. Peak Level: 1.32 in. Min Level: 0.79 in.110 6 Avg Velocity: 5.12 fps Peak Velocity: 6.57 fps Min Velocity: 1.62 fps1106 Avg Flow: 0.131 mgd Peak Flow: 0.221 mgd Min Flow: 0.028 mgd1106 Site E.2 Monitoring Site:Level, Velocity and Flow From 2/28/2011 to 3/7/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 2/28 3/1 3/2 3/3 3/4 3/5 3/6Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.23 inches Avg Level: 1.04 in. Peak Level: 1.28 in. Min Level: 0.75 in.110 7 Avg Velocity: 4.82 fps Peak Velocity: 5.97 fps Min Velocity: 1.88 fps1107 Avg Flow: 0.12 mgd Peak Flow: 0.196 mgd Min Flow: 0.032 mgd1107 Site E.2 Monitoring Site:Level, Velocity and Flow From 3/7/2011 to 3/14/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 3/7 3/8 3/9 3/10 3/11 3/12 3/13Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.04 inches Avg Level: 0.98 in. Peak Level: 1.25 in. Min Level: 0.77 in.110 8 Avg Velocity: 4.64 fps Peak Velocity: 5.88 fps Min Velocity: 1.78 fps1108 Avg Flow: 0.106 mgd Peak Flow: 0.181 mgd Min Flow: 0.031 mgd1108 Monitoring Site: Location: Size/Type Line: Site F.1 Manhole K09-49: Osos Street and Pacific Street 8-inch Sanitary Sewer Pipe Temporary Flow Monitoring Study Sanitary Sewer Collection System Data Summary Report Site F.1 Location:Manhole K09-49: Osos Street and Pacific Street Diameter:8 Monitoring Site:Site Information Report Average Dry Weather Flow:0.052 Peak Measured Flow:0.331 mgd mgd Sanitary Map Latitude: 35.2796° Longitude:-120.6594° Rim Elevation:215 feet above sea level inches Flow Diagram Satellite Map Street View Photo Site F.1Monitoring Site:Average Dry Weather Flow0.13Average Dry Weather Flow:mgd0.0520.000.020.040.060.080.100.120.140:001:002:003:004:005:006:007:008:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:0023:00Flow (mgd)WeekdayWeekend Site F.1 Monitoring Site:Level, Velocity and Flow From 10/18/2010 to 10/25/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 10/18 10/19 10/20 10/21 10/22 10/23 10/24Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.91 inches Avg Level: 1.12 in. Peak Level: 2 in. Min Level: 0.61 in.4 Avg Velocity: 2.69 fps Peak Velocity: 4.13 fps Min Velocity: 0.43 fps4 Avg Flow: 0.06 mgd Peak Flow: 0.178 mgd Min Flow: 0.003 mgd4 Site F.1 Monitoring Site:Level, Velocity and Flow From 10/25/2010 to 11/1/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 10/25 10/26 10/27 10/28 10/29 10/30 10/31Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.48 inches Avg Level: 1 in. Peak Level: 1.89 in. Min Level: 0.44 in.4 Avg Velocity: 2.83 fps Peak Velocity: 4.06 fps Min Velocity: 0.39 fps4 Avg Flow: 0.052 mgd Peak Flow: 0.155 mgd Min Flow: 0.004 mgd42 Site F.1 Monitoring Site:Level, Velocity and Flow From 11/1/2010 to 11/8/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 11/1 11/2 11/3 11/4 11/5 11/6 11/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.4 inches Avg Level: 1.01 in. Peak Level: 2.55 in. Min Level: 0.56 in.4 Avg Velocity: 2.58 fps Peak Velocity: 4.01 fps Min Velocity: 0.44 fps4 Avg Flow: 0.049 mgd Peak Flow: 0.23 mgd Min Flow: 0.005 mgd43 0.000.050.100.150.200.250.300.350.4030-JanSat31-JanSun1-FebMon2-FebTue3-FebWed4-FebThu5-FebFri6-FebSat7-FebSun8-FebMon9-FebTue10-FebWed11-FebThu12-FebFri13-FebSat14-FebSun15-FebMon16-FebTue17-FebWed18-FebThu19-FebFri20-FebSat21-FebSun22-FebMon23-FebTue24-FebWed25-FebThu26-FebFri27-FebSat28-FebSunFlow (mgd)0.00.10.20.30.40.50.60.70.8Rainfall (in/hr)RainFlowBLFlowSite F.1Monitoring Site:Period Flow Summary0.0540.0570.0640.0470.0810.0640.0850.0720.0680.0750.0750.0780.0810.0690.0570.0530.0630.0570.0920.0720.0630.0650.0590.0620.0610.0560.0580.0560.0600.0560.0580.0560.0640.0610.0520.0550.0570.0600.0520.000.050.100.150.201/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/28Flow (MGal)0.00.40.81.21.62.02.42.8Rainfall (in/day)0.000.050.100.150.200.250.300.350.4028-FebSun1-MarMon2-MarTue3-MarWed4-MarThu5-MarFri6-MarSat7-MarSun8-MarMon9-MarTue10-MarWed11-MarThu12-MarFri13-MarSat14-MarSun15-MarMon16-MarTue17-MarWed18-MarThu19-MarFri20-MarSat21-MarSun22-MarMon23-MarTue24-MarWed25-MarThu26-MarFri27-MarSat28-MarSunFlow (mgd)0.00.10.20.30.40.50.60.70.8Rainfall (in/hr)0.0600.0580.1060.0830.0720.0650.0550.0560.1900.1130.0570.0680.0550.0570.0570.0510.0560.0540.000.050.100.150.201/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/280.00.40.81.21.62.02.42.80.0880.000.050.100.150.201/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/280.00.40.81.21.62.02.42.8January 30 to March 28, 2010Total Period Rainfall: 6.13 inchesAvg Flow: 0.067 mgd Peak Flow: 0.331 mgd Min Flow: 0.006 mgd Diameter0.01.02.03.04.05.06.07.08.09.002/0202/0302/0402/0502/0602/0702/0802/0902/1002/1102/1202/1302/1402/1502/1602/1702/1802/1902/2002/2102/2202/2302/2402/2502/2602/2702/2803/0103/0203/0303/0403/0503/0603/0703/0803/0903/1003/1103/1203/1303/1403/15Level (inches)Site F.1Monitoring Site:Site Capacity / Surcharge SummaryRealtime Flow Levels with Rainfall Data over Monitoring Period Peak Measured Level:3.8Peak d/D Ratio:0.48Pipe Diameter:8inchesinches Site F.1 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.05 0.10 0.15 0.20 0.25 0.30 02/0402/0502/0602/0702/0802/09Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.27 0.16 3.80 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 5.10 3.11 d/D Ratio:0.48 126,000 1.47Total I/I per ADWF:per in-rain 0.8%R-Value: 23% mgd RDI (% of BL): 0.01 Event 1 Event 1 Detail Graph (2/8/2010) RDI:Acre:33 PkI/I:Acre:449 Storm Event I/I Analysis (Rain = 1.64 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: 2,613Total I/I per IDM:per in-rainPkI/I:IDM:5,529 gpd/IDM RDI:IDM:408 gpd/IDM Site F.1 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 02/2602/2702/2803/0103/02Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.33 0.22 3.63 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 6.38 4.26 d/D Ratio:0.45 259,000 2.48Total I/I per ADWF:per in-rain 1.3%R-Value: 39% mgd RDI (% of BL): 0.02 Event 2 Event 2 Detail Graph (3/1/2010) RDI:Acre:56 PkI/I:Acre:615 Storm Event I/I Analysis (Rain = 2.01 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: 4,406Total I/I per IDM:per in-rainPkI/I:IDM:7,564 gpd/IDM RDI:IDM:691 gpd/IDM Site F.1 Monitoring Site:Level, Velocity and Flow From 1/25/2010 to 2/1/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 1/25 1/26 1/27 1/28 1/29 1/30 1/31Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.08 inches Avg Level: 1.62 in. Peak Level: 2.36 in. Min Level: 0.84 in.25 1 Avg Velocity: 1.82 fps Peak Velocity: 2.68 fps Min Velocity: 0.82 fps251 Avg Flow: 0.064 mgd Peak Flow: 0.143 mgd Min Flow: 0.014 mgd251 Site F.1 Monitoring Site:Level, Velocity and Flow From 2/1/2010 to 2/8/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 2/1 2/2 2/3 2/4 2/5 2/6 2/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 1.65 inches Avg Level: 1.73 in. Peak Level: 3.8 in. Min Level: 0.75 in.25 2 Avg Velocity: 1.8 fps Peak Velocity: 2.62 fps Min Velocity: 0.59 fps252 Avg Flow: 0.07 mgd Peak Flow: 0.265 mgd Min Flow: 0.007 mgd252 Site F.1 Monitoring Site:Level, Velocity and Flow From 2/8/2010 to 2/15/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 2/8 2/9 2/10 2/11 2/12 2/13 2/14Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.51 inches Avg Level: 1.69 in. Peak Level: 2.9 in. Min Level: 0.99 in.25 3 Avg Velocity: 1.94 fps Peak Velocity: 2.79 fps Min Velocity: 1.03 fps253 Avg Flow: 0.071 mgd Peak Flow: 0.173 mgd Min Flow: 0.018 mgd253 Site F.1 Monitoring Site:Level, Velocity and Flow From 2/15/2010 to 2/22/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 2/15 2/16 2/17 2/18 2/19 2/20 2/21Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.24 inches Avg Level: 2.01 in. Peak Level: 3.16 in. Min Level: 0.86 in.25 4 Avg Velocity: 1.52 fps Peak Velocity: 2.65 fps Min Velocity: 0.73 fps254 Avg Flow: 0.072 mgd Peak Flow: 0.17 mgd Min Flow: 0.012 mgd254 Site F.1 Monitoring Site:Level, Velocity and Flow From 2/22/2010 to 3/1/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 2/22 2/23 2/24 2/25 2/26 2/27 2/28Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 2.46 inches Avg Level: 1.83 in. Peak Level: 3.63 in. Min Level: 0.82 in.25 5 Avg Velocity: 1.95 fps Peak Velocity: 3.43 fps Min Velocity: 0.75 fps255 Avg Flow: 0.089 mgd Peak Flow: 0.331 mgd Min Flow: 0.01 mgd255 Site F.1 Monitoring Site:Level, Velocity and Flow From 3/1/2010 to 3/8/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 3/1 3/2 3/3 3/4 3/5 3/6 3/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 1.04 inches Avg Level: 1.63 in. Peak Level: 2.58 in. Min Level: 0.88 in.25 6 Avg Velocity: 1.82 fps Peak Velocity: 2.71 fps Min Velocity: 0.9 fps256 Avg Flow: 0.064 mgd Peak Flow: 0.158 mgd Min Flow: 0.013 mgd256 Site F.1 Monitoring Site:Level, Velocity and Flow From 3/8/2010 to 3/15/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 3/8 3/9 3/10 3/11 3/12 3/13 3/14Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.16 inches Avg Level: 1.52 in. Peak Level: 2.35 in. Min Level: 0.65 in.25 7 Avg Velocity: 1.77 fps Peak Velocity: 2.78 fps Min Velocity: 0.71 fps257 Avg Flow: 0.058 mgd Peak Flow: 0.141 mgd Min Flow: 0.008 mgd257 Site F.1 Monitoring Site:Level, Velocity and Flow From 3/15/2010 to 3/22/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 3/15 3/16 3/17 3/18 3/19 3/20 3/21Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 1.52 in. Peak Level: 2.48 in. Min Level: 0.54 in.25 8 Avg Velocity: 1.75 fps Peak Velocity: 2.74 fps Min Velocity: 0.67 fps258 Avg Flow: 0.058 mgd Peak Flow: 0.158 mgd Min Flow: 0.006 mgd258 Site F.1 Monitoring Site:Level, Velocity and Flow From 3/22/2010 to 3/29/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 3/22 3/23 3/24 3/25 3/26 3/27 3/28Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 1.5 in. Peak Level: 2.36 in. Min Level: 0.56 in.25 9 Avg Velocity: 1.69 fps Peak Velocity: 2.61 fps Min Velocity: 0.67 fps259 Avg Flow: 0.055 mgd Peak Flow: 0.128 mgd Min Flow: 0.006 mgd259 Monitoring Site: Location: Size/Type Line: Site F.2 Manhole L07-47: 1890 San Luis Drive 8-inch Sanitary Sewer Pipe Temporary Flow Monitoring Study Sanitary Sewer Collection System Data Summary Report Site F.2 Location:Manhole L07-47: 1890 San Luis Drive Diameter:8 Monitoring Site:Site Information Report Average Dry Weather Flow:0.031 Peak Measured Flow:0.234 mgd mgd Sewer Map Satellite View Latitude: 35.2887° Longitude:-120.6486° Rim Elevation:273 feet inches Flow Diagram Street View Site F.2Monitoring Site:Average Dry Weather Flow0.13Average Dry Weather Flow:mgd0.0310.000.010.020.030.040.050.060.070.080.090:001:002:003:004:005:006:007:008:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:0023:00Flow (mgd)WeekdayWeekend Site F.2 Monitoring Site:Level, Velocity and Flow From 10/18/2010 to 10/25/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 10/18 10/19 10/20 10/21 10/22 10/23 10/24Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.91 inches Avg Level: 1.25 in. Peak Level: 2.03 in. Min Level: 0.5 in.5 Avg Velocity: 1.81 fps Peak Velocity: 3.86 fps Min Velocity: 0.57 fps5 Avg Flow: 0.047 mgd Peak Flow: 0.174 mgd Min Flow: 0.006 mgd5 Site F.2 Monitoring Site:Level, Velocity and Flow From 10/25/2010 to 11/1/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 10/25 10/26 10/27 10/28 10/29 10/30 10/31Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.48 inches Avg Level: 1.12 in. Peak Level: 1.76 in. Min Level: 0.45 in.5 Avg Velocity: 1.61 fps Peak Velocity: 3.5 fps Min Velocity: 0.4 fps5 Avg Flow: 0.033 mgd Peak Flow: 0.1 mgd Min Flow: 0.003 mgd52 Site F.2 Monitoring Site:Level, Velocity and Flow From 11/1/2010 to 11/8/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 11/1 11/2 11/3 11/4 11/5 11/6 11/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.4 inches Avg Level: 1.04 in. Peak Level: 2.1 in. Min Level: 0.25 in.5 Avg Velocity: 1.69 fps Peak Velocity: 3.35 fps Min Velocity: 0.48 fps5 Avg Flow: 0.034 mgd Peak Flow: 0.144 mgd Min Flow: 0.002 mgd53 0.000.050.100.150.200.250.300.350.4020-Jan Thu21-Jan Fri22-Jan Sat23-Jan Sun24-Jan Mon25-Jan Tue26-Jan Wed27-Jan Thu28-Jan Fri29-Jan Sat30-Jan Sun31-Jan Mon1-Feb Tue2-Feb Wed3-Feb Thu4-Feb Fri5-Feb Sat6-Feb Sun7-Feb Mon8-Feb Tue9-Feb Wed10-Feb Thu11-Feb Fri12-Feb Sat13-Feb SunFlow (mgd)0.000.050.100.150.200.250.300.350.40Rainfall (in/hr)RainFlowBLFlowSite F.2Monitoring Site:Period Flow Summary0.0400.0430.0460.0410.0330.0340.0460.0380.0290.0220.0290.0330.0360.0370.0250.0310.0350.0280.0320.0510.0370.0800.0380.0340.0350.0780.0410.0300.0270.0290.0330.000.020.040.060.080.100.121/201/211/221/231/241/251/261/271/281/291/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/6Flow (MGal)0.00.40.81.21.62.02.42.8Rainfall (in/day)0.000.050.100.150.200.250.300.350.4013-FebSun14-FebMon15-FebTue16-FebWed17-FebThu18-FebFri19-FebSat20-FebSun21-FebMon22-FebTue23-FebWed24-FebThu25-FebFri26-FebSat27-FebSun28-FebMon1-Mar Tue2-Mar Wed3-Mar Thu4-Mar Fri5-Mar Sat6-Mar Sun7-Mar MonFlow (mgd)0.000.050.100.150.200.250.300.350.40Rainfall (in/hr)0.0480.0460.0440.0500.0370.0440.0430.0420.0970.0670.0670.0550.0420.0480.000.020.040.060.080.100.121/201/211/221/231/241/251/261/271/281/291/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/60.00.40.81.21.62.02.42.80.0520.000.020.040.060.080.100.121/201/211/221/231/241/251/261/271/281/291/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/60.00.40.81.21.62.02.42.8January 20 to March 7, 2011 Diameter0.01.02.03.04.05.06.07.08.09.002/1402/1502/1602/1702/1802/1902/2002/2102/2202/2302/2402/2502/2602/2702/2803/0103/02Level (inches)Site F.2Monitoring Site:Site Capacity / Surcharge SummaryRealtime Flow Levels with Rainfall Data over Monitoring Period Peak Measured Level:2.24Peak d/D Ratio:0.28Pipe Diameter:8inchesinches Site F.2 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.05 0.10 0.15 0.20 0.25 02/1402/1502/1602/1702/1802/1902/2002/2102/2202/2302/2402/25Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.234 0.191 2.24 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 7.66 6.27 d/D Ratio:0.28 216,000 2.42Total I/I per ADWF:per in-rain 5.1%R-Value: 61% mgd RDI (% of BL): 0.019 Event 1 Event 1 Detail Graph (2/21/2011) RDI:Acre:352 PkI/I:Acre:3,598 Storm Event I/I Analysis (Rain = 2.93 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: Site F.2 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 0.20 02/2502/2602/2702/2803/0103/02Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.175 0.144 1.90 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 5.71 4.72 d/D Ratio:0.24 116,000 4.33Total I/I per ADWF:per in-rain 9.2%R-Value: 66% mgd RDI (% of BL): 0.020 Event 2 Event 2 Detail Graph (2/27/2011) RDI:Acre:378 PkI/I:Acre:2,712 Storm Event I/I Analysis (Rain = 0.87 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: Site F.2 Monitoring Site:Level, Velocity and Flow From 1/17/2011 to 1/24/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 1/17 1/18 1/19 1/20 1/21 1/22 1/23Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 1.25 in. Peak Level: 1.97 in. Min Level: 0.69 in.111 1 Avg Velocity: 1.87 fps Peak Velocity: 3.27 fps Min Velocity: 0.97 fps1111 Avg Flow: 0.045 mgd Peak Flow: 0.117 mgd Min Flow: 0.011 mgd1111 Site F.2 Monitoring Site:Level, Velocity and Flow From 1/24/2011 to 1/31/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 1/24 1/25 1/26 1/27 1/28 1/29 1/30Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.29 inches Avg Level: 1.33 in. Peak Level: 2.04 in. Min Level: 0.65 in.111 2 Avg Velocity: 1.62 fps Peak Velocity: 3.51 fps Min Velocity: 0.48 fps1112 Avg Flow: 0.042 mgd Peak Flow: 0.157 mgd Min Flow: 0.009 mgd1112 Site F.2 Monitoring Site:Level, Velocity and Flow From 1/31/2011 to 2/7/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 1/31 2/1 2/2 2/3 2/4 2/5 2/6Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.01 inches Avg Level: 1.05 in. Peak Level: 1.72 in. Min Level: 0.42 in.111 3 Avg Velocity: 1.7 fps Peak Velocity: 3.33 fps Min Velocity: 0.41 fps1113 Avg Flow: 0.033 mgd Peak Flow: 0.117 mgd Min Flow: 0.005 mgd1113 Site F.2 Monitoring Site:Level, Velocity and Flow From 2/7/2011 to 2/14/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 2/7 2/8 2/9 2/10 2/11 2/12 2/13Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 1.09 in. Peak Level: 1.94 in. Min Level: 0.46 in.111 4 Avg Velocity: 1.74 fps Peak Velocity: 3.68 fps Min Velocity: 0.61 fps1114 Avg Flow: 0.036 mgd Peak Flow: 0.121 mgd Min Flow: 0.005 mgd1114 Site F.2 Monitoring Site:Level, Velocity and Flow From 2/14/2011 to 2/21/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 2/14 2/15 2/16 2/17 2/18 2/19 2/20Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 2.93 inches Avg Level: 1.24 in. Peak Level: 2.24 in. Min Level: 0.43 in.111 5 Avg Velocity: 2.2 fps Peak Velocity: 4.72 fps Min Velocity: 0.74 fps1115 Avg Flow: 0.056 mgd Peak Flow: 0.234 mgd Min Flow: 0.005 mgd1115 Site F.2 Monitoring Site:Level, Velocity and Flow From 2/21/2011 to 2/28/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 2/21 2/22 2/23 2/24 2/25 2/26 2/27Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.87 inches Avg Level: 1.2 in. Peak Level: 1.9 in. Min Level: 0.51 in.111 6 Avg Velocity: 2.22 fps Peak Velocity: 4.24 fps Min Velocity: 0.86 fps1116 Avg Flow: 0.051 mgd Peak Flow: 0.175 mgd Min Flow: 0.009 mgd1116 Site F.2 Monitoring Site:Level, Velocity and Flow From 2/28/2011 to 3/7/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 2/28 3/1 3/2 3/3 3/4 3/5 3/6Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.24 inches Avg Level: 1.07 in. Peak Level: 1.69 in. Min Level: 0.52 in.111 7 Avg Velocity: 1.85 fps Peak Velocity: 3.69 fps Min Velocity: 0.99 fps1117 Avg Flow: 0.036 mgd Peak Flow: 0.124 mgd Min Flow: 0.007 mgd1117 Site F.2 Monitoring Site:Level, Velocity and Flow From 3/7/2011 to 3/14/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 3/7 3/8 3/9 3/10 3/11 3/12 3/13Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.03 inches Avg Level: 0.89 in. Peak Level: 1.39 in. Min Level: 0.5 in.111 8 Avg Velocity: 1.78 fps Peak Velocity: 3.16 fps Min Velocity: 0.91 fps1118 Avg Flow: 0.027 mgd Peak Flow: 0.072 mgd Min Flow: 0.006 mgd1118 Monitoring Site: Location: Size/Type Line: Site G.1 Manhole J09-47: Higuera Street southwest of Broad Street 8-inch Sanitary Sewer Pipe Temporary Flow Monitoring Study Sanitary Sewer Collection System Data Summary Report Site G.1 Location:Manhole J09-47: Higuera Street southwest of Broad Street Diameter:8 Monitoring Site:Site Information Report Average Dry Weather Flow:0.044 Peak Measured Flow:0.132 mgd mgd Flow Diagram Satellite Map Latitude: 35.2786° Longitude:-120.6649° Rim Elevation:195 feet above sea level inches Street View Photo Sanitary Map Plan View Photo Site G.1Monitoring Site:Average Dry Weather Flow0.19Average Dry Weather Flow:mgd0.0460.000.010.020.030.040.050.060.070.080.090.100:001:002:003:004:005:006:007:008:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:0023:00Flow (mgd)WeekdayWeekend Site G.1 Monitoring Site:Level, Velocity and Flow From 10/18/2010 to 10/25/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 10/18 10/19 10/20 10/21 10/22 10/23 10/24Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.91 inches Avg Level: 1.49 in. Peak Level: 2.59 in. Min Level: 0.36 in.6 Avg Velocity: 1.49 fps Peak Velocity: 2.62 fps Min Velocity: 0.35 fps6 Avg Flow: 0.052 mgd Peak Flow: 0.166 mgd Min Flow: 0.002 mgd6 Site G.1 Monitoring Site:Level, Velocity and Flow From 10/25/2010 to 11/1/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 10/25 10/26 10/27 10/28 10/29 10/30 10/31Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.48 inches Avg Level: 1.46 in. Peak Level: 2.59 in. Min Level: 0.38 in.6 Avg Velocity: 1.45 fps Peak Velocity: 2.6 fps Min Velocity: 0.33 fps6 Avg Flow: 0.049 mgd Peak Flow: 0.164 mgd Min Flow: 0.001 mgd62 Site G.1 Monitoring Site:Level, Velocity and Flow From 11/1/2010 to 11/8/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 11/1 11/2 11/3 11/4 11/5 11/6 11/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.4 inches Avg Level: 1.56 in. Peak Level: 3.51 in. Min Level: 0.41 in.6 Avg Velocity: 1.34 fps Peak Velocity: 2.57 fps Min Velocity: 0.46 fps6 Avg Flow: 0.047 mgd Peak Flow: 0.218 mgd Min Flow: 0.002 mgd63 0.000.020.040.060.080.100.120.140.160.180.2030-JanSat31-JanSun1-FebMon2-FebTue3-FebWed4-FebThu5-FebFri6-FebSat7-FebSun8-FebMon9-FebTue10-FebWed11-FebThu12-FebFri13-FebSat14-FebSun15-FebMon16-FebTue17-FebWed18-FebThu19-FebFri20-FebSat21-FebSun22-FebMon23-FebTue24-FebWed25-FebThu26-FebFri27-FebSat28-FebSunFlow (mgd)0.00.10.20.30.40.50.60.70.8Rainfall (in/hr)RainFlowBLFlowSite G.1Monitoring Site:Period Flow Summary0.0330.0320.0330.0350.0360.0350.0350.0320.0360.0380.0280.0280.0290.0360.0260.0270.0300.0320.0390.0280.0300.0340.0400.0440.0350.0320.0310.0370.0400.0340.0330.0420.0430.0410.0350.0360.0450.0430.0450.000.010.020.030.040.050.061/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/28Flow (MGal)0.00.40.81.21.62.02.42.8Rainfall (in/day)0.000.020.040.060.080.100.120.140.160.180.2028-FebSun1-MarMon2-MarTue3-MarWed4-MarThu5-MarFri6-MarSat7-MarSun8-MarMon9-MarTue10-MarWed11-MarThu12-MarFri13-MarSat14-MarSun15-MarMon16-MarTue17-MarWed18-MarThu19-MarFri20-MarSat21-MarSun22-MarMon23-MarTue24-MarWed25-MarThu26-MarFri27-MarSat28-MarSunFlow (mgd)0.00.10.20.30.40.50.60.70.8Rainfall (in/hr)0.0470.0380.0440.0340.0420.0460.0360.0290.0410.0330.0440.0430.0420.0400.0410.0380.0400.0340.000.010.020.030.040.050.061/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/280.00.40.81.21.62.02.42.80.0320.000.010.020.030.040.050.061/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/280.00.40.81.21.62.02.42.8January 30 to March 28, 2010Total Period Rainfall: 6.39 inchesAvg Flow: 0.036 mgd Peak Flow: 0.132 mgd Min Flow: 0.002 mgd Diameter0.01.02.03.04.05.06.07.08.09.002/0202/0302/0402/0502/0602/0702/0802/0902/1002/1102/1202/1302/1402/1502/1602/1702/1802/1902/2002/2102/2202/2302/2402/2502/2602/2702/2803/0103/0203/0303/0403/0503/0603/0703/0803/0903/1003/1103/1203/1303/1403/15Level (inches)Site G.1Monitoring Site:Site Capacity / Surcharge SummaryRealtime Flow Levels with Rainfall Data over Monitoring Period Peak Measured Level:2.49Peak d/D Ratio:0.31Pipe Diameter:8inchesinches Site G.1 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 02/0402/0502/0602/0702/0802/09Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.13 0.11 2.48 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 3.02 2.49 d/D Ratio:0.31 -31,000 -0.42Total I/I per ADWF:per in-rain -1.4%R-Value: 0% mgd RDI (% of BL): 0.00 Event 1 Event 1 Detail Graph (2/8/2010) RDI:Acre:0 PkI/I:Acre:2,285 Storm Event I/I Analysis (Rain = 1.7 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: -1,637Total I/I per IDM:per in-rainPkI/I:IDM:9,669 gpd/IDM RDI:IDM:0 gpd/IDM Site G.1 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.02 0.04 0.06 0.08 0.10 0.12 02/2602/2702/2803/0103/02Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.10 0.04 2.49 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 2.35 1.00 d/D Ratio:0.31 -41,000 -0.45Total I/I per ADWF:per in-rain -1.5%R-Value: 0% mgd RDI (% of BL): 0.00 Event 2 Event 2 Detail Graph (3/1/2010) RDI:Acre:0 PkI/I:Acre:917 Storm Event I/I Analysis (Rain = 2.11 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: -1,731Total I/I per IDM:per in-rainPkI/I:IDM:3,880 gpd/IDM RDI:IDM:0 gpd/IDM Site G.1 Monitoring Site:Level, Velocity and Flow From 1/25/2010 to 2/1/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 0.20 1/25 1/26 1/27 1/28 1/29 1/30 1/31Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.08 inches Avg Level: 1.49 in. Peak Level: 2.31 in. Min Level: 0.55 in.26 1 Avg Velocity: 1.36 fps Peak Velocity: 2.18 fps Min Velocity: 0.59 fps261 Avg Flow: 0.044 mgd Peak Flow: 0.106 mgd Min Flow: 0.004 mgd261 Site G.1 Monitoring Site:Level, Velocity and Flow From 2/1/2010 to 2/8/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 0.20 2/1 2/2 2/3 2/4 2/5 2/6 2/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 1.7 inches Avg Level: 1.39 in. Peak Level: 2.48 in. Min Level: 0.42 in.26 2 Avg Velocity: 1.18 fps Peak Velocity: 2.22 fps Min Velocity: 0.41 fps262 Avg Flow: 0.035 mgd Peak Flow: 0.132 mgd Min Flow: 0.002 mgd262 Site G.1 Monitoring Site:Level, Velocity and Flow From 2/8/2010 to 2/15/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 0.20 2/8 2/9 2/10 2/11 2/12 2/13 2/14Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.55 inches Avg Level: 1.41 in. Peak Level: 2.51 in. Min Level: 0.48 in.26 3 Avg Velocity: 1.24 fps Peak Velocity: 2.09 fps Min Velocity: 0.45 fps263 Avg Flow: 0.038 mgd Peak Flow: 0.123 mgd Min Flow: 0.002 mgd263 Site G.1 Monitoring Site:Level, Velocity and Flow From 2/15/2010 to 2/22/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 0.20 2/15 2/16 2/17 2/18 2/19 2/20 2/21Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.24 inches Avg Level: 1.32 in. Peak Level: 2.12 in. Min Level: 0.48 in.26 4 Avg Velocity: 1.13 fps Peak Velocity: 1.9 fps Min Velocity: 0.34 fps264 Avg Flow: 0.031 mgd Peak Flow: 0.079 mgd Min Flow: 0.002 mgd264 Site G.1 Monitoring Site:Level, Velocity and Flow From 2/22/2010 to 3/1/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 0.20 2/22 2/23 2/24 2/25 2/26 2/27 2/28Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 2.58 inches Avg Level: 1.39 in. Peak Level: 2.49 in. Min Level: 0.5 in.26 5 Avg Velocity: 1.1 fps Peak Velocity: 1.9 fps Min Velocity: 0.31 fps265 Avg Flow: 0.032 mgd Peak Flow: 0.103 mgd Min Flow: 0.003 mgd265 Site G.1 Monitoring Site:Level, Velocity and Flow From 3/1/2010 to 3/8/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 0.20 3/1 3/2 3/3 3/4 3/5 3/6 3/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 1.08 inches Avg Level: 1.52 in. Peak Level: 2.66 in. Min Level: 0.64 in.26 6 Avg Velocity: 1.1 fps Peak Velocity: 1.89 fps Min Velocity: 0.43 fps266 Avg Flow: 0.038 mgd Peak Flow: 0.102 mgd Min Flow: 0.004 mgd266 Site G.1 Monitoring Site:Level, Velocity and Flow From 3/8/2010 to 3/15/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 0.20 3/8 3/9 3/10 3/11 3/12 3/13 3/14Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.16 inches Avg Level: 1.49 in. Peak Level: 2.53 in. Min Level: 0.4 in.26 7 Avg Velocity: 1.09 fps Peak Velocity: 1.9 fps Min Velocity: 0.32 fps267 Avg Flow: 0.037 mgd Peak Flow: 0.1 mgd Min Flow: 0.002 mgd267 Site G.1 Monitoring Site:Level, Velocity and Flow From 3/15/2010 to 3/22/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 0.20 3/15 3/16 3/17 3/18 3/19 3/20 3/21Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 1.55 in. Peak Level: 2.62 in. Min Level: 0.27 in.26 8 Avg Velocity: 1.07 fps Peak Velocity: 1.94 fps Min Velocity: 0.35 fps268 Avg Flow: 0.039 mgd Peak Flow: 0.12 mgd Min Flow: 0.002 mgd268 Site G.1 Monitoring Site:Level, Velocity and Flow From 3/22/2010 to 3/29/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 0.20 3/22 3/23 3/24 3/25 3/26 3/27 3/28Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 1.6 in. Peak Level: 2.76 in. Min Level: 0.53 in.26 9 Avg Velocity: 1.07 fps Peak Velocity: 2.03 fps Min Velocity: 0.33 fps269 Avg Flow: 0.04 mgd Peak Flow: 0.11 mgd Min Flow: 0.003 mgd269 Monitoring Site: Location: Size/Type Line: Site H.1 Manhole J10-52: Carmel Street and Pismo Street 6-inch Sanitary Sewer Pipe Temporary Flow Monitoring Study Sanitary Sewer Collection System Data Summary Report Site H.1 Location:Manhole J10-52: Carmel Street and Pismo Street Diameter:6 Monitoring Site:Site Information Report Average Dry Weather Flow:0.069 Peak Measured Flow:0.565 mgd mgd Flow Diagram Satellite Map Latitude: 35.2742° Longitude:-120.6663° Rim Elevation:184 feet above sea level inches Street View Photo Sanitary Map Plan View Photo Site H.1Monitoring Site:Average Dry Weather Flow0.21Average Dry Weather Flow:mgd0.0690.000.020.040.060.080.100.120.140:001:002:003:004:005:006:007:008:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:0023:00Flow (mgd)WeekdayWeekend Site H.1 Monitoring Site:Level, Velocity and Flow From 10/18/2010 to 10/25/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 10/18 10/19 10/20 10/21 10/22 10/23 10/24Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.91 inches Avg Level: 1.4 in. Peak Level: 2.89 in. Min Level: 0.51 in.7 Avg Velocity: 3.43 fps Peak Velocity: 3.93 fps Min Velocity: 2.27 fps7 Avg Flow: 0.082 mgd Peak Flow: 0.229 mgd Min Flow: 0.013 mgd7 Site H.1 Monitoring Site:Level, Velocity and Flow From 10/25/2010 to 11/1/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 10/25 10/26 10/27 10/28 10/29 10/30 10/31Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.48 inches Avg Level: 1.35 in. Peak Level: 2.39 in. Min Level: 0.43 in.7 Avg Velocity: 3.5 fps Peak Velocity: 4.12 fps Min Velocity: 2.18 fps7 Avg Flow: 0.079 mgd Peak Flow: 0.184 mgd Min Flow: 0.011 mgd72 Site H.1 Monitoring Site:Level, Velocity and Flow From 11/1/2010 to 11/8/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 11/1 11/2 11/3 11/4 11/5 11/6 11/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.4 inches Avg Level: 1.25 in. Peak Level: 2.18 in. Min Level: 0.47 in.7 Avg Velocity: 3.42 fps Peak Velocity: 3.96 fps Min Velocity: 2.46 fps7 Avg Flow: 0.07 mgd Peak Flow: 0.158 mgd Min Flow: 0.013 mgd73 0.000.100.200.300.400.500.600.7030-JanSat31-JanSun1-FebMon2-FebTue3-FebWed4-FebThu5-FebFri6-FebSat7-FebSun8-FebMon9-FebTue10-FebWed11-FebThu12-FebFri13-FebSat14-FebSun15-FebMon16-FebTue17-FebWed18-FebThu19-FebFri20-FebSat21-FebSun22-FebMon23-FebTue24-FebWed25-FebThu26-FebFri27-FebSat28-FebSunFlow (mgd)0.00.10.20.30.40.50.60.70.8Rainfall (in/hr)RainFlowBLFlowSite H.1Monitoring Site:Period Flow Summary0.3010.2790.3190.3230.4040.3980.4040.4020.3620.3600.2930.3230.3220.2920.3400.3340.4280.3820.3850.4860.4600.4550.5020.4570.4500.3980.2830.1450.1530.1290.1190.1210.1040.1340.0920.1180.1080.0940.0880.000.100.200.300.400.500.601/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/28Flow (MGal)0.00.40.81.21.62.02.42.8Rainfall (in/day)0.000.100.200.300.400.500.600.7028-FebSun1-MarMon2-MarTue3-MarWed4-MarThu5-MarFri6-MarSat7-MarSun8-MarMon9-MarTue10-MarWed11-MarThu12-MarFri13-MarSat14-MarSun15-MarMon16-MarTue17-MarWed18-MarThu19-MarFri20-MarSat21-MarSun22-MarMon23-MarTue24-MarWed25-MarThu26-MarFri27-MarSat28-MarSunFlow (mgd)0.00.10.20.30.40.50.60.70.8Rainfall (in/hr)0.3830.3520.3810.4280.2760.2540.3560.3370.5390.5160.4450.4800.1740.1490.1230.1060.0940.1070.000.100.200.300.400.500.601/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/280.00.40.81.21.62.02.42.80.2770.000.100.200.300.400.500.601/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/280.00.40.81.21.62.02.42.8January 30 to March 28, 2010Total Period Rainfall: 6.84 inchesAvg Flow: 0.299 mgd Peak Flow: 0.565 mgd Min Flow: 0.022 mgd Diameter0.01.02.03.04.05.06.07.002/0202/0302/0402/0502/0602/0702/0802/0902/1002/1102/1202/1302/1402/1502/1602/1702/1802/1902/2002/2102/2202/2302/2402/2502/2602/2702/2803/0103/0203/0303/0403/0503/0603/0703/0803/0903/1003/1103/1203/1303/1403/15Level (inches)Site H.1Monitoring Site:Site Capacity / Surcharge SummaryRealtime Flow Levels with Rainfall Data over Monitoring PeriodSurcharged 0.3 inches over crownPeak Measured Level:6.35Peak d/D Ratio:1.06Pipe Diameter:6inchesinches Site H.1 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.50 02/0402/0502/0602/0702/0802/09Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.48 0.45 5.94 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 6.93 6.53 d/D Ratio:0.99 1,361,000 11.34Total I/I per ADWF:per in-rain 117.0%R-Value: 489% mgd RDI (% of BL): 0.34 Event 1 Event 1 Detail Graph (2/8/2010) RDI:Acre:13,698 PkI/I:Acre:18,311 Storm Event I/I Analysis (Rain = 1.75 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: 25,666Total I/I per IDM:per in-rainPkI/I:IDM:14,789 gpd/IDM RDI:IDM:11,063 gpd/IDM Site H.1 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.10 0.20 0.30 0.40 0.50 0.60 02/2602/2702/2803/0103/02Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.56 0.54 6.35 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 8.24 7.83 d/D Ratio:1.06 1,654,000 10.52Total I/I per ADWF:per in-rain 108.6%R-Value: 619% mgd RDI (% of BL): 0.42 Event 2 Event 2 Detail Graph (3/1/2010) RDI:Acre:17,353 PkI/I:Acre:21,952 Storm Event I/I Analysis (Rain = 2.29 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: 23,820Total I/I per IDM:per in-rainPkI/I:IDM:17,729 gpd/IDM RDI:IDM:14,015 gpd/IDM Site H.1 Monitoring Site:Level, Velocity and Flow From 1/25/2010 to 2/1/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 1/25 1/26 1/27 1/28 1/29 1/30 1/31Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.09 inches Avg Level: 4.1 in. Peak Level: 4.65 in. Min Level: 3.36 in.31 1 Avg Velocity: 3.94 fps Peak Velocity: 4.18 fps Min Velocity: 3.68 fps311 Avg Flow: 0.363 mgd Peak Flow: 0.415 mgd Min Flow: 0.279 mgd311 Site H.1 Monitoring Site:Level, Velocity and Flow From 2/1/2010 to 2/8/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 2/1 2/2 2/3 2/4 2/5 2/6 2/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 1.76 inches Avg Level: 4.06 in. Peak Level: 5.94 in. Min Level: 2.67 in.31 2 Avg Velocity: 3.89 fps Peak Velocity: 4.22 fps Min Velocity: 3.06 fps312 Avg Flow: 0.348 mgd Peak Flow: 0.475 mgd Min Flow: 0.208 mgd312 Site H.1 Monitoring Site:Level, Velocity and Flow From 2/8/2010 to 2/15/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 2/8 2/9 2/10 2/11 2/12 2/13 2/14Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.61 inches Avg Level: 4.14 in. Peak Level: 5.48 in. Min Level: 2.15 in.31 3 Avg Velocity: 3.83 fps Peak Velocity: 4.23 fps Min Velocity: 3.04 fps313 Avg Flow: 0.351 mgd Peak Flow: 0.493 mgd Min Flow: 0.16 mgd313 Site H.1 Monitoring Site:Level, Velocity and Flow From 2/15/2010 to 2/22/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 2/15 2/16 2/17 2/18 2/19 2/20 2/21Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.25 inches Avg Level: 3.63 in. Peak Level: 5.83 in. Min Level: 2.38 in.31 4 Avg Velocity: 3.97 fps Peak Velocity: 4.28 fps Min Velocity: 3.27 fps314 Avg Flow: 0.314 mgd Peak Flow: 0.49 mgd Min Flow: 0.185 mgd314 Site H.1 Monitoring Site:Level, Velocity and Flow From 2/22/2010 to 3/1/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 2/22 2/23 2/24 2/25 2/26 2/27 2/28Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 2.8 inches Avg Level: 4.76 in. Peak Level: 6.29 in. Min Level: 2.9 in.31 5 Avg Velocity: 4.05 fps Peak Velocity: 4.49 fps Min Velocity: 3.38 fps315 Avg Flow: 0.418 mgd Peak Flow: 0.565 mgd Min Flow: 0.238 mgd315 Site H.1 Monitoring Site:Level, Velocity and Flow From 3/1/2010 to 3/8/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 3/1 3/2 3/3 3/4 3/5 3/6 3/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 1.18 inches Avg Level: 5.46 in. Peak Level: 6.37 in. Min Level: 3.42 in.31 6 Avg Velocity: 3.99 fps Peak Velocity: 4.32 fps Min Velocity: 3.18 fps316 Avg Flow: 0.469 mgd Peak Flow: 0.544 mgd Min Flow: 0.301 mgd316 Site H.1 Monitoring Site:Level, Velocity and Flow From 3/8/2010 to 3/15/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 3/8 3/9 3/10 3/11 3/12 3/13 3/14Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.17 inches Avg Level: 3.27 in. Peak Level: 6.52 in. Min Level: 1.51 in.31 7 Avg Velocity: 3.67 fps Peak Velocity: 4.26 fps Min Velocity: 3.02 fps317 Avg Flow: 0.25 mgd Peak Flow: 0.537 mgd Min Flow: 0.078 mgd317 Site H.1 Monitoring Site:Level, Velocity and Flow From 3/15/2010 to 3/22/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 3/15 3/16 3/17 3/18 3/19 3/20 3/21Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 1.85 in. Peak Level: 2.98 in. Min Level: 1.1 in.31 8 Avg Velocity: 3.5 fps Peak Velocity: 3.96 fps Min Velocity: 2.77 fps318 Avg Flow: 0.119 mgd Peak Flow: 0.244 mgd Min Flow: 0.049 mgd318 Site H.1 Monitoring Site:Level, Velocity and Flow From 3/22/2010 to 3/29/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 3/22 3/23 3/24 3/25 3/26 3/27 3/28Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 1.64 in. Peak Level: 2.57 in. Min Level: 0.67 in.31 9 Avg Velocity: 3.43 fps Peak Velocity: 3.94 fps Min Velocity: 2.66 fps319 Avg Flow: 0.1 mgd Peak Flow: 0.197 mgd Min Flow: 0.022 mgd319 Monitoring Site: Location: Size/Type Line: Site H.2 Manhole J11-45: 254 Branch Street 12-inch Sanitary Sewer Pipe Temporary Flow Monitoring Study Sanitary Sewer Collection System Data Summary Report Site H.2 Location:Manhole J11-45: 254 Branch Street Diameter:10 Monitoring Site:Site Information Report Average Dry Weather Flow:0.095 Peak Measured Flow:0.806 mgd mgd Flow Diagram Satellite Map Latitude: 35.2702° Longitude:-120.6669° Rim Elevation:176 feet above sea level inches Street View Photo Sanitary Map Plan View Photo Site H.2Monitoring Site:Average Dry Weather Flow0.09Average Dry Weather Flow:mgd0.0950.000.020.040.060.080.100.120.140.160.180:001:002:003:004:005:006:007:008:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:0023:00Flow (mgd)WeekdayWeekend Site H.2 Monitoring Site:Level, Velocity and Flow From 10/18/2010 to 10/25/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 10/18 10/19 10/20 10/21 10/22 10/23 10/24Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.91 inches Avg Level: 1.14 in. Peak Level: 1.71 in. Min Level: 0.69 in.8 Avg Velocity: 4.12 fps Peak Velocity: 4.96 fps Min Velocity: 2.49 fps8 Avg Flow: 0.107 mgd Peak Flow: 0.212 mgd Min Flow: 0.03 mgd8 Site H.2 Monitoring Site:Level, Velocity and Flow From 10/25/2010 to 11/1/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 10/25 10/26 10/27 10/28 10/29 10/30 10/31Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.48 inches Avg Level: 1.18 in. Peak Level: 1.67 in. Min Level: 0.74 in.8 Avg Velocity: 4.28 fps Peak Velocity: 4.99 fps Min Velocity: 2.77 fps8 Avg Flow: 0.113 mgd Peak Flow: 0.209 mgd Min Flow: 0.037 mgd82 Site H.2 Monitoring Site:Level, Velocity and Flow From 11/1/2010 to 11/8/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 11/1 11/2 11/3 11/4 11/5 11/6 11/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.4 inches Avg Level: 1.1 in. Peak Level: 1.52 in. Min Level: 0.75 in.8 Avg Velocity: 4.13 fps Peak Velocity: 4.96 fps Min Velocity: 2.83 fps8 Avg Flow: 0.1 mgd Peak Flow: 0.182 mgd Min Flow: 0.038 mgd83 0.000.100.200.300.400.500.600.700.800.901.0030-JanSat31-JanSun1-FebMon2-FebTue3-FebWed4-FebThu5-FebFri6-FebSat7-FebSun8-FebMon9-FebTue10-FebWed11-FebThu12-FebFri13-FebSat14-FebSun15-FebMon16-FebTue17-FebWed18-FebThu19-FebFri20-FebSat21-FebSun22-FebMon23-FebTue24-FebWed25-FebThu26-FebFri27-FebSat28-FebSunFlow (mgd)0.00.10.20.30.40.50.60.70.8Rainfall (in/hr)RainFlowBLFlowSite H.2Monitoring Site:Period Flow Summary0.1180.1160.1150.1080.2650.1700.1970.1670.1440.1400.1060.1060.1010.1040.1110.1030.1460.1330.1690.1580.1480.1520.1720.1480.1330.1250.1210.1200.1160.1060.1040.1050.1050.1060.1060.1070.1040.1060.1060.000.050.100.150.200.250.300.350.400.451/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/28Flow (MGal)0.00.40.81.21.62.02.42.8Rainfall (in/day)0.000.100.200.300.400.500.600.700.800.901.0028-FebSun1-MarMon2-MarTue3-MarWed4-MarThu5-MarFri6-MarSat7-MarSun8-MarMon9-MarTue10-MarWed11-MarThu12-MarFri13-MarSat14-MarSun15-MarMon16-MarTue17-MarWed18-MarThu19-MarFri20-MarSat21-MarSun22-MarMon23-MarTue24-MarWed25-MarThu26-MarFri27-MarSat28-MarSunFlow (mgd)0.00.10.20.30.40.50.60.70.8Rainfall (in/hr)0.1410.1330.4120.2950.1260.1150.1070.1160.3880.2010.1530.1520.1200.1160.1140.1140.1150.1130.000.050.100.150.200.250.300.350.400.451/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/280.00.40.81.21.62.02.42.80.1160.000.050.100.150.200.250.300.350.400.451/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/280.00.40.81.21.62.02.42.8January 30 to March 28, 2010Total Period Rainfall: 6.98 inchesAvg Flow: 0.142 mgd Peak Flow: 0.806 mgd Min Flow: 0.033 mgd Diameter0.02.04.06.08.010.012.002/0202/0302/0402/0502/0602/0702/0802/0902/1002/1102/1202/1302/1402/1502/1602/1702/1802/1902/2002/2102/2202/2302/2402/2502/2602/2702/2803/0103/0203/0303/0403/0503/0603/0703/0803/0903/1003/1103/1203/1303/1403/15Level (inches)Site H.2Monitoring Site:Site Capacity / Surcharge SummaryRealtime Flow Levels with Rainfall Data over Monitoring Period Peak Measured Level:3.82Peak d/D Ratio:0.38Pipe Diameter:10inchesinches Site H.2 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 02/0402/0502/0602/0702/0802/09Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.81 0.67 3.82 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 8.48 7.01 d/D Ratio:0.38 772,000 4.64Total I/I per ADWF:per in-rain 8.7%R-Value: 75% mgd RDI (% of BL): 0.07 Event 1 Event 1 Detail Graph (2/8/2010) RDI:Acre:382 PkI/I:Acre:3,584 Storm Event I/I Analysis (Rain = 1.75 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: 22,349Total I/I per IDM:per in-rainPkI/I:IDM:33,747 gpd/IDM RDI:IDM:3,597 gpd/IDM Site H.2 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 02/2602/2702/2803/0103/02Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.67 0.54 3.41 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 7.03 5.67 d/D Ratio:0.34 543,000 2.44Total I/I per ADWF:per in-rain 4.6%R-Value: 62% mgd RDI (% of BL): 0.06 Event 2 Event 2 Detail Graph (3/1/2010) RDI:Acre:316 PkI/I:Acre:2,901 Storm Event I/I Analysis (Rain = 2.34 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: 11,771Total I/I per IDM:per in-rainPkI/I:IDM:27,310 gpd/IDM RDI:IDM:2,972 gpd/IDM Site H.2 Monitoring Site:Level, Velocity and Flow From 1/25/2010 to 2/1/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 1/25 1/26 1/27 1/28 1/29 1/30 1/31Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.09 inches Avg Level: 1.41 in. Peak Level: 1.89 in. Min Level: 0.91 in.32 1 Avg Velocity: 4.1 fps Peak Velocity: 4.63 fps Min Velocity: 3.35 fps321 Avg Flow: 0.141 mgd Peak Flow: 0.237 mgd Min Flow: 0.06 mgd321 Site H.2 Monitoring Site:Level, Velocity and Flow From 2/1/2010 to 2/8/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 2/1 2/2 2/3 2/4 2/5 2/6 2/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 1.76 inches Avg Level: 1.66 in. Peak Level: 3.82 in. Min Level: 0.73 in.32 2 Avg Velocity: 4.27 fps Peak Velocity: 5.8 fps Min Velocity: 3.08 fps322 Avg Flow: 0.204 mgd Peak Flow: 0.806 mgd Min Flow: 0.039 mgd322 Site H.2 Monitoring Site:Level, Velocity and Flow From 2/8/2010 to 2/15/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 2/8 2/9 2/10 2/11 2/12 2/13 2/14Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.63 inches Avg Level: 1.46 in. Peak Level: 2.25 in. Min Level: 0.85 in.32 3 Avg Velocity: 4.14 fps Peak Velocity: 4.9 fps Min Velocity: 3.26 fps323 Avg Flow: 0.151 mgd Peak Flow: 0.323 mgd Min Flow: 0.052 mgd323 Site H.2 Monitoring Site:Level, Velocity and Flow From 2/15/2010 to 2/22/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 2/15 2/16 2/17 2/18 2/19 2/20 2/21Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.25 inches Avg Level: 1.2 in. Peak Level: 1.75 in. Min Level: 0.66 in.32 4 Avg Velocity: 3.89 fps Peak Velocity: 4.55 fps Min Velocity: 2.98 fps324 Avg Flow: 0.108 mgd Peak Flow: 0.208 mgd Min Flow: 0.033 mgd324 Site H.2 Monitoring Site:Level, Velocity and Flow From 2/22/2010 to 3/1/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 2/22 2/23 2/24 2/25 2/26 2/27 2/28Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 2.86 inches Avg Level: 1.55 in. Peak Level: 3.41 in. Min Level: 0.7 in.32 5 Avg Velocity: 4.21 fps Peak Velocity: 5.63 fps Min Velocity: 3.03 fps325 Avg Flow: 0.179 mgd Peak Flow: 0.669 mgd Min Flow: 0.036 mgd325 Site H.2 Monitoring Site:Level, Velocity and Flow From 3/1/2010 to 3/8/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 3/1 3/2 3/3 3/4 3/5 3/6 3/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 1.24 inches Avg Level: 1.49 in. Peak Level: 1.99 in. Min Level: 1.02 in.32 6 Avg Velocity: 4.18 fps Peak Velocity: 4.66 fps Min Velocity: 3.45 fps326 Avg Flow: 0.155 mgd Peak Flow: 0.256 mgd Min Flow: 0.072 mgd326 Site H.2 Monitoring Site:Level, Velocity and Flow From 3/8/2010 to 3/15/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 3/8 3/9 3/10 3/11 3/12 3/13 3/14Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.17 inches Avg Level: 1.3 in. Peak Level: 1.8 in. Min Level: 0.78 in.32 7 Avg Velocity: 3.97 fps Peak Velocity: 4.52 fps Min Velocity: 3.13 fps327 Avg Flow: 0.122 mgd Peak Flow: 0.216 mgd Min Flow: 0.044 mgd327 Site H.2 Monitoring Site:Level, Velocity and Flow From 3/15/2010 to 3/22/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 3/15 3/16 3/17 3/18 3/19 3/20 3/21Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 1.21 in. Peak Level: 1.69 in. Min Level: 0.67 in.32 8 Avg Velocity: 3.89 fps Peak Velocity: 4.41 fps Min Velocity: 3.21 fps328 Avg Flow: 0.108 mgd Peak Flow: 0.185 mgd Min Flow: 0.037 mgd328 Site H.2 Monitoring Site:Level, Velocity and Flow From 3/22/2010 to 3/29/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 3/22 3/23 3/24 3/25 3/26 3/27 3/28Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 1.22 in. Peak Level: 1.69 in. Min Level: 0.66 in.32 9 Avg Velocity: 3.87 fps Peak Velocity: 4.37 fps Min Velocity: 3.19 fps329 Avg Flow: 0.108 mgd Peak Flow: 0.187 mgd Min Flow: 0.036 mgd329 Monitoring Site: Location: Size/Type Line: Site H.3 Manhole K11-56: 531 Branch Street 8-inch Sanitary Sewer Pipe Temporary Flow Monitoring Study Sanitary Sewer Collection System Data Summary Report Site H.3 Location:Manhole K11-56: 531 Branch Street Diameter:8 Monitoring Site:Site Information Report Average Dry Weather Flow:0.028 Peak Measured Flow:0.195 mgd mgd Sewer Map Satellite View Latitude: 35.2702° Longitude:-120.6599° Rim Elevation:200 feet inches Flow Diagram Street View Site H.3Monitoring Site:Average Dry Weather Flow0.13Average Dry Weather Flow:mgd0.0280.000.010.020.030.040.050.060.070:001:002:003:004:005:006:007:008:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:0023:00Flow (mgd)WeekdayWeekend Site H.3 Monitoring Site:Level, Velocity and Flow From 10/18/2010 to 10/25/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 10/18 10/19 10/20 10/21 10/22 10/23 10/24Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.91 inches Avg Level: 0.93 in. Peak Level: 1.45 in. Min Level: 0.38 in.9 Avg Velocity: 1.46 fps Peak Velocity: 3.38 fps Min Velocity: 0.14 fps9 Avg Flow: 0.025 mgd Peak Flow: 0.094 mgd Min Flow: 0.001 mgd9 Site H.3 Monitoring Site:Level, Velocity and Flow From 10/25/2010 to 11/1/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 10/25 10/26 10/27 10/28 10/29 10/30 10/31Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.48 inches Avg Level: 1.02 in. Peak Level: 1.51 in. Min Level: 0.64 in.9 Avg Velocity: 1.49 fps Peak Velocity: 3.14 fps Min Velocity: 0.26 fps9 Avg Flow: 0.028 mgd Peak Flow: 0.091 mgd Min Flow: 0.002 mgd92 0.000.050.100.150.200.250.300.3520-Jan Thu21-Jan Fri22-Jan Sat23-Jan Sun24-Jan Mon25-Jan Tue26-Jan Wed27-Jan Thu28-Jan Fri29-Jan Sat30-Jan Sun31-Jan Mon1-Feb Tue2-Feb Wed3-Feb Thu4-Feb Fri5-Feb Sat6-Feb Sun7-Feb Mon8-Feb Tue9-Feb Wed10-Feb Thu11-Feb Fri12-Feb Sat13-Feb SunFlow (mgd)0.000.050.100.150.200.250.300.350.40Rainfall (in/hr)RainFlowBLFlowSite H.3Monitoring Site:Period Flow Summary0.0350.0330.0280.0260.0260.0280.0260.0310.0300.0310.0260.0330.0290.0290.0280.0320.0320.0260.0280.0440.0410.0650.0520.0410.0380.0700.0470.0430.0400.0470.0440.000.010.020.030.040.050.060.070.080.091/201/211/221/231/241/251/261/271/281/291/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/6Flow (MGal)0.00.40.81.21.62.02.42.8Rainfall (in/day)0.000.050.100.150.200.250.300.3513-FebSun14-FebMon15-FebTue16-FebWed17-FebThu18-FebFri19-FebSat20-FebSun21-FebMon22-FebTue23-FebWed24-FebThu25-FebFri26-FebSat27-FebSun28-FebMon1-Mar Tue2-Mar Wed3-Mar Thu4-Mar Fri5-Mar Sat6-Mar Sun7-Mar MonFlow (mgd)0.000.050.100.150.200.250.300.350.40Rainfall (in/hr)0.0320.0280.0310.0370.0260.0320.0320.0320.0850.0650.0660.0520.0410.0370.000.010.020.030.040.050.060.070.080.091/201/211/221/231/241/251/261/271/281/291/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/60.00.40.81.21.62.02.42.80.0600.000.010.020.030.040.050.060.070.080.091/201/211/221/231/241/251/261/271/281/291/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/60.00.40.81.21.62.02.42.8January 20 to March 7, 2011 Diameter0.01.02.03.04.05.06.07.08.09.002/1402/1502/1602/1702/1802/1902/2002/2102/2202/2302/2402/2502/2602/2702/2803/0103/02Level (inches)Site H.3Monitoring Site:Site Capacity / Surcharge SummaryRealtime Flow Levels with Rainfall Data over Monitoring Period Peak Measured Level:2.22Peak d/D Ratio:0.28Pipe Diameter:8inchesinches Site H.3 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.05 0.10 0.15 0.20 0.25 02/1402/1502/1602/1702/1802/1902/2002/2102/2202/2302/2402/25Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.195 0.171 2.22 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 7.02 6.17 d/D Ratio:0.28 239,000 3.21Total I/I per ADWF:per in-rain 10.2%R-Value: 105% mgd RDI (% of BL): 0.029 Event 1 Event 1 Detail Graph (2/21/2011) RDI:Acre:908 PkI/I:Acre:5,344 Storm Event I/I Analysis (Rain = 2.68 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: Site H.3 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 02/2502/2602/2702/2803/0103/02Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.131 0.099 1.88 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 4.70 3.55 d/D Ratio:0.24 137,000 5.25Total I/I per ADWF:per in-rain 16.8%R-Value: 75% mgd RDI (% of BL): 0.021 Event 2 Event 2 Detail Graph (2/27/2011) RDI:Acre:648 PkI/I:Acre:3,073 Storm Event I/I Analysis (Rain = 0.94 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: Site H.3 Monitoring Site:Level, Velocity and Flow From 1/17/2011 to 1/24/2011 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 1/17 1/18 1/19 1/20 1/21 1/22 1/23Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 1.06 in. Peak Level: 1.53 in. Min Level: 0.51 in.112 1 Avg Velocity: 1.64 fps Peak Velocity: 3.3 fps Min Velocity: 0.21 fps1121 Avg Flow: 0.033 mgd Peak Flow: 0.091 mgd Min Flow: 0.001 mgd1121 Site H.3 Monitoring Site:Level, Velocity and Flow From 1/24/2011 to 1/31/2011 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 1/24 1/25 1/26 1/27 1/28 1/29 1/30Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.39 inches Avg Level: 1.02 in. Peak Level: 4.52 in. Min Level: 0.47 in.112 2 Avg Velocity: 1.55 fps Peak Velocity: 3.6 fps Min Velocity: 0.26 fps1122 Avg Flow: 0.029 mgd Peak Flow: 0.099 mgd Min Flow: 0.003 mgd1122 Site H.3 Monitoring Site:Level, Velocity and Flow From 1/31/2011 to 2/7/2011 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 1/31 2/1 2/2 2/3 2/4 2/5 2/6Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.01 inches Avg Level: 1.06 in. Peak Level: 1.5 in. Min Level: 0.59 in.112 3 Avg Velocity: 1.52 fps Peak Velocity: 3.57 fps Min Velocity: 0.17 fps1123 Avg Flow: 0.03 mgd Peak Flow: 0.101 mgd Min Flow: 0.001 mgd1123 Site H.3 Monitoring Site:Level, Velocity and Flow From 2/7/2011 to 2/14/2011 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 2/7 2/8 2/9 2/10 2/11 2/12 2/13Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.01 inches Avg Level: 1.12 in. Peak Level: 1.9 in. Min Level: 0.56 in.112 4 Avg Velocity: 1.41 fps Peak Velocity: 3.38 fps Min Velocity: 0.17 fps1124 Avg Flow: 0.031 mgd Peak Flow: 0.083 mgd Min Flow: 0.002 mgd1124 Site H.3 Monitoring Site:Level, Velocity and Flow From 2/14/2011 to 2/21/2011 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 2/14 2/15 2/16 2/17 2/18 2/19 2/20Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 2.68 inches Avg Level: 1.73 in. Peak Level: 2.22 in. Min Level: 1 in.112 5 Avg Velocity: 1.29 fps Peak Velocity: 4.1 fps Min Velocity: 0.27 fps1125 Avg Flow: 0.051 mgd Peak Flow: 0.195 mgd Min Flow: 0.004 mgd1125 Site H.3 Monitoring Site:Level, Velocity and Flow From 2/21/2011 to 2/28/2011 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 2/21 2/22 2/23 2/24 2/25 2/26 2/27Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.94 inches Avg Level: 1.62 in. Peak Level: 2 in. Min Level: 1.1 in.112 6 Avg Velocity: 1.56 fps Peak Velocity: 3.5 fps Min Velocity: 0.44 fps1126 Avg Flow: 0.054 mgd Peak Flow: 0.131 mgd Min Flow: 0.009 mgd1126 Site H.3 Monitoring Site:Level, Velocity and Flow From 2/28/2011 to 3/7/2011 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 2/28 3/1 3/2 3/3 3/4 3/5 3/6Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.24 inches Avg Level: 1.43 in. Peak Level: 1.76 in. Min Level: 0.77 in.112 7 Avg Velocity: 1.49 fps Peak Velocity: 3.49 fps Min Velocity: 0.28 fps1127 Avg Flow: 0.043 mgd Peak Flow: 0.114 mgd Min Flow: 0.005 mgd1127 Site H.3 Monitoring Site:Level, Velocity and Flow From 3/7/2011 to 3/14/2011 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 3/7 3/8 3/9 3/10 3/11 3/12 3/13Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.03 inches Avg Level: 1.09 in. Peak Level: 1.47 in. Min Level: 0.74 in.112 8 Avg Velocity: 1.72 fps Peak Velocity: 3.13 fps Min Velocity: 0.34 fps1128 Avg Flow: 0.035 mgd Peak Flow: 0.084 mgd Min Flow: 0.004 mgd1128 Monitoring Site: Location: Size/Type Line: Site I.1 Manhole M13-3: South of Scheimer Park 18-inch Sanitary Sewer Pipe Temporary Flow Monitoring Study Sanitary Sewer Collection System Data Summary Report Site I.1 Location:Manhole M13-3: South of Scheimer Park Diameter:18 Monitoring Site:Site Information Report Average Dry Weather Flow:0.244 Peak Measured Flow:0.759 mgd mgd Flow Diagram Satellite Map Latitude: 35.2652° Longitude:-120.6472° Rim Elevation:240 feet above sea level inches Street View Photo Sanitary Map Plan View Photo Site I.1Monitoring Site:Average Dry Weather Flow0.24Average Dry Weather Flow:mgd0.2440.000.050.100.150.200.250.300.350.400.450:001:002:003:004:005:006:007:008:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:0023:00Flow (mgd)WeekdayWeekend Site I.1 Monitoring Site:Level, Velocity and Flow From 10/18/2010 to 10/25/2010 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 10/18 10/19 10/20 10/21 10/22 10/23 10/24Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.91 inches Avg Level: 4.18 in. Peak Level: 5.47 in. Min Level: 2.65 in.0 Avg Velocity: 1.19 fps Peak Velocity: 1.58 fps Min Velocity: 0.68 fps0 Avg Flow: 0.255 mgd Peak Flow: 0.45 mgd Min Flow: 0.076 mgd0 Site I.1 Monitoring Site:Level, Velocity and Flow From 10/25/2010 to 11/1/2010 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 10/25 10/26 10/27 10/28 10/29 10/30 10/31Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.48 inches Avg Level: 4.24 in. Peak Level: 6.06 in. Min Level: 2.68 in.0 Avg Velocity: 1.19 fps Peak Velocity: 1.73 fps Min Velocity: 0.58 fps0 Avg Flow: 0.259 mgd Peak Flow: 0.585 mgd Min Flow: 0.066 mgd02 Site I.1 Monitoring Site:Level, Velocity and Flow From 11/1/2010 to 11/8/2010 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 11/1 11/2 11/3 11/4 11/5 11/6 11/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.4 inches Avg Level: 4.37 in. Peak Level: 5.85 in. Min Level: 2.85 in.0 Avg Velocity: 1.14 fps Peak Velocity: 1.57 fps Min Velocity: 0.55 fps0 Avg Flow: 0.257 mgd Peak Flow: 0.472 mgd Min Flow: 0.07 mgd03 0.000.200.400.600.801.001.201.401.6030-JanSat31-JanSun1-FebMon2-FebTue3-FebWed4-FebThu5-FebFri6-FebSat7-FebSun8-FebMon9-FebTue10-FebWed11-FebThu12-FebFri13-FebSat14-FebSun15-FebMon16-FebTue17-FebWed18-FebThu19-FebFri20-FebSat21-FebSun22-FebMon23-FebTue24-FebWed25-FebThu26-FebFri27-FebSat28-FebSunFlow (mgd)0.00.10.20.30.40.50.60.70.8Rainfall (in/hr)RainFlowBLFlowSite I.1Monitoring Site:Period Flow Summary0.2790.2640.2610.2510.3450.3580.4200.3860.3420.3170.2870.2860.2780.2610.2790.2630.3010.2960.3310.4000.3870.4100.4250.3730.3490.3350.3550.3380.3200.3220.3100.3080.3010.2870.2810.2710.2670.2670.2590.000.100.200.300.400.500.601/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/28Flow (MGal)0.00.40.81.21.62.02.42.8Rainfall (in/day)0.000.200.400.600.801.001.201.401.6028-FebSun1-MarMon2-MarTue3-MarWed4-MarThu5-MarFri6-MarSat7-MarSun8-MarMon9-MarTue10-MarWed11-MarThu12-MarFri13-MarSat14-MarSun15-MarMon16-MarTue17-MarWed18-MarThu19-MarFri20-MarSat21-MarSun22-MarMon23-MarTue24-MarWed25-MarThu26-MarFri27-MarSat28-MarSunFlow (mgd)0.00.10.20.30.40.50.60.70.8Rainfall (in/hr)0.3100.2920.4210.4050.2950.2820.2700.2810.5680.4820.3780.3930.3210.3290.2780.2810.2580.2630.000.100.200.300.400.500.601/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/280.00.40.81.21.62.02.42.80.2980.000.100.200.300.400.500.601/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/280.00.40.81.21.62.02.42.8January 30 to March 28, 2010Total Period Rainfall: 6.92 inchesAvg Flow: 0.324 mgd Peak Flow: 0.759 mgd Min Flow: 0.105 mgd Diameter0.02.04.06.08.010.012.014.016.018.020.002/0202/0302/0402/0502/0602/0702/0802/0902/1002/1102/1202/1302/1402/1502/1602/1702/1802/1902/2002/2102/2202/2302/2402/2502/2602/2702/2803/0103/0203/0303/0403/0503/0603/0703/0803/0903/1003/1103/1203/1303/1403/15Level (inches)Site I.1Monitoring Site:Site Capacity / Surcharge SummaryRealtime Flow Levels with Rainfall Data over Monitoring Period Peak Measured Level:7.14Peak d/D Ratio:0.40Pipe Diameter:18inchesinches Site I.1 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 02/0402/0502/0602/0702/0802/09Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.66 0.28 6.51 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 2.72 1.15 d/D Ratio:0.36 554,000 1.30Total I/I per ADWF:per in-rain 3.2%R-Value: 47% mgd RDI (% of BL): 0.11 Event 1 Event 1 Detail Graph (2/8/2010) RDI:Acre:315 PkI/I:Acre:771 Storm Event I/I Analysis (Rain = 1.75 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: 4,593Total I/I per IDM:per in-rainPkI/I:IDM:4,056 gpd/IDM RDI:IDM:1,656 gpd/IDM Site I.1 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 02/2602/2702/2803/0103/02Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.76 0.40 7.14 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 3.11 1.64 d/D Ratio:0.40 806,000 1.43Total I/I per ADWF:per in-rain 3.5%R-Value: 64% mgd RDI (% of BL): 0.16 Event 2 Event 2 Detail Graph (3/1/2010) RDI:Acre:432 PkI/I:Acre:1,101 Storm Event I/I Analysis (Rain = 2.31 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: 5,037Total I/I per IDM:per in-rainPkI/I:IDM:5,791 gpd/IDM RDI:IDM:2,272 gpd/IDM Site I.1 Monitoring Site:Level, Velocity and Flow From 1/25/2010 to 2/1/2010 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1/25 1/26 1/27 1/28 1/29 1/30 1/31Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.09 inches Avg Level: 4.37 in. Peak Level: 5.32 in. Min Level: 3.2 in.38 1 Avg Velocity: 1.38 fps Peak Velocity: 1.73 fps Min Velocity: 1 fps381 Avg Flow: 0.304 mgd Peak Flow: 0.484 mgd Min Flow: 0.14 mgd381 Site I.1 Monitoring Site:Level, Velocity and Flow From 2/1/2010 to 2/8/2010 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 2/1 2/2 2/3 2/4 2/5 2/6 2/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 1.76 inches Avg Level: 4.41 in. Peak Level: 6.51 in. Min Level: 2.82 in.38 2 Avg Velocity: 1.41 fps Peak Velocity: 1.87 fps Min Velocity: 0.93 fps382 Avg Flow: 0.318 mgd Peak Flow: 0.664 mgd Min Flow: 0.108 mgd382 Site I.1 Monitoring Site:Level, Velocity and Flow From 2/8/2010 to 2/15/2010 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 2/8 2/9 2/10 2/11 2/12 2/13 2/14Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.62 inches Avg Level: 4.45 in. Peak Level: 6.43 in. Min Level: 3.09 in.38 3 Avg Velocity: 1.52 fps Peak Velocity: 1.92 fps Min Velocity: 1.15 fps383 Avg Flow: 0.343 mgd Peak Flow: 0.652 mgd Min Flow: 0.151 mgd383 Site I.1 Monitoring Site:Level, Velocity and Flow From 2/15/2010 to 2/22/2010 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 2/15 2/16 2/17 2/18 2/19 2/20 2/21Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.25 inches Avg Level: 4.24 in. Peak Level: 6 in. Min Level: 3 in.38 4 Avg Velocity: 1.32 fps Peak Velocity: 1.84 fps Min Velocity: 0.76 fps384 Avg Flow: 0.28 mgd Peak Flow: 0.613 mgd Min Flow: 0.121 mgd384 Site I.1 Monitoring Site:Level, Velocity and Flow From 2/22/2010 to 3/1/2010 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 2/22 2/23 2/24 2/25 2/26 2/27 2/28Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 2.83 inches Avg Level: 4.72 in. Peak Level: 7.14 in. Min Level: 2.88 in.38 5 Avg Velocity: 1.43 fps Peak Velocity: 1.88 fps Min Velocity: 0.89 fps385 Avg Flow: 0.36 mgd Peak Flow: 0.759 mgd Min Flow: 0.106 mgd385 Site I.1 Monitoring Site:Level, Velocity and Flow From 3/1/2010 to 3/8/2010 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 3/1 3/2 3/3 3/4 3/5 3/6 3/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 1.22 inches Avg Level: 5.05 in. Peak Level: 6.39 in. Min Level: 3.96 in.38 6 Avg Velocity: 1.48 fps Peak Velocity: 1.84 fps Min Velocity: 1.09 fps386 Avg Flow: 0.395 mgd Peak Flow: 0.636 mgd Min Flow: 0.204 mgd386 Site I.1 Monitoring Site:Level, Velocity and Flow From 3/8/2010 to 3/15/2010 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 3/8 3/9 3/10 3/11 3/12 3/13 3/14Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.17 inches Avg Level: 4.83 in. Peak Level: 6.03 in. Min Level: 3.69 in.38 7 Avg Velocity: 1.33 fps Peak Velocity: 1.72 fps Min Velocity: 0.84 fps387 Avg Flow: 0.335 mgd Peak Flow: 0.547 mgd Min Flow: 0.149 mgd387 Site I.1 Monitoring Site:Level, Velocity and Flow From 3/15/2010 to 3/22/2010 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 3/15 3/16 3/17 3/18 3/19 3/20 3/21Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 4.69 in. Peak Level: 6.09 in. Min Level: 3.51 in.38 8 Avg Velocity: 1.22 fps Peak Velocity: 1.6 fps Min Velocity: 0.8 fps388 Avg Flow: 0.298 mgd Peak Flow: 0.531 mgd Min Flow: 0.128 mgd388 Site I.1 Monitoring Site:Level, Velocity and Flow From 3/22/2010 to 3/29/2010 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 3/22 3/23 3/24 3/25 3/26 3/27 3/28Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 4.58 in. Peak Level: 6.12 in. Min Level: 3.31 in.38 9 Avg Velocity: 1.12 fps Peak Velocity: 1.6 fps Min Velocity: 0.7 fps389 Avg Flow: 0.267 mgd Peak Flow: 0.546 mgd Min Flow: 0.105 mgd389 Monitoring Site: Location: Size/Type Line: Site I.2 Manhole N13-54: 1300 Orcutt Road 10-inch Sanitary Sewer Pipe Temporary Flow Monitoring Study Sanitary Sewer Collection System Data Summary Report Site I.2 Location:Manhole N13-54: 1300 Orcutt Road Diameter:10 Monitoring Site:Site Information Report Average Dry Weather Flow:0.035 Peak Measured Flow:0.201 mgd mgd Sewer Map Satellite View Latitude: 35.2614° Longitude:-120.6387° Rim Elevation:287 feet inches Flow Diagram Street View Site I.2Monitoring Site:Average Dry Weather Flow0.12Average Dry Weather Flow:mgd0.0350.000.010.020.030.040.050.060.070.080:001:002:003:004:005:006:007:008:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:0023:00Flow (mgd)WeekdayWeekend Site I.2 Monitoring Site:Level, Velocity and Flow From 10/18/2010 to 10/25/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 10/18 10/19 10/20 10/21 10/22 10/23 10/24Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.91 inches Avg Level: 0.88 in. Peak Level: 2.45 in. Min Level: 0.31 in. Avg Velocity: 2.41 fps Peak Velocity: 4.5 fps Min Velocity: 0.78 fps Avg Flow: 0.032 mgd Peak Flow: 0.142 mgd Min Flow: 0.003 mgd Site I.2 Monitoring Site:Level, Velocity and Flow From 10/25/2010 to 11/1/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 10/25 10/26 10/27 10/28 10/29 10/30 10/31Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.48 inches Avg Level: 0.85 in. Peak Level: 1.71 in. Min Level: 0.3 in. Avg Velocity: 2.42 fps Peak Velocity: 4.39 fps Min Velocity: 0.58 fps Avg Flow: 0.028 mgd Peak Flow: 0.086 mgd Min Flow: 0.002 mgd2 Site I.2 Monitoring Site:Level, Velocity and Flow From 11/1/2010 to 11/8/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 11/1 11/2 11/3 11/4 11/5 11/6 11/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.4 inches Avg Level: 0.88 in. Peak Level: 1.98 in. Min Level: 0.33 in. Avg Velocity: 2.57 fps Peak Velocity: 4.08 fps Min Velocity: 0.65 fps Avg Flow: 0.031 mgd Peak Flow: 0.119 mgd Min Flow: 0.003 mgd3 0.000.050.100.150.200.250.300.3520-Jan Thu21-Jan Fri22-Jan Sat23-Jan Sun24-Jan Mon25-Jan Tue26-Jan Wed27-Jan Thu28-Jan Fri29-Jan Sat30-Jan Sun31-Jan Mon1-Feb Tue2-Feb Wed3-Feb Thu4-Feb Fri5-Feb Sat6-Feb Sun7-Feb Mon8-Feb Tue9-Feb Wed10-Feb Thu11-Feb Fri12-Feb Sat13-Feb SunFlow (mgd)0.000.050.100.150.200.250.300.350.40Rainfall (in/hr)RainFlowBLFlowSite I.2Monitoring Site:Period Flow Summary0.0600.0490.0590.0550.0570.0600.0620.0540.0450.0400.0390.0430.0490.0530.0420.0450.0410.0410.0420.0590.0460.0760.0720.0660.0580.1020.0810.0710.0660.0690.0660.000.020.040.060.080.100.120.141/201/211/221/231/241/251/261/271/281/291/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/6Flow (MGal)0.00.40.81.21.62.02.42.8Rainfall (in/day)0.000.050.100.150.200.250.300.3513-FebSun14-FebMon15-FebTue16-FebWed17-FebThu18-FebFri19-FebSat20-FebSun21-FebMon22-FebTue23-FebWed24-FebThu25-FebFri26-FebSat27-FebSun28-FebMon1-Mar Tue2-Mar Wed3-Mar Thu4-Mar Fri5-Mar Sat6-Mar Sun7-Mar MonFlow (mgd)0.000.050.100.150.200.250.300.350.40Rainfall (in/hr)0.0510.0580.0580.0660.0460.0490.0530.0450.1320.1030.1140.1000.0710.0760.000.020.040.060.080.100.120.141/201/211/221/231/241/251/261/271/281/291/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/60.00.40.81.21.62.02.42.80.0870.000.020.040.060.080.100.120.141/201/211/221/231/241/251/261/271/281/291/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/60.00.40.81.21.62.02.42.8January 20 to March 7, 2011 Diameter0.02.04.06.08.010.012.002/1402/1502/1602/1702/1802/1902/2002/2102/2202/2302/2402/2502/2602/2702/2803/0103/02Level (inches)Site I.2Monitoring Site:Site Capacity / Surcharge SummaryRealtime Flow Levels with Rainfall Data over Monitoring Period Peak Measured Level:2.83Peak d/D Ratio:0.28Pipe Diameter:10inchesinches Site I.2 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.05 0.10 0.15 0.20 0.25 02/1402/1502/1602/1702/1802/1902/2002/2102/2202/2302/2402/25Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.201 0.162 2.83 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 5.68 4.58 d/D Ratio:0.28 393,000 4.16Total I/I per ADWF:per in-rain 4.1%R-Value: 140% mgd RDI (% of BL): 0.050 Event 1 Event 1 Detail Graph (2/21/2011) RDI:Acre:377 PkI/I:Acre:1,238 Storm Event I/I Analysis (Rain = 2.67 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: Site I.2 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 0.20 02/2502/2602/2702/2803/0103/02Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.182 0.136 2.67 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 5.13 3.85 d/D Ratio:0.27 289,000 8.39Total I/I per ADWF:per in-rain 8.3%R-Value: 174% mgd RDI (% of BL): 0.062 Event 2 Event 2 Detail Graph (2/27/2011) RDI:Acre:470 PkI/I:Acre:1,039 Storm Event I/I Analysis (Rain = 0.97 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: Site I.2 Monitoring Site:Level, Velocity and Flow From 1/17/2011 to 1/24/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 1/17 1/18 1/19 1/20 1/21 1/22 1/23Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 1.45 in. Peak Level: 2.32 in. Min Level: 0.91 in.113 1 Avg Velocity: 1.74 fps Peak Velocity: 2.57 fps Min Velocity: 0.92 fps1131 Avg Flow: 0.056 mgd Peak Flow: 0.135 mgd Min Flow: 0.016 mgd1131 Site I.2 Monitoring Site:Level, Velocity and Flow From 1/24/2011 to 1/31/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 1/24 1/25 1/26 1/27 1/28 1/29 1/30Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.41 inches Avg Level: 1.51 in. Peak Level: 2.37 in. Min Level: 0.85 in.113 2 Avg Velocity: 1.71 fps Peak Velocity: 2.31 fps Min Velocity: 0.64 fps1132 Avg Flow: 0.06 mgd Peak Flow: 0.123 mgd Min Flow: 0.01 mgd1132 Site I.2 Monitoring Site:Level, Velocity and Flow From 1/31/2011 to 2/7/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 1/31 2/1 2/2 2/3 2/4 2/5 2/6Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.01 inches Avg Level: 1.3 in. Peak Level: 2.15 in. Min Level: 0.74 in.113 3 Avg Velocity: 1.56 fps Peak Velocity: 2.42 fps Min Velocity: 0.58 fps1133 Avg Flow: 0.045 mgd Peak Flow: 0.13 mgd Min Flow: 0.008 mgd1133 Site I.2 Monitoring Site:Level, Velocity and Flow From 2/7/2011 to 2/14/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 2/7 2/8 2/9 2/10 2/11 2/12 2/13Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.04 inches Avg Level: 1.4 in. Peak Level: 2.15 in. Min Level: 0.85 in.113 4 Avg Velocity: 1.49 fps Peak Velocity: 2.22 fps Min Velocity: 0.45 fps1134 Avg Flow: 0.047 mgd Peak Flow: 0.123 mgd Min Flow: 0.007 mgd1134 Site I.2 Monitoring Site:Level, Velocity and Flow From 2/14/2011 to 2/21/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 2/14 2/15 2/16 2/17 2/18 2/19 2/20Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 2.67 inches Avg Level: 1.61 in. Peak Level: 2.83 in. Min Level: 0.73 in.113 5 Avg Velocity: 1.74 fps Peak Velocity: 2.59 fps Min Velocity: 0.56 fps1135 Avg Flow: 0.071 mgd Peak Flow: 0.201 mgd Min Flow: 0.008 mgd1135 Site I.2 Monitoring Site:Level, Velocity and Flow From 2/21/2011 to 2/28/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 2/21 2/22 2/23 2/24 2/25 2/26 2/27Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.97 inches Avg Level: 1.8 in. Peak Level: 2.67 in. Min Level: 1.16 in.113 6 Avg Velocity: 1.9 fps Peak Velocity: 2.55 fps Min Velocity: 0.81 fps1136 Avg Flow: 0.085 mgd Peak Flow: 0.182 mgd Min Flow: 0.018 mgd1136 Site I.2 Monitoring Site:Level, Velocity and Flow From 2/28/2011 to 3/7/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 2/28 3/1 3/2 3/3 3/4 3/5 3/6Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.21 inches Avg Level: 1.55 in. Peak Level: 2.19 in. Min Level: 1.09 in.113 7 Avg Velocity: 2.01 fps Peak Velocity: 2.51 fps Min Velocity: 1.04 fps1137 Avg Flow: 0.071 mgd Peak Flow: 0.143 mgd Min Flow: 0.022 mgd1137 Site I.2 Monitoring Site:Level, Velocity and Flow From 3/7/2011 to 3/14/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 3/7 3/8 3/9 3/10 3/11 3/12 3/13Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.04 inches Avg Level: 1.44 in. Peak Level: 2.03 in. Min Level: 1.05 in.113 8 Avg Velocity: 2.13 fps Peak Velocity: 2.49 fps Min Velocity: 1.71 fps1138 Avg Flow: 0.068 mgd Peak Flow: 0.12 mgd Min Flow: 0.035 mgd1138 Monitoring Site: Location: Size/Type Line: Site J.1 Manhole J12-10: Bridge Street east of Beebee Street 18-inch Sanitary Sewer Pipe Temporary Flow Monitoring Study Sanitary Sewer Collection System Data Summary Report Site J.1 Location:Manhole J12-10: Bridge Street east of Beebee Street Diameter:18 Monitoring Site:Site Information Report Average Dry Weather Flow:0.343 Peak Measured Flow:1.743 mgd mgd Flow Diagram Satellite Map Latitude: 35.2677° Longitude:-120.6669° Rim Elevation:162 feet above sea level inches Street View Photo Sanitary Map Plan View Photo Site J.1Monitoring Site:Average Dry Weather Flow0.21Average Dry Weather Flow:mgd0.3430.000.100.200.300.400.500.600.700:001:002:003:004:005:006:007:008:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:0023:00Flow (mgd)WeekdayWeekend Site J.1 Monitoring Site:Level, Velocity and Flow From 10/18/2010 to 10/25/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 10/18 10/19 10/20 10/21 10/22 10/23 10/24Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.91 inches Avg Level: 3.86 in. Peak Level: 5.31 in. Min Level: 2.15 in.2 Avg Velocity: 1.96 fps Peak Velocity: 2.55 fps Min Velocity: 1.22 fps2 Avg Flow: 0.377 mgd Peak Flow: 0.715 mgd Min Flow: 0.098 mgd2 Site J.1 Monitoring Site:Level, Velocity and Flow From 10/25/2010 to 11/1/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 10/25 10/26 10/27 10/28 10/29 10/30 10/31Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.48 inches Avg Level: 3.88 in. Peak Level: 5.34 in. Min Level: 2.15 in.2 Avg Velocity: 1.93 fps Peak Velocity: 2.56 fps Min Velocity: 0.67 fps2 Avg Flow: 0.374 mgd Peak Flow: 0.726 mgd Min Flow: 0.055 mgd22 Site J.1 Monitoring Site:Level, Velocity and Flow From 11/1/2010 to 11/8/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 11/1 11/2 11/3 11/4 11/5 11/6 11/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.4 inches Avg Level: 3.66 in. Peak Level: 5.22 in. Min Level: 2.08 in.2 Avg Velocity: 1.96 fps Peak Velocity: 2.5 fps Min Velocity: 1.22 fps2 Avg Flow: 0.348 mgd Peak Flow: 0.674 mgd Min Flow: 0.092 mgd23 0.000.200.400.600.801.001.201.401.601.802.0030-JanSat31-JanSun1-FebMon2-FebTue3-FebWed4-FebThu5-FebFri6-FebSat7-FebSun8-FebMon9-FebTue10-FebWed11-FebThu12-FebFri13-FebSat14-FebSun15-FebMon16-FebTue17-FebWed18-FebThu19-FebFri20-FebSat21-FebSun22-FebMon23-FebTue24-FebWed25-FebThu26-FebFri27-FebSat28-FebSunFlow (mgd)0.00.10.20.30.40.50.60.70.8Rainfall (in/hr)RainFlowBLFlowSite J.1Monitoring Site:Period Flow Summary0.6420.6120.5950.5820.8360.8190.9450.8280.7410.6930.6020.5990.5670.5520.5420.5560.6480.6210.6960.7950.7790.8260.8860.7200.7550.7170.7250.6410.5640.5800.5470.5370.5670.5270.4710.4760.4650.4550.4330.000.200.400.600.801.001.201.401/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/28Flow (MGal)0.00.40.81.21.62.02.42.8Rainfall (in/day)0.000.200.400.600.801.001.201.401.601.802.0028-FebSun1-MarMon2-MarTue3-MarWed4-MarThu5-MarFri6-MarSat7-MarSun8-MarMon9-MarTue10-MarWed11-MarThu12-MarFri13-MarSat14-MarSun15-MarMon16-MarTue17-MarWed18-MarThu19-MarFri20-MarSat21-MarSun22-MarMon23-MarTue24-MarWed25-MarThu26-MarFri27-MarSat28-MarSunFlow (mgd)0.00.10.20.30.40.50.60.70.8Rainfall (in/hr)0.7010.6611.0300.9450.6420.6050.5160.5171.1960.9570.7310.8280.5580.5740.4740.4880.4510.4660.000.200.400.600.801.001.201.401/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/280.00.40.81.21.62.02.42.80.6310.000.200.400.600.801.001.201.401/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/280.00.40.81.21.62.02.42.8January 30 to March 28, 2010Total Period Rainfall: 7.07 inchesAvg Flow: 0.657 mgd Peak Flow: 1.743 mgd Min Flow: 0.189 mgd Diameter0.02.04.06.08.010.012.014.016.018.020.002/0202/0302/0402/0502/0602/0702/0802/0902/1002/1102/1202/1302/1402/1502/1602/1702/1802/1902/2002/2102/2202/2302/2402/2502/2602/2702/2803/0103/0203/0303/0403/0503/0603/0703/0803/0903/1003/1103/1203/1303/1403/15Level (inches)Site J.1Monitoring Site:Site Capacity / Surcharge SummaryRealtime Flow Levels with Rainfall Data over Monitoring Period Peak Measured Level:8.59Peak d/D Ratio:0.48Pipe Diameter:18inchesinches Site J.1 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 02/0402/0502/0602/0702/0802/09Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)1.74 1.13 8.59 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 5.08 3.29 d/D Ratio:0.48 2,274,000 3.77Total I/I per ADWF:per in-rain 5.9%R-Value: 140% mgd RDI (% of BL): 0.48 Event 1 Event 1 Detail Graph (2/8/2010) RDI:Acre:594 PkI/I:Acre:1,391 Storm Event I/I Analysis (Rain = 1.76 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: 8,705Total I/I per IDM:per in-rainPkI/I:IDM:7,585 gpd/IDM RDI:IDM:3,238 gpd/IDM Site J.1 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 02/2602/2702/2803/0103/02Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)1.63 1.08 8.35 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 4.75 3.16 d/D Ratio:0.46 2,270,000 2.79Total I/I per ADWF:per in-rain 4.4%R-Value: 134% mgd RDI (% of BL): 0.46 Event 2 Event 2 Detail Graph (3/1/2010) RDI:Acre:565 PkI/I:Acre:1,335 Storm Event I/I Analysis (Rain = 2.37 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: 6,442Total I/I per IDM:per in-rainPkI/I:IDM:7,280 gpd/IDM RDI:IDM:3,081 gpd/IDM Site J.1 Monitoring Site:Level, Velocity and Flow From 1/25/2010 to 2/1/2010 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 1/25 1/26 1/27 1/28 1/29 1/30 1/31Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.09 inches Avg Level: 5.41 in. Peak Level: 6.34 in. Min Level: 4.2 in.39 1 Avg Velocity: 2.34 fps Peak Velocity: 2.82 fps Min Velocity: 1.84 fps391 Avg Flow: 0.687 mgd Peak Flow: 1.002 mgd Min Flow: 0.381 mgd391 Site J.1 Monitoring Site:Level, Velocity and Flow From 2/1/2010 to 2/8/2010 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2/1 2/2 2/3 2/4 2/5 2/6 2/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 1.77 inches Avg Level: 5.67 in. Peak Level: 8.59 in. Min Level: 3.79 in.39 2 Avg Velocity: 2.35 fps Peak Velocity: 3.27 fps Min Velocity: 1.63 fps392 Avg Flow: 0.749 mgd Peak Flow: 1.743 mgd Min Flow: 0.3 mgd392 Site J.1 Monitoring Site:Level, Velocity and Flow From 2/8/2010 to 2/15/2010 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2/8 2/9 2/10 2/11 2/12 2/13 2/14Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.64 inches Avg Level: 5.72 in. Peak Level: 7.96 in. Min Level: 4.05 in.39 3 Avg Velocity: 2.37 fps Peak Velocity: 3.03 fps Min Velocity: 1.7 fps393 Avg Flow: 0.753 mgd Peak Flow: 1.458 mgd Min Flow: 0.329 mgd393 Site J.1 Monitoring Site:Level, Velocity and Flow From 2/15/2010 to 2/22/2010 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2/15 2/16 2/17 2/18 2/19 2/20 2/21Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.26 inches Avg Level: 5 in. Peak Level: 6.63 in. Min Level: 3.36 in.39 4 Avg Velocity: 2.14 fps Peak Velocity: 2.7 fps Min Velocity: 1.64 fps394 Avg Flow: 0.569 mgd Peak Flow: 0.97 mgd Min Flow: 0.244 mgd394 Site J.1 Monitoring Site:Level, Velocity and Flow From 2/22/2010 to 3/1/2010 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2/22 2/23 2/24 2/25 2/26 2/27 2/28Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 2.89 inches Avg Level: 5.63 in. Peak Level: 8.35 in. Min Level: 3.42 in.39 5 Avg Velocity: 2.33 fps Peak Velocity: 3.23 fps Min Velocity: 1.59 fps395 Avg Flow: 0.745 mgd Peak Flow: 1.629 mgd Min Flow: 0.253 mgd395 Site J.1 Monitoring Site:Level, Velocity and Flow From 3/1/2010 to 3/8/2010 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 3/1 3/2 3/3 3/4 3/5 3/6 3/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 1.26 inches Avg Level: 5.88 in. Peak Level: 7.55 in. Min Level: 4.11 in.39 6 Avg Velocity: 2.41 fps Peak Velocity: 2.96 fps Min Velocity: 1.77 fps396 Avg Flow: 0.795 mgd Peak Flow: 1.346 mgd Min Flow: 0.35 mgd396 Site J.1 Monitoring Site:Level, Velocity and Flow From 3/8/2010 to 3/15/2010 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 3/8 3/9 3/10 3/11 3/12 3/13 3/14Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.17 inches Avg Level: 5.33 in. Peak Level: 6.9 in. Min Level: 3.67 in.39 7 Avg Velocity: 2.23 fps Peak Velocity: 2.79 fps Min Velocity: 1.63 fps397 Avg Flow: 0.648 mgd Peak Flow: 1.119 mgd Min Flow: 0.287 mgd397 Site J.1 Monitoring Site:Level, Velocity and Flow From 3/15/2010 to 3/22/2010 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 3/15 3/16 3/17 3/18 3/19 3/20 3/21Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 4.83 in. Peak Level: 6.25 in. Min Level: 3.34 in.39 8 Avg Velocity: 2.1 fps Peak Velocity: 2.66 fps Min Velocity: 1.48 fps398 Avg Flow: 0.531 mgd Peak Flow: 0.903 mgd Min Flow: 0.219 mgd398 Site J.1 Monitoring Site:Level, Velocity and Flow From 3/22/2010 to 3/29/2010 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 3/22 3/23 3/24 3/25 3/26 3/27 3/28Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 4.5 in. Peak Level: 6 in. Min Level: 3.13 in.39 9 Avg Velocity: 1.99 fps Peak Velocity: 2.54 fps Min Velocity: 1.4 fps399 Avg Flow: 0.46 mgd Peak Flow: 0.838 mgd Min Flow: 0.189 mgd399 Monitoring Site: Location: Size/Type Line: Site J.2 Manhole L12-35: 2401 Broad Street 8-inch Sanitary Sewer Pipe Temporary Flow Monitoring Study Sanitary Sewer Collection System Data Summary Report Site J.2 Location:Manhole L12-35: 2401 Broad Street Diameter:8 Monitoring Site:Site Information Report Average Dry Weather Flow:0.045 Peak Measured Flow:0.613 mgd mgd Sewer Map Satellite View Latitude: 35.2672° Longitude:-120.6546° Rim Elevation:212 feet inches Flow Diagram Street View Site J.2Monitoring Site:Average Dry Weather Flow0.17Average Dry Weather Flow:mgd0.0450.000.010.020.030.040.050.060.070.080.090.100:001:002:003:004:005:006:007:008:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:0023:00Flow (mgd)WeekdayWeekend Site J.2 Monitoring Site:Level, Velocity and Flow From 10/18/2010 to 10/25/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 10/18 10/19 10/20 10/21 10/22 10/23 10/24Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.91 inches Avg Level: 1.42 in. Peak Level: 2.1 in. Min Level: 0.72 in.3 Avg Velocity: 1.61 fps Peak Velocity: 3.12 fps Min Velocity: 0.33 fps3 Avg Flow: 0.049 mgd Peak Flow: 0.127 mgd Min Flow: 0.004 mgd3 Site J.2 Monitoring Site:Level, Velocity and Flow From 10/25/2010 to 11/1/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 10/25 10/26 10/27 10/28 10/29 10/30 10/31Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.48 inches Avg Level: 1.48 in. Peak Level: 3.27 in. Min Level: 0.75 in.3 Avg Velocity: 1.63 fps Peak Velocity: 3.22 fps Min Velocity: -0.63 fps3 Avg Flow: 0.053 mgd Peak Flow: 0.264 mgd Min Flow: -0.051 mgd32 Site J.2 Monitoring Site:Level, Velocity and Flow From 11/1/2010 to 11/8/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 11/1 11/2 11/3 11/4 11/5 11/6 11/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.4 inches Avg Level: 1.37 in. Peak Level: 2.09 in. Min Level: 0.69 in.3 Avg Velocity: 1.56 fps Peak Velocity: 2.9 fps Min Velocity: 0.24 fps3 Avg Flow: 0.045 mgd Peak Flow: 0.12 mgd Min Flow: 0.003 mgd33 0.000.200.400.600.801.001.2020-Jan Thu21-Jan Fri22-Jan Sat23-Jan Sun24-Jan Mon25-Jan Tue26-Jan Wed27-Jan Thu28-Jan Fri29-Jan Sat30-Jan Sun31-Jan Mon1-Feb Tue2-Feb Wed3-Feb Thu4-Feb Fri5-Feb Sat6-Feb Sun7-Feb Mon8-Feb Tue9-Feb Wed10-Feb Thu11-Feb Fri12-Feb Sat13-Feb SunFlow (mgd)0.000.050.100.150.200.250.300.350.40Rainfall (in/hr)RainFlowBLFlowSite J.2Monitoring Site:Period Flow Summary0.0560.0540.0640.0520.0480.0500.0520.0510.0530.0530.0510.0550.0530.0500.0470.0460.0520.0440.0460.0670.0570.1030.0700.0640.0620.1190.0740.0660.0710.0700.0690.000.020.040.060.080.100.120.141/201/211/221/231/241/251/261/271/281/291/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/6Flow (MGal)0.00.40.81.21.62.02.42.8Rainfall (in/day)0.000.200.400.600.801.001.2013-FebSun14-FebMon15-FebTue16-FebWed17-FebThu18-FebFri19-FebSat20-FebSun21-FebMon22-FebTue23-FebWed24-FebThu25-FebFri26-FebSat27-FebSun28-FebMon1-Mar Tue2-Mar Wed3-Mar Thu4-Mar Fri5-Mar Sat6-Mar Sun7-Mar MonFlow (mgd)0.000.050.100.150.200.250.300.350.40Rainfall (in/hr)0.0510.0550.0480.0620.0560.0560.0500.0520.1260.0980.0960.0820.0680.0740.000.020.040.060.080.100.120.141/201/211/221/231/241/251/261/271/281/291/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/60.00.40.81.21.62.02.42.80.0790.000.020.040.060.080.100.120.141/201/211/221/231/241/251/261/271/281/291/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/60.00.40.81.21.62.02.42.8January 20 to March 7, 2011 Diameter0.01.02.03.04.05.06.07.08.09.002/1402/1502/1602/1702/1802/1902/2002/2102/2202/2302/2402/2502/2602/2702/2803/0103/02Level (inches)Site J.2Monitoring Site:Site Capacity / Surcharge SummaryRealtime Flow Levels with Rainfall Data over Monitoring Period Peak Measured Level:3.33Peak d/D Ratio:0.42Pipe Diameter:8inchesinches Site J.2 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 02/1402/1502/1602/1702/1802/1902/2002/2102/2202/2302/2402/25Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.296 0.240 3.33 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 6.59 5.33 d/D Ratio:0.42 322,000 2.73Total I/I per ADWF:per in-rain 5.9%R-Value: 76% mgd RDI (% of BL): 0.034 Event 1 Event 1 Detail Graph (2/21/2011) RDI:Acre:445 PkI/I:Acre:3,126 Storm Event I/I Analysis (Rain = 2.62 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: Site J.2 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.05 0.10 0.15 0.20 0.25 02/2502/2602/2702/2803/0103/02Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.234 0.177 3.17 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 5.21 3.93 d/D Ratio:0.40 213,000 5.12Total I/I per ADWF:per in-rain 11.1%R-Value: 82% mgd RDI (% of BL): 0.037 Event 2 Event 2 Detail Graph (2/27/2011) RDI:Acre:483 PkI/I:Acre:2,305 Storm Event I/I Analysis (Rain = 0.93 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: Site J.2 Monitoring Site:Level, Velocity and Flow From 1/17/2011 to 1/24/2011 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1/17 1/18 1/19 1/20 1/21 1/22 1/23Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 1.54 in. Peak Level: 2.19 in. Min Level: 0.66 in.114 1 Avg Velocity: 1.7 fps Peak Velocity: 2.93 fps Min Velocity: 0.37 fps1141 Avg Flow: 0.057 mgd Peak Flow: 0.142 mgd Min Flow: 0.004 mgd1141 Site J.2 Monitoring Site:Level, Velocity and Flow From 1/24/2011 to 1/31/2011 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1/24 1/25 1/26 1/27 1/28 1/29 1/30Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.38 inches Avg Level: 1.49 in. Peak Level: 6.91 in. Min Level: 0.63 in.114 2 Avg Velocity: 1.65 fps Peak Velocity: 3.12 fps Min Velocity: 0.38 fps1142 Avg Flow: 0.054 mgd Peak Flow: 0.613 mgd Min Flow: 0.004 mgd1142 Site J.2 Monitoring Site:Level, Velocity and Flow From 1/31/2011 to 2/7/2011 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1/31 2/1 2/2 2/3 2/4 2/5 2/6Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.01 inches Avg Level: 1.45 in. Peak Level: 2.16 in. Min Level: 0.5 in.114 3 Avg Velocity: 1.69 fps Peak Velocity: 2.95 fps Min Velocity: 0.42 fps1143 Avg Flow: 0.053 mgd Peak Flow: 0.127 mgd Min Flow: 0.003 mgd1143 Site J.2 Monitoring Site:Level, Velocity and Flow From 2/7/2011 to 2/14/2011 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 2/7 2/8 2/9 2/10 2/11 2/12 2/13Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.02 inches Avg Level: 1.41 in. Peak Level: 2.27 in. Min Level: 0.51 in.114 4 Avg Velocity: 1.62 fps Peak Velocity: 2.97 fps Min Velocity: 0.25 fps1144 Avg Flow: 0.05 mgd Peak Flow: 0.129 mgd Min Flow: 0.002 mgd1144 Site J.2 Monitoring Site:Level, Velocity and Flow From 2/14/2011 to 2/21/2011 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 2/14 2/15 2/16 2/17 2/18 2/19 2/20Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 2.62 inches Avg Level: 1.84 in. Peak Level: 3.33 in. Min Level: 0.62 in.114 5 Avg Velocity: 1.76 fps Peak Velocity: 3.7 fps Min Velocity: 0.4 fps1145 Avg Flow: 0.077 mgd Peak Flow: 0.296 mgd Min Flow: 0.005 mgd1145 Site J.2 Monitoring Site:Level, Velocity and Flow From 2/21/2011 to 2/28/2011 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 2/21 2/22 2/23 2/24 2/25 2/26 2/27Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.93 inches Avg Level: 1.85 in. Peak Level: 3.17 in. Min Level: 0.89 in.114 6 Avg Velocity: 1.94 fps Peak Velocity: 2.98 fps Min Velocity: 0.69 fps1146 Avg Flow: 0.082 mgd Peak Flow: 0.234 mgd Min Flow: 0.01 mgd1146 Site J.2 Monitoring Site:Level, Velocity and Flow From 2/28/2011 to 3/7/2011 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 2/28 3/1 3/2 3/3 3/4 3/5 3/6Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.22 inches Avg Level: 1.73 in. Peak Level: 2.67 in. Min Level: 1.03 in.114 7 Avg Velocity: 1.83 fps Peak Velocity: 2.88 fps Min Velocity: 0.81 fps1147 Avg Flow: 0.07 mgd Peak Flow: 0.147 mgd Min Flow: 0.014 mgd1147 Site J.2 Monitoring Site:Level, Velocity and Flow From 3/7/2011 to 3/14/2011 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 3/7 3/8 3/9 3/10 3/11 3/12 3/13Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.04 inches Avg Level: 1.66 in. Peak Level: 2.39 in. Min Level: 0.98 in.114 8 Avg Velocity: 1.65 fps Peak Velocity: 2.71 fps Min Velocity: 0.7 fps1148 Avg Flow: 0.061 mgd Peak Flow: 0.142 mgd Min Flow: 0.011 mgd1148 Monitoring Site: Location: Size/Type Line: Site L.1 Manhole H17-16: Calle Joaquin (Hojo Pump Station) 10-inch Sanitary Sewer Pipe Temporary Flow Monitoring Study Sanitary Sewer Collection System Data Summary Report Site L.1 Location:Manhole H17-16: Calle Joaquin (Hojo Pump Station) Diameter:10 Monitoring Site:Site Information Report Average Dry Weather Flow:0.063 Peak Measured Flow:0.159 mgd mgd Flow Diagram Satellite Map Latitude: 35.2430° Longitude:-120.6836° Rim Elevation:106 feet above sea level inches Street View Photo Sanitary Map Plan View Photo Site L.1Monitoring Site:Average Dry Weather Flow0.17Average Dry Weather Flow:mgd0.0630.000.020.040.060.080.100.120:001:002:003:004:005:006:007:008:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:0023:00Flow (mgd)WeekdayWeekend Site L.1 Monitoring Site:Level, Velocity and Flow From 10/18/2010 to 10/25/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 10/18 10/19 10/20 10/21 10/22 10/23 10/24Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.91 inches Avg Level: 1.66 in. Peak Level: 2.5 in. Min Level: 1.01 in.4 Avg Velocity: 1.46 fps Peak Velocity: 1.99 fps Min Velocity: 0.95 fps4 Avg Flow: 0.059 mgd Peak Flow: 0.131 mgd Min Flow: 0.02 mgd4 Site L.1 Monitoring Site:Level, Velocity and Flow From 10/25/2010 to 11/1/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 10/25 10/26 10/27 10/28 10/29 10/30 10/31Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.48 inches Avg Level: 1.76 in. Peak Level: 2.62 in. Min Level: 0.96 in.4 Avg Velocity: 1.51 fps Peak Velocity: 2.04 fps Min Velocity: 0.88 fps4 Avg Flow: 0.066 mgd Peak Flow: 0.15 mgd Min Flow: 0.018 mgd42 Site L.1 Monitoring Site:Level, Velocity and Flow From 11/1/2010 to 11/8/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 11/1 11/2 11/3 11/4 11/5 11/6 11/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.4 inches Avg Level: 1.76 in. Peak Level: 2.43 in. Min Level: 1.12 in.4 Avg Velocity: 1.51 fps Peak Velocity: 1.97 fps Min Velocity: 1.02 fps4 Avg Flow: 0.065 mgd Peak Flow: 0.131 mgd Min Flow: 0.025 mgd43 0.000.020.040.060.080.100.120.140.160.180.2030-JanSat31-JanSun1-FebMon2-FebTue3-FebWed4-FebThu5-FebFri6-FebSat7-FebSun8-FebMon9-FebTue10-FebWed11-FebThu12-FebFri13-FebSat14-FebSun15-FebMon16-FebTue17-FebWed18-FebThu19-FebFri20-FebSat21-FebSun22-FebMon23-FebTue24-FebWed25-FebThu26-FebFri27-FebSat28-FebSunFlow (mgd)0.00.10.20.30.40.50.60.70.8Rainfall (in/hr)RainFlowBLFlowSite L.1Monitoring Site:Period Flow Summary0.0380.0590.0810.0770.0810.0610.0610.0630.0550.0570.0540.0570.0520.0470.0720.0620.0810.0760.0760.0840.0850.0850.0720.0450.0480.0470.0450.0440.0440.0440.0440.0460.0440.0430.0420.0410.0420.0440.0460.000.010.020.030.040.050.060.070.080.091/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/28Flow (MGal)0.00.40.81.21.62.02.42.8Rainfall (in/day)0.000.020.040.060.080.100.120.140.160.180.2028-FebSun1-MarMon2-MarTue3-MarWed4-MarThu5-MarFri6-MarSat7-MarSun8-MarMon9-MarTue10-MarWed11-MarThu12-MarFri13-MarSat14-MarSun15-MarMon16-MarTue17-MarWed18-MarThu19-MarFri20-MarSat21-MarSun22-MarMon23-MarTue24-MarWed25-MarThu26-MarFri27-MarSat28-MarSunFlow (mgd)0.00.10.20.30.40.50.60.70.8Rainfall (in/hr)0.0620.0610.0600.0530.0830.0850.0630.0790.0800.0810.0440.0430.0420.0420.0420.0420.0390.0350.000.010.020.030.040.050.060.070.080.091/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/280.00.40.81.21.62.02.42.80.0840.000.010.020.030.040.050.060.070.080.091/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/280.00.40.81.21.62.02.42.8January 30 to March 28, 2010Total Period Rainfall: 7.17 inchesAvg Flow: 0.058 mgd Peak Flow: 0.159 mgd Min Flow: 0.011 mgd Diameter0.02.04.06.08.010.012.002/0202/0302/0402/0502/0602/0702/0802/0902/1002/1102/1202/1302/1402/1502/1602/1702/1802/1902/2002/2102/2202/2302/2402/2502/2602/2702/2803/0103/0203/0303/0403/0503/0603/0703/0803/0903/1003/1103/1203/1303/1403/15Level (inches)Site L.1Monitoring Site:Site Capacity / Surcharge SummaryRealtime Flow Levels with Rainfall Data over Monitoring Period Peak Measured Level:2.75Peak d/D Ratio:0.28Pipe Diameter:10inchesinches Site L.1 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 02/0402/0502/0602/0702/0802/09Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.10 0.02 2.47 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 1.65 0.37 d/D Ratio:0.25 -20,000 -0.17Total I/I per ADWF:per in-rain -0.6%R-Value: 0% mgd RDI (% of BL): 0.00 Event 1 Event 1 Detail Graph (2/8/2010) RDI:Acre:0 PkI/I:Acre:323 Storm Event I/I Analysis (Rain = 1.89 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: -803Total I/I per IDM:per in-rainPkI/I:IDM:1,736 gpd/IDM RDI:IDM:0 gpd/IDM Site L.1 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 02/2602/2702/2803/0103/02Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.15 0.07 2.75 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 2.33 1.18 d/D Ratio:0.28 66,000 0.42Total I/I per ADWF:per in-rain 1.4%R-Value: 36% mgd RDI (% of BL): 0.02 Event 2 Event 2 Detail Graph (3/1/2010) RDI:Acre:318 PkI/I:Acre:1,039 Storm Event I/I Analysis (Rain = 2.52 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: 1,976Total I/I per IDM:per in-rainPkI/I:IDM:5,575 gpd/IDM RDI:IDM:1,709 gpd/IDM Site L.1 Monitoring Site:Level, Velocity and Flow From 1/25/2010 to 2/1/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 0.20 1/25 1/26 1/27 1/28 1/29 1/30 1/31Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.08 inches Avg Level: 1.86 in. Peak Level: 2.47 in. Min Level: 1.27 in.40 1 Avg Velocity: 1.41 fps Peak Velocity: 2.08 fps Min Velocity: 0.67 fps401 Avg Flow: 0.066 mgd Peak Flow: 0.13 mgd Min Flow: 0.019 mgd401 Site L.1 Monitoring Site:Level, Velocity and Flow From 2/1/2010 to 2/8/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 0.20 2/1 2/2 2/3 2/4 2/5 2/6 2/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 1.92 inches Avg Level: 1.77 in. Peak Level: 2.41 in. Min Level: 1.09 in.40 2 Avg Velocity: 1.43 fps Peak Velocity: 2.18 fps Min Velocity: 0.54 fps402 Avg Flow: 0.064 mgd Peak Flow: 0.142 mgd Min Flow: 0.013 mgd402 Site L.1 Monitoring Site:Level, Velocity and Flow From 2/8/2010 to 2/15/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 0.20 2/8 2/9 2/10 2/11 2/12 2/13 2/14Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.62 inches Avg Level: 1.89 in. Peak Level: 2.61 in. Min Level: 1.41 in.40 3 Avg Velocity: 1.38 fps Peak Velocity: 2.14 fps Min Velocity: 0.84 fps403 Avg Flow: 0.066 mgd Peak Flow: 0.151 mgd Min Flow: 0.028 mgd403 Site L.1 Monitoring Site:Level, Velocity and Flow From 2/15/2010 to 2/22/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 0.20 2/15 2/16 2/17 2/18 2/19 2/20 2/21Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.22 inches Avg Level: 1.91 in. Peak Level: 2.57 in. Min Level: 1.25 in.40 4 Avg Velocity: 1.28 fps Peak Velocity: 2.22 fps Min Velocity: 0.41 fps404 Avg Flow: 0.062 mgd Peak Flow: 0.159 mgd Min Flow: 0.011 mgd404 Site L.1 Monitoring Site:Level, Velocity and Flow From 2/22/2010 to 3/1/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 0.20 2/22 2/23 2/24 2/25 2/26 2/27 2/28Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 3.11 inches Avg Level: 1.94 in. Peak Level: 2.75 in. Min Level: 1.44 in.40 5 Avg Velocity: 1.54 fps Peak Velocity: 2.11 fps Min Velocity: 0.98 fps405 Avg Flow: 0.075 mgd Peak Flow: 0.146 mgd Min Flow: 0.034 mgd405 Site L.1 Monitoring Site:Level, Velocity and Flow From 3/1/2010 to 3/8/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 0.20 3/1 3/2 3/3 3/4 3/5 3/6 3/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 1.1 inches Avg Level: 1.77 in. Peak Level: 2.4 in. Min Level: 1.26 in.40 6 Avg Velocity: 1.48 fps Peak Velocity: 2.11 fps Min Velocity: 0.92 fps406 Avg Flow: 0.066 mgd Peak Flow: 0.137 mgd Min Flow: 0.024 mgd406 Site L.1 Monitoring Site:Level, Velocity and Flow From 3/8/2010 to 3/15/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 0.20 3/8 3/9 3/10 3/11 3/12 3/13 3/14Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.15 inches Avg Level: 1.58 in. Peak Level: 1.99 in. Min Level: 1.25 in.40 7 Avg Velocity: 1.23 fps Peak Velocity: 1.52 fps Min Velocity: 0.93 fps407 Avg Flow: 0.045 mgd Peak Flow: 0.076 mgd Min Flow: 0.025 mgd407 Site L.1 Monitoring Site:Level, Velocity and Flow From 3/15/2010 to 3/22/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 0.20 3/15 3/16 3/17 3/18 3/19 3/20 3/21Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 1.54 in. Peak Level: 2.02 in. Min Level: 1.21 in.40 8 Avg Velocity: 1.24 fps Peak Velocity: 1.59 fps Min Velocity: 0.87 fps408 Avg Flow: 0.044 mgd Peak Flow: 0.081 mgd Min Flow: 0.021 mgd408 Site L.1 Monitoring Site:Level, Velocity and Flow From 3/22/2010 to 3/29/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 0.20 3/22 3/23 3/24 3/25 3/26 3/27 3/28Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.01 inches Avg Level: 1.52 in. Peak Level: 2.09 in. Min Level: 1.12 in.40 9 Avg Velocity: 1.19 fps Peak Velocity: 1.59 fps Min Velocity: 0.83 fps409 Avg Flow: 0.041 mgd Peak Flow: 0.072 mgd Min Flow: 0.018 mgd409 Monitoring Site: Location: Size/Type Line: Site L.2 Manhole H18-4: Stream southwest of Los Osos Valley Road 12-inch Sanitary Sewer Pipe Temporary Flow Monitoring Study Sanitary Sewer Collection System Data Summary Report Site L.2 Location:Manhole H18-4: Stream southwest of Los Osos Valley Road Diameter:12 Monitoring Site:Site Information Report Average Dry Weather Flow:0.170 Peak Measured Flow:0.370 mgd mgd Flow Diagram Satellite Map Latitude: 35.2422° Longitude:-120.6817° Rim Elevation:101 feet above sea level inches Street View Photo Sanitary Map Plan View Photo Site L.2Monitoring Site:Average Dry Weather Flow0.56Average Dry Weather Flow:mgd0.1650.000.050.100.150.200.250.300:001:002:003:004:005:006:007:008:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:0023:00Flow (mgd)WeekdayWeekend Site L.2 Monitoring Site:Level, Velocity and Flow From 10/18/2010 to 10/25/2010 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 10/18 10/19 10/20 10/21 10/22 10/23 10/24Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.91 inches Avg Level: 6.39 in. Peak Level: 8.69 in. Min Level: 2.6 in.5 Avg Velocity: 0.92 fps Peak Velocity: 1.58 fps Min Velocity: 0.17 fps5 Avg Flow: 0.172 mgd Peak Flow: 0.363 mgd Min Flow: 0.005 mgd5 Site L.2 Monitoring Site:Level, Velocity and Flow From 10/25/2010 to 11/1/2010 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 10/25 10/26 10/27 10/28 10/29 10/30 10/31Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.48 inches Avg Level: 6.59 in. Peak Level: 8.93 in. Min Level: 4.47 in.5 Avg Velocity: 0.89 fps Peak Velocity: 1.47 fps Min Velocity: 0.12 fps5 Avg Flow: 0.178 mgd Peak Flow: 0.402 mgd Min Flow: 0.006 mgd52 Site L.2 Monitoring Site:Level, Velocity and Flow From 11/1/2010 to 11/8/2010 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 11/1 11/2 11/3 11/4 11/5 11/6 11/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.4 inches Avg Level: 6.96 in. Peak Level: 9.13 in. Min Level: 3.46 in.5 Avg Velocity: 0.82 fps Peak Velocity: 1.51 fps Min Velocity: 0.02 fps5 Avg Flow: 0.18 mgd Peak Flow: 0.383 mgd Min Flow: 0.007 mgd53 0.000.200.400.600.801.001.201.4030-JanSat31-JanSun1-FebMon2-FebTue3-FebWed4-FebThu5-FebFri6-FebSat7-FebSun8-FebMon9-FebTue10-FebWed11-FebThu12-FebFri13-FebSat14-FebSun15-FebMon16-FebTue17-FebWed18-FebThu19-FebFri20-FebSat21-FebSun22-FebMon23-FebTue24-FebWed25-FebThu26-FebFri27-FebSat28-FebSunFlow (mgd)0.00.10.20.30.40.50.60.70.8Rainfall (in/hr)RainFlowBLFlowSite L.2Monitoring Site:Period Flow Summary0.1810.1720.1630.1820.1970.2490.2240.2210.2210.2010.1880.1870.1900.1640.1710.1740.1930.1730.1880.2260.2140.2040.2320.1880.2140.1960.2220.2160.2000.1840.1810.1820.1890.1680.1930.1620.1680.1820.1840.000.050.100.150.200.250.301/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/28Flow (MGal)0.00.40.81.21.62.02.42.8Rainfall (in/day)0.000.200.400.600.801.001.201.4028-FebSun1-MarMon2-MarTue3-MarWed4-MarThu5-MarFri6-MarSat7-MarSun8-MarMon9-MarTue10-MarWed11-MarThu12-MarFri13-MarSat14-MarSun15-MarMon16-MarTue17-MarWed18-MarThu19-MarFri20-MarSat21-MarSun22-MarMon23-MarTue24-MarWed25-MarThu26-MarFri27-MarSat28-MarSunFlow (mgd)0.00.10.20.30.40.50.60.70.8Rainfall (in/hr)0.1680.1870.1900.2300.1930.2090.1750.1670.2350.2240.1940.1790.1870.1680.1730.1620.1720.1890.000.050.100.150.200.250.301/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/280.00.40.81.21.62.02.42.80.1760.000.050.100.150.200.250.301/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/280.00.40.81.21.62.02.42.8January 30 to March 28, 2010Total Period Rainfall: 7.07 inchesAvg Flow: 0.192 mgd Peak Flow: 0.37 mgd Min Flow: 0 mgd Diameter0.02.04.06.08.010.012.014.002/0202/0302/0402/0502/0602/0702/0802/0902/1002/1102/1202/1302/1402/1502/1602/1702/1802/1902/2002/2102/2202/2302/2402/2502/2602/2702/2803/0103/0203/0303/0403/0503/0603/0703/0803/0903/1003/1103/1203/1303/1403/15Level (inches)Site L.2Monitoring Site:Site Capacity / Surcharge SummaryRealtime Flow Levels with Rainfall Data over Monitoring Period Peak Measured Level:7Peak d/D Ratio:0.58Pipe Diameter:12inchesinches Site L.2 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 02/0402/0502/0602/0702/0802/09Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.37 0.18 7.00 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 2.18 1.08 d/D Ratio:0.58 78,000 0.25Total I/I per ADWF:per in-rain 0.9%R-Value: 46% mgd RDI (% of BL): 0.08 Event 1 Event 1 Detail Graph (2/8/2010) RDI:Acre:471 PkI/I:Acre:1,113 Storm Event I/I Analysis (Rain = 1.86 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: 1,368Total I/I per IDM:per in-rainPkI/I:IDM:5,961 gpd/IDM RDI:IDM:2,524 gpd/IDM Site L.2 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 02/2602/2702/2803/0103/02Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.33 0.13 6.46 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 1.95 0.75 d/D Ratio:0.54 55,000 0.13Total I/I per ADWF:per in-rain 0.5%R-Value: 32% mgd RDI (% of BL): 0.05 Event 2 Event 2 Detail Graph (3/1/2010) RDI:Acre:330 PkI/I:Acre:776 Storm Event I/I Analysis (Rain = 2.46 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: 725Total I/I per IDM:per in-rainPkI/I:IDM:4,157 gpd/IDM RDI:IDM:1,769 gpd/IDM Site L.2 Monitoring Site:Level, Velocity and Flow From 1/25/2010 to 2/1/2010 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1/25 1/26 1/27 1/28 1/29 1/30 1/31Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.08 inches Avg Level: 6.18 in. Peak Level: 7.63 in. Min Level: 4.37 in.41 1 Avg Velocity: 0.99 fps Peak Velocity: 1.51 fps Min Velocity: 0.55 fps411 Avg Flow: 0.178 mgd Peak Flow: 0.341 mgd Min Flow: 0.042 mgd411 Site L.2 Monitoring Site:Level, Velocity and Flow From 2/1/2010 to 2/8/2010 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 2/1 2/2 2/3 2/4 2/5 2/6 2/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 1.89 inches Avg Level: 6.02 in. Peak Level: 7.75 in. Min Level: 4.15 in.41 2 Avg Velocity: 1.01 fps Peak Velocity: 1.71 fps Min Velocity: 0.13 fps412 Avg Flow: 0.188 mgd Peak Flow: 0.359 mgd Min Flow: 0.005 mgd412 Site L.2 Monitoring Site:Level, Velocity and Flow From 2/8/2010 to 2/15/2010 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 2/8 2/9 2/10 2/11 2/12 2/13 2/14Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.61 inches Avg Level: 5.8 in. Peak Level: 7.85 in. Min Level: 3.94 in.41 3 Avg Velocity: 1.15 fps Peak Velocity: 1.72 fps Min Velocity: 0.4 fps413 Avg Flow: 0.217 mgd Peak Flow: 0.37 mgd Min Flow: 0.033 mgd413 Site L.2 Monitoring Site:Level, Velocity and Flow From 2/15/2010 to 2/22/2010 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 2/15 2/16 2/17 2/18 2/19 2/20 2/21Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.22 inches Avg Level: 5.47 in. Peak Level: 7.39 in. Min Level: 3.88 in.41 4 Avg Velocity: 1.11 fps Peak Velocity: 1.74 fps Min Velocity: 0.35 fps414 Avg Flow: 0.178 mgd Peak Flow: 0.343 mgd Min Flow: 0.015 mgd414 Site L.2 Monitoring Site:Level, Velocity and Flow From 2/22/2010 to 3/1/2010 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 2/22 2/23 2/24 2/25 2/26 2/27 2/28Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 3.03 inches Avg Level: 5.57 in. Peak Level: 7.42 in. Min Level: 3.91 in.41 5 Avg Velocity: 1.06 fps Peak Velocity: 1.73 fps Min Velocity: 0.34 fps415 Avg Flow: 0.194 mgd Peak Flow: 0.336 mgd Min Flow: 0.003 mgd415 Site L.2 Monitoring Site:Level, Velocity and Flow From 3/1/2010 to 3/8/2010 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 3/1 3/2 3/3 3/4 3/5 3/6 3/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 1.1 inches Avg Level: 5.46 in. Peak Level: 7.5 in. Min Level: 4.35 in.41 6 Avg Velocity: 1.17 fps Peak Velocity: 1.73 fps Min Velocity: 0.45 fps416 Avg Flow: 0.205 mgd Peak Flow: 0.332 mgd Min Flow: 0.021 mgd416 Site L.2 Monitoring Site:Level, Velocity and Flow From 3/8/2010 to 3/15/2010 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 3/8 3/9 3/10 3/11 3/12 3/13 3/14Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.15 inches Avg Level: 5.93 in. Peak Level: 8.22 in. Min Level: 4.18 in.41 7 Avg Velocity: 0.99 fps Peak Velocity: 1.59 fps Min Velocity: 0.19 fps417 Avg Flow: 0.2 mgd Peak Flow: 0.352 mgd Min Flow: 0.008 mgd417 Site L.2 Monitoring Site:Level, Velocity and Flow From 3/15/2010 to 3/22/2010 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 3/15 3/16 3/17 3/18 3/19 3/20 3/21Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 5.82 in. Peak Level: 8.15 in. Min Level: 3.72 in.41 8 Avg Velocity: 0.93 fps Peak Velocity: 1.52 fps Min Velocity: 0.16 fps418 Avg Flow: 0.177 mgd Peak Flow: 0.317 mgd Min Flow: 0.013 mgd418 Site L.2 Monitoring Site:Level, Velocity and Flow From 3/22/2010 to 3/29/2010 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 3/22 3/23 3/24 3/25 3/26 3/27 3/28Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.01 inches Avg Level: 5.53 in. Peak Level: 7.67 in. Min Level: 3.66 in.41 9 Avg Velocity: 0.99 fps Peak Velocity: 1.66 fps Min Velocity: 0 fps419 Avg Flow: 0.179 mgd Peak Flow: 0.338 mgd Min Flow: 0 mgd419 Monitoring Site: Location: Size/Type Line: Site M.1 Manhole H15-5: 1954 Oceanaire Drive (behind house) 15-inch Sanitary Sewer Pipe Temporary Flow Monitoring Study Sanitary Sewer Collection System Data Summary Report Site M.1 Location:Manhole H15-5: 1954 Oceanaire Drive (behind house) Diameter:15 Monitoring Site:Site Information Report Average Dry Weather Flow:0.480 Peak Measured Flow:1.269 mgd mgd Satellite Map Latitude: 35.2550° Longitude:-120.6840° Rim Elevation:122 feet above sea level inches Sanitary Map Flow Diagram Site M.1Monitoring Site:Average Dry Weather Flow0.41Average Dry Weather Flow:mgd0.4800.000.100.200.300.400.500.600.700.800.900:001:002:003:004:005:006:007:008:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:0023:00Flow (mgd)WeekdayWeekend Site M.1 Monitoring Site:Level, Velocity and Flow From 10/18/2010 to 10/25/2010 0.0 5.0 10.0 15.0 20.0 25.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 10/18 10/19 10/20 10/21 10/22 10/23 10/24Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.91 inches Avg Level: 6.37 in. Peak Level: 12.79 in. Min Level: 3.32 in.6 Avg Velocity: 1.54 fps Peak Velocity: 1.94 fps Min Velocity: 0.83 fps6 Avg Flow: 0.497 mgd Peak Flow: 0.831 mgd Min Flow: 0.134 mgd6 Site M.1 Monitoring Site:Level, Velocity and Flow From 10/25/2010 to 11/1/2010 0.0 5.0 10.0 15.0 20.0 25.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 10/25 10/26 10/27 10/28 10/29 10/30 10/31Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.48 inches Avg Level: 6.34 in. Peak Level: 13.82 in. Min Level: 3.42 in.6 Avg Velocity: 1.57 fps Peak Velocity: 2.02 fps Min Velocity: 0.92 fps6 Avg Flow: 0.505 mgd Peak Flow: 0.84 mgd Min Flow: 0.141 mgd62 Site M.1 Monitoring Site:Level, Velocity and Flow From 11/1/2010 to 11/8/2010 0.0 5.0 10.0 15.0 20.0 25.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 11/1 11/2 11/3 11/4 11/5 11/6 11/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.4 inches Avg Level: 6.21 in. Peak Level: 13.06 in. Min Level: 3.36 in.6 Avg Velocity: 1.56 fps Peak Velocity: 1.98 fps Min Velocity: 0.87 fps6 Avg Flow: 0.496 mgd Peak Flow: 0.833 mgd Min Flow: 0.132 mgd63 0.000.200.400.600.801.001.201.401.601.8030-JanSat31-JanSun1-FebMon2-FebTue3-FebWed4-FebThu5-FebFri6-FebSat7-FebSun8-FebMon9-FebTue10-FebWed11-FebThu12-FebFri13-FebSat14-FebSun15-FebMon16-FebTue17-FebWed18-FebThu19-FebFri20-FebSat21-FebSun22-FebMon23-FebTue24-FebWed25-FebThu26-FebFri27-FebSat28-FebSunFlow (mgd)0.00.10.20.30.40.50.60.70.8Rainfall (in/hr)RainFlowBLFlowSite M.1Monitoring Site:Period Flow Summary0.5960.5850.5840.5790.6860.6790.7180.6840.6630.6660.5910.5530.5290.5690.5630.5380.5840.5670.6420.7250.6960.7060.7400.6730.6620.6430.6320.6240.6230.6260.6550.6530.6590.6430.6110.5980.5880.5720.5580.000.200.400.600.801.001/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/28Flow (MGal)0.00.40.81.21.62.02.42.8Rainfall (in/day)0.000.200.400.600.801.001.201.401.601.8028-FebSun1-MarMon2-MarTue3-MarWed4-MarThu5-MarFri6-MarSat7-MarSun8-MarMon9-MarTue10-MarWed11-MarThu12-MarFri13-MarSat14-MarSun15-MarMon16-MarTue17-MarWed18-MarThu19-MarFri20-MarSat21-MarSun22-MarMon23-MarTue24-MarWed25-MarThu26-MarFri27-MarSat28-MarSunFlow (mgd)0.00.10.20.30.40.50.60.70.8Rainfall (in/hr)0.6470.6500.7500.7340.6610.6490.6030.6020.9180.8440.6550.7260.6520.6560.5630.6360.5380.5610.000.200.400.600.801.001/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/280.00.40.81.21.62.02.42.80.6480.000.200.400.600.801.001/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/280.00.40.81.21.62.02.42.8January 30 to March 28, 2010Total Period Rainfall: 7.41 inchesAvg Flow: 0.641 mgd Peak Flow: 1.269 mgd Min Flow: 0.197 mgd Diameter0.05.010.015.020.025.030.035.040.002/0202/0302/0402/0502/0602/0702/0802/0902/1002/1102/1202/1302/1402/1502/1602/1702/1802/1902/2002/2102/2202/2302/2402/2502/2602/2702/2803/0103/0203/0303/0403/0503/0603/0703/0803/0903/1003/1103/1203/1303/1403/15Level (inches)Site M.1Monitoring Site:Site Capacity / Surcharge SummaryRealtime Flow Levels with Rainfall Data over Monitoring PeriodSurcharged 21 inches over crownPeak Measured Level:36.1Peak d/D Ratio:2.40Pipe Diameter:15inchesinches Site M.1 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 02/0402/0502/0602/0702/0802/09Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)1.17 0.46 29.03 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 2.43 0.95 d/D Ratio:1.94 918,000 0.98Total I/I per ADWF:per in-rain 1.4%R-Value: 43% mgd RDI (% of BL): 0.21 Event 1 Event 1 Detail Graph (2/8/2010) RDI:Acre:168 PkI/I:Acre:370 Storm Event I/I Analysis (Rain = 1.96 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: 3,279Total I/I per IDM:per in-rainPkI/I:IDM:3,200 gpd/IDM RDI:IDM:1,457 gpd/IDM Site M.1 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 02/2602/2702/2803/0103/02Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)1.27 0.59 36.05 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 2.64 1.22 d/D Ratio:2.40 1,191,000 0.93Total I/I per ADWF:per in-rain 1.3%R-Value: 53% mgd RDI (% of BL): 0.26 Event 2 Event 2 Detail Graph (3/1/2010) RDI:Acre:206 PkI/I:Acre:475 Storm Event I/I Analysis (Rain = 2.67 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: 3,121Total I/I per IDM:per in-rainPkI/I:IDM:4,109 gpd/IDM RDI:IDM:1,783 gpd/IDM Site M.1 Monitoring Site:Level, Velocity and Flow From 1/25/2010 to 2/1/2010 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 1/25 1/26 1/27 1/28 1/29 1/30 1/31Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.08 inches Avg Level: 9 in. Peak Level: 18.43 in. Min Level: 4.22 in.42 1 Avg Velocity: 1.48 fps Peak Velocity: 2.02 fps Min Velocity: 0.96 fps421 Avg Flow: 0.639 mgd Peak Flow: 1.044 mgd Min Flow: 0.284 mgd421 Site M.1 Monitoring Site:Level, Velocity and Flow From 2/1/2010 to 2/8/2010 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2/1 2/2 2/3 2/4 2/5 2/6 2/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 2 inches Avg Level: 9 in. Peak Level: 29.03 in. Min Level: 4.08 in.42 2 Avg Velocity: 1.55 fps Peak Velocity: 2.1 fps Min Velocity: 0.96 fps422 Avg Flow: 0.645 mgd Peak Flow: 1.169 mgd Min Flow: 0.263 mgd422 Site M.1 Monitoring Site:Level, Velocity and Flow From 2/8/2010 to 2/15/2010 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2/8 2/9 2/10 2/11 2/12 2/13 2/14Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.63 inches Avg Level: 9.47 in. Peak Level: 23.47 in. Min Level: 4.29 in.42 3 Avg Velocity: 1.47 fps Peak Velocity: 2 fps Min Velocity: 1 fps423 Avg Flow: 0.674 mgd Peak Flow: 1.105 mgd Min Flow: 0.293 mgd423 Site M.1 Monitoring Site:Level, Velocity and Flow From 2/15/2010 to 2/22/2010 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2/15 2/16 2/17 2/18 2/19 2/20 2/21Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.21 inches Avg Level: 8 in. Peak Level: 18.06 in. Min Level: 4.03 in.42 4 Avg Velocity: 1.5 fps Peak Velocity: 1.99 fps Min Velocity: 0.61 fps424 Avg Flow: 0.585 mgd Peak Flow: 0.991 mgd Min Flow: 0.197 mgd424 Site M.1 Monitoring Site:Level, Velocity and Flow From 2/22/2010 to 3/1/2010 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2/22 2/23 2/24 2/25 2/26 2/27 2/28Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 3.3 inches Avg Level: 10.21 in. Peak Level: 36.05 in. Min Level: 3.88 in.42 5 Avg Velocity: 1.53 fps Peak Velocity: 1.99 fps Min Velocity: 0.9 fps425 Avg Flow: 0.665 mgd Peak Flow: 1.269 mgd Min Flow: 0.22 mgd425 Site M.1 Monitoring Site:Level, Velocity and Flow From 3/1/2010 to 3/8/2010 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 3/1 3/2 3/3 3/4 3/5 3/6 3/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 1.08 inches Avg Level: 10.54 in. Peak Level: 22.17 in. Min Level: 4.75 in.42 6 Avg Velocity: 1.42 fps Peak Velocity: 2.04 fps Min Velocity: 0.5 fps426 Avg Flow: 0.703 mgd Peak Flow: 1.089 mgd Min Flow: 0.264 mgd426 Site M.1 Monitoring Site:Level, Velocity and Flow From 3/8/2010 to 3/15/2010 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 3/8 3/9 3/10 3/11 3/12 3/13 3/14Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.14 inches Avg Level: 9.06 in. Peak Level: 34.7 in. Min Level: 4.29 in.42 7 Avg Velocity: 1.48 fps Peak Velocity: 2.05 fps Min Velocity: 0.97 fps427 Avg Flow: 0.642 mgd Peak Flow: 1.161 mgd Min Flow: 0.295 mgd427 Site M.1 Monitoring Site:Level, Velocity and Flow From 3/15/2010 to 3/22/2010 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 3/15 3/16 3/17 3/18 3/19 3/20 3/21Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 8.42 in. Peak Level: 19.5 in. Min Level: 4.37 in.42 8 Avg Velocity: 1.5 fps Peak Velocity: 2.06 fps Min Velocity: 0.64 fps428 Avg Flow: 0.634 mgd Peak Flow: 0.912 mgd Min Flow: 0.293 mgd428 Site M.1 Monitoring Site:Level, Velocity and Flow From 3/22/2010 to 3/29/2010 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 3/22 3/23 3/24 3/25 3/26 3/27 3/28Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.01 inches Avg Level: 7.38 in. Peak Level: 17.65 in. Min Level: 3.99 in.42 9 Avg Velocity: 1.54 fps Peak Velocity: 2 fps Min Velocity: 0.93 fps429 Avg Flow: 0.575 mgd Peak Flow: 0.991 mgd Min Flow: 0.22 mgd429 Monitoring Site: Location: Size/Type Line: Site M.2 Manhole G13-15: 1248 Oceanaire Drive 12-inch Sanitary Sewer Pipe Temporary Flow Monitoring Study Sanitary Sewer Collection System Data Summary Report Site M.2 Location:Manhole G13-15: 1248 Oceanaire Drive Diameter:12 Monitoring Site:Site Information Report Average Dry Weather Flow:0.086 Peak Measured Flow:0.337 mgd mgd Sewer Map Satellite View Latitude: 35.2631° Longitude:-120.6918° Rim Elevation:123 feet inches Flow Diagram Street View Site M.2Monitoring Site:Average Dry Weather Flow0.14Average Dry Weather Flow:mgd0.0860.000.050.100.150.200.250:001:002:003:004:005:006:007:008:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:0023:00Flow (mgd)WeekdayWeekend Site M.2 Monitoring Site:Level, Velocity and Flow From 10/18/2010 to 10/25/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.50 10/18 10/19 10/20 10/21 10/22 10/23 10/24Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.91 inches Avg Level: 1.73 in. Peak Level: 2.68 in. Min Level: 1.03 in.7 Avg Velocity: 1.97 fps Peak Velocity: 2.92 fps Min Velocity: 1.01 fps7 Avg Flow: 0.098 mgd Peak Flow: 0.246 mgd Min Flow: 0.024 mgd7 Site M.2 Monitoring Site:Level, Velocity and Flow From 10/25/2010 to 11/1/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.50 10/25 10/26 10/27 10/28 10/29 10/30 10/31Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.48 inches Avg Level: 1.62 in. Peak Level: 2.92 in. Min Level: 0.91 in.7 Avg Velocity: 1.95 fps Peak Velocity: 3.02 fps Min Velocity: 0.48 fps7 Avg Flow: 0.088 mgd Peak Flow: 0.281 mgd Min Flow: 0.009 mgd72 Site M.2 Monitoring Site:Level, Velocity and Flow From 11/1/2010 to 11/8/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.50 11/1 11/2 11/3 11/4 11/5 11/6 11/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.4 inches Avg Level: 1.68 in. Peak Level: 2.96 in. Min Level: 0.91 in.7 Avg Velocity: 1.94 fps Peak Velocity: 3.11 fps Min Velocity: 0.5 fps7 Avg Flow: 0.092 mgd Peak Flow: 0.297 mgd Min Flow: 0.01 mgd73 0.000.100.200.300.400.500.6020-Jan Thu21-Jan Fri22-Jan Sat23-Jan Sun24-Jan Mon25-Jan Tue26-Jan Wed27-Jan Thu28-Jan Fri29-Jan Sat30-Jan Sun31-Jan Mon1-Feb Tue2-Feb Wed3-Feb Thu4-Feb Fri5-Feb Sat6-Feb Sun7-Feb Mon8-Feb Tue9-Feb Wed10-Feb Thu11-Feb Fri12-Feb Sat13-Feb SunFlow (mgd)0.000.050.100.150.200.250.300.350.40Rainfall (in/hr)RainFlowBLFlowSite M.2Monitoring Site:Period Flow Summary0.0940.0960.0940.0920.0910.0890.0910.0900.0860.0860.0840.0870.0970.0920.0910.0920.0870.0900.0920.1180.1050.1090.1040.0960.0980.1130.1050.1010.0990.1000.0980.000.020.040.060.080.100.120.141/201/211/221/231/241/251/261/271/281/291/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/6Flow (MGal)0.00.40.81.21.62.02.42.8Rainfall (in/day)0.000.100.200.300.400.500.6013-FebSun14-FebMon15-FebTue16-FebWed17-FebThu18-FebFri19-FebSat20-FebSun21-FebMon22-FebTue23-FebWed24-FebThu25-FebFri26-FebSat27-FebSun28-FebMon1-Mar Tue2-Mar Wed3-Mar Thu4-Mar Fri5-Mar Sat6-Mar Sun7-Mar MonFlow (mgd)0.000.050.100.150.200.250.300.350.40Rainfall (in/hr)0.0990.1020.0970.1000.0930.1020.0980.1000.1210.1160.1220.1160.1060.1100.000.020.040.060.080.100.120.141/201/211/221/231/241/251/261/271/281/291/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/60.00.40.81.21.62.02.42.80.1100.000.020.040.060.080.100.120.141/201/211/221/231/241/251/261/271/281/291/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/60.00.40.81.21.62.02.42.8January 20 to March 7, 2011 Diameter0.02.04.06.08.010.012.014.002/1402/1502/1602/1702/1802/1902/2002/2102/2202/2302/2402/2502/2602/2702/2803/0103/02Level (inches)Site M.2Monitoring Site:Site Capacity / Surcharge SummaryRealtime Flow Levels with Rainfall Data over Monitoring Period Peak Measured Level:3.39Peak d/D Ratio:0.28Pipe Diameter:12inchesinches Site M.2 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 02/1402/1502/1602/1702/1802/1902/2002/2102/2202/2302/2402/25Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.337 0.148 3.39 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 3.90 1.71 d/D Ratio:0.28 211,000 0.65Total I/I per ADWF:per in-rain 0.7%R-Value: 20% mgd RDI (% of BL): 0.017 Event 1 Event 1 Detail Graph (2/21/2011) RDI:Acre:57 PkI/I:Acre:496 Storm Event I/I Analysis (Rain = 3.75 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: Site M.2 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.05 0.10 0.15 0.20 0.25 0.30 02/2502/2602/2702/2803/0103/02Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.279 0.116 2.93 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 3.22 1.34 d/D Ratio:0.24 119,000 1.13Total I/I per ADWF:per in-rain 1.2%R-Value: 24% mgd RDI (% of BL): 0.020 Event 2 Event 2 Detail Graph (2/27/2011) RDI:Acre:69 PkI/I:Acre:389 Storm Event I/I Analysis (Rain = 1.22 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: Site M.2 Monitoring Site:Level, Velocity and Flow From 1/17/2011 to 1/24/2011 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 1/17 1/18 1/19 1/20 1/21 1/22 1/23Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 1.78 in. Peak Level: 2.67 in. Min Level: 1.08 in.115 1 Avg Velocity: 1.97 fps Peak Velocity: 2.83 fps Min Velocity: 0.71 fps1151 Avg Flow: 0.099 mgd Peak Flow: 0.233 mgd Min Flow: 0.016 mgd1151 Site M.2 Monitoring Site:Level, Velocity and Flow From 1/24/2011 to 1/31/2011 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 1/24 1/25 1/26 1/27 1/28 1/29 1/30Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.4 inches Avg Level: 1.7 in. Peak Level: 2.93 in. Min Level: 1.04 in.115 2 Avg Velocity: 1.96 fps Peak Velocity: 2.83 fps Min Velocity: 0.55 fps1152 Avg Flow: 0.093 mgd Peak Flow: 0.267 mgd Min Flow: 0.012 mgd1152 Site M.2 Monitoring Site:Level, Velocity and Flow From 1/31/2011 to 2/7/2011 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 1/31 2/1 2/2 2/3 2/4 2/5 2/6Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 1.65 in. Peak Level: 2.66 in. Min Level: 0.92 in.115 3 Avg Velocity: 1.97 fps Peak Velocity: 2.88 fps Min Velocity: 0.54 fps1153 Avg Flow: 0.09 mgd Peak Flow: 0.231 mgd Min Flow: 0.01 mgd1153 Site M.2 Monitoring Site:Level, Velocity and Flow From 2/7/2011 to 2/14/2011 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 2/7 2/8 2/9 2/10 2/11 2/12 2/13Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 1.7 in. Peak Level: 2.8 in. Min Level: 1.02 in.115 4 Avg Velocity: 1.96 fps Peak Velocity: 2.93 fps Min Velocity: 0.61 fps1154 Avg Flow: 0.094 mgd Peak Flow: 0.248 mgd Min Flow: 0.013 mgd1154 Site M.2 Monitoring Site:Level, Velocity and Flow From 2/14/2011 to 2/21/2011 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 2/14 2/15 2/16 2/17 2/18 2/19 2/20Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 3.76 inches Avg Level: 1.83 in. Peak Level: 3.22 in. Min Level: 1.04 in.115 5 Avg Velocity: 2.04 fps Peak Velocity: 3.07 fps Min Velocity: 0.64 fps1155 Avg Flow: 0.107 mgd Peak Flow: 0.337 mgd Min Flow: 0.014 mgd1155 Site M.2 Monitoring Site:Level, Velocity and Flow From 2/21/2011 to 2/28/2011 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 2/21 2/22 2/23 2/24 2/25 2/26 2/27Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 1.22 inches Avg Level: 1.83 in. Peak Level: 3.39 in. Min Level: 1.09 in.115 6 Avg Velocity: 2.07 fps Peak Velocity: 2.89 fps Min Velocity: 0.93 fps1156 Avg Flow: 0.109 mgd Peak Flow: 0.331 mgd Min Flow: 0.025 mgd1156 Site M.2 Monitoring Site:Level, Velocity and Flow From 2/28/2011 to 3/7/2011 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 2/28 3/1 3/2 3/3 3/4 3/5 3/6Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.27 inches Avg Level: 1.8 in. Peak Level: 2.93 in. Min Level: 1.16 in.115 7 Avg Velocity: 2 fps Peak Velocity: 2.91 fps Min Velocity: 0.96 fps1157 Avg Flow: 0.103 mgd Peak Flow: 0.278 mgd Min Flow: 0.024 mgd1157 Site M.2 Monitoring Site:Level, Velocity and Flow From 3/7/2011 to 3/14/2011 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 3/7 3/8 3/9 3/10 3/11 3/12 3/13Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.04 inches Avg Level: 1.79 in. Peak Level: 2.87 in. Min Level: 1.23 in.115 8 Avg Velocity: 1.95 fps Peak Velocity: 2.88 fps Min Velocity: 1.07 fps1158 Avg Flow: 0.101 mgd Peak Flow: 0.269 mgd Min Flow: 0.03 mgd1158 Monitoring Site: Location: Size/Type Line: Site N.1 Manhole I16-13: Creakside Mobile Home Park 12-inch Sanitary Sewer Pipe Temporary Flow Monitoring Study Sanitary Sewer Collection System Data Summary Report Site N.1 Location:Manhole I16-13: Creakside Mobile Home Park Diameter:12 Monitoring Site:Site Information Report Average Dry Weather Flow:0.036 Peak Measured Flow:0.131 mgd mgd Flow Diagram Satellite Map Latitude: 35.2489° Longitude:-120.6756° Rim Elevation:121 feet above sea level inches Street View Photo Sanitary Map Plan View Photo Site N.1Monitoring Site:Average Dry Weather Flow0.11Average Dry Weather Flow:mgd0.0360.000.010.020.030.040.050.060.070.080.090:001:002:003:004:005:006:007:008:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:0023:00Flow (mgd)WeekdayWeekend Site N.1 Monitoring Site:Level, Velocity and Flow From 10/18/2010 to 10/25/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 10/18 10/19 10/20 10/21 10/22 10/23 10/24Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.91 inches Avg Level: 1.29 in. Peak Level: 2.15 in. Min Level: 0.72 in.8 Avg Velocity: 1.12 fps Peak Velocity: 1.91 fps Min Velocity: 0.42 fps8 Avg Flow: 0.038 mgd Peak Flow: 0.118 mgd Min Flow: 0.006 mgd8 Site N.1 Monitoring Site:Level, Velocity and Flow From 10/25/2010 to 11/1/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 10/25 10/26 10/27 10/28 10/29 10/30 10/31Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.48 inches Avg Level: 1.34 in. Peak Level: 2.34 in. Min Level: 0.67 in.8 Avg Velocity: 1.19 fps Peak Velocity: 2.12 fps Min Velocity: 0.39 fps8 Avg Flow: 0.042 mgd Peak Flow: 0.147 mgd Min Flow: 0.005 mgd82 Site N.1 Monitoring Site:Level, Velocity and Flow From 11/1/2010 to 11/8/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 11/1 11/2 11/3 11/4 11/5 11/6 11/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.4 inches Avg Level: 1.3 in. Peak Level: 2.33 in. Min Level: 0.69 in.8 Avg Velocity: 1.21 fps Peak Velocity: 2.03 fps Min Velocity: 0.38 fps8 Avg Flow: 0.04 mgd Peak Flow: 0.141 mgd Min Flow: 0.005 mgd83 0.000.020.040.060.080.100.120.140.160.1830-JanSat31-JanSun1-FebMon2-FebTue3-FebWed4-FebThu5-FebFri6-FebSat7-FebSun8-FebMon9-FebTue10-FebWed11-FebThu12-FebFri13-FebSat14-FebSun15-FebMon16-FebTue17-FebWed18-FebThu19-FebFri20-FebSat21-FebSun22-FebMon23-FebTue24-FebWed25-FebThu26-FebFri27-FebSat28-FebSunFlow (mgd)0.00.10.20.30.40.50.60.70.8Rainfall (in/hr)RainFlowBLFlowSite N.1Monitoring Site:Period Flow Summary0.0470.0450.0430.0480.0490.0460.0630.0720.0680.0580.0600.0450.0500.0460.0570.0480.0390.0490.0480.0490.0520.0560.0600.0530.0510.0410.0550.0470.0510.0500.0550.0450.0500.0540.0590.0520.0550.0570.0420.000.010.020.030.040.050.060.070.081/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/28Flow (MGal)0.00.40.81.21.62.02.42.8Rainfall (in/day)0.000.020.040.060.080.100.120.140.160.1828-FebSun1-MarMon2-MarTue3-MarWed4-MarThu5-MarFri6-MarSat7-MarSun8-MarMon9-MarTue10-MarWed11-MarThu12-MarFri13-MarSat14-MarSun15-MarMon16-MarTue17-MarWed18-MarThu19-MarFri20-MarSat21-MarSun22-MarMon23-MarTue24-MarWed25-MarThu26-MarFri27-MarSat28-MarSunFlow (mgd)0.00.10.20.30.40.50.60.70.8Rainfall (in/hr)0.0340.0380.0380.0210.0440.0400.0310.0380.0370.0390.0300.0370.0330.0300.0330.0380.0340.0390.000.010.020.030.040.050.060.070.081/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/280.00.40.81.21.62.02.42.80.0510.000.010.020.030.040.050.060.070.081/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/280.00.40.81.21.62.02.42.8January 30 to March 28, 2010Total Period Rainfall: 7.06 inchesAvg Flow: 0.047 mgd Peak Flow: 0.131 mgd Min Flow: 0.006 mgd Diameter0.02.04.06.08.010.012.014.002/0202/0302/0402/0502/0602/0702/0802/0902/1002/1102/1202/1302/1402/1502/1602/1702/1802/1902/2002/2102/2202/2302/2402/2502/2602/2702/2803/0103/0203/0303/0403/0503/0603/0703/0803/0903/1003/1103/1203/1303/1403/15Level (inches)Site N.1Monitoring Site:Site Capacity / Surcharge SummaryRealtime Flow Levels with Rainfall Data over Monitoring Period Peak Measured Level:2.35Peak d/D Ratio:0.20Pipe Diameter:12inchesinches Site N.1 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 02/0402/0502/0602/0702/0802/09Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.12 0.08 2.35 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 3.38 2.26 d/D Ratio:0.20 27,000 0.40Total I/I per ADWF:per in-rain 0.2%R-Value: 11% mgd RDI (% of BL): 0.00 Event 1 Event 1 Detail Graph (2/8/2010) RDI:Acre:13 PkI/I:Acre:271 Storm Event I/I Analysis (Rain = 1.85 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: 509Total I/I per IDM:per in-rainPkI/I:IDM:2,848 gpd/IDM RDI:IDM:141 gpd/IDM Site N.1 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.02 0.04 0.06 0.08 0.10 0.12 02/2602/2702/2803/0103/02Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.11 0.06 2.27 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 3.07 1.75 d/D Ratio:0.19 43,000 0.49Total I/I per ADWF:per in-rain 0.2%R-Value: 18% mgd RDI (% of BL): 0.01 Event 2 Event 2 Detail Graph (3/1/2010) RDI:Acre:22 PkI/I:Acre:210 Storm Event I/I Analysis (Rain = 2.45 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: 615Total I/I per IDM:per in-rainPkI/I:IDM:2,204 gpd/IDM RDI:IDM:228 gpd/IDM Site N.1 Monitoring Site:Level, Velocity and Flow From 1/25/2010 to 2/1/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 1/25 1/26 1/27 1/28 1/29 1/30 1/31Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.08 inches Avg Level: 1.24 in. Peak Level: 2.3 in. Min Level: 0.63 in.43 1 Avg Velocity: 1.33 fps Peak Velocity: 1.96 fps Min Velocity: 0.76 fps431 Avg Flow: 0.04 mgd Peak Flow: 0.124 mgd Min Flow: 0.008 mgd431 Site N.1 Monitoring Site:Level, Velocity and Flow From 2/1/2010 to 2/8/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 2/1 2/2 2/3 2/4 2/5 2/6 2/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 1.88 inches Avg Level: 1.37 in. Peak Level: 2.59 in. Min Level: 0.53 in.43 2 Avg Velocity: 1.19 fps Peak Velocity: 2.19 fps Min Velocity: 0.41 fps432 Avg Flow: 0.042 mgd Peak Flow: 0.123 mgd Min Flow: 0.006 mgd432 Site N.1 Monitoring Site:Level, Velocity and Flow From 2/8/2010 to 2/15/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 2/8 2/9 2/10 2/11 2/12 2/13 2/14Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.61 inches Avg Level: 1.77 in. Peak Level: 2.71 in. Min Level: 0.69 in.43 3 Avg Velocity: 1.11 fps Peak Velocity: 1.81 fps Min Velocity: 0.34 fps433 Avg Flow: 0.056 mgd Peak Flow: 0.131 mgd Min Flow: 0.006 mgd433 Site N.1 Monitoring Site:Level, Velocity and Flow From 2/15/2010 to 2/22/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 2/15 2/16 2/17 2/18 2/19 2/20 2/21Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.23 inches Avg Level: 1.66 in. Peak Level: 2.62 in. Min Level: 1.1 in.43 4 Avg Velocity: 1.02 fps Peak Velocity: 1.75 fps Min Velocity: 0.34 fps434 Avg Flow: 0.046 mgd Peak Flow: 0.12 mgd Min Flow: 0.009 mgd434 Site N.1 Monitoring Site:Level, Velocity and Flow From 2/22/2010 to 3/1/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 2/22 2/23 2/24 2/25 2/26 2/27 2/28Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 3.02 inches Avg Level: 1.57 in. Peak Level: 2.41 in. Min Level: 0.88 in.43 5 Avg Velocity: 1.05 fps Peak Velocity: 1.8 fps Min Velocity: 0.39 fps435 Avg Flow: 0.045 mgd Peak Flow: 0.124 mgd Min Flow: 0.007 mgd435 Site N.1 Monitoring Site:Level, Velocity and Flow From 3/1/2010 to 3/8/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 3/1 3/2 3/3 3/4 3/5 3/6 3/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 1.11 inches Avg Level: 1.53 in. Peak Level: 2.45 in. Min Level: 0.93 in.43 6 Avg Velocity: 1.19 fps Peak Velocity: 1.8 fps Min Velocity: 0.43 fps436 Avg Flow: 0.048 mgd Peak Flow: 0.126 mgd Min Flow: 0.009 mgd436 Site N.1 Monitoring Site:Level, Velocity and Flow From 3/8/2010 to 3/15/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 3/8 3/9 3/10 3/11 3/12 3/13 3/14Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.15 inches Avg Level: 1.46 in. Peak Level: 2.4 in. Min Level: 0.84 in.43 7 Avg Velocity: 1.14 fps Peak Velocity: 1.76 fps Min Velocity: 0.33 fps437 Avg Flow: 0.044 mgd Peak Flow: 0.127 mgd Min Flow: 0.006 mgd437 Site N.1 Monitoring Site:Level, Velocity and Flow From 3/15/2010 to 3/22/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 3/15 3/16 3/17 3/18 3/19 3/20 3/21Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 1.62 in. Peak Level: 2.44 in. Min Level: 0.81 in.43 8 Avg Velocity: 1.06 fps Peak Velocity: 1.78 fps Min Velocity: 0.28 fps438 Avg Flow: 0.046 mgd Peak Flow: 0.123 mgd Min Flow: 0.008 mgd438 Site N.1 Monitoring Site:Level, Velocity and Flow From 3/22/2010 to 3/29/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 3/22 3/23 3/24 3/25 3/26 3/27 3/28Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.01 inches Avg Level: 1.65 in. Peak Level: 2.36 in. Min Level: 0.92 in.43 9 Avg Velocity: 1.05 fps Peak Velocity: 1.78 fps Min Velocity: 0.31 fps439 Avg Flow: 0.048 mgd Peak Flow: 0.123 mgd Min Flow: 0.007 mgd439 Monitoring Site: Location: Size/Type Line: Site N.2 Manhole H18-1: 1775 Calle Joaquin 8-inch Sanitary Sewer Pipe Temporary Flow Monitoring Study Sanitary Sewer Collection System Data Summary Report Site N.2 Location:Manhole H18-1: 1775 Calle Joaquin Diameter:8 Monitoring Site:Site Information Report Average Dry Weather Flow:0.007 Peak Measured Flow:0.022 mgd mgd Sewer Map Satellite View Latitude: 35.2421° Longitude:-120.6839° Rim Elevation:107 feet inches Flow Diagram Street View Site N.2Monitoring Site:Average Dry Weather Flow0.11Average Dry Weather Flow:mgd0.0070.000.000.000.000.000.010.010.010.010.010:001:002:003:004:005:006:007:008:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:0023:00Flow (mgd)WeekdayWeekend 0.000.010.010.020.020.030.030.040.0420-Jan Thu21-Jan Fri22-Jan Sat23-Jan Sun24-Jan Mon25-Jan Tue26-Jan Wed27-Jan Thu28-Jan Fri29-Jan Sat30-Jan Sun31-Jan Mon1-Feb Tue2-Feb Wed3-Feb Thu4-Feb Fri5-Feb Sat6-Feb Sun7-Feb Mon8-Feb Tue9-Feb Wed10-Feb Thu11-Feb Fri12-Feb Sat13-Feb SunFlow (mgd)0.000.050.100.150.200.250.300.350.40Rainfall (in/hr)RainFlowBLFlowSite N.2Monitoring Site:Period Flow Summary0.0080.0110.0150.0100.0060.0050.0050.0060.0060.0070.0070.0080.0100.0100.0090.0060.0070.0090.0090.0070.0070.0060.0060.0060.0050.0070.0090.0090.0090.0100.0090.000.000.000.010.010.010.010.010.020.021/201/211/221/231/241/251/261/271/281/291/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/6Flow (MGal)0.00.40.81.21.62.02.42.8Rainfall (in/day)0.000.010.010.020.020.030.030.040.0413-FebSun14-FebMon15-FebTue16-FebWed17-FebThu18-FebFri19-FebSat20-FebSun21-FebMon22-FebTue23-FebWed24-FebThu25-FebFri26-FebSat27-FebSun28-FebMon1-Mar Tue2-Mar Wed3-Mar Thu4-Mar Fri5-Mar Sat6-Mar Sun7-Mar MonFlow (mgd)0.000.050.100.150.200.250.300.350.40Rainfall (in/hr)0.0150.0160.0060.0050.0090.0090.0070.0080.0050.0060.0080.0090.0080.0090.000.000.000.010.010.010.010.010.020.021/201/211/221/231/241/251/261/271/281/291/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/60.00.40.81.21.62.02.42.80.0060.000.000.000.010.010.010.010.010.020.021/201/211/221/231/241/251/261/271/281/291/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/60.00.40.81.21.62.02.42.8January 20 to March 7, 2011 Diameter0.01.02.03.04.05.06.07.08.09.002/1402/1502/1602/1702/1802/1902/2002/2102/2202/2302/2402/2502/2602/2702/2803/0103/02Level (inches)Site N.2Monitoring Site:Site Capacity / Surcharge SummaryRealtime Flow Levels with Rainfall Data over Monitoring Period Peak Measured Level:1.34Peak d/D Ratio:0.17Pipe Diameter:8inchesinches Site N.2 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.00 0.00 0.01 0.01 0.01 0.01 0.01 02/1402/1502/1602/1702/1802/1902/2002/2102/2202/2302/2402/25Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.013 0.005 1.12 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 1.70 0.70 d/D Ratio:0.14 -10,000 -0.54Total I/I per ADWF:per in-rain -1.2%R-Value: 0% mgd RDI (% of BL): 0.000 Event 1 Event 1 Detail Graph (2/21/2011) RDI:Acre:0 PkI/I:Acre:431 Storm Event I/I Analysis (Rain = 2.59 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: Site N.2 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.01 0.01 0.02 0.02 0.03 02/2502/2602/2702/2803/0103/02Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.020 0.012 1.34 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 2.67 1.65 d/D Ratio:0.17 4,000 0.73Total I/I per ADWF:per in-rain 1.7%R-Value: 18% mgd RDI (% of BL): 0.001 Event 2 Event 2 Detail Graph (2/27/2011) RDI:Acre:114 PkI/I:Acre:1,021 Storm Event I/I Analysis (Rain = 0.79 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: Site N.2 Monitoring Site:Level, Velocity and Flow From 1/17/2011 to 1/24/2011 0.0 0.5 1.0 1.5 2.0 2.5 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 Velocity (fps)Vel 0.00 0.01 0.01 0.02 0.02 0.03 0.03 0.04 0.04 1/17 1/18 1/19 1/20 1/21 1/22 1/23Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 1.03 in. Peak Level: 1.21 in. Min Level: 0.78 in.116 1 Avg Velocity: 0.67 fps Peak Velocity: 0.85 fps Min Velocity: 0.37 fps1161 Avg Flow: 0.012 mgd Peak Flow: 0.017 mgd Min Flow: 0.004 mgd1161 Site N.2 Monitoring Site:Level, Velocity and Flow From 1/24/2011 to 1/31/2011 0.0 0.5 1.0 1.5 2.0 2.5 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 Velocity (fps)Vel 0.00 0.01 0.01 0.02 0.02 0.03 0.03 0.04 0.04 1/24 1/25 1/26 1/27 1/28 1/29 1/30Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.3 inches Avg Level: 0.89 in. Peak Level: 1.32 in. Min Level: 0.72 in.116 2 Avg Velocity: 0.53 fps Peak Velocity: 0.89 fps Min Velocity: 0.32 fps1162 Avg Flow: 0.008 mgd Peak Flow: 0.022 mgd Min Flow: 0.003 mgd1162 Site N.2 Monitoring Site:Level, Velocity and Flow From 1/31/2011 to 2/7/2011 0.0 0.5 1.0 1.5 2.0 2.5 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 Velocity (fps)Vel 0.00 0.01 0.01 0.02 0.02 0.03 0.03 0.04 0.04 1/31 2/1 2/2 2/3 2/4 2/5 2/6Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.01 inches Avg Level: 0.92 in. Peak Level: 1.05 in. Min Level: 0.77 in.116 3 Avg Velocity: 0.51 fps Peak Velocity: 0.68 fps Min Velocity: 0.37 fps1163 Avg Flow: 0.007 mgd Peak Flow: 0.012 mgd Min Flow: 0.005 mgd1163 Site N.2 Monitoring Site:Level, Velocity and Flow From 2/7/2011 to 2/14/2011 0.0 0.5 1.0 1.5 2.0 2.5 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 Velocity (fps)Vel 0.00 0.01 0.01 0.02 0.02 0.03 0.03 0.04 0.04 2/7 2/8 2/9 2/10 2/11 2/12 2/13Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 0.92 in. Peak Level: 1.13 in. Min Level: 0.8 in.116 4 Avg Velocity: 0.55 fps Peak Velocity: 0.71 fps Min Velocity: 0.4 fps1164 Avg Flow: 0.008 mgd Peak Flow: 0.014 mgd Min Flow: 0.005 mgd1164 Site N.2 Monitoring Site:Level, Velocity and Flow From 2/14/2011 to 2/21/2011 0.0 0.5 1.0 1.5 2.0 2.5 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 Velocity (fps)Vel 0.00 0.01 0.01 0.02 0.02 0.03 0.03 0.04 0.04 2/14 2/15 2/16 2/17 2/18 2/19 2/20Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 2.59 inches Avg Level: 0.92 in. Peak Level: 1.12 in. Min Level: 0.83 in.116 5 Avg Velocity: 0.48 fps Peak Velocity: 0.7 fps Min Velocity: 0.38 fps1165 Avg Flow: 0.007 mgd Peak Flow: 0.013 mgd Min Flow: 0.005 mgd1165 Site N.2 Monitoring Site:Level, Velocity and Flow From 2/21/2011 to 2/28/2011 0.0 0.5 1.0 1.5 2.0 2.5 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 Velocity (fps)Vel 0.00 0.01 0.01 0.02 0.02 0.03 0.03 0.04 0.04 2/21 2/22 2/23 2/24 2/25 2/26 2/27Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.79 inches Avg Level: 0.94 in. Peak Level: 1.23 in. Min Level: 0.84 in.116 6 Avg Velocity: 0.45 fps Peak Velocity: 0.67 fps Min Velocity: 0.31 fps1166 Avg Flow: 0.007 mgd Peak Flow: 0.015 mgd Min Flow: 0.004 mgd1166 Site N.2 Monitoring Site:Level, Velocity and Flow From 2/28/2011 to 3/7/2011 0.0 0.5 1.0 1.5 2.0 2.5 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 Velocity (fps)Vel 0.00 0.01 0.01 0.02 0.02 0.03 0.03 0.04 0.04 2/28 3/1 3/2 3/3 3/4 3/5 3/6Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.21 inches Avg Level: 1.02 in. Peak Level: 1.34 in. Min Level: 0.95 in.116 7 Avg Velocity: 0.54 fps Peak Velocity: 0.8 fps Min Velocity: 0.46 fps1167 Avg Flow: 0.009 mgd Peak Flow: 0.02 mgd Min Flow: 0.007 mgd1167 Site N.2 Monitoring Site:Level, Velocity and Flow From 3/7/2011 to 3/14/2011 0.0 0.5 1.0 1.5 2.0 2.5 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 Velocity (fps)Vel 0.00 0.01 0.01 0.02 0.02 0.03 0.03 0.04 0.04 3/7 3/8 3/9 3/10 3/11 3/12 3/13Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.03 inches Avg Level: 1.08 in. Peak Level: 1.16 in. Min Level: 1.02 in.116 8 Avg Velocity: 0.58 fps Peak Velocity: 0.66 fps Min Velocity: 0.51 fps1168 Avg Flow: 0.011 mgd Peak Flow: 0.013 mgd Min Flow: 0.009 mgd1168 Monitoring Site: Location: Size/Type Line: Site O.1 Manhole J17-5: Tank Farm Road 18-inch Sanitary Sewer Pipe Temporary Flow Monitoring Study Sanitary Sewer Collection System Data Summary Report Site O.1 Location:Manhole J17-5: Tank Farm Road Diameter:18 Monitoring Site:Site Information Report Average Dry Weather Flow:0.256 Peak Measured Flow:1.416 mgd mgd Flow Diagram Satellite Map Latitude: 35.2468° Longitude:-120.6633° Rim Elevation:124 feet above sea level inches Street View Photo Sanitary Map Plan View Photo Site O.1Monitoring Site:Average Dry Weather Flow0.11Average Dry Weather Flow:mgd0.2560.000.050.100.150.200.250.300.350.400.450.500:001:002:003:004:005:006:007:008:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:0023:00Flow (mgd)WeekdayWeekend Site O.1 Monitoring Site:Level, Velocity and Flow From 10/18/2010 to 10/25/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 10/18 10/19 10/20 10/21 10/22 10/23 10/24Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.91 inches Avg Level: 1.9 in. Peak Level: 2.91 in. Min Level: 1.07 in.9 Avg Velocity: 3.76 fps Peak Velocity: 4.4 fps Min Velocity: 2.65 fps9 Avg Flow: 0.254 mgd Peak Flow: 0.528 mgd Min Flow: 0.073 mgd9 Site O.1 Monitoring Site:Level, Velocity and Flow From 10/25/2010 to 11/1/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 10/25 10/26 10/27 10/28 10/29 10/30 10/31Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.48 inches Avg Level: 1.97 in. Peak Level: 2.87 in. Min Level: 1.06 in.9 Avg Velocity: 3.81 fps Peak Velocity: 4.39 fps Min Velocity: 2.59 fps9 Avg Flow: 0.27 mgd Peak Flow: 0.485 mgd Min Flow: 0.082 mgd92 Site O.1 Monitoring Site:Level, Velocity and Flow From 11/1/2010 to 11/8/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 11/1 11/2 11/3 11/4 11/5 11/6 11/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.4 inches Avg Level: 1.95 in. Peak Level: 3 in. Min Level: 0.98 in.9 Avg Velocity: 3.81 fps Peak Velocity: 4.4 fps Min Velocity: 2.84 fps9 Avg Flow: 0.268 mgd Peak Flow: 0.54 mgd Min Flow: 0.069 mgd93 0.000.200.400.600.801.001.201.401.6030-JanSat31-JanSun1-FebMon2-FebTue3-FebWed4-FebThu5-FebFri6-FebSat7-FebSun8-FebMon9-FebTue10-FebWed11-FebThu12-FebFri13-FebSat14-FebSun15-FebMon16-FebTue17-FebWed18-FebThu19-FebFri20-FebSat21-FebSun22-FebMon23-FebTue24-FebWed25-FebThu26-FebFri27-FebSat28-FebSunFlow (mgd)0.00.10.20.30.40.50.60.70.8Rainfall (in/hr)RainFlowBLFlowSite O.1Monitoring Site:Period Flow Summary0.3950.3780.3780.3850.4560.3750.4830.4230.4230.4020.3600.3550.3460.3370.3660.3570.3740.3680.4680.3800.3850.3830.4200.4140.4100.3900.4010.4030.4200.3990.3570.3540.3650.3640.3660.4050.4070.4010.3810.000.100.200.300.400.500.601/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/28Flow (MGal)0.00.40.81.21.62.02.42.8Rainfall (in/day)0.000.200.400.600.801.001.201.4028-FebSun1-MarMon2-MarTue3-MarWed4-MarThu5-MarFri6-MarSat7-MarSun8-MarMon9-MarTue10-MarWed11-MarThu12-MarFri13-MarSat14-MarSun15-MarMon16-MarTue17-MarWed18-MarThu19-MarFri20-MarSat21-MarSun22-MarMon23-MarTue24-MarWed25-MarThu26-MarFri27-MarSat28-MarSunFlow (mgd)0.00.10.20.30.40.50.60.70.8Rainfall (in/hr)0.4370.4170.4360.3820.3660.3330.3410.3410.4940.3900.4220.4070.3960.3960.3470.3520.3840.3830.000.100.200.300.400.500.601/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/280.00.40.81.21.62.02.42.80.4190.000.100.200.300.400.500.601/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/280.00.40.81.21.62.02.42.8January 30 to March 28, 2010Total Period Rainfall: 6.8 inchesAvg Flow: 0.391 mgd Peak Flow: 1.416 mgd Min Flow: 0.138 mgd Diameter0.02.04.06.08.010.012.014.016.018.020.002/0202/0302/0402/0502/0602/0702/0802/0902/1002/1102/1202/1302/1402/1502/1602/1702/1802/1902/2002/2102/2202/2302/2402/2502/2602/2702/2803/0103/0203/0303/0403/0503/0603/0703/0803/0903/1003/1103/1203/1303/1403/15Level (inches)Site O.1Monitoring Site:Site Capacity / Surcharge SummaryRealtime Flow Levels with Rainfall Data over Monitoring Period Peak Measured Level:4.65Peak d/D Ratio:0.26Pipe Diameter:18inchesinches Site O.1 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 02/0402/0502/0602/0702/0802/09Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.86 0.48 4.01 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 3.37 1.87 d/D Ratio:0.22 639,000 1.42Total I/I per ADWF:per in-rain 2.4%R-Value: 45% mgd RDI (% of BL): 0.12 Event 1 Event 1 Detail Graph (2/8/2010) RDI:Acre:206 PkI/I:Acre:856 Storm Event I/I Analysis (Rain = 1.76 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: 2,580Total I/I per IDM:per in-rainPkI/I:IDM:3,406 gpd/IDM RDI:IDM:821 gpd/IDM Site O.1 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.20 0.40 0.60 0.80 1.00 1.20 02/2602/2702/2803/0103/02Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)1.12 0.82 4.65 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 4.39 3.18 d/D Ratio:0.26 714,000 1.22Total I/I per ADWF:per in-rain 2.1%R-Value: 47% mgd RDI (% of BL): 0.12 Event 2 Event 2 Detail Graph (3/1/2010) RDI:Acre:215 PkI/I:Acre:1,455 Storm Event I/I Analysis (Rain = 2.28 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: 2,220Total I/I per IDM:per in-rainPkI/I:IDM:5,789 gpd/IDM RDI:IDM:854 gpd/IDM Site O.1 Monitoring Site:Level, Velocity and Flow From 1/25/2010 to 2/1/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1/25 1/26 1/27 1/28 1/29 1/30 1/31Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.08 inches Avg Level: 2.72 in. Peak Level: 3.59 in. Min Level: 2.03 in.44 1 Avg Velocity: 3.88 fps Peak Velocity: 4.37 fps Min Velocity: 3.14 fps441 Avg Flow: 0.429 mgd Peak Flow: 0.658 mgd Min Flow: 0.238 mgd441 Site O.1 Monitoring Site:Level, Velocity and Flow From 2/1/2010 to 2/8/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 2/1 2/2 2/3 2/4 2/5 2/6 2/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 1.77 inches Avg Level: 2.58 in. Peak Level: 4.01 in. Min Level: 1.42 in.44 2 Avg Velocity: 3.89 fps Peak Velocity: 4.55 fps Min Velocity: 2.94 fps442 Avg Flow: 0.401 mgd Peak Flow: 0.863 mgd Min Flow: 0.138 mgd442 Site O.1 Monitoring Site:Level, Velocity and Flow From 2/8/2010 to 2/15/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 2/8 2/9 2/10 2/11 2/12 2/13 2/14Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.6 inches Avg Level: 2.56 in. Peak Level: 5.22 in. Min Level: 1.61 in.44 3 Avg Velocity: 3.9 fps Peak Velocity: 5.15 fps Min Velocity: 3.19 fps443 Avg Flow: 0.401 mgd Peak Flow: 1.416 mgd Min Flow: 0.17 mgd443 Site O.1 Monitoring Site:Level, Velocity and Flow From 2/15/2010 to 2/22/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 2/15 2/16 2/17 2/18 2/19 2/20 2/21Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.24 inches Avg Level: 2.41 in. Peak Level: 3.6 in. Min Level: 1.58 in.44 4 Avg Velocity: 3.8 fps Peak Velocity: 4.3 fps Min Velocity: 2.98 fps444 Avg Flow: 0.357 mgd Peak Flow: 0.672 mgd Min Flow: 0.15 mgd444 Site O.1 Monitoring Site:Level, Velocity and Flow From 2/22/2010 to 3/1/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 2/22 2/23 2/24 2/25 2/26 2/27 2/28Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 2.79 inches Avg Level: 2.57 in. Peak Level: 4.65 in. Min Level: 1.59 in.44 5 Avg Velocity: 3.89 fps Peak Velocity: 4.81 fps Min Velocity: 3 fps445 Avg Flow: 0.402 mgd Peak Flow: 1.125 mgd Min Flow: 0.164 mgd445 Site O.1 Monitoring Site:Level, Velocity and Flow From 3/1/2010 to 3/8/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 3/1 3/2 3/3 3/4 3/5 3/6 3/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 1.16 inches Avg Level: 2.59 in. Peak Level: 4.67 in. Min Level: 1.78 in.44 6 Avg Velocity: 3.88 fps Peak Velocity: 4.72 fps Min Velocity: 3.14 fps446 Avg Flow: 0.402 mgd Peak Flow: 1.111 mgd Min Flow: 0.19 mgd446 Site O.1 Monitoring Site:Level, Velocity and Flow From 3/8/2010 to 3/15/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 3/8 3/9 3/10 3/11 3/12 3/13 3/14Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.16 inches Avg Level: 2.61 in. Peak Level: 3.77 in. Min Level: 1.59 in.44 7 Avg Velocity: 3.83 fps Peak Velocity: 4.39 fps Min Velocity: 3.07 fps447 Avg Flow: 0.402 mgd Peak Flow: 0.728 mgd Min Flow: 0.157 mgd447 Site O.1 Monitoring Site:Level, Velocity and Flow From 3/15/2010 to 3/22/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 3/15 3/16 3/17 3/18 3/19 3/20 3/21Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 2.44 in. Peak Level: 3.49 in. Min Level: 1.65 in.44 8 Avg Velocity: 3.79 fps Peak Velocity: 4.39 fps Min Velocity: 2.88 fps448 Avg Flow: 0.362 mgd Peak Flow: 0.649 mgd Min Flow: 0.151 mgd448 Site O.1 Monitoring Site:Level, Velocity and Flow From 3/22/2010 to 3/29/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Velocity (fps)Vel 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 3/22 3/23 3/24 3/25 3/26 3/27 3/28Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 2.58 in. Peak Level: 3.52 in. Min Level: 1.73 in.44 9 Avg Velocity: 3.76 fps Peak Velocity: 4.49 fps Min Velocity: 2.87 fps449 Avg Flow: 0.389 mgd Peak Flow: 0.679 mgd Min Flow: 0.165 mgd449 Monitoring Site: Location: Size/Type Line: Site O.2 Manhole O17-22: 1392 Purple Sage Lane 10-inch Sanitary Sewer Pipe Temporary Flow Monitoring Study Sanitary Sewer Collection System Data Summary Report Site O.2 Location:Manhole O17-22: 1392 Purple Sage Lane Diameter:10 Monitoring Site:Site Information Report Average Dry Weather Flow:0.026 Peak Measured Flow:0.128 mgd mgd Flow Diagram Satellite View Latitude: 35.2459° Longitude:-120.6301° Rim Elevation:229 feet inches Plan View Sewer Map Site O.2Monitoring Site:Average Dry Weather Flow0.13Average Dry Weather Flow:mgd0.0260.000.010.020.030.040.050.060.070.080.090:001:002:003:004:005:006:007:008:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:0023:00Flow (mgd)WeekdayWeekend Site O.2 Monitoring Site:Level, Velocity and Flow From 10/18/2010 to 10/25/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 10/18 10/19 10/20 10/21 10/22 10/23 10/24Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.91 inches Avg Level: 1.29 in. Peak Level: 2.11 in. Min Level: 0.46 in.0 Avg Velocity: 0.89 fps Peak Velocity: 1.54 fps Min Velocity: 0.29 fps0 Avg Flow: 0.027 mgd Peak Flow: 0.083 mgd Min Flow: 0.002 mgd0 Site O.2 Monitoring Site:Level, Velocity and Flow From 10/25/2010 to 11/1/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 10/25 10/26 10/27 10/28 10/29 10/30 10/31Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.48 inches Avg Level: 1.25 in. Peak Level: 2.26 in. Min Level: 0.11 in.0 Avg Velocity: 0.84 fps Peak Velocity: 1.61 fps Min Velocity: 0.2 fps0 Avg Flow: 0.025 mgd Peak Flow: 0.095 mgd Min Flow: 0 mgd02 Site O.2 Monitoring Site:Level, Velocity and Flow From 11/1/2010 to 11/8/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 11/1 11/2 11/3 11/4 11/5 11/6 11/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.4 inches Avg Level: 1.29 in. Peak Level: 2.3 in. Min Level: 0.51 in.0 Avg Velocity: 0.86 fps Peak Velocity: 1.66 fps Min Velocity: 0.22 fps0 Avg Flow: 0.027 mgd Peak Flow: 0.102 mgd Min Flow: 0.002 mgd03 0.000.050.100.150.200.2520-Jan Thu21-Jan Fri22-Jan Sat23-Jan Sun24-Jan Mon25-Jan Tue26-Jan Wed27-Jan Thu28-Jan Fri29-Jan Sat30-Jan Sun31-Jan Mon1-Feb Tue2-Feb Wed3-Feb Thu4-Feb Fri5-Feb Sat6-Feb Sun7-Feb Mon8-Feb Tue9-Feb Wed10-Feb Thu11-Feb Fri12-Feb Sat13-Feb SunFlow (mgd)0.000.050.100.150.200.250.300.350.40Rainfall (in/hr)RainFlowBLFlowSite O.2Monitoring Site:Period Flow Summary0.0250.0260.0280.0270.0270.0290.0260.0310.0260.0280.0270.0250.0270.0250.0260.0250.0200.0300.0250.0270.0290.0270.0290.0280.0280.0300.0290.0290.0280.0290.0280.000.010.010.020.020.030.030.040.041/201/211/221/231/241/251/261/271/281/291/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/6Flow (MGal)0.00.40.81.21.62.02.42.8Rainfall (in/day)0.000.050.100.150.200.2513-FebSun14-FebMon15-FebTue16-FebWed17-FebThu18-FebFri19-FebSat20-FebSun21-FebMon22-FebTue23-FebWed24-FebThu25-FebFri26-FebSat27-FebSun28-FebMon1-Mar Tue2-Mar Wed3-Mar Thu4-Mar Fri5-Mar Sat6-Mar Sun7-Mar MonFlow (mgd)0.000.050.100.150.200.250.300.350.40Rainfall (in/hr)0.0290.0280.0340.0350.0290.0310.0270.0280.0330.0320.0340.0330.0310.0320.000.010.010.020.020.030.030.040.041/201/211/221/231/241/251/261/271/281/291/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/60.00.40.81.21.62.02.42.80.0330.000.010.010.020.020.030.030.040.041/201/211/221/231/241/251/261/271/281/291/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/60.00.40.81.21.62.02.42.8January 20 to March 7, 2011 Diameter0.02.04.06.08.010.012.002/1402/1502/1602/1702/1802/1902/2002/2102/2202/2302/2402/2502/2602/2702/2803/0103/02Level (inches)Site O.2Monitoring Site:Site Capacity / Surcharge SummaryRealtime Flow Levels with Rainfall Data over Monitoring Period Peak Measured Level:2.19Peak d/D Ratio:0.22Pipe Diameter:10inchesinches Site O.2 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.01 0.02 0.03 0.04 0.05 0.06 0.07 0.08 0.09 0.10 02/1402/1502/1602/1702/1802/1902/2002/2102/2202/2302/2402/25Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.092 0.032 2.19 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 3.58 1.26 d/D Ratio:0.22 40,000 0.65Total I/I per ADWF:per in-rain 0.6%R-Value: 25% mgd RDI (% of BL): 0.006 Event 1 Event 1 Detail Graph (2/21/2011) RDI:Acre:59 PkI/I:Acre:298 Storm Event I/I Analysis (Rain = 2.41 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: Site O.2 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.01 0.02 0.03 0.04 0.05 0.06 0.07 0.08 0.09 02/2502/2602/2702/2803/0103/02Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.083 0.036 2.11 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 3.25 1.41 d/D Ratio:0.21 26,000 1.04Total I/I per ADWF:per in-rain 0.9%R-Value: 22% mgd RDI (% of BL): 0.006 Event 2 Event 2 Detail Graph (2/27/2011) RDI:Acre:51 PkI/I:Acre:336 Storm Event I/I Analysis (Rain = 0.97 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: Site O.2 Monitoring Site:Level, Velocity and Flow From 1/17/2011 to 1/24/2011 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 1/17 1/18 1/19 1/20 1/21 1/22 1/23Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 1.21 in. Peak Level: 2.25 in. Min Level: 0.32 in.117 1 Avg Velocity: 0.95 fps Peak Velocity: 1.67 fps Min Velocity: 0.19 fps1171 Avg Flow: 0.027 mgd Peak Flow: 0.099 mgd Min Flow: 0.001 mgd1171 Site O.2 Monitoring Site:Level, Velocity and Flow From 1/24/2011 to 1/31/2011 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 1/24 1/25 1/26 1/27 1/28 1/29 1/30Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.44 inches Avg Level: 1.29 in. Peak Level: 6.8 in. Min Level: 0.32 in.117 2 Avg Velocity: 0.96 fps Peak Velocity: 1.58 fps Min Velocity: 0.2 fps1172 Avg Flow: 0.03 mgd Peak Flow: 0.128 mgd Min Flow: 0.001 mgd1172 Site O.2 Monitoring Site:Level, Velocity and Flow From 1/31/2011 to 2/7/2011 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 1/31 2/1 2/2 2/3 2/4 2/5 2/6Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 1.25 in. Peak Level: 5.64 in. Min Level: 0.38 in.117 3 Avg Velocity: 0.95 fps Peak Velocity: 1.8 fps Min Velocity: 0.21 fps1173 Avg Flow: 0.028 mgd Peak Flow: 0.127 mgd Min Flow: 0.001 mgd1173 Site O.2 Monitoring Site:Level, Velocity and Flow From 2/7/2011 to 2/14/2011 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 2/7 2/8 2/9 2/10 2/11 2/12 2/13Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.12 inches Avg Level: 1.17 in. Peak Level: 2.11 in. Min Level: 0.28 in.117 4 Avg Velocity: 0.91 fps Peak Velocity: 1.62 fps Min Velocity: 0.24 fps1174 Avg Flow: 0.025 mgd Peak Flow: 0.088 mgd Min Flow: 0.001 mgd1174 Site O.2 Monitoring Site:Level, Velocity and Flow From 2/14/2011 to 2/21/2011 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 2/14 2/15 2/16 2/17 2/18 2/19 2/20Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 2.41 inches Avg Level: 1.27 in. Peak Level: 2.19 in. Min Level: 0.35 in.117 5 Avg Velocity: 0.97 fps Peak Velocity: 1.61 fps Min Velocity: 0.23 fps1175 Avg Flow: 0.029 mgd Peak Flow: 0.092 mgd Min Flow: 0.001 mgd1175 Site O.2 Monitoring Site:Level, Velocity and Flow From 2/21/2011 to 2/28/2011 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 2/21 2/22 2/23 2/24 2/25 2/26 2/27Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.97 inches Avg Level: 1.3 in. Peak Level: 2.13 in. Min Level: 0.4 in.117 6 Avg Velocity: 0.99 fps Peak Velocity: 1.63 fps Min Velocity: 0.27 fps1176 Avg Flow: 0.031 mgd Peak Flow: 0.089 mgd Min Flow: 0.001 mgd1176 Site O.2 Monitoring Site:Level, Velocity and Flow From 2/28/2011 to 3/7/2011 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 2/28 3/1 3/2 3/3 3/4 3/5 3/6Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.08 inches Avg Level: 1.28 in. Peak Level: 2.23 in. Min Level: 0.39 in.117 7 Avg Velocity: 0.97 fps Peak Velocity: 1.65 fps Min Velocity: 0.3 fps1177 Avg Flow: 0.029 mgd Peak Flow: 0.097 mgd Min Flow: 0.002 mgd1177 Site O.2 Monitoring Site:Level, Velocity and Flow From 3/7/2011 to 3/14/2011 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 3/7 3/8 3/9 3/10 3/11 3/12 3/13Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.08 inches Avg Level: 1.17 in. Peak Level: 2.26 in. Min Level: 0.45 in.117 8 Avg Velocity: 0.9 fps Peak Velocity: 1.63 fps Min Velocity: 0.14 fps1178 Avg Flow: 0.026 mgd Peak Flow: 0.097 mgd Min Flow: 0.001 mgd1178 Monitoring Site: Location: Size/Type Line: Site P.1 Manhole K09-57: Morro Street and Pacific Street 10-inch Sanitary Sewer Pipe Temporary Flow Monitoring Study Sanitary Sewer Collection System Data Summary Report Site P.1 Location:Manhole K09-57: Morro Street and Pacific Street Diameter:10 Monitoring Site:Site Information Report Average Dry Weather Flow:0.064 Peak Measured Flow:0.206 mgd mgd Flow Diagram Satellite Map Latitude: 35.2791° Longitude:-120.6604° Rim Elevation:211 feet above sea level inches Street View Photo Sanitary Map Plan View Photo Site P.1Monitoring Site:Average Dry Weather Flow0.25Average Dry Weather Flow:mgd0.0660.000.020.040.060.080.100.120:001:002:003:004:005:006:007:008:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:0023:00Flow (mgd)WeekdayWeekend Site P.1 Monitoring Site:Level, Velocity and Flow From 10/18/2010 to 10/25/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 10/18 10/19 10/20 10/21 10/22 10/23 10/24Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.91 inches Avg Level: 2.52 in. Peak Level: 3.35 in. Min Level: 1.59 in. Avg Velocity: 0.99 fps Peak Velocity: 1.46 fps Min Velocity: 0.45 fps Avg Flow: 0.073 mgd Peak Flow: 0.152 mgd Min Flow: 0.017 mgd Site P.1 Monitoring Site:Level, Velocity and Flow From 10/25/2010 to 11/1/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 10/25 10/26 10/27 10/28 10/29 10/30 10/31Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.48 inches Avg Level: 2.6 in. Peak Level: 3.51 in. Min Level: 1.67 in. Avg Velocity: 0.98 fps Peak Velocity: 1.44 fps Min Velocity: 0.44 fps Avg Flow: 0.075 mgd Peak Flow: 0.148 mgd Min Flow: 0.018 mgd2 Site P.1 Monitoring Site:Level, Velocity and Flow From 11/1/2010 to 11/8/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 11/1 11/2 11/3 11/4 11/5 11/6 11/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.4 inches Avg Level: 2.42 in. Peak Level: 3.37 in. Min Level: 1.42 in. Avg Velocity: 0.98 fps Peak Velocity: 1.43 fps Min Velocity: 0.4 fps Avg Flow: 0.068 mgd Peak Flow: 0.137 mgd Min Flow: 0.015 mgd3 0.000.050.100.150.200.2530-JanSat31-JanSun1-FebMon2-FebTue3-FebWed4-FebThu5-FebFri6-FebSat7-FebSun8-FebMon9-FebTue10-FebWed11-FebThu12-FebFri13-FebSat14-FebSun15-FebMon16-FebTue17-FebWed18-FebThu19-FebFri20-FebSat21-FebSun22-FebMon23-FebTue24-FebWed25-FebThu26-FebFri27-FebSat28-FebSunFlow (mgd)0.00.10.20.30.40.50.60.70.8Rainfall (in/hr)RainFlowBLFlowSite P.1Monitoring Site:Period Flow Summary0.0870.0890.0870.0900.1130.1050.1070.0960.0700.0590.0750.0900.0910.0890.0920.0940.0850.0710.0770.0770.0730.0800.0820.0720.0670.0650.0620.0630.0660.0690.0710.0680.0670.0640.0600.0680.0690.0690.0650.000.020.040.060.080.100.120.141/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/28Flow (MGal)0.00.40.81.21.62.02.42.8Rainfall (in/day)0.000.020.040.060.080.100.120.140.1628-FebSun1-MarMon2-MarTue3-MarWed4-MarThu5-MarFri6-MarSat7-MarSun8-MarMon9-MarTue10-MarWed11-MarThu12-MarFri13-MarSat14-MarSun15-MarMon16-MarTue17-MarWed18-MarThu19-MarFri20-MarSat21-MarSun22-MarMon23-MarTue24-MarWed25-MarThu26-MarFri27-MarSat28-MarSunFlow (mgd)0.00.10.20.30.40.50.60.70.8Rainfall (in/hr)0.0900.0850.1290.1210.0750.0760.0880.0860.1160.0850.0680.0690.0690.0670.0580.0570.0640.0690.000.020.040.060.080.100.120.141/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/280.00.40.81.21.62.02.42.80.0720.000.020.040.060.080.100.120.141/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/280.00.40.81.21.62.02.42.8January 30 to March 28, 2010Total Period Rainfall: 6.8 inchesAvg Flow: 0.079 mgd Peak Flow: 0.206 mgd Min Flow: 0.026 mgd Diameter0.02.04.06.08.010.012.002/0202/0302/0402/0502/0602/0702/0802/0902/1002/1102/1202/1302/1402/1502/1602/1702/1802/1902/2002/2102/2202/2302/2402/2502/2602/2702/2803/0103/0203/0303/0403/0503/0603/0703/0803/0903/1003/1103/1203/1303/1403/15Level (inches)Site P.1Monitoring Site:Site Capacity / Surcharge SummaryRealtime Flow Levels with Rainfall Data over Monitoring Period Peak Measured Level:4.05Peak d/D Ratio:0.41Pipe Diameter:10inchesinches Site P.1 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.05 0.10 0.15 0.20 0.25 02/0402/0502/0602/0702/0802/09Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.21 0.12 3.98 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 3.21 1.89 d/D Ratio:0.40 220,000 1.98Total I/I per ADWF:per in-rain 3.2%R-Value: 59% mgd RDI (% of BL): 0.04 Event 1 Event 1 Detail Graph (2/8/2010) RDI:Acre:258 PkI/I:Acre:833 Storm Event I/I Analysis (Rain = 1.73 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: 5,606Total I/I per IDM:per in-rainPkI/I:IDM:5,350 gpd/IDM RDI:IDM:1,657 gpd/IDM Site P.1 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 0.20 02/2602/2702/2803/0103/02Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.17 0.10 4.05 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 2.71 1.49 d/D Ratio:0.41 104,000 0.71Total I/I per ADWF:per in-rain 1.2%R-Value: 16% mgd RDI (% of BL): 0.01 Event 2 Event 2 Detail Graph (3/1/2010) RDI:Acre:71 PkI/I:Acre:656 Storm Event I/I Analysis (Rain = 2.27 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: 2,011Total I/I per IDM:per in-rainPkI/I:IDM:4,211 gpd/IDM RDI:IDM:459 gpd/IDM Site P.1 Monitoring Site:Level, Velocity and Flow From 1/25/2010 to 2/1/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 1/25 1/26 1/27 1/28 1/29 1/30 1/31Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.09 inches Avg Level: 2.95 in. Peak Level: 3.41 in. Min Level: 2.4 in.45 1 Avg Velocity: 1.01 fps Peak Velocity: 1.3 fps Min Velocity: 0.64 fps451 Avg Flow: 0.089 mgd Peak Flow: 0.129 mgd Min Flow: 0.047 mgd451 Site P.1 Monitoring Site:Level, Velocity and Flow From 2/1/2010 to 2/8/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 2/1 2/2 2/3 2/4 2/5 2/6 2/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 1.74 inches Avg Level: 3.04 in. Peak Level: 3.98 in. Min Level: 2.33 in.45 2 Avg Velocity: 1.1 fps Peak Velocity: 1.62 fps Min Velocity: 0.64 fps452 Avg Flow: 0.102 mgd Peak Flow: 0.206 mgd Min Flow: 0.042 mgd452 Site P.1 Monitoring Site:Level, Velocity and Flow From 2/8/2010 to 2/15/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 2/8 2/9 2/10 2/11 2/12 2/13 2/14Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.61 inches Avg Level: 2.87 in. Peak Level: 3.64 in. Min Level: 2.14 in.45 3 Avg Velocity: 0.97 fps Peak Velocity: 1.46 fps Min Velocity: 0.47 fps453 Avg Flow: 0.084 mgd Peak Flow: 0.169 mgd Min Flow: 0.029 mgd453 Site P.1 Monitoring Site:Level, Velocity and Flow From 2/15/2010 to 2/22/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 2/15 2/16 2/17 2/18 2/19 2/20 2/21Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.25 inches Avg Level: 2.85 in. Peak Level: 3.63 in. Min Level: 2.26 in.45 4 Avg Velocity: 0.99 fps Peak Velocity: 1.43 fps Min Velocity: 0.5 fps454 Avg Flow: 0.085 mgd Peak Flow: 0.158 mgd Min Flow: 0.03 mgd454 Site P.1 Monitoring Site:Level, Velocity and Flow From 2/22/2010 to 3/1/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 0.20 2/22 2/23 2/24 2/25 2/26 2/27 2/28Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 2.77 inches Avg Level: 3.01 in. Peak Level: 4.05 in. Min Level: 2.17 in.45 5 Avg Velocity: 0.96 fps Peak Velocity: 1.43 fps Min Velocity: 0.56 fps455 Avg Flow: 0.089 mgd Peak Flow: 0.174 mgd Min Flow: 0.031 mgd455 Site P.1 Monitoring Site:Level, Velocity and Flow From 3/1/2010 to 3/8/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 3/1 3/2 3/3 3/4 3/5 3/6 3/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 1.2 inches Avg Level: 2.91 in. Peak Level: 3.59 in. Min Level: 2.28 in.45 6 Avg Velocity: 0.86 fps Peak Velocity: 1.12 fps Min Velocity: 0.59 fps456 Avg Flow: 0.074 mgd Peak Flow: 0.123 mgd Min Flow: 0.035 mgd456 Site P.1 Monitoring Site:Level, Velocity and Flow From 3/8/2010 to 3/15/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 3/8 3/9 3/10 3/11 3/12 3/13 3/14Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.17 inches Avg Level: 2.65 in. Peak Level: 3.28 in. Min Level: 2.1 in.45 7 Avg Velocity: 0.86 fps Peak Velocity: 1.14 fps Min Velocity: 0.53 fps457 Avg Flow: 0.066 mgd Peak Flow: 0.11 mgd Min Flow: 0.031 mgd457 Site P.1 Monitoring Site:Level, Velocity and Flow From 3/15/2010 to 3/22/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 3/15 3/16 3/17 3/18 3/19 3/20 3/21Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 2.57 in. Peak Level: 3.23 in. Min Level: 1.99 in.45 8 Avg Velocity: 0.88 fps Peak Velocity: 1.18 fps Min Velocity: 0.54 fps458 Avg Flow: 0.065 mgd Peak Flow: 0.114 mgd Min Flow: 0.029 mgd458 Site P.1 Monitoring Site:Level, Velocity and Flow From 3/22/2010 to 3/29/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 3/22 3/23 3/24 3/25 3/26 3/27 3/28Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 2.6 in. Peak Level: 3.59 in. Min Level: 1.92 in.45 9 Avg Velocity: 0.88 fps Peak Velocity: 1.21 fps Min Velocity: 0.55 fps459 Avg Flow: 0.066 mgd Peak Flow: 0.138 mgd Min Flow: 0.026 mgd459 Monitoring Site: Location: Size/Type Line: Site P.2 Manhole L09-23: 1242 Buchon Street 8-inch Sanitary Sewer Pipe Temporary Flow Monitoring Study Sanitary Sewer Collection System Data Summary Report Site P.2 Location:Manhole L09-23: 1242 Buchon Street Diameter:8 Monitoring Site:Site Information Report Average Dry Weather Flow:0.048 Peak Measured Flow:0.274 mgd mgd Sewer Map Satellite View Latitude: 35.2805° Longitude:-120.6541° Rim Elevation:236 feet inches Flow Diagram Street View Site P.2Monitoring Site:Average Dry Weather Flow0.23Average Dry Weather Flow:mgd0.0440.000.010.020.030.040.050.060.070.080.090:001:002:003:004:005:006:007:008:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:0023:00Flow (mgd)WeekdayWeekend Site P.2 Monitoring Site:Level, Velocity and Flow From 10/18/2010 to 10/25/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 0.20 10/18 10/19 10/20 10/21 10/22 10/23 10/24Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.91 inches Avg Level: 1.76 in. Peak Level: 2.73 in. Min Level: 0.71 in.2 Avg Velocity: 1.15 fps Peak Velocity: 1.62 fps Min Velocity: 0.59 fps2 Avg Flow: 0.045 mgd Peak Flow: 0.106 mgd Min Flow: 0.008 mgd2 Site P.2 Monitoring Site:Level, Velocity and Flow From 10/25/2010 to 11/1/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 0.20 10/25 10/26 10/27 10/28 10/29 10/30 10/31Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.48 inches Avg Level: 1.81 in. Peak Level: 2.65 in. Min Level: 0.94 in.2 Avg Velocity: 1.16 fps Peak Velocity: 1.64 fps Min Velocity: 0.47 fps2 Avg Flow: 0.047 mgd Peak Flow: 0.107 mgd Min Flow: 0.008 mgd22 Site P.2 Monitoring Site:Level, Velocity and Flow From 11/1/2010 to 11/8/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 0.20 11/1 11/2 11/3 11/4 11/5 11/6 11/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.4 inches Avg Level: 1.84 in. Peak Level: 2.75 in. Min Level: 1.01 in.2 Avg Velocity: 1.2 fps Peak Velocity: 1.64 fps Min Velocity: 0.62 fps2 Avg Flow: 0.05 mgd Peak Flow: 0.107 mgd Min Flow: 0.012 mgd23 0.000.050.100.150.200.250.300.350.400.450.5020-Jan Thu21-Jan Fri22-Jan Sat23-Jan Sun24-Jan Mon25-Jan Tue26-Jan Wed27-Jan Thu28-Jan Fri29-Jan Sat30-Jan Sun31-Jan Mon1-Feb Tue2-Feb Wed3-Feb Thu4-Feb Fri5-Feb Sat6-Feb Sun7-Feb Mon8-Feb Tue9-Feb Wed10-Feb Thu11-Feb Fri12-Feb Sat13-Feb SunFlow (mgd)0.000.050.100.150.200.250.300.350.40Rainfall (in/hr)RainFlowBLFlowSite P.2Monitoring Site:Period Flow Summary0.0770.0630.0480.0440.0540.0470.0430.0370.0450.0450.0490.0510.0500.0520.0470.0520.0590.0450.0480.0640.0600.0780.0570.0690.0670.0790.0670.0610.0690.0650.0620.000.020.040.060.080.100.121/201/211/221/231/241/251/261/271/281/291/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/6Flow (MGal)0.00.40.81.21.62.02.42.8Rainfall (in/day)0.000.050.100.150.200.250.300.350.400.450.5013-FebSun14-FebMon15-FebTue16-FebWed17-FebThu18-FebFri19-FebSat20-FebSun21-FebMon22-FebTue23-FebWed24-FebThu25-FebFri26-FebSat27-FebSun28-FebMon1-Mar Tue2-Mar Wed3-Mar Thu4-Mar Fri5-Mar Sat6-Mar Sun7-Mar MonFlow (mgd)0.000.050.100.150.200.250.300.350.40Rainfall (in/hr)0.0590.0510.0400.0370.0390.0430.0460.0480.0820.0790.0770.0730.0580.0540.000.020.040.060.080.100.121/201/211/221/231/241/251/261/271/281/291/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/60.00.40.81.21.62.02.42.80.0650.000.020.040.060.080.100.121/201/211/221/231/241/251/261/271/281/291/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/60.00.40.81.21.62.02.42.8January 20 to March 7, 2011 Diameter0.01.02.03.04.05.06.07.08.09.002/1402/1502/1602/1702/1802/1902/2002/2102/2202/2302/2402/2502/2602/2702/2803/0103/02Level (inches)Site P.2Monitoring Site:Site Capacity / Surcharge SummaryRealtime Flow Levels with Rainfall Data over Monitoring Period Peak Measured Level:3.11Peak d/D Ratio:0.39Pipe Diameter:8inchesinches Site P.2 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 02/1402/1502/1602/1702/1802/1902/2002/2102/2202/2302/2402/25Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.166 0.115 3.11 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 3.44 2.38 d/D Ratio:0.39 183,000 1.32Total I/I per ADWF:per in-rain 2.4%R-Value: 39% mgd RDI (% of BL): 0.019 Event 1 Event 1 Detail Graph (2/21/2011) RDI:Acre:190 PkI/I:Acre:1,160 Storm Event I/I Analysis (Rain = 2.86 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: Site P.2 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 02/2502/2602/2702/2803/0103/02Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.137 0.076 2.71 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 2.82 1.58 d/D Ratio:0.34 116,000 2.39Total I/I per ADWF:per in-rain 4.3%R-Value: 59% mgd RDI (% of BL): 0.028 Event 2 Event 2 Detail Graph (2/27/2011) RDI:Acre:286 PkI/I:Acre:769 Storm Event I/I Analysis (Rain = 1.01 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: Site P.2 Monitoring Site:Level, Velocity and Flow From 1/17/2011 to 1/24/2011 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.50 1/17 1/18 1/19 1/20 1/21 1/22 1/23Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 2.19 in. Peak Level: 3.79 in. Min Level: 1.61 in.118 1 Avg Velocity: 1.24 fps Peak Velocity: 2.61 fps Min Velocity: 0.29 fps1181 Avg Flow: 0.066 mgd Peak Flow: 0.274 mgd Min Flow: 0.011 mgd1181 Site P.2 Monitoring Site:Level, Velocity and Flow From 1/24/2011 to 1/31/2011 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.50 1/24 1/25 1/26 1/27 1/28 1/29 1/30Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.4 inches Avg Level: 1.89 in. Peak Level: 2.68 in. Min Level: 1.27 in.118 2 Avg Velocity: 1.04 fps Peak Velocity: 2.11 fps Min Velocity: 0.14 fps1182 Avg Flow: 0.045 mgd Peak Flow: 0.134 mgd Min Flow: 0.004 mgd1182 Site P.2 Monitoring Site:Level, Velocity and Flow From 1/31/2011 to 2/7/2011 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.50 1/31 2/1 2/2 2/3 2/4 2/5 2/6Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.01 inches Avg Level: 1.92 in. Peak Level: 2.57 in. Min Level: 1.35 in.118 3 Avg Velocity: 1.03 fps Peak Velocity: 1.93 fps Min Velocity: 0.12 fps1183 Avg Flow: 0.044 mgd Peak Flow: 0.108 mgd Min Flow: 0.004 mgd1183 Site P.2 Monitoring Site:Level, Velocity and Flow From 2/7/2011 to 2/14/2011 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.50 2/7 2/8 2/9 2/10 2/11 2/12 2/13Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 1.99 in. Peak Level: 2.92 in. Min Level: 1.38 in.118 4 Avg Velocity: 1.12 fps Peak Velocity: 1.82 fps Min Velocity: 0.3 fps1184 Avg Flow: 0.051 mgd Peak Flow: 0.129 mgd Min Flow: 0.011 mgd1184 Site P.2 Monitoring Site:Level, Velocity and Flow From 2/14/2011 to 2/21/2011 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.50 2/14 2/15 2/16 2/17 2/18 2/19 2/20Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 2.86 inches Avg Level: 2.13 in. Peak Level: 3.11 in. Min Level: 1.33 in.118 5 Avg Velocity: 1.31 fps Peak Velocity: 2.12 fps Min Velocity: 0.31 fps1185 Avg Flow: 0.065 mgd Peak Flow: 0.166 mgd Min Flow: 0.009 mgd1185 Site P.2 Monitoring Site:Level, Velocity and Flow From 2/21/2011 to 2/28/2011 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.50 2/21 2/22 2/23 2/24 2/25 2/26 2/27Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 1.01 inches Avg Level: 2.13 in. Peak Level: 2.76 in. Min Level: 1.5 in.118 6 Avg Velocity: 1.41 fps Peak Velocity: 2.08 fps Min Velocity: 0.49 fps1186 Avg Flow: 0.069 mgd Peak Flow: 0.137 mgd Min Flow: 0.017 mgd1186 Site P.2 Monitoring Site:Level, Velocity and Flow From 2/28/2011 to 3/7/2011 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.50 2/28 3/1 3/2 3/3 3/4 3/5 3/6Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.27 inches Avg Level: 2.07 in. Peak Level: 2.65 in. Min Level: 1.52 in.118 7 Avg Velocity: 1.32 fps Peak Velocity: 2.04 fps Min Velocity: 0.5 fps1187 Avg Flow: 0.062 mgd Peak Flow: 0.133 mgd Min Flow: 0.017 mgd1187 Site P.2 Monitoring Site:Level, Velocity and Flow From 3/7/2011 to 3/14/2011 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.50 3/7 3/8 3/9 3/10 3/11 3/12 3/13Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.03 inches Avg Level: 1.95 in. Peak Level: 2.63 in. Min Level: 1.5 in.118 8 Avg Velocity: 1.23 fps Peak Velocity: 1.76 fps Min Velocity: 0.7 fps1188 Avg Flow: 0.053 mgd Peak Flow: 0.101 mgd Min Flow: 0.022 mgd1188 Monitoring Site: Location: Size/Type Line: Site Q.1 Manhole K10-28: Morron Street and Islay Street 8-inch Sanitary Sewer Pipe Temporary Flow Monitoring Study Sanitary Sewer Collection System Data Summary Report Site Q.1 Location:Manhole K10-28: Morron Street and Islay Street Diameter:8 Monitoring Site:Site Information Report Average Dry Weather Flow:0.036 Peak Measured Flow:0.498 mgd mgd Flow Diagram Satellite Map Latitude: 35.2767° Longitude:-120.6582° Rim Elevation:218 feet above sea level inches Street View Photo Sanitary Map Plan View Photo Site Q.1Monitoring Site:Average Dry Weather Flow0.25Average Dry Weather Flow:mgd0.0360.000.010.020.030.040.050.060.070.080:001:002:003:004:005:006:007:008:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:0023:00Flow (mgd)WeekdayWeekend Site Q.1 Monitoring Site:Level, Velocity and Flow From 10/18/2010 to 10/25/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 0.20 10/18 10/19 10/20 10/21 10/22 10/23 10/24Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.91 inches Avg Level: 2.11 in. Peak Level: 3.1 in. Min Level: 0.9 in.3 Avg Velocity: 0.87 fps Peak Velocity: 1.38 fps Min Velocity: 0.37 fps3 Avg Flow: 0.044 mgd Peak Flow: 0.094 mgd Min Flow: 0.005 mgd3 Site Q.1 Monitoring Site:Level, Velocity and Flow From 10/25/2010 to 11/1/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 0.20 10/25 10/26 10/27 10/28 10/29 10/30 10/31Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.48 inches Avg Level: 2.09 in. Peak Level: 3.35 in. Min Level: 0.96 in.3 Avg Velocity: 0.91 fps Peak Velocity: 1.5 fps Min Velocity: 0.38 fps3 Avg Flow: 0.046 mgd Peak Flow: 0.11 mgd Min Flow: 0.006 mgd32 Site Q.1 Monitoring Site:Level, Velocity and Flow From 11/1/2010 to 11/8/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 0.20 11/1 11/2 11/3 11/4 11/5 11/6 11/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.4 inches Avg Level: 1.94 in. Peak Level: 3.09 in. Min Level: 0.79 in.3 Avg Velocity: 0.82 fps Peak Velocity: 1.3 fps Min Velocity: 0.35 fps3 Avg Flow: 0.038 mgd Peak Flow: 0.094 mgd Min Flow: 0.005 mgd33 0.000.100.200.300.400.500.6030-JanSat31-JanSun1-FebMon2-FebTue3-FebWed4-FebThu5-FebFri6-FebSat7-FebSun8-FebMon9-FebTue10-FebWed11-FebThu12-FebFri13-FebSat14-FebSun15-FebMon16-FebTue17-FebWed18-FebThu19-FebFri20-FebSat21-FebSun22-FebMon23-FebTue24-FebWed25-FebThu26-FebFri27-FebSat28-FebSunFlow (mgd)0.00.10.20.30.40.50.60.70.8Rainfall (in/hr)RainFlowBLFlowSite Q.1Monitoring Site:Period Flow Summary0.2660.2640.2680.2790.3410.3070.3480.2860.2440.2240.2070.2070.2090.2010.2090.2080.2490.2300.2520.2820.2500.2900.3230.2730.2620.2420.1510.0600.0560.0510.0470.0440.0480.0310.0420.0450.0410.0360.0350.000.100.200.300.400.501/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/28Flow (MGal)0.00.40.81.21.62.02.42.8Rainfall (in/day)0.000.100.200.300.400.500.6028-FebSun1-MarMon2-MarTue3-MarWed4-MarThu5-MarFri6-MarSat7-MarSun8-MarMon9-MarTue10-MarWed11-MarThu12-MarFri13-MarSat14-MarSun15-MarMon16-MarTue17-MarWed18-MarThu19-MarFri20-MarSat21-MarSun22-MarMon23-MarTue24-MarWed25-MarThu26-MarFri27-MarSat28-MarSunFlow (mgd)0.00.10.20.30.40.50.60.70.8Rainfall (in/hr)0.2640.2520.3900.3950.2110.2050.1980.2070.4300.3830.2910.2910.0520.0500.0300.0360.0320.0340.000.100.200.300.400.501/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/280.00.40.81.21.62.02.42.80.2030.000.100.200.300.400.501/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/280.00.40.81.21.62.02.42.8January 30 to March 28, 2010Total Period Rainfall: 6.96 inchesAvg Flow: 0.196 mgd Peak Flow: 0.498 mgd Min Flow: 0.004 mgd Diameter0.05.010.015.020.025.030.035.040.045.050.002/0202/0302/0402/0502/0602/0702/0802/0902/1002/1102/1202/1302/1402/1502/1602/1702/1802/1902/2002/2102/2202/2302/2402/2502/2602/2702/2803/0103/0203/0303/0403/0503/0603/0703/0803/0903/1003/1103/1203/1303/1403/15Level (inches)Site Q.1Monitoring Site:Site Capacity / Surcharge SummaryRealtime Flow Levels with Rainfall Data over Monitoring PeriodSurcharged 38.2 inches over crownPeak Measured Level:46.3Peak d/D Ratio:5.78Pipe Diameter:8inchesinches Site Q.1 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.10 0.20 0.30 0.40 0.50 0.60 02/0402/0502/0602/0702/0802/09Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.50 0.43 46.25 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 13.74 11.99 d/D Ratio:5.78 1,313,000 20.77Total I/I per ADWF:per in-rain 31.2%R-Value: 736% mgd RDI (% of BL): 0.27 Event 1 Event 1 Detail Graph (2/8/2010) RDI:Acre:3,000 PkI/I:Acre:4,885 Storm Event I/I Analysis (Rain = 1.74 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: 50,786Total I/I per IDM:per in-rainPkI/I:IDM:29,319 gpd/IDM RDI:IDM:18,005 gpd/IDM Site Q.1 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.50 02/2602/2702/2803/0103/02Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.47 0.42 34.42 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 13.00 11.67 d/D Ratio:4.30 1,205,000 14.30Total I/I per ADWF:per in-rain 21.5%R-Value: 669% mgd RDI (% of BL): 0.24 Event 2 Event 2 Detail Graph (3/1/2010) RDI:Acre:2,726 PkI/I:Acre:4,754 Storm Event I/I Analysis (Rain = 2.33 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: 34,969Total I/I per IDM:per in-rainPkI/I:IDM:28,529 gpd/IDM RDI:IDM:16,360 gpd/IDM Site Q.1 Monitoring Site:Level, Velocity and Flow From 1/25/2010 to 2/1/2010 0.0 5.0 10.0 15.0 20.0 25.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 1/25 1/26 1/27 1/28 1/29 1/30 1/31Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.09 inches Avg Level: 9.25 in. Peak Level: 22.37 in. Min Level: 3.29 in.46 1 Avg Velocity: 1.71 fps Peak Velocity: 2.15 fps Min Velocity: 1.13 fps461 Avg Flow: 0.26 mgd Peak Flow: 0.345 mgd Min Flow: 0.178 mgd461 Site Q.1 Monitoring Site:Level, Velocity and Flow From 2/1/2010 to 2/8/2010 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 45.0 50.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 2/1 2/2 2/3 2/4 2/5 2/6 2/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 1.75 inches Avg Level: 18.46 in. Peak Level: 46.25 in. Min Level: 3.17 in.46 2 Avg Velocity: 1.63 fps Peak Velocity: 2.21 fps Min Velocity: 1.14 fps462 Avg Flow: 0.315 mgd Peak Flow: 0.498 mgd Min Flow: 0.171 mgd462 Site Q.1 Monitoring Site:Level, Velocity and Flow From 2/8/2010 to 2/15/2010 0.0 5.0 10.0 15.0 20.0 25.0 30.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 2/8 2/9 2/10 2/11 2/12 2/13 2/14Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.63 inches Avg Level: 5.75 in. Peak Level: 26.66 in. Min Level: 2.97 in.46 3 Avg Velocity: 2.06 fps Peak Velocity: 2.35 fps Min Velocity: 1.42 fps463 Avg Flow: 0.261 mgd Peak Flow: 0.459 mgd Min Flow: 0.152 mgd463 Site Q.1 Monitoring Site:Level, Velocity and Flow From 2/15/2010 to 2/22/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 2/15 2/16 2/17 2/18 2/19 2/20 2/21Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.25 inches Avg Level: 3.57 in. Peak Level: 4.48 in. Min Level: 2.89 in.46 4 Avg Velocity: 2.1 fps Peak Velocity: 2.27 fps Min Velocity: 1.92 fps464 Avg Flow: 0.205 mgd Peak Flow: 0.277 mgd Min Flow: 0.151 mgd464 Site Q.1 Monitoring Site:Level, Velocity and Flow From 2/22/2010 to 3/1/2010 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 2/22 2/23 2/24 2/25 2/26 2/27 2/28Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 2.84 inches Avg Level: 9.48 in. Peak Level: 34.42 in. Min Level: 2.94 in.46 5 Avg Velocity: 2.08 fps Peak Velocity: 2.41 fps Min Velocity: 1.66 fps465 Avg Flow: 0.28 mgd Peak Flow: 0.471 mgd Min Flow: 0.158 mgd465 Site Q.1 Monitoring Site:Level, Velocity and Flow From 3/1/2010 to 3/8/2010 0.0 5.0 10.0 15.0 20.0 25.0 30.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 3/1 3/2 3/3 3/4 3/5 3/6 3/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 1.23 inches Avg Level: 6.91 in. Peak Level: 26 in. Min Level: 3.27 in.46 6 Avg Velocity: 1.97 fps Peak Velocity: 2.32 fps Min Velocity: 1.48 fps466 Avg Flow: 0.286 mgd Peak Flow: 0.422 mgd Min Flow: 0.184 mgd466 Site Q.1 Monitoring Site:Level, Velocity and Flow From 3/8/2010 to 3/15/2010 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 3/8 3/9 3/10 3/11 3/12 3/13 3/14Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.17 inches Avg Level: 3.06 in. Peak Level: 14.32 in. Min Level: 1.2 in.46 7 Avg Velocity: 1.47 fps Peak Velocity: 2.22 fps Min Velocity: 0.89 fps467 Avg Flow: 0.125 mgd Peak Flow: 0.384 mgd Min Flow: 0.021 mgd467 Site Q.1 Monitoring Site:Level, Velocity and Flow From 3/15/2010 to 3/22/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 3/15 3/16 3/17 3/18 3/19 3/20 3/21Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 1.74 in. Peak Level: 2.92 in. Min Level: 0.69 in.46 8 Avg Velocity: 1.05 fps Peak Velocity: 1.53 fps Min Velocity: 0.34 fps468 Avg Flow: 0.041 mgd Peak Flow: 0.102 mgd Min Flow: 0.004 mgd468 Site Q.1 Monitoring Site:Level, Velocity and Flow From 3/22/2010 to 3/29/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Velocity (fps)Vel 0.00 0.10 0.20 0.30 0.40 0.50 0.60 3/22 3/23 3/24 3/25 3/26 3/27 3/28Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 1.58 in. Peak Level: 2.57 in. Min Level: 0.62 in.46 9 Avg Velocity: 1.12 fps Peak Velocity: 1.6 fps Min Velocity: 0.65 fps469 Avg Flow: 0.038 mgd Peak Flow: 0.086 mgd Min Flow: 0.006 mgd469 Monitoring Site: Location: Size/Type Line: Site Q.2 Manhole L10-17: 1236 George Street 6-inch Sanitary Sewer Pipe Temporary Flow Monitoring Study Sanitary Sewer Collection System Data Summary Report Site Q.2 Location:Manhole L10-17: 1236 George Street Diameter:8 Monitoring Site:Site Information Report Average Dry Weather Flow:0.017 Peak Measured Flow:0.073 mgd mgd Sewer Map Satellite View Latitude: 35.2764° Longitude:-120.6516° Rim Elevation:282 feet inches Flow Diagram Street View Site Q.2Monitoring Site:Average Dry Weather Flow0.14Average Dry Weather Flow:mgd0.0170.0000.0050.0100.0150.0200.0250.0300.0350.0400.0450:001:002:003:004:005:006:007:008:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:0023:00Flow (mgd)WeekdayWeekend Site Q.2 Monitoring Site:Level, Velocity and Flow From 10/18/2010 to 10/25/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 Velocity (fps)Vel 0.000 0.020 0.040 0.060 0.080 0.100 0.120 0.140 0.160 10/18 10/19 10/20 10/21 10/22 10/23 10/24Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.91 inches Avg Level: 0.88 in. Peak Level: 1.53 in. Min Level: 0.32 in.4 Avg Velocity: 1.23 fps Peak Velocity: 2.54 fps Min Velocity: 0.32 fps4 Avg Flow: 0.017 mgd Peak Flow: 0.061 mgd Min Flow: 0.001 mgd4 Site Q.2 Monitoring Site:Level, Velocity and Flow From 10/25/2010 to 11/1/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 Velocity (fps)Vel 0.000 0.020 0.040 0.060 0.080 0.100 0.120 0.140 0.160 10/25 10/26 10/27 10/28 10/29 10/30 10/31Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.48 inches Avg Level: 0.9 in. Peak Level: 1.84 in. Min Level: 0.24 in.4 Avg Velocity: 1.35 fps Peak Velocity: 2.72 fps Min Velocity: 0.3 fps4 Avg Flow: 0.019 mgd Peak Flow: 0.086 mgd Min Flow: 0.001 mgd42 Site Q.2 Monitoring Site:Level, Velocity and Flow From 11/1/2010 to 11/8/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 Velocity (fps)Vel 0.000 0.020 0.040 0.060 0.080 0.100 0.120 0.140 0.160 11/1 11/2 11/3 11/4 11/5 11/6 11/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.4 inches Avg Level: 0.82 in. Peak Level: 1.39 in. Min Level: 0.2 in.4 Avg Velocity: 1.39 fps Peak Velocity: 2.63 fps Min Velocity: 0.21 fps4 Avg Flow: 0.017 mgd Peak Flow: 0.059 mgd Min Flow: 0.001 mgd43 0.000.020.040.060.080.100.120.1420-Jan Thu21-Jan Fri22-Jan Sat23-Jan Sun24-Jan Mon25-Jan Tue26-Jan Wed27-Jan Thu28-Jan Fri29-Jan Sat30-Jan Sun31-Jan Mon1-Feb Tue2-Feb Wed3-Feb Thu4-Feb Fri5-Feb Sat6-Feb Sun7-Feb Mon8-Feb Tue9-Feb Wed10-Feb Thu11-Feb Fri12-Feb Sat13-Feb SunFlow (mgd)0.000.050.100.150.200.250.300.350.40Rainfall (in/hr)RainFlowBLFlowSite Q.2Monitoring Site:Period Flow Summary0.0210.0150.0130.0130.0130.0130.0140.0220.0200.0230.0200.0210.0310.0250.0250.0240.0180.0130.0120.0180.0150.0270.0310.0290.0260.0390.0280.0290.0280.0260.0240.000.010.010.020.020.030.030.040.040.051/201/211/221/231/241/251/261/271/281/291/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/6Flow (MGal)0.00.40.81.21.62.02.42.8Rainfall (in/day)0.000.020.040.060.080.100.120.1413-FebSun14-FebMon15-FebTue16-FebWed17-FebThu18-FebFri19-FebSat20-FebSun21-FebMon22-FebTue23-FebWed24-FebThu25-FebFri26-FebSat27-FebSun28-FebMon1-Mar Tue2-Mar Wed3-Mar Thu4-Mar Fri5-Mar Sat6-Mar Sun7-Mar MonFlow (mgd)0.000.050.100.150.200.250.300.350.40Rainfall (in/hr)0.0100.0100.0110.0180.0240.0210.0160.0110.0240.0230.0300.0250.0190.0200.000.010.010.020.020.030.030.040.040.051/201/211/221/231/241/251/261/271/281/291/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/60.00.40.81.21.62.02.42.80.0280.000.010.010.020.020.030.030.040.040.051/201/211/221/231/241/251/261/271/281/291/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/60.00.40.81.21.62.02.42.8January 20 to March 7, 2011 Diameter0.01.02.03.04.05.06.07.08.09.002/1402/1502/1602/1702/1802/1902/2002/2102/2202/2302/2402/2502/2602/2702/2803/0103/02Level (inches)Site Q.2Monitoring Site:Site Capacity / Surcharge SummaryRealtime Flow Levels with Rainfall Data over Monitoring Period Peak Measured Level:2.23Peak d/D Ratio:0.28Pipe Diameter:8inchesinches Site Q.2 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.01 0.02 0.03 0.04 0.05 0.06 0.07 0.08 02/1402/1502/1602/1702/1802/1902/2002/2102/2202/2302/2402/25Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.072 0.057 2.23 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 4.17 3.29 d/D Ratio:0.28 56,000 1.15Total I/I per ADWF:per in-rain 2.3%R-Value: 96% mgd RDI (% of BL): 0.017 Event 1 Event 1 Detail Graph (2/21/2011) RDI:Acre:526 PkI/I:Acre:1,792 Storm Event I/I Analysis (Rain = 2.85 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: Site Q.2 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.01 0.02 0.03 0.04 0.05 0.06 0.07 0.08 02/2502/2602/2702/2803/0103/02Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.070 0.047 1.80 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 4.04 2.70 d/D Ratio:0.23 68,000 3.85Total I/I per ADWF:per in-rain 7.7%R-Value: 88% mgd RDI (% of BL): 0.015 Event 2 Event 2 Detail Graph (2/27/2011) RDI:Acre:478 PkI/I:Acre:1,473 Storm Event I/I Analysis (Rain = 1.02 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: Site Q.2 Monitoring Site:Level, Velocity and Flow From 1/17/2011 to 1/24/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 1/17 1/18 1/19 1/20 1/21 1/22 1/23Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 1.02 in. Peak Level: 1.96 in. Min Level: 0.71 in.119 1 Avg Velocity: 1.07 fps Peak Velocity: 1.84 fps Min Velocity: 0.55 fps1191 Avg Flow: 0.016 mgd Peak Flow: 0.061 mgd Min Flow: 0.005 mgd1191 Site Q.2 Monitoring Site:Level, Velocity and Flow From 1/24/2011 to 1/31/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 1/24 1/25 1/26 1/27 1/28 1/29 1/30Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.41 inches Avg Level: 0.98 in. Peak Level: 1.59 in. Min Level: 0.61 in.119 2 Avg Velocity: 0.96 fps Peak Velocity: 1.95 fps Min Velocity: 0.51 fps1192 Avg Flow: 0.014 mgd Peak Flow: 0.037 mgd Min Flow: 0.004 mgd1192 Site Q.2 Monitoring Site:Level, Velocity and Flow From 1/31/2011 to 2/7/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 1/31 2/1 2/2 2/3 2/4 2/5 2/6Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.01 inches Avg Level: 1.09 in. Peak Level: 1.59 in. Min Level: 0.66 in.119 3 Avg Velocity: 1.33 fps Peak Velocity: 2.06 fps Min Velocity: 0.71 fps1193 Avg Flow: 0.022 mgd Peak Flow: 0.048 mgd Min Flow: 0.006 mgd1193 Site Q.2 Monitoring Site:Level, Velocity and Flow From 2/7/2011 to 2/14/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 2/7 2/8 2/9 2/10 2/11 2/12 2/13Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 1.12 in. Peak Level: 1.98 in. Min Level: 0.64 in.119 4 Avg Velocity: 1.19 fps Peak Velocity: 2 fps Min Velocity: 0.4 fps1194 Avg Flow: 0.021 mgd Peak Flow: 0.073 mgd Min Flow: 0.003 mgd1194 Site Q.2 Monitoring Site:Level, Velocity and Flow From 2/14/2011 to 2/21/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 2/14 2/15 2/16 2/17 2/18 2/19 2/20Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 2.85 inches Avg Level: 1.09 in. Peak Level: 2.23 in. Min Level: 0.58 in.119 5 Avg Velocity: 1.11 fps Peak Velocity: 1.8 fps Min Velocity: 0.54 fps1195 Avg Flow: 0.019 mgd Peak Flow: 0.072 mgd Min Flow: 0.003 mgd1195 Site Q.2 Monitoring Site:Level, Velocity and Flow From 2/21/2011 to 2/28/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 2/21 2/22 2/23 2/24 2/25 2/26 2/27Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 1.02 inches Avg Level: 1.19 in. Peak Level: 1.8 in. Min Level: 0.83 in.119 6 Avg Velocity: 1.61 fps Peak Velocity: 2.18 fps Min Velocity: 0.85 fps1196 Avg Flow: 0.03 mgd Peak Flow: 0.07 mgd Min Flow: 0.011 mgd1196 Site Q.2 Monitoring Site:Level, Velocity and Flow From 2/28/2011 to 3/7/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 2/28 3/1 3/2 3/3 3/4 3/5 3/6Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.27 inches Avg Level: 1.11 in. Peak Level: 1.66 in. Min Level: 0.78 in.119 7 Avg Velocity: 1.47 fps Peak Velocity: 2.1 fps Min Velocity: 0.86 fps1197 Avg Flow: 0.025 mgd Peak Flow: 0.06 mgd Min Flow: 0.009 mgd1197 Site Q.2 Monitoring Site:Level, Velocity and Flow From 3/7/2011 to 3/14/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Velocity (fps)Vel 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 3/7 3/8 3/9 3/10 3/11 3/12 3/13Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.03 inches Avg Level: 1.1 in. Peak Level: 1.83 in. Min Level: 0.8 in.119 8 Avg Velocity: 1.38 fps Peak Velocity: 2.02 fps Min Velocity: 0.79 fps1198 Avg Flow: 0.024 mgd Peak Flow: 0.062 mgd Min Flow: 0.008 mgd1198 Monitoring Site: Location: Size/Type Line: Site R.1 Manhole L12-49: West of Scheimer Park 8-inch Sanitary Sewer Pipe Temporary Flow Monitoring Study Sanitary Sewer Collection System Data Summary Report Site R.1 Location:Manhole L12-49: West of Scheimer Park Diameter:8 Monitoring Site:Site Information Report Average Dry Weather Flow:0.033 Peak Measured Flow:0.375 mgd mgd Flow Diagram Satellite Map Latitude: 35.2666° Longitude:-120.6487° Rim Elevation:256 feet above sea level inches Street View Photo Sanitary Map Plan View Photo Site R.1Monitoring Site:Average Dry Weather Flow0.14Average Dry Weather Flow:mgd0.0330.000.010.020.030.040.050.060.070.080:001:002:003:004:005:006:007:008:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:0023:00Flow (mgd)WeekdayWeekend Site R.1 Monitoring Site:Level, Velocity and Flow From 10/18/2010 to 10/25/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 10/18 10/19 10/20 10/21 10/22 10/23 10/24Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.91 inches Avg Level: 1.07 in. Peak Level: 1.54 in. Min Level: 0.38 in.5 Avg Velocity: 1.59 fps Peak Velocity: 3.46 fps Min Velocity: 0.2 fps5 Avg Flow: 0.033 mgd Peak Flow: 0.103 mgd Min Flow: 0.002 mgd5 Site R.1 Monitoring Site:Level, Velocity and Flow From 10/25/2010 to 11/1/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 10/25 10/26 10/27 10/28 10/29 10/30 10/31Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.48 inches Avg Level: 1.18 in. Peak Level: 1.63 in. Min Level: 0.54 in.5 Avg Velocity: 1.85 fps Peak Velocity: 3.77 fps Min Velocity: 0.27 fps5 Avg Flow: 0.041 mgd Peak Flow: 0.123 mgd Min Flow: 0.002 mgd52 Site R.1 Monitoring Site:Level, Velocity and Flow From 11/1/2010 to 11/8/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 11/1 11/2 11/3 11/4 11/5 11/6 11/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.4 inches Avg Level: 1.12 in. Peak Level: 1.49 in. Min Level: 0.62 in.5 Avg Velocity: 1.77 fps Peak Velocity: 3.48 fps Min Velocity: 0.28 fps5 Avg Flow: 0.037 mgd Peak Flow: 0.101 mgd Min Flow: 0.003 mgd53 0.000.050.100.150.200.250.300.350.400.450.5030-JanSat31-JanSun1-FebMon2-FebTue3-FebWed4-FebThu5-FebFri6-FebSat7-FebSun8-FebMon9-FebTue10-FebWed11-FebThu12-FebFri13-FebSat14-FebSun15-FebMon16-FebTue17-FebWed18-FebThu19-FebFri20-FebSat21-FebSun22-FebMon23-FebTue24-FebWed25-FebThu26-FebFri27-FebSat28-FebSunFlow (mgd)0.00.10.20.30.40.50.60.70.8Rainfall (in/hr)RainFlowBLFlowSite R.1Monitoring Site:Period Flow Summary0.1050.0900.0870.0910.1530.1710.1790.1610.1380.1300.1090.1050.1000.0940.0960.0930.1110.1070.1220.1630.1460.1490.1580.1430.1260.1160.1150.1070.1040.1000.0960.0940.0910.0870.0790.0770.0780.0780.0770.000.050.100.150.200.250.301/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/28Flow (MGal)0.00.40.81.21.62.02.42.8Rainfall (in/day)0.000.050.100.150.200.250.300.350.400.450.5028-FebSun1-MarMon2-MarTue3-MarWed4-MarThu5-MarFri6-MarSat7-MarSun8-MarMon9-MarTue10-MarWed11-MarThu12-MarFri13-MarSat14-MarSun15-MarMon16-MarTue17-MarWed18-MarThu19-MarFri20-MarSat21-MarSun22-MarMon23-MarTue24-MarWed25-MarThu26-MarFri27-MarSat28-MarSunFlow (mgd)0.00.10.20.30.40.50.60.70.8Rainfall (in/hr)0.1240.1170.2080.1970.1260.1190.0930.1000.2780.2000.1380.1460.1080.1100.0830.0830.0770.0730.000.050.100.150.200.250.301/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/280.00.40.81.21.62.02.42.80.1210.000.050.100.150.200.250.301/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/280.00.40.81.21.62.02.42.8January 30 to March 28, 2010Total Period Rainfall: 7.1 inchesAvg Flow: 0.119 mgd Peak Flow: 0.375 mgd Min Flow: 0.04 mgd Diameter0.01.02.03.04.05.06.07.08.09.002/0202/0302/0402/0502/0602/0702/0802/0902/1002/1102/1202/1302/1402/1502/1602/1702/1802/1902/2002/2102/2202/2302/2402/2502/2602/2702/2803/0103/0203/0303/0403/0503/0603/0703/0803/0903/1003/1103/1203/1303/1403/15Level (inches)Site R.1Monitoring Site:Site Capacity / Surcharge SummaryRealtime Flow Levels with Rainfall Data over Monitoring Period Peak Measured Level:2.93Peak d/D Ratio:0.37Pipe Diameter:8inchesinches Site R.1 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 02/0402/0502/0602/0702/0802/09Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.35 0.27 2.81 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 10.55 8.27 d/D Ratio:0.35 603,000 10.47Total I/I per ADWF:per in-rain 10.5%R-Value: 437% mgd RDI (% of BL): 0.14 Event 1 Event 1 Detail Graph (2/8/2010) RDI:Acre:1,194 PkI/I:Acre:2,260 Storm Event I/I Analysis (Rain = 1.76 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: 5,924Total I/I per IDM:per in-rainPkI/I:IDM:4,680 gpd/IDM RDI:IDM:2,472 gpd/IDM Site R.1 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 02/2602/2702/2803/0103/02Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.37 0.32 2.93 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 11.45 9.65 d/D Ratio:0.37 631,000 8.10Total I/I per ADWF:per in-rain 8.1%R-Value: 411% mgd RDI (% of BL): 0.13 Event 2 Event 2 Detail Graph (3/1/2010) RDI:Acre:1,124 PkI/I:Acre:2,636 Storm Event I/I Analysis (Rain = 2.38 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: 4,582Total I/I per IDM:per in-rainPkI/I:IDM:5,458 gpd/IDM RDI:IDM:2,327 gpd/IDM Site R.1 Monitoring Site:Level, Velocity and Flow From 1/25/2010 to 2/1/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.50 1/25 1/26 1/27 1/28 1/29 1/30 1/31Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.09 inches Avg Level: 2.02 in. Peak Level: 2.35 in. Min Level: 1.68 in.52 1 Avg Velocity: 2.76 fps Peak Velocity: 3.34 fps Min Velocity: 2.23 fps521 Avg Flow: 0.124 mgd Peak Flow: 0.172 mgd Min Flow: 0.08 mgd521 Site R.1 Monitoring Site:Level, Velocity and Flow From 2/1/2010 to 2/8/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.50 2/1 2/2 2/3 2/4 2/5 2/6 2/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 1.77 inches Avg Level: 1.98 in. Peak Level: 2.81 in. Min Level: 1.55 in.52 2 Avg Velocity: 2.92 fps Peak Velocity: 4.89 fps Min Velocity: 1.84 fps522 Avg Flow: 0.133 mgd Peak Flow: 0.345 mgd Min Flow: 0.057 mgd522 Site R.1 Monitoring Site:Level, Velocity and Flow From 2/8/2010 to 2/15/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.50 2/8 2/9 2/10 2/11 2/12 2/13 2/14Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.65 inches Avg Level: 2.11 in. Peak Level: 2.66 in. Min Level: 1.6 in.52 3 Avg Velocity: 3.05 fps Peak Velocity: 4.05 fps Min Velocity: 2.23 fps523 Avg Flow: 0.146 mgd Peak Flow: 0.256 mgd Min Flow: 0.078 mgd523 Site R.1 Monitoring Site:Level, Velocity and Flow From 2/15/2010 to 2/22/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.50 2/15 2/16 2/17 2/18 2/19 2/20 2/21Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.26 inches Avg Level: 1.71 in. Peak Level: 2.11 in. Min Level: 1.41 in.52 4 Avg Velocity: 2.86 fps Peak Velocity: 3.87 fps Min Velocity: 1.85 fps524 Avg Flow: 0.103 mgd Peak Flow: 0.184 mgd Min Flow: 0.051 mgd524 Site R.1 Monitoring Site:Level, Velocity and Flow From 2/22/2010 to 3/1/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.50 2/22 2/23 2/24 2/25 2/26 2/27 2/28Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 2.91 inches Avg Level: 1.88 in. Peak Level: 2.93 in. Min Level: 1.36 in.52 5 Avg Velocity: 3.34 fps Peak Velocity: 5.14 fps Min Velocity: 2.07 fps525 Avg Flow: 0.144 mgd Peak Flow: 0.375 mgd Min Flow: 0.056 mgd525 Site R.1 Monitoring Site:Level, Velocity and Flow From 3/1/2010 to 3/8/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.50 3/1 3/2 3/3 3/4 3/5 3/6 3/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 1.27 inches Avg Level: 2.06 in. Peak Level: 2.5 in. Min Level: 1.79 in.52 6 Avg Velocity: 3.24 fps Peak Velocity: 4.58 fps Min Velocity: 2.47 fps526 Avg Flow: 0.149 mgd Peak Flow: 0.235 mgd Min Flow: 0.102 mgd526 Site R.1 Monitoring Site:Level, Velocity and Flow From 3/8/2010 to 3/15/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.50 3/8 3/9 3/10 3/11 3/12 3/13 3/14Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.17 inches Avg Level: 1.85 in. Peak Level: 2.45 in. Min Level: 1.5 in.52 7 Avg Velocity: 2.81 fps Peak Velocity: 3.67 fps Min Velocity: 2.04 fps527 Avg Flow: 0.112 mgd Peak Flow: 0.212 mgd Min Flow: 0.063 mgd527 Site R.1 Monitoring Site:Level, Velocity and Flow From 3/15/2010 to 3/22/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.50 3/15 3/16 3/17 3/18 3/19 3/20 3/21Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 1.66 in. Peak Level: 2.21 in. Min Level: 1.37 in.52 8 Avg Velocity: 2.64 fps Peak Velocity: 3.51 fps Min Velocity: 1.86 fps528 Avg Flow: 0.091 mgd Peak Flow: 0.176 mgd Min Flow: 0.053 mgd528 Site R.1 Monitoring Site:Level, Velocity and Flow From 3/22/2010 to 3/29/2010 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.50 3/22 3/23 3/24 3/25 3/26 3/27 3/28Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 1.57 in. Peak Level: 2.09 in. Min Level: 1.18 in.52 9 Avg Velocity: 2.43 fps Peak Velocity: 3.15 fps Min Velocity: 1.67 fps529 Avg Flow: 0.077 mgd Peak Flow: 0.146 mgd Min Flow: 0.04 mgd529 Monitoring Site: Location: Size/Type Line: Site R.2 Manhole M11-85: 2410 Helena Street 6-inch Sanitary Sewer Pipe Temporary Flow Monitoring Study Sanitary Sewer Collection System Data Summary Report Site R.2 Location:Manhole M11-85: 2410 Helena Street Diameter:6 Monitoring Site:Site Information Report Average Dry Weather Flow:0.022 Peak Measured Flow:0.214 mgd mgd Sewer Map Satellite View Latitude: 35.2699° Longitude:-120.6479° Rim Elevation:295 feet inches Flow Diagram Street View Site R.2Monitoring Site:Average Dry Weather Flow0.13Average Dry Weather Flow:mgd0.0220.0000.0050.0100.0150.0200.0250.0300.0350.0400.0450:001:002:003:004:005:006:007:008:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:0023:00Flow (mgd)WeekdayWeekend Site R.2 Monitoring Site:Level, Velocity and Flow From 10/18/2010 to 10/25/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Velocity (fps)Vel 0.000 0.050 0.100 0.150 0.200 0.250 10/18 10/19 10/20 10/21 10/22 10/23 10/24Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.91 inches Avg Level: 0.88 in. Peak Level: 2.45 in. Min Level: 0.31 in.6 Avg Velocity: 2.41 fps Peak Velocity: 4.5 fps Min Velocity: 0.78 fps6 Avg Flow: 0.032 mgd Peak Flow: 0.142 mgd Min Flow: 0.003 mgd6 Site R.2 Monitoring Site:Level, Velocity and Flow From 10/25/2010 to 11/1/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Velocity (fps)Vel 0.000 0.050 0.100 0.150 0.200 0.250 10/25 10/26 10/27 10/28 10/29 10/30 10/31Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.48 inches Avg Level: 0.85 in. Peak Level: 1.71 in. Min Level: 0.3 in.6 Avg Velocity: 2.42 fps Peak Velocity: 4.39 fps Min Velocity: 0.58 fps6 Avg Flow: 0.028 mgd Peak Flow: 0.086 mgd Min Flow: 0.002 mgd62 Site R.2 Monitoring Site:Level, Velocity and Flow From 11/1/2010 to 11/8/2010 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Velocity (fps)Vel 0.000 0.050 0.100 0.150 0.200 0.250 11/1 11/2 11/3 11/4 11/5 11/6 11/7Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.4 inches Avg Level: 0.88 in. Peak Level: 1.98 in. Min Level: 0.33 in.6 Avg Velocity: 2.57 fps Peak Velocity: 4.08 fps Min Velocity: 0.65 fps6 Avg Flow: 0.031 mgd Peak Flow: 0.119 mgd Min Flow: 0.003 mgd63 0.000.050.100.150.200.250.300.350.4020-Jan Thu21-Jan Fri22-Jan Sat23-Jan Sun24-Jan Mon25-Jan Tue26-Jan Wed27-Jan Thu28-Jan Fri29-Jan Sat30-Jan Sun31-Jan Mon1-Feb Tue2-Feb Wed3-Feb Thu4-Feb Fri5-Feb Sat6-Feb Sun7-Feb Mon8-Feb Tue9-Feb Wed10-Feb Thu11-Feb Fri12-Feb Sat13-Feb SunFlow (mgd)0.000.050.100.150.200.250.300.350.40Rainfall (in/hr)RainFlowBLFlowSite R.2Monitoring Site:Period Flow Summary0.0210.0260.0200.0260.0270.0220.0250.0250.0200.0230.0220.0220.0230.0170.0160.0130.0180.0220.0190.0300.0280.0320.0180.0390.0310.0560.0410.0280.0320.0290.0240.000.020.040.060.080.100.121/201/211/221/231/241/251/261/271/281/291/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/6Flow (MGal)0.00.40.81.21.62.02.42.8Rainfall (in/day)0.000.050.100.150.200.250.300.350.4013-FebSun14-FebMon15-FebTue16-FebWed17-FebThu18-FebFri19-FebSat20-FebSun21-FebMon22-FebTue23-FebWed24-FebThu25-FebFri26-FebSat27-FebSun28-FebMon1-Mar Tue2-Mar Wed3-Mar Thu4-Mar Fri5-Mar Sat6-Mar Sun7-Mar MonFlow (mgd)0.000.050.100.150.200.250.300.350.40Rainfall (in/hr)0.0320.0240.0250.0280.0230.0270.0220.0250.0570.0390.1010.0470.0190.0180.000.020.040.060.080.100.121/201/211/221/231/241/251/261/271/281/291/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/60.00.40.81.21.62.02.42.80.0170.000.020.040.060.080.100.121/201/211/221/231/241/251/261/271/281/291/301/312/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/283/13/23/33/43/53/60.00.40.81.21.62.02.42.8January 20 to March 7, 2011 Diameter0.01.02.03.04.05.06.07.002/1402/1502/1602/1702/1802/1902/2002/2102/2202/2302/2402/2502/2602/2702/2803/0103/02Level (inches)Site R.2Monitoring Site:Site Capacity / Surcharge SummaryRealtime Flow Levels with Rainfall Data over Monitoring Period Peak Measured Level:2.18Peak d/D Ratio:0.36Pipe Diameter:6inchesinches Site R.2 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 02/1402/1502/1602/1702/1802/1902/2002/2102/2202/2302/2402/25Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.171 0.142 1.94 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 7.64 6.36 d/D Ratio:0.32 86,000 1.36Total I/I per ADWF:per in-rain 1.4%R-Value: 0% mgd RDI (% of BL): 0.000 Event 1 Event 1 Detail Graph (2/21/2011) RDI:Acre:0 PkI/I:Acre:1,765 Storm Event I/I Analysis (Rain = 2.84 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: Site R.2 Monitoring Site:I/I Summary Baseline and Realtime Flows with Rainfall Data over Monitoring Period 0.00 0.05 0.10 0.15 0.20 0.25 02/2502/2602/2702/2803/0103/02Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.214 0.178 2.18 Peak Flow: Peak I/I Rate:Total I/I: PF: Pk I/I:ADWF: Peak Level: mgd mgd gallons in 9.57 7.93 d/D Ratio:0.36 159,000 6.98Total I/I per ADWF:per in-rain 7.1%R-Value: 93% mgd RDI (% of BL): 0.021 Event 2 Event 2 Detail Graph (2/27/2011) RDI:Acre:259 PkI/I:Acre:2,200 Storm Event I/I Analysis (Rain = 1.02 inches) Capacity Inflow GPAD RDI (infiltration) GPAD Combined I/I Infiltration Rate: Site R.2 Monitoring Site:Level, Velocity and Flow From 1/17/2011 to 1/24/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 1/17 1/18 1/19 1/20 1/21 1/22 1/23Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 0.78 in. Peak Level: 1.23 in. Min Level: 0.32 in.120 1 Avg Velocity: 2.4 fps Peak Velocity: 3.46 fps Min Velocity: 1.35 fps1201 Avg Flow: 0.024 mgd Peak Flow: 0.061 mgd Min Flow: 0.005 mgd1201 Site R.2 Monitoring Site:Level, Velocity and Flow From 1/24/2011 to 1/31/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 1/24 1/25 1/26 1/27 1/28 1/29 1/30Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.41 inches Avg Level: 0.8 in. Peak Level: 1.37 in. Min Level: 0.31 in.120 2 Avg Velocity: 2.3 fps Peak Velocity: 3.6 fps Min Velocity: 1.4 fps1202 Avg Flow: 0.025 mgd Peak Flow: 0.07 mgd Min Flow: 0.004 mgd1202 Site R.2 Monitoring Site:Level, Velocity and Flow From 1/31/2011 to 2/7/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 1/31 2/1 2/2 2/3 2/4 2/5 2/6Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.01 inches Avg Level: 0.77 in. Peak Level: 1.44 in. Min Level: 0.27 in.120 3 Avg Velocity: 2.27 fps Peak Velocity: 3.46 fps Min Velocity: 1.22 fps1203 Avg Flow: 0.023 mgd Peak Flow: 0.074 mgd Min Flow: 0.003 mgd1203 Site R.2 Monitoring Site:Level, Velocity and Flow From 2/7/2011 to 2/14/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 2/7 2/8 2/9 2/10 2/11 2/12 2/13Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlow Avg Level: 0.68 in. Peak Level: 1.33 in. Min Level: 0.16 in.120 4 Avg Velocity: 2.19 fps Peak Velocity: 3.4 fps Min Velocity: 1.04 fps1204 Avg Flow: 0.019 mgd Peak Flow: 0.071 mgd Min Flow: 0.001 mgd1204 Site R.2 Monitoring Site:Level, Velocity and Flow From 2/14/2011 to 2/21/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 2/14 2/15 2/16 2/17 2/18 2/19 2/20Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 2.84 inches Avg Level: 0.83 in. Peak Level: 1.72 in. Min Level: 0.21 in.120 5 Avg Velocity: 2.87 fps Peak Velocity: 5.82 fps Min Velocity: 1.05 fps1205 Avg Flow: 0.032 mgd Peak Flow: 0.155 mgd Min Flow: 0.002 mgd1205 Site R.2 Monitoring Site:Level, Velocity and Flow From 2/21/2011 to 2/28/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 2/21 2/22 2/23 2/24 2/25 2/26 2/27Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 1.02 inches Avg Level: 1.1 in. Peak Level: 2.18 in. Min Level: 0.01 in.120 6 Avg Velocity: 2.51 fps Peak Velocity: 5.68 fps Min Velocity: 1.05 fps1206 Avg Flow: 0.044 mgd Peak Flow: 0.214 mgd Min Flow: 0 mgd1206 Site R.2 Monitoring Site:Level, Velocity and Flow From 2/28/2011 to 3/7/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 2/28 3/1 3/2 3/3 3/4 3/5 3/6Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.27 inches Avg Level: 0.99 in. Peak Level: 1.75 in. Min Level: 0.47 in.120 7 Avg Velocity: 1.86 fps Peak Velocity: 2.9 fps Min Velocity: 0.97 fps1207 Avg Flow: 0.027 mgd Peak Flow: 0.085 mgd Min Flow: 0.005 mgd1207 Site R.2 Monitoring Site:Level, Velocity and Flow From 3/7/2011 to 3/14/2011 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Mon Tue Wed Thu Fri Sat Sun Level (in)Lev 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 Velocity (fps)Vel 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 3/7 3/8 3/9 3/10 3/11 3/12 3/13Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Rain Flow BLFlowTotal Weekly Rainfall: 0.03 inches Avg Level: 0.68 in. Peak Level: 1.1 in. Min Level: 0.27 in.120 8 Avg Velocity: 1.75 fps Peak Velocity: 2.65 fps Min Velocity: 0.99 fps1208 Avg Flow: 0.015 mgd Peak Flow: 0.042 mgd Min Flow: 0.003 mgd1208 City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx Appendix C APPENDIX C SAMPLE LATERAL GRANT PROGRAMS 1. Castro Valley Sanitary District 2. West County Wastewater District 3. Leucadia Wastewater District 4. City of Pacifica 5. Ross Valley Sanitary District 6. City of Sausalito Castro Valley Sanitary District’s Lateral Replacement Grant Program (LRGP) will cover 50% of the cost, up to a maximum of $2,000, provided you follow the guidelines. For more information—and before you hire a contractor—look inside, or call CVSan at (510) 606-1300. HOMEOWNERS: NEED TO REPLACE THAT LEAKY OLD SEWER LATERAL? Let CVSan help you pay for it! Grants up to $2,000 available. LATERAL REPLACEMENT gRANT PROgRAM gui DELi NES Not all applications will be granted. All applications are subject to a Condition Rating by CVSan. 2011/2012 WHAT iS A SEWER LATERAL? Within the Castro Valley Sanitary District (CVSan), the building lateral is defined as the portion of the sewer system, beginning at the junction with the building plumbing system, usually located within two (2) feet of the foundation wall of the building, and extending to and including the connection to the public sewer main (see Figure #1, at right). The building lateral is the pri- vate property of the property owner who is, therefore, responsible for all costs relating to the installation, con- nection, maintenance, repair, construction, alteration, abandonment or removal of the building lateral. These building laterals are often a significant source of infiltration and inflow (“I/I”). The Lateral Replacement Grant Program (LRGP), is designed to help defray a portion of the costs when the property owner or their agent is required to replace the entire lateral including the connection to the main. AMOuNT OF gRANT The maximum amount of assistance for any one resi- dential building lateral replacement or repair is 50% of the approved cost up to a maximum reimbursement of $2,000. Only complete replacement of the building lateral or repair in excess of $2,000, that completely eliminates infiltration and inflow is eligible for the program. Not all applications will be granted. All ap- plications are subject to a Condition Rating by CVSan. The property owner is responsible for notifying their selected contractor that their entire building lateral must pass CVSan inspection requirements (even if only a partial replacement was performed) in order to be eli- gible for reimbursement. Grant payment shall be made to the property owner(s). Notice: All work for the LRGP must be performed by a licensed contractor qualified by CVSan. For a list of CVSan qualified contractors, please visit www.cvsan.org or contact CVSan at 510-606-1300. BEFORE BEgiNNiNg ANY CONSTRuCTiON WORK: A. A video inspection must be performed by a contractor, and witnessed by CVSan personnel. B. Property owner must submit a completed application, including price quotes from at least three (3) CVSan Qualified Contractors. C. A Letter of Approval must be issued by CVSan to property owner. iMPORTANT REquiREMENTS Warning: If the above requirements are not met prior to commencement of construction work, no funds will be obligated to the property owner. LR g P CHECKLiST LATERAL iNSPECTiNg Lateral inspection must be performed prior to repair or replacement of the building lateral in order for grant funding to be considered. Inspecting and testing methods shall include the following technique: • Recorded Video Inspection Video inspection shall reveal the condition of the lateral and each service connection. Video inspection shall be done by an independent contractor and observed by CVSan personnel who shall document the inspection. The video inspection must be recorded and the lateral fully viewable. Cleaning and/or de-clogging should be performed prior to the inspection. Schedule appointment - Beginning Tuesday, July 5, 2011 at 7:30 a.m., call (510) 606-1300, or visit CVSan at 20211 Patio Drive, Suite 200, Castro Valley, to schedule a lateral video inspection appointment. Lateral inspection observations will be scheduled beginning the week of July 11, 2011. Property owner submits application to CVSan with three (3) valid quotations. Qualification is determined after video inspection. All applica- tions are subject to a Condition Rating by CVSan. Not all applications will be granted. Applications may NOT be submitted by Contractor. A Letter of Approval must be issued by CVSan to property owner. Warning: If items A.-C. (see “Important Require- ments” on previous page) are not met prior to commencement of construction work, no funds will be obligated to the property owner. Property owner/Contractor obtains required permit(s). Property owner schedules work with contractor. Construction inspection of repair work by CVSan personnel prior to backfilling. Property owner submits copy of paid-in-full invoice to CVSan for the work performed by contractor. CVSan processes application for payment. Pay- ment will be made within four (4) to six (6) weeks. 2011/2012 APPLiCATiON The property owner(s) shall submit a Lateral Re- placement Grant application, provided by CVSan, prior to commencement of work. The request will be reviewed by CVSan, and the determination of eli- gibility will be made by the designated representative whose decision shall be final. Grant funds are available for fiscal year 2011/12 starting July 5, 2011 at 7:30 a.m. Funds will be obligated on a first come, first qualified, first served basis, until all funds are allocated or the end of the fiscal year (June 30, 2012). Funds will be obligated for a period not to exceed ninety (90) days from approval. The obligation period shall include all work, inspection, payment to Con- tractor by property owner, and submission of paid receipt(s) to CVSan. Work not completed by June 30, 2012, will not be eligible for payment and may result in disqualifica- tion from the current program year. For consideration of the FY 2011/12 LRGP, applica- tions must be submitted as soon as the line qualifies. Property owners must complete the current 2011/12 form. Applications accepted on a continual basis until program is completed or all funds are allocated. APPLiCATiON How do I get an application for the Lateral Replacement Grant Program? Download an application at www.cvsan.org, pick one up at CVSan’s Capital Improvement Project office located at 20211 Patio Drive, Suite 200, Castro Valley, or request a copy be mailed to you by calling (510) 606-1300. Please be aware the property owner is responsible for obtaining an application. What do I do after I receive my application? After you receive your application form, you will need to fill out Sections I-III. CCTV iNSPECTiON & PRiCE quOTES From whom can I get price quotations? You can get price quotations from CVSan Qualified Contractors. How many quotes do I need to obtain? You need to obtain three (3) quotes; however, CVSan encourages you to obtain four (4) for better price comparison. Can CVSan recommend licensed contractors? Legally, CVSan may not recommend any contractors. However, CVSan can supply you with a list of CVSan Qualified Contractors who have worked in the District. For a list of CVSan qualified contractors, please visit www.cvsan.org or contact CVSan at 510-606-1300. What is a Condition Rating? Condition rating is an assessment of the sewer lateral to determine the degree of defects to the line. Condition ratings take into consideration: pipe cracks, roots, water infiltration evidence, and other defects. Each defect is given a numerical designation (this is similar to the method used on public sanitary sewer lines). Those laterals in poor condition (condition rating) will receive grant funding. Castro Valley Sanitary District Capital Improvement Projects Office 20211 Patio Drive, Suite 200 Castro Valley, California 94546-6020 Phone: (510) 606-1300 | Fax: (510) 733-5011 www.cvsan.org S:\Engineering\Programs\Program Info\LRGP\11-12 -LRGP Brochure.indd APPROVAL & PERMiTS How do I know if I have qualified for the LRGP? When you receive a Letter of Approval from CVSan stating that you have qualified and funds have been obligated for your project. Do I need any permits for this work? Yes. You will need a repair permit from CVSan to perform this work. You may also need an encroachment permit from Alameda County Public Works if you are doing work in the public roadway. All permits must be obtained prior to commencement of construction work. After I have received my Letter of Approval, what happens next? You will be able to commence work. You will have 90 days in which to complete construction, inspection, pay contractor in full, and submit copy of receipt to CVSan. SiTE iNSPECTiON & PAYMENT When do I need an inspection? A site inspection is required by CVSan personnel after the new sewer line has been installed, but prior to any backfilling. CVSan personnel will witness testing of the entire line from the building foundation to the connection to the main. Testing will be performed by your contractor. What happens after the site inspection? Once inspection is complete, you need to submit a copy of your paid-in-full invoice to CVSan for the work performed. CVSan will then process your application for payment. Payment will be made within four (4) to six (6) weeks. FREquENTLY ASKED quESTiONS S:\Engineering\Programs\LRGP\2011\LRGP 1112 APPLICATION.docx 2011-2012 LRGP #1112- Page 1 of 2 CASTRO VALLEY SANITARY DISTRICT Lateral Replacement Grant Program Application SECTION I. General Information Please print clearly. 1. Grant Address: 2. Property Owner Name: 3. Property Owner Address: (if different from above) Street City State Zip 4. Property Owner Phone/Fax: ________________ ________________ ________________ _______________ Home Work Cell Fax Email Address: I certify by signing this application that I am the legal owner of the property described herein . I am aware the submission of this document does not constitute that a grant has been approved by Castro Valley Sanitary District (CVSan). I have read the brochure discussing the requirements for the Lateral Replacement Grant Program and am aware that a letter will be issued advising if funds have been granted. Any repair work performed prior to receiving a letter of obligation from CVSan is performed at my own risk and cost, and makes this application null and void. I understand not all applications will be granted. I understand all applications are subject to a Condition Rating approved by CVSan. Signature: Date: SECTION II: Site Information 1. State the nature of problem(s): Tree Roots Collapsed Pipe Fats, Oils, and Grease Build-up Other. If Other, please specify: How many times has this occurred in the last 12 months? 2. Layout sketch provided showing the dwelling and building sewer including clean-outs, if known. Yes No 3. Is there an insurance claim for this work? Yes Please provide a copy of any claim information. No Notes: 1. All Video Inspections must be observed by CVSan personnel. 2. Grant funds will not be obligated until after the inspection and price quotations have been submitted. Castro Valley Sanitary District, 20211 Patio Drive, Suite 200, Castro Valley, CA 94546 Phone: 510-606-1300 / Fax: 510-733-5011 / Website: www.cvsan.org S:\Engineering\Programs\LRGP\2011\LRGP 1112 APPLICATION.docx 2011-2012 LRGP #1112- Page 2 of 2 SECTION III: Video Inspection Information and Price Quotations Video Contractor Name: Please supply at lease three (3) price quotations from contractors listed on the CVSan Qualified Contractors List and submit to CVSan for review. 1. Contractor Name: Quotation: $ Repair Method: Pipe Bursting or Open Trench 2. Contractor Name: Quotation: $ Repair Method: Pipe Bursting or Open Trench 3. Contractor Name: Quotation: $ Repair Method: Pipe Bursting or Open Trench 4. Contractor Name: Quotation: $ Repair Method: Pipe Bursting or Open Trench Please be advised: CVSan will review price quotations for reasonableness of scope and cost. CVSan will use historical cost data to determine the reasonableness of a price quotation. Additional estimates may be requested by CVSan. Reminder: Please submit your completed application to Castro Valley Sanitary District, 20211 Patio Drive, Suite 200, Castro Valley, CA 94546. Castro Valley Sanitary District, 20211 Patio Drive, Suite 200, Castro Valley, CA 94546 Phone: 510-606-1300 / Fax: 510-733-5011 / Website: ww.cvsan.org ATLAS ENGINEERING, INC.BEYOND PLUMBING EPS INC. 1673 Albani Place 650 McClary Avenue 307 N. Amphlett Blvd. Brentwood, CA 94513 Oakland, CA 94621-1915 San Mateo, CA 94401-1806 Phone: 925-727-6206 Phone: 510-867-0756 Phone: 800-246-6425 Fax: 925-240-0486 Fax: 510-638-9726 Fax: 650-343-8256 License #900824 License #810801 License #778428 Website: N/A Website: www.beyondplumbing.com Website: www.expressplumbing.com Email: heathculbreath@sbcglobal.net Email: beyondplumbingcompany@yahoo.com Email: janet@expressplumbing.com or nick@expressplumbing.com ORTIZ CONSTRUCTION PLUMBING SQUAD ROTO ROOTER 4061 E. Castro Valley Blvd. #449 44850 Industrial Dr., Unit C 333 N. Canyons Parkway, Ste. 221 Castro Valley, CA 94552 Fremont, CA 94538 Livermore, CA 94551-9478 Phone: 510-538-9464 Phone: 510-943-2618 Phone: 510-278-0823 Fax: 510-538-2870 Fax: 510-257-5500 Fax: 925-605-4354 License #760739 License #917303 License #604196 Website: www.fortizconstruction.com Website: www.plumbingsquad.com Website: www.rotorooter.com Email: ortizjr@gmail.com Email: info@plumbingsquad.com Email: d.nannini@sanacthq.com SEWER CONNECTION, INC.SEWERS 4 LESS STAR ROOTER AND PLUMBING P.O. Box 903 1862 Toulouse Lane P.O. Box 490 Pinole, CA 94564 Brentwood, CA 94513 San Lorenzo, CA 94580 Phone: 510-222-2002 Phone: 510-612-1560 Ed Phone: 510-377-4749 Fred Fax: 510-758-4100 Fax: 925-240-5116 Fax: 510-481-1741 License #796452 License #668482 License #884481 Website: www.sewerconnectioninc.com Website: N/A Website: www.starrooter.com Email: sewerconnection@comcast.net Email: N/A Email: fred@starrooter.com STREAMLINE PLUMBING THE PLUMBING MINISTRY 20885 Redwood Road #406 1637 80TH Avenue Castro Valley, CA 94546-5915 Oakland, CA 94621 Phone: 510-755-1893 Phone: 510-430-1853 Fax: 925-516-1994 Fax: 510-430-1290 License: 672250 License: 894946 Website: www.streamlineplumbingco.com Website: theplumbingministry.com Email: streamlinegreg@comcast.net Email: plumbingministry@att.net CVSan encourages you to check with the Contractors State License Board - Phone: 800-321-2752 / website: www.cslb.ca.gov and the Better Business Bureau - Phone: 510-844-2000 / website: www.bbb.org prior to hiring a contractor. The following list of Qualified Contractors is provided by Castro Valley Sanitary District (CVSan) as a service to its residents and may be used for information purposes only. This list is comprised by the use of historical data. All contractors listed below are properly licensed, do not have any outstanding matters with CVSan, and have not presented any misleading or confusing print media about the District's LRGP. We do not warrant that the information is current, although every effort is made to ensure that it is kept as current as possible. CVSan assumes no responsibility for any direct, indirect, incidental or consequential damages arising out of or relating to the Contractors. No advice or information given by CVSan shall create any warranty or liability. List of CVSan Qualified Contractors Fiscal Year 2011/2012 S:\Engineering\Programs\LRGP\2011\1112 CONTRACTOR LIST - 2011-06-10 1112 Updated 8/3/2010 2009-09-21 Page 1 of 2 Lateral Grant Application Guidelines ENGINEERING DEPARTMENT 450 Civic Center Plaza Richmond, California 94804 Introduction In 2006, the City of Richmond adopted an ordinance requiring all private sewer mains and laterals to be certified as meeting the standards set forth in Richmond Municipal Code Chapter 12.17. To obtain the required “Certificate of Lateral Compliance,” many property owners must incur significant costs to repair or replace private mains or laterals. To help defray the costs to property owners, the City has budgeted $100,000 per fiscal year for ten years to be distributed as grants of up to $3,000 each to qualifying applicants. Residents who own their homes and tax-exempt public service organizations owning property within the Richmond Sanitary Sewer District may apply for a grant of up to $3,000 as reimbursement for costs incurred to bring a private sewer main or lateral into compliance. Eligibility Guidelines: 1. Eligible applicants own property served by the Richmond Sanitary Sewer District and they are either (i) the occupying owner(s) of a residence, or (ii) a tax-exempt public service organization. Owners of property within the City of Richmond served by the Stege Sanitary District or West County Wastewater District are not eligible to receive City grants. Tax-exempt organizations must attach proof of tax-exempt status to the grant application. Before awarding any grants, the City will verify property ownership. 2. Prior to applying for a grant, the eligible applicant must have the private sewer main or lateral inspected in accordance with Richmond Municipal Code Section 12.17.050. If the inspection reveals that the private main or lateral requires repairs or replacement in order to meet the City’s standards (set forth at RMC Chapter 12.17), then the property owner must seek competitive bids from a minimum of three contractors duly licensed in California to perform the necessary work in order to be eligible for a grant. Copies of at least three bids must be attached to the grant application, unless the applicant received a Certificate of Lateral Compliance prior to May 16, 2008. If the applicant holds a valid Certificate of Lateral Compliance issued prior to May 16, 2008, she or he must attach to the grant application a receipt from a duly licensed contractor for work performed on the subject private main or lateral in order to bring it into compliance. Only the property owner who paid for the work will be eligible for a grant; a person who acquired the property after the Certificate of Lateral Compliance was issued will not be eligible for a grant. Eligible property owners who received Certificates of Compliance prior to May 16, 2008 may submit grant applications for a period of two years from the date of the Certificate of Lateral Compliance. 3. Complete grant applications must be received by 5 pm on the published deadline. Each fiscal year, the City will accept grant applications by mail or in person on the date and at the place published in the Notice of Grant Availability. The Notice of Grant Availability will be minimally posted on the City’s website, at the Engineering counter, and at the Building Services counter, and it will be published in the West County Times. The City reserves the right to reject all incomplete applications. Grant recipients will be notified by mail or, if an e-mail address is provided, by e-mail within sixty days from receipt of the application. 2009-09-21 Page 2 of 2 4. Funds will be disbursed to grant recipients after they have received Certificates of Compliance. Every grant recipient must complete the work necessary to bring the private sewer main or lateral into compliance with Richmond Municipal Code Chapter 12.17 and receive a Certificate of Compliance before the City will issue a check for the grant funds. Award Limits: 1. Grants will not exceed one half of the lowest competitive bid for the required work, or, in the case of applicants holding a Certificate of Lateral Compliance issued prior to May 1, 2008, one half of actual costs incurred for the required work, up to a maximum award of $3,000. 2. Each fiscal year the City will provide $100,000 to be awarded in private sewer main or lateral repair or replacement grants. Any funds remaining at the end of each fiscal year shall roll over to the next fiscal year. Because funds are limited, it is possible that not every eligible applicant will receive a grant. Persons not awarded a grant due to unavailability of funds may reapply the following fiscal year. Each property owner is eligible for no more than one private sewer main or lateral repair or replacement grant. 2008-04-16 Page 1 of 1 (To be completed by City staff) Lateral Grant Application *Please type or print in blue or black ink* ENGINEERING SERVICES DEPARTMENT Date and time received: 450 Civic Center Plaza Richmond, California 94804 Subject Property Information Address or location, including ZIP Date of Inspection (attach copy of inspection report) Amount of bids received (attach copies of bids) 1. _____________________________ 2. _____________________________ 3. _____________________________ Brief description of work required to bring lateral into compliance with RMC Chapter 12.17 For applicants who repaired or replaced a private sewer main or lateral prior to May 16, 2008, date Certificate of Lateral Compliance issued by City of Richmond: __________________________________ (Attach receipt from licensed contractor for work performed to bring main or lateral into compliance.) Applicant Information Name of Property Owner (If an organization, attach proof of tax-exempt status) Daytime telephone ______________________ E-mail ________________________________ Address (if different than above) City, State ZIP By signing this application, I certify that (i) I am the legal owner or, if the owner is a tax-exempt public service organization, the legal representative of the owner of the subject property described above; (ii) I have read the “Lateral Grant Application Guidelines”; (iii) I recognize that acceptance of this grant application is not a guarantee or promise by the City of Richmond to approve a grant of funds to aid in the repair or replacement of the private sewer main or lateral at the above-described property; (iv) I must maintain the private sewer main or lateral at the above- described property in compliance with Richmond Municipal Code Chapter 12.17 even if this grant application is not approved; (v) I have not submitted a claim to the City or any other public agency for reimbursement of costs incurred to make the repairs described above; (vi) Any funds granted by the City of Richmond in response to this application will be used solely to cover costs incurred in repairing or replacing the main or lateral at the above described property; and (vii) I understand that the City of Richmond does not guarantee the work of contractors on private sewer mains and laterals. I hereby grant the City of Richmond all rights of access to the subject property necessary to process this application, such rights to be exercised only during normal business hours and with reasonable notice to occupants of the subject property. Dated____________________________ Signed_____________________________ Print Name__________________________ City of Pacifica Sewer Lateral Replacement Program: Program Guidelines Background The City of Pacifica municipal code requires that property owners or persons in possession of property properly maintain side, or lateral, sewer lines connecting privately-owned buildings to the City’s main sewer lines at the owners’ own costs. On Oct. 17, 2011, City of Pacifica will begin their Sewer Lateral Replacement Program (“Program”) to enable the City to (a) inspect potentially defective, leaking and/or failed laterals connecting private residences to the City’s main sewer line, and (b) offer grants to reimburse property owners a portion of the cost of replacing qualifying defective, leaking and/or failed laterals. The Program will focus on areas that have shown to have the highest storm water infiltration based on flow studies that were done last winter. Those studies showed the highest infiltration rates in the lower Linda Mar area followed by Pedro Point, Vallemar and Fairway Park (both East & West Fairway). Eligibility To be eligible for a lateral inspection under this Program: 1. the property must be a private, single-family primary residence or the property must be owned and operated by a nonprofit organization, on a not-for-profit basis, as temporary or transitional housing or related services for homeless persons; 2. the property must not have already received benefits through this Program; 3. the lateral must be at least ten years old or there must be a reasonable basis to believe that the lateral is defective, leaking and/or failed, as determined by City staff. To be eligible for a grant for lateral replacement reimbursement under this Program: 1. the above criteria for lateral inspection must be met; 2. the lateral must have been inspected through this Program; 3. the lateral must have been found by City staff to be leaking due to root infiltration, breaks, cracks, failed pipe, “Orangeburg” pipe, or alignment problems; 4. the property owner must submit evidence that the lateral has been replaced in conformance with current City codes and specifications, including receipt of required permits, by a contractor licensed to perform such replacement; 5. the property owner must submit evidence of full payment to the contractor. Award Limits For each grant given under this Program, reimbursements are limited to $1,000 per property. When the City has reached the maximum budget for the Program in any fiscal year, the Program may be suspended until further funds are available. When the City has reached the maximum aggregate budget for the Program, the Program may be terminated. City of Pacifica Sewer Lateral Replacement Program: Application for Free Sewer Lateral Inspection and Right of Entry for Inspection of Lateral Property Address: Name of Applicant: This property is: ___ a private, single-family primary residence ___ owned and operated by a nonprofit organization, on a not-for-profit basis, as temporary or transitional housing or related services for homeless persons I am the legal owner of the property located at the above address. [_____] (initial here) or I am a legal representative of the nonprofit organization that owns the property located at the above address. [_____] (initial here) The lateral on this property is at least 10 years old. [_____] (initial here) or I have the following reasons to believe that the lateral located at the above-identified property is defective, leaking and/or failed: [_____] (initial here) AUTHORIZATIONS, WAIVERS, ACKNOWLEDGMENTS AND AGREEMENTS I hereby authorize and grant employees or agents of the City of Pacifica the right to enter the above-identified property for purposes of inspecting the lateral connecting building(s) located on the above-identified property to the City’s main sewer line at any time during regular business hours, upon reasonable notice. [_____] (initial here) I hereby acknowledge that lateral inspection may require the removal of plants and landscaping, and authorize City employees or agents to remove plants and landscaping as necessary to conduct the inspection. I understand that City employees or agents will return the plants and landscaping to as close to their prior condition as practicable. [_____] (initial here) I hereby acknowledge that lateral inspections may be performed by the use of closed-circuit video cameras. If City employees or agents create a video recording of the inspection of any lateral located on my property, such recording(s), as well as copies of any written reports on the inspection, will be provided to me after City review and will belong to me. However, I will grant the City reasonable access to such videos upon request. [_____] (initial here) I hereby waive and agree not to assert any claim, demand or cause of action against the City, its officers, employees, councilmembers, volunteers and agents arising from exercise of this Right of Entry and/or performance of any lateral inspection on my property by City employees or agents. [_____] (initial here) I hereby acknowledge and agree that the entry of, and inspection by, any City employees or agents does not relieve me of my legal responsibility for the maintenance, nor ownership, of the inspected lateral. [_____] (initial here) I hereby acknowledge and agree that completion of a lateral inspection by City employees or agents does not qualify me or my property for any further City-provided benefits, including the grant of funds for repair or replacement of the inspected lateral. [_____] (initial here) _____________________________ _________________________ Print name here Mailing Address _____________________________ _________________________ Signature Telephone Number(s) _____________________________ Date Applications may be submitted by mail or in person to: City of Pacifica Waste Water Treatment Department, 700 Coast Highway, Pacifica, CA 94044, Attn: Sewer Lateral Replacement Program Note: To the extent possible, an employee or agent of the City of Pacifica will contact each applicant within ten (10) days of receipt of this application to inform the applicant of the status of their application. ____________________________________________________________________________ For City staff use only: Application received on (date): _________________ Application reviewed by: _________________ Application decision made on (date): _________________ Application decision: ____ Application for inspection accepted ____ Application for inspection denied Reason(s) for denial, if appropriate: * * * If application for inspection granted Inspection performed by: _________________ Inspection performed on (date): _________________ Copy of video made: ____ Yes ____ No Report completed on (date): _________________ Notes: City of Pacifica Sewer Lateral Replacement Program: Application for Grant to Reimburse for Costs of Lateral Replacement Property Address: Name of Applicant: This property is: ___ a private, single-family primary residence ___ owned and operated by a nonprofit organization, on a not-for-profit basis, as temporary or transitional housing or related services for homeless persons I am the legal owner of the property located at the above address. [_____] (initial here) or I am a legal representative of the nonprofit organization that owns the property located at the above address. [_____] (initial here) Date of lateral inspection through City of Pacifica Sewer Lateral Replacement Program (attach written Property Evaluation Response report): Date(s) of lateral replacement (attach invoice and any other available evidence that the lateral has been replaced in conformance with current City codes and specifications. WAIVERS , ACKNOWLEDGMENTS AND AGREEMENTS I hereby waive and agree not to assert any claim, demand or cause of action against the City, its officers, employees, councilmembers, volunteers and agents arising from the lateral replacement at the above-identified property. [_____] (initial here) I hereby acknowledge and agree that a grant from the City does not relieve me of my legal responsibility for the maintenance, nor ownership, of the replaced lateral(s). [_____] (initial here) I hereby acknowledge and agree that I undertook the lateral replacement at my own risk and that the City does not warrant work performed the contractor who performed the lateral replacement. [_____] (initial here) _____________________________ _________________________ Print name here Mailing Address _____________________________ _________________________ Signature Telephone Number(s) _____________________________ Date Applications may be submitted by mail or in person to: City of Pacifica Waste Water Treatment Department, 700 Coast Highway, Pacifica, CA 94044, Attn: Sewer Lateral Replacement Program Note: To the extent possible, an employee or agent of the City of Pacifica will contact each applicant within ten (10) days of receipt of this application to inform the applicant of the status of their application. ____________________________________________________________________________ For City staff use only: Application received on (date): _________________ Application reviewed by: _________________ Application decision made on (date): _________________ Application decision: ____ Grant awarded in the amount of $______ ____ Grant application denied Reason(s) for denial, if appropriate: * * * If grant awarded Reimbursement issued by: _________________ Reimbursement issued on (date): _________________ Notes: Lateral Replacement Grant Program Guide An Innovative Program to Protect Human Health & the Environment Ross Valley Sanitary District The Ross Valley Sanitary District Board of Directors approved the Lateral Replacement Grant Program on August 25, 2009. Dear Customers: Thank you for helping us protect the community by repairing your end of the pipe! As you may have learned, nearly 50% of all sewer spills are caused by leaky lateral pipes on private property. This program is designed to help encourage property owners like you to repair your pipe and help protect our environment. Here is how to take advantage of our innovative grant program: •The District will fund either $4,000 or half of the total cost of the lowest bid to replace your lateral pipe, whichever is less. •Three bids from any of the District’s pre-qualified contractors must be submitted to the district along with a DVD of the lateral inspection performed by a contractor and observed by a District Inspector. You will need to coordinate the video recording of your damaged pipe with our district staff so we can be on hand for the inspection. •Once the inspection is completed and you have your DVD and bids, you’ll submit them to the district along with our Lateral Grant Application. •The district will review the DVD, bids and your application then notify you about the status of your grant funding request. A flow chart of these steps, an application and a list of pre-qualified contractors is included on the following pages. Contractors who are interested in being added to the list should con- tact the District or the local builder’s exchange. Many contractors already understand the program and can assist you in applying for it. Naturally we are more than happy to assist you as well. Please contact us with your questions. Sincerely, Brett Richards General Manager Customer Service:(415) 259-2949 Inquiries & Suggestions:info@rvsd.org Ross Valley Sanitary District 2960 Kerner Boulevard San Rafael,CA 94901 PROPERTY OWNER obtains CCTV inspection of private lateral by RVSD qualified contractor, with RVSD personnel present, and gets copy of DVD PROPERTY OWNER submits completed application to RVSD (this includes application form, at least 3 price quotes from RVSD qualified contractors, and DVD). It is preferable if the RVSD Side Sewer Repair Permit is included. Letter of Approval must be issued by RVSD to Property Owner IMPORTANT REQUIREMENTS Before ANY work can begin WARNING: If the above requirements are not met prior to commencement of construction work, than any repair work performed prior to receiving a letter of obligation from the District is performed at homeowner’s own risk and cost INSPECTION APPLICATION LETTER OF APPROVAL RVSD LATERAL GRANT PROGRAM Application to be reviewed by RVSD and determination of eligibility will be made by the General Manager or designee whose decision shall be final REVIEW for ELIGIBILITY PROPERTY OWNER/Contractor obtain required permit(s), including the RVSD Side Sewer Repair Permit if not already submitted. PROPERTY OWNER schedules work with independent Contractor Construction inspection of repair work by RVSD personnel prior to backfilling PROPERTY OWNER submits copy of paid in full invoices to RVSD for work performed by independent Contractor OBTAIN PERMIT(S) PERFORM WORK SUBMIT INVOICES INSPECT WORK RVSD processes application for paymentPAYMENT WORK MUST BE PERFORMED WITHIN 90 DAYS of APPROVAL ROSS VALLEY SANITARY DISTRICT 2960 Kerner Blvd San Rafael, CA 94901 (415) 259-2949 ~ rvsd.org List of RVSD Qualified Contractors FY 09/10 Page 1 of 2 The following list of Qualified Contractors is provided by Ross Valley Sanitary District (RVSD) of Marin County as a service to its residents and may be used for information purposes only. This list is comprised of contractors by the use of historical data, whereby we have observed and inspected their work in the field. The District makes no p reference to the contractors listed herein. All contractors listed below are properly licensed, do not have any outstanding matters with RVSD, and have not presented any misleading or confusing print media about the District’s Lateral Replacement Grant Program (LRGP). We do not warrant that the information is current, although every effort is made to ensure that it is kept as current as possible. RVSD assumes no responsibility for any direct, indirect, incidental or consequential damages ari sing out of or relating to the Contractors. No advice or information given by RVSD shall create any warranty or liability. Contractor Address City Zip Phone Fax or email License # A Plumbing Solution 107 Cora St San Francisco 94134 (415) 240-8223 damianhowai@gmail.com 848530 AB Plumbing 507 Oxford Street San Francisco 94134 (415) 333-5566 (415) 333-5568 876212 All Terrain Engineering PO Box 71098 Richmond 94807 (415) 459-1488 (415) 459-1074 827896 American Leak Detection 1201 Andersen Drive San Rafael 94901 (415) 883-1690 (415) 485-1250 662617 Amesos Plumbing Inc. 1525 Francisco Blvd. East San Rafael 94901 (415) 457-6363 (415) 457-6330 814542 ARS dba Rescue Rooter 825 Mahler Rd. Burlingame 94010 (650) 652-1050 (650) 652-1049 765155 Barcewski Inc dba Sunshine Construction 4136 Redwood Hwy Ste 13 San Rafael 94903 (415) 479-5566 (415) 479-8002 315245 Ben Franklin Plumbing 517 Jacoby St San Rafael 94901 (415) 459-5909 kimba_barrios@yahoo.com 857357 Brown Construction 13767 N. Bloomfield Rd. Nevada City 95959 (415) 450-8473 alastairbrown@att.net 500600 California Dirt Inc. 1201 Andersen Dr., Unit 1 San Rafael 94901 (415) 256-1661 gerrysconcrete@aol.com 776015 City Front Plumbing 50 Tiburon Street Ste 25 San Rafael 94901 (415) 454-6737 (415) 454-6797 443156 Community Action Marin 29 Mary Street San Rafael 94901 (415) 526-7500 (415) 457-9677 685781 Condor Construction Inc. 18 Broadmoor Ave. San Anselmo 94960 (415) 456-8497 (415) 456-8497 619383 Doke’s Plumbing Inc 1201 Anderson Dr, Ste J San Rafael 94901 (415) 453-7508 (415) 453-7509 801049 Frank Thomas Plumbing Co 68 Medway Road San Anselmo 94960 (415) 686-4236 frankthomasplumbing@gmail.com 945065 Garris W. Chuba Construction 4889 Petaluma Hill Rd. Santa Rosa 95404 (707) 586-9798 (707) 874-1419 498262 Gene Burch Plumbing 14 Commercial Blvd. #133 Novato 94949 (415) 883-8135 387500 Gotelli Plumbing Co. 21 Lovell Ave. San Rafael 94901 (415) 457-1145 (415) 456-1744 254603 Grier Argall Plumbing Inc. 336 Laurel Ave. San Anselmo 94960 (415) 457-0748 (415) 456-3929 736901 Hardiman Construction 3 Heather Way Larkspur 94939 (415) 847-7650 hardimanconst@pacbell.net 611970 Harkin Services 644 Santana Rd Novato 94945 (415) 806-4586 (415) 897-5775 730482 H & R Plumbing & Drain Cleaning 3990 La Cima Rd El Sobrante 94803 (510) 222-5556 (510) 222-4627 878364 John’s Plumbing & Sewer Service 620 Eldridge Court Novato 94947 (415) 898-2867 (415) 898-1001 628703 Kilpatrick’s 6078 Della Court Rohnert Park 94928 (415) 265-1661 (707) 206-0860 587711 Linscott Engineering Contractors, Inc. 397 Smith Ranch Rd. San Rafael 94903 (415) 492-1755 (415) 492-0301 477476 Marin H2O, Inc. 40 Paul Drive San Rafael 94903 (415) 479-8411 (415) 472-2766 839817 Marin Mechanical II, Inc. 3100 Kerner Blvd., Ste B1 San Rafael 94901 (415) 485-4472 (415) 485-4371 749299 Marin Plumbing 40 Montego Key Novato 94949 (415) 883-1243 Brian Cooke@Juno.com 611745 Mason Plumbing Inc. 80 Chester Ave Fairfax 94930 (415) 456-4554 (415) 456-4551 817803 Check with the Better Business Bureau – Phone 510-844-2000/ website: www.bbb.com Note: Any contractor wishing to have their Company’s name added to this list should contact Ross Valley Sanitary District‘s Engineering Department at 415-259-2949 Contractor List Updated on: 11/9/2011 ROSS VALLEY SANITARY DISTRICT 2960 Kerner Blvd San Rafael, CA 94901 (415) 259-2949 ~ rvsd.org List of RVSD Qualified Contractors FY 09/10 Page 2 of 2 The following list of Qualified Contractors is provided by Ross Valley Sanitary District (RVSD) of Marin County as a service to its residents and may be used for information purposes only. This list is comprised of contractors by the use of historical data, whereby we have observed and inspected their work in the field. The District makes no preference to the contractors listed herein. All contr actors listed below are properly licensed, do not have any outstanding matters with RVSD, and have not presented any misleading or confusing prin t media about the District’s Lateral Replacement Grant Program (LRGP). We do not warrant that the information is current, al though every effort is made to ensure that it is kept as current as possible. RVSD assumes no responsibility for any direct, indirect, incidental or consequential damages arising out of or relating to the Contractors. No advice or information given by RVSD shall create any warranty or liability. Contractor Address City Zip Phone Fax or email License # Mc Mahon Plumbing 939 Oak Street Sonoma 95476 (707) 756-0113 (707) 996-8302 710248 Medina Plumbing 1625 Sir Francis Drake Fairfax 94930 (415) 455-8285 (415) 726-7569 cell 852184 Mike Testa Plumbing Inc. 4244 Redwood Hwy. San Rafael 94903 (415) 479-0110 (415) 479-5434 519618 Miksis Services, Inc. 55 Healdsburg Ave Healdsburg 95448 (707) 433-8053 (707) 433-8085 95448 Millsap, Degnan & Associates 4280 Redwood Hwy, Ste 10 San Rafael 94903 (415) 472-4244 ddegnan@millsapdegnan.com 777635 Mr Rooter Plumbing 131 Camino Dorado Napa 94558 (707) 252-6578 (707) 258-8662 511333 New Town Construction 3100 Kerner Blvd, Ste. V San Rafael 94901 (415) 342-7559 (415) 891-8724 577810 North Bay Construction, Inc 431 Payran Street Petaluma 94952 (707) 763-2891 (707) 765-6417 357560 Northstar Plumbing 1671 Northstar Drive Petaluma 94954 (707) 338-0094 sgplumber@comcast.net 953010 O’Connell Plumbing 18 Hill Avenue Fairfax 94930 (415) 457-8932 (415) 485-1991 841039 O’Fiaro Building & Engineering 217 South 1st Street Richmond 94804 (510) 233-4292 ofiaro@sbcglobal.net 450916 Ongaro and Sons, Inc. 243 San Anselmo Ave. San Anselmo 94960 (415) 454-7400 (707) 579-0842 215233 Paul’s Plumbing Service 375 W. Cintura Ave Lagunitas 94938 (415) 488-9375 pdubdub@gmail.com 716272 Pedro Femenia & Sons PO Box 2196 Mill Valley 94942 (415) 721-7473 (415) 721-7411 392227 Pipe Spy PO Box 503 Larkspur 94977 (415) 927-0287 myles.pipespy@gmail.com 909818 Plumbing Pros PO Box 1182 Novato 94948 (415) 987-7767 plumbingpros@ymail.com 921603 Plumbing Repair Specialists 140 Gary Place San Rafael 94901 (415) 453-6682 (415) 454-6160 460208 Preferred Plumbing & Drain 1989 Olivera Rd, Ste F Concord 94520 (925) 677-0900 (925) 677-0917 848878 R.T. Wilson Plumbing PO Box 286 Forest Knolls 94933 (415) 488-1806 (415) 609-5903 cell 723535 Rapidflo dba Bragg Plumbing 354 Bel Marin Keys, Ste C Novato 94949 (415) 382-1215 (415) 382-1095 821844 Reggie’s Reliable Plumbing Service 1627 Center Rd. Novato 94948 (415) 686-2440 (415) 532-1819 948155 Roto Rooter 885 Olive Ave, Suite D Novato 94945 (415) 898-2700 (415) 898-6074 288461 Roy’s Sewer Service Inc. 577 Portal Street Cotati 94931 (415) 892-5480 wwall@sonic.net 491815 R.V. Stitch Construction Inc. PO Box 1707 Richmond 94802 (415) 310-1355 (510) 412-8831 530135 Sewer Connection Inc. 5017 Appian Way El Sobrante 94564 (800) 655-7473 (510) 758-4100 796452 Starving Plumbers 12 E. Sir Francis Drake Larkspur 94939 (415) 925-1234 (415) 925-1802 759372 Team Ghilotti, Inc 2531 Petaluma Blvd. So. Petaluma 94952 (707) 763-8700 (707) 762-1430 895384 The Trenchless Co. 600 Broadway Ste #C Sacramento 95818 (916) 455-4433 (916) 454-4859 775703 Tight Access Excavation Inc 6804 Orchard Station Sebastopol 95472 (707) 792-0369 (707) 795-8975 687105 United Vi Plumbing. PO Box 5336 Novato 94948 (415) 320-9001 900215 W.R. Forde Associates 984 Hensley Street Richmond 94801 (510) 215-9338 (510) 215-9867 814744 White Water Plumbing 138 F. Hamilton Drive Novato 94949 (415) 902-5443 wwplumb@yahoo.com 875153 Wilson’s Plumbing 85 Alder Ave. San Anselmo 94960 (415) 457-6941 (415) 457-7509 623217 Check with the Better Business Bureau – Phone 510-844-2000/ website: www.bbb.com Note: Any contractor wishing to have their Company’s name added to this list should contact Ross Valley Sanitary District‘s Engineering Department at 415-259-2949 Contractor List Updated on: 11/9/2011 ROSS VALLEY SANITARY DISTRICT Application.doc Serving the Greater Ross Valley Area for 110 Years 2960 Kerner Boulevard San Rafael, Ca 94901 Ph: 415.259.2949 Fax: 415.460.2149 WWW.RVSD.ORG  Brett N. Richards ~ General Manager Directors: Marcia Johnson, President ~ Patrick Guasco, Treasurer ~ Peter Wm. Sullivan, M.D., Secretary ~ Sue Brown ~ Pamela Meigs LATERAL REPLACEMENT GRANT PROGRAM APPLICATION Fiscal Year: __________ LRGP#:_____________ I certify by signing this application that I am the legal owner of the property described herein. I am aware the submission of this document does not constitute that a grant has been approved by the District. I have read the brochure discussing the requirements for the Lateral Replacement Grant Program and am aware that a letter will be issued advising if funds have been granted. Any repair work performed prior to receiving a letter of obligation from the District is performed at my own risk and cost. I understand not all applications will be granted. I understand all applications are subject to a Condition Rating determined by the District that will determine eligibility for funding. Signature:____________________________________________ Date: ___________________ Owner(s) Name: Property Address: City/Town: ZIP: Mailing Address: City/Town: ZIP: Phone: FAX or email: ¸ ¸ ¸ ¸ ¸ ¸ ¸ ¸ ¸ ¸ ¸ ¸ ¸ ¸ ¸ ¸ ¸ ¸ ¸ ¸ ¸ ¸ ¸ ¸ ¸ ¸ ¸ ¸ ¸ ¸ ¸ ¸ ¸ ¸ ¸ ¸ ¸ ¸ Staff Use Only Type of Connection: Residential / Commercial RVSD Side Sewer Repair Permit provided? Y / N No. CCTV Video Provided? Y / N Condition Assessment Score and Rating No. of Bids Received (Minimum of 3) Pre-Qualified Contractors? Y / N Lowest Pre-Qualified Contractor Lowest Pre-Qualified Contractor Bid Grant Amount (50% of lowest bid, up to $4,000) Application Granted (Y / N) If no, Reason: _ ____________________________ Date: _____________________________ (Note: Expires ninety (90) calendar days from date issued, or cancelled by recipient or District.) Serving: Bon Airx Fairfaxx Greenbraex Kentfield x Kent Woodlandsx Larkspurx Murray Parkx Oak Manorx Rossx San Anselmox Sleepy Hollowx San Quentin S:\Lateral Grant Program_LRGP\LRGP FY09-10 City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx Appendix D APPENDIX D SAMPLE SEWER LATERAL TESTING ORDINANCES 1. City of Burlingame 2. City of Richmond 3. City of Alameda 4. City of Oakland – Public Outreach Sewer Lateral Test Ordinance 1329 MUNICIPAL CODE SECTION 15.12.110 Click here for Sewer Lateral Ordinance Test Results PRIVATE SEWER LATERAL AND TESTING PROCEDURE AND REQUIREMENTS Ordinance No. 1329, which was adopted July 7, 1986 and became effective August 7, 1986 and was modified by Ordinance 1623 on March 23, 2000, requires the abatement of sewer laterals and cleanouts which are found to contain leaks or separations; laterals covered are from the building served to the cleanout in the City right-of-way. The ordinance also requires the testing and repair of laterals prior to the sale of the property if the building was constructed 25 years or more before the date of sale. Date of construction shall be the date the Building Permit was finaled. In addition, testing is required if two (2) or more plumbing fixture units are added to a property. The following procedures and requirements are adopted to implement Ordinance No. 1329. It shall be the owner's responsibility to determine if testing is needed. Contact the Building Department to determine the age of the structure and if the lateral had been tested and/or repaired within the past ten (10) years. It can be assumed that testing and repairs have not been done unless the property has been sold after August 1986. If the lateral needs testing, the property owner shall obtain a contractor or plumber to perform the test. The test shall be performed as follows: The test must be witnessed by a City representative to meet the ordinance requirements. The contractor or owner shall first obtain an Encroachment Permit from the Public Works Department in City Hall and pay the $303 testing fee. Obtaining the permit can be done before or concurrently with scheduling an appointment but is required at the time of the test. All arrangements and set up should be completed by the time the City representative arrives to witness the test. Call (650) 558-7670 to schedule an appointment. Each lateral is to have a cleanout located in the City right-of-way. If a cleanout does not exist, then one is required to be installed. The private owner's contractor will install the cleanout with an Encroachment Permit from the Department of Public Works. City personnel will spend a limited amount of time to assist in locating the cleanout or lateral. A cleanout located adjacent to the building will be a help in testing and repairing and is also required by the Uniform Plumbing Code. A Plumbing Permit from the Building Department is required for the cleanout adjacent to the building or for any work done on private property. Testing will be accomplished by either a water exfiltration test or an air test. The air test shall be used in hillside areas where the hydraulic head pressures could damage the pipe. Water Exfiltration Test: The contractor shall furnish all materials and equipment, except the calibrated bucket. The contractor shall plug the lateral and riser at the City cleanout and then surcharge the line with water to a point equal to the foundation grade (floor joist level) or slab floor level. The minimum height of the water level shall be two feet (2'-0") above the lateral at the City cleanout. If there is any fixture inside the structure lower than the testing water level, the contractor shall have to either plug the fixture or the lateral at the building. An approved backwater valve shall be installed if there are any plumbing fixtures below the level of the City cleanout. A Plumbing Permit is required for this work. The contractor may also install or use an existing cleanout near the structure at the foundation grade (floor joist level) or slab floor level to establish the minimum two feet (2'-0") water level. (See Standard Drawing No. SS-2_3) [pdf] The lateral shall be surcharged for 30 minutes and the amount of water lost shall be measured. The lateral shall be considered acceptable if the amount of water lost is less than four (4) gallons. No increase or allowance is allowed for long laterals or for laterals larger than the 4-inch minimum size. Air Test: The contractor shall furnish all materials, equipment and labor for making the test, except the pressure test gauge. Air test equipment shall be approved by the City. The contractor shall clean pipe and plug the lateral at the building line and the City cleanout. (If a cleanout is within two feet (2'-0") of the building, the lateral may be plugged at the cleanout.) The leakage test of the lateral shall be conducted in the presence of the City in the following manner: Air shall be slowly supplied to the plugged lateral until the internal air pressure reaches 4.0 pounds per square inch greater than the average back pressure of any groundwater that may submerge the pipe. The air pressure shall be regulated by a suitable regulator valve. At least two minutes shall be allowed for temperature stabilization before proceeding further. The rate of air loss shall then be determined by measuring the time interval for the internal pressure to decrease from 3.5 to 2.5 pounds per square inch greater than the average back pressure of any groundwater that may submerge the pipe. The lateral shall be considered acceptable if the time interval measured for the internal pressure to drop from 3.5 to 2.5 pounds per square inch is 10 seconds or greater. Air test data is on Standard Drawing No. SS-2-4. [pdf] If the lateral passes the test, it shall be certified as acceptable and the sale can take place without any further action. The certification shall be placed in the Building Department file. This certification shall be effective for ten (10) years. If the lateral fails the test, the lateral shall be either repaired or replaced and retested until the lateral passes. There will City of Burlingame CA : Sewer Lateral Test Ordinance 1329 http://www.burlingame.org/Index.aspx?page=351 1 of 2 1/31/2012 10:54 AM be a $10 fee for the second retest and each retest thereafter, payable at the Department of Public Works. A Plumbing Permit will be required for any repairs or replacement. A complete replacement from building to City cleanout is effective for 25 years. A repaired and tested lateral is effective for ten (10) years. The City neither has nor will make any determination as to who will pay for the testing and repairing. That is to be decided between the parties involved in the sale. Syed Murtuza, P.E. City Engineer (Rev. 3/9/03 new Encr. Permit fee) (Rev. 4/14/00 Ten-Year) (Rev. 3/2/93 Ordinance No. 1473 eff. 10/5/92) (Rev. 7/19/88) (Rev. 2/2/87 Enc. Per. Fee) City of Burlingame CA : Sewer Lateral Test Ordinance 1329 http://www.burlingame.org/Index.aspx?page=351 2 of 2 1/31/2012 10:54 AM 09/29/11  CITY OF RICHMOND MUNICIPAL SEWER DISTRICT SEWER LATERAL COMPLIANCE PLAN Standards & Procedures 2011 9/30/2011  Sewer Lateral Compliance Plan ‐ 1  9/30/2011  Sewer Lateral Compliance Plan ‐ 1  SECTION 1 – PURPOSE AND APPLICABILITY 3 SECTION 2 – DEFINITIONS 4 SECTION 3 – COMPLIANCE INSPECTION 6 ● Repair of the Sewer Lateral 7 ● Sale of Property 7 ● Upgrades and Remodeling 7 ● Issuance of a Building Permit 7 ● Evidence of a improper sewer connection 7 ● Home Owners Associations and Cooperatives 7 ● Waiver of Inspections: 8 SECTION 4 – COMPLIANCE 9 ● Properties in escrow 9 ● Upgrades and Remodeling Extension 9 SECTION 5 – LATERAL WORK 10 ● Shared Sewer Lateral Corrections 10 ● Backflow valve or overflow device required 11 SECTION 6 – FEE, PERMITS AND INSPECTIONS 12 ● Permits 12 ● Inspection 12 ● Right of entry 12 ● Fees 12 SECTION 7 – CERTIFICATION OF SEWER LATERALS 13 ● Certificate of Lateral Compliance 13 ● Point of Sale 13 ● General Requirements 13 9/30/2011  Sewer Lateral Compliance Plan ‐ 2  ● Exceptions 13 SECTION 8 – LONG TERM COMPLIANCE 14 SECTION 9 – APPEAL OF CITY ENGINEER’S ASSESSMENT 14 SECTION 10 – FAILURE TO COMPLY 14 ● General 14 SECTION 11 - NOTIFICATION TO PROPERTY OWNER 14 9/30/2011  Sewer Lateral Compliance Plan ‐ 3  Section 1 – Purpose and Applicability Overall this plan will reduce the leakage of sewage into public receiving waters and the infiltration and inflow (I & I) of storm, ground and tidal waters from private laterals into the City of Richmond’s (COR) publicly owned sanitary sewer collection system. The primary result of a poorly operating or failed lateral allowing I & I is hydrological overloading (surcharging) of the COR sanitary sewer collection system during rain events contributing to sanitary sewer overflows. Additionally, the lack of their integrity promotes ex-filtration causing standing sewage on private and public property, discharges of sewage to the storm drains, public health, general nuisance and wellbeing problems. There are approximately 18,000 private laterals in the Richmond Municipal Sewer District, an estimated 2721 miles in total length. Following the guidelines from the California Regional Water Quality Control Board, San Francisco Bay Region (CRWQBSFB) Resolution number R2-2005-0059, “In Support of Program for Inspection and Rehabilitation of Private Sewer Laterals,” and the direction of CRWQCBSFB Resolution Number R2-2003-0095, “In Support of Collaboration between the Regional Board and Bay Area Clean Water Agencies to Report and Manage Sanitary Sewer Overflows,” is the purpose of this plan, and to collectively maintain the beneficial use of all receiving waters. The purpose of this plan is to establish fair and consistent policies and procedures for the testing, repair, and replacement of all defective sewer laterals. To effect the purposes of this plan, the COR may enter upon private property for inspecting, testing, and repair of the sewer laterals. A sewer lateral is defined as the portion of the sewer serving a property starting at the structure or building and running to and including the connection to the COR’s main line. The sewer lateral is owned by the property owner, who paid for the installation and therefore is also responsible for its maintenance and repair; at no time has the COR accepted transfer of the ownership of a private lateral. This plan does not reduce, negate, change, modify, or eliminate this basic understanding. 1. Estimated 80 feet per lateral length average 9/30/2011  Sewer Lateral Compliance Plan ‐ 4  Section 2 – Definitions The following terms apply to this chapter and augment definitions found in the Uniform Plumbing Code. (a) “Backflow Valve” shall mean a valve that is opened by the flow of sewage exiting a structure but closes when the flow reverses, preventing sewage from backing into the structure. All backflow valves shall conform to the specifications set forth in the Uniform Plumbing Code and all guidelines and policies established by the City Engineer to implement this Chapter. (b) “Building sewer” shall have the same meaning as “lateral,” defined below. (c) “Certificate of Lateral Compliance” shall mean the certificate issued by the City Engineer certifying that a lateral complies with the standards set forth in this Chapter. A Certificate of Compliance is valid only for the lateral at the address specified in the Certificate and for a period of fifteen (15) years. (d) “City authorized representative” shall mean the City Engineer or his or her designee. (e) “City of Richmond” or “City” shall mean the City of Richmond and shall include Richmond Municipal Sewer District Number 1. (f) “City’s fee and rate schedule” shall mean a list of all City of Richmond service, penalty, interest, and permit fees, and hourly personnel and equipment rates, as amended from time to time. (g) “Cleanout” shall mean a segment of pipe connected to a sewer lateral and rising to the surface, providing access to the lateral for purposes of inspection and removal of obstructions. (See also “two-way cleanout,” defined below.) (h) “Lateral,” “building sewer,” or “service lateral” shall mean the sewer pipeline conveying wastewater from the premises of a user to the City’s sewer system. (i) "Main” or “sewer main” shall mean any sewer pipe within a public or private street or right-of-way receiving or intended to receive the discharges of one or more sewer lateral(s). No sewer main constructed after the effective date of this Chapter shall be less than eight inches (8”) in diameter nor be laid or constructed in any city street, easement or right-of- way under the control of the City, except to the lines, grades, and specifications approved by the City Engineer. (j) “Maintenance” shall mean routine flushing or rodding of a sewer to maintain a free flowing condition. 9/30/2011  Sewer Lateral Compliance Plan ‐ 5  (k) "Overflow device” shall mean a device designed to relieve the pressure created when a gravity sewer is flowing full. All overflow devices require the approval of the City Engineer for proper application before their installation. (l) “Person” shall mean any individual, partnership, firm, company, corporation, association, Joint Stock Company, trust, estate, governmental entity or any other legal entity, or their legal representative, agents or assigns. The masculine gender shall include the feminine, the singular shall include the plural where indicated by context. (m) “Plumbing fixtures” shall mean sinks, baths, showers, toilets, bidets, and all fixtures and appliances, such as dishwashers and washing machines, from which water or wastewater are discharged. (n) “Repair” shall mean physical exposure of a section of pipe and/or appurtenances for the purpose of resuming proper operating condition. (o) “Replacement” shall mean removal and replacement of existing pipe and/or appurtenances. (p) “Sanitary sewer system” shall have the same meaning as “publicly owned treatment works” as that term is defined at Richmond Municipal Code Section 12.18.020. (q) “Service lateral” shall have the same meaning as “lateral,” defined above. (r) "Sewage” shall mean water carrying wastes from residences, business buildings, institutions and industrial establishments; together with such other waters as may be present, or any combination of such wastes and water. (s) “Sewer facilities” shall mean and include the sanitary and storm sewage collection systems owned and operated by the City, all appurtenances thereto, and all portions thereof. (t) “Storm sewer” or “storm drain” shall mean a pipe or conduit which carries storm and surface waters and drainage, but excludes sewage and polluted industrial wastes. (u) “Subdivide” shall mean to cause land to be divided into separate developed or developable lots that are or may be owned by different persons. (v) “Two-way cleanout” shall mean a “Y”- or “V”-shaped segment of pipe connected to a sewer lateral and rising to the surface, providing access to the lateral in both directions for purposes of inspection and removal of obstructions. (w) “User” shall mean and include any person who causes or permits a discharge of sewage into the City’s sanitary sewer system. 9/30/2011  Sewer Lateral Compliance Plan ‐ 6  Section 3 – Compliance Inspection Testing may be accomplished by either a water ex-filtration test or an air test or Closed Circuit Video recording observation. If a Closed Circuit Video recording observation is selected as the preferred method of inspection then the video shall meet the following requirements: 1) shall be in DVD format 2) shall be in color (any black & white, cloudy, fuzzy, or otherwise unclear video will be returned for resubmission) 3) shall show the address of the lateral 4) shall show the date the video was taken 5) shall clearly show the cleanout or access point used to insert the cameral into the lateral 6) shall have a running foot or time marker clearly visible on the screen 7) where joints are present, shall briefly stop the camera at each to clearly indicate their integrity 8) shall have the date the DVD was submitted to the City written on the DVD along with the address of the inspection site and telephone number for the point of contact At the City Engineer’s discretion, the video may be returned for resubmission in accordance with the above requirements if any of the above requirements are not strictly adhered to. The selected inspection method can be performed by contractors who have a current state license. The City Engineer will notify the property owner(s) and tenants regarding when a sewer lateral inspection is required except when it is required due the sale of property, otherwise the inspection is initiated as part of all applicable sections of Richmond Municipal Code Chapter (RMC) 12.17. The inspection of the lateral may be initiated by any of the following: ● Capital Improvement Project Sewer Rehabilitation The project-by-project inspection program will not preclude the COR from testing sewer laterals in conjunction with other projects anywhere in the City of Richmond. It does not preclude a property owner from testing their sewer lateral at any time and making repairs at their expense. 9/30/2011  Sewer Lateral Compliance Plan ‐ 7  ● Repair of the Sewer Lateral Whenever a sewer lateral fails during normal usage or is broken into before making any repair to the sewer lateral. ● Sale of Property Whenever a property is to be sold or there is a transfer of title, a sewer Certificate of Lateral Compliance” must be obtained. The procedures herein must be followed by the property owner to obtain a Certificate of Lateral Compliance. ● Upgrades and Remodeling Whenever property located in the City of Richmond is remodeled to include the addition of two or more plumbing fixtures that discharge into a sanitary sewer system, the sewer lateral(s) to the property shall be tested. Before final building inspection, all repairs or replacements necessary to bring a lateral into compliance shall be performed. ● Issuance of a Building Permit When a building permit is issued by the City or County requires compliance with all applicable Codes ● Evidence of a improper sewer connection Failure of the property owner to comply with RMC section 12.17.020 or 12.17.040 may require them to conduct testing by direction of the City Engineer and obtain a Certificate of Lateral Compliance at anytime. (RMC12.17.080) ● Home Owners Associations and Cooperatives The City of Richmond Engineering Division has become aware of the need to clarify sanitary sewer lateral inspections as it relates specifically to Homeowners Associations and Cooperatives during property sales. Each property owner is responsible for obtaining a Certificate of Lateral Compliance of a single family dwelling, or an arrangement between the property owners and the cooperative or homeowners association for ensuring compliance in the stated regulatory time frames for property sales will need to be provided to the City Engineer. If the lateral is jointly shared then an arrangement between the property owners and the cooperative or homeowners association for ensuring compliance in the stated regulatory time frames for property 9/30/2011  Sewer Lateral Compliance Plan ‐ 8  sales will need to be provided to the City Engineer. The mains servicing the development will need to be tested every fifteen (15) years by an arrangement between the property owners and the cooperative or homeowners association. All arrangements between the cooperative or homeowners associations for compliance of this ordinance need to be on record with the City Engineer. As of March 20, 2007 arrangements between the property owners and the cooperative or homeowners association for ensuring compliance in the stated regulatory time frames for property sales will need to be provided to the City Engineer for review by April 1, 2008. After a satisfactory review and approval of the arrangement the lateral inspections and any subsequent repairs or required unified plumbing updates need to be completed and the Certificate of Lateral Compliance obtained no later than April 1, 2009 and every fifteen year thereafter. ● Waiver of Inspections: 1. The house/dwelling/structure lateral was constructed within the last 15 years, and a Certificate of Lateral Compliance was obtained within 5 years of its construction. 2. The lateral was completely replaced within the last 5 years. (have the receipts/invoices from the contractor that show the repair/replacement done.) 3. Have previously obtained a Certificate of Lateral Compliance The waiver of inspection still requires the issuance of a Certificate of Lateral Compliance to record the 15 year inspection requirement in the City’s database. 9/30/2011  Sewer Lateral Compliance Plan ‐ 9  Section 4 – Compliance The sewer lateral will be evaluated based upon a review and evaluation of the test results. COR designated staff will perform this evaluation and determine if the lateral complies with RMC 12.17.070, “Lateral Certification.” Broken pipe, offset and/or distorted joints, root intrusion, lack of cleanouts, all constitute deficiencies that do not comply with Standard Specifications and will require either repair or replacement. Repairs or replacements will be required prior to the close of escrow in the case of property transfer, or within one month of the lateral test results. ● Properties in escrow The COR has no intention of holding up sales transactions for properties in escrow. However, an extension of 60 days to obtain a Certificate of Lateral Compliance will be verbally granted by the City Engineer on a case by case need. The extension is documented in the escrow addendum. The property owner is responsible to ensure the documentation occurs stating who will complete the compliance action and the timetable of compliance. Generally monies can be left in escrow by the seller to pay the contractor’s fees for any necessary repairs. If the buyer elects to assume all responsibility for obtaining a Certificate of Lateral Compliance a notarized letter or a statement in the escrow addendum stating that the requirements will be met sixty (60) days after the close of escrow is necessary. A copy of the signed addendum or notarized letter must be received by the City Engineer’s office no later than the close of escrow. ● Upgrades and Remodeling Extension Currently extensions of up to one year to complete this requirement for upgrades or remodeling are available upon approval by the City Engineer. This is the responsibility of the property owner. 9/30/2011  Sewer Lateral Compliance Plan ‐ 10  Section 5 – Lateral Work The property owner shall be responsible for making any and all repairs and replacements of the sewer lateral. All work shall be done according to standards in the latest edition of the Uniform Plumbing Code as adopted by the COR in its Standard Specifications and Drawings, and any standards issued by the City Engineer. Repairs must bring the lateral into full compliance with these standards. ● Shared Sewer Lateral Corrections General: When any repairs or replacements are done to those laterals that are jointly shared by more than one building or structure from different properties, each shall require a discrete connection to the City’s sanitary sewer main as part of the repair. If a property with two buildings or structures with plumbing fixtures requiring drainage is subdivided, each building or structures shall require a discrete connection to the City’s sanitary sewer main as a condition of subdividing (RMC 12.17.050). At the discretion of the City Engineer a statement of agreement between the subject property owners will be filed with the escrow/title company, County Clerk or on record with the deed stating who is responsible for any necessary repairs as required by RMC. This statement of agreement, approved by the City Engineer can supersede the requirement to install discrete connections. If the sewer lateral is shared with other properties or structures, the necessary repairs, separation of the system, or relocation of the system will be as approved by the City Engineer. Such work shall be done according to standards issued by the City Engineer, and in the latest edition of the Unified Plumbing Code and COR’s Standard Specifications and Drawings. Exceptions: If a letter of agreement exists with the property deed explaining that joint responsibilities between property owners or the following: The City will need to have a record of the notarized agreement that is filed with the finalized deed. It is recommended the agreement should at least state: 1. The location of any private easement on the subject easement property 2. What section or sections of the joint lateral each property owner is responsible to individually maintain and pay associated costs. 9/30/2011  Sewer Lateral Compliance Plan ‐ 11  3. What section or sections of the joint lateral that the maintenance and associated costs are shared by both or all involved parties. 4. The duration of the agreement 5. The right to terminate the private easement agreement in writing and within a reasonable timeframe for the purpose of property improvements or plumbing relocation by the subject private easement property owner. ● Backflow valve or overflow device required When any repairs are done to lateral that does not have an existing backflow valve or overflow device, the property owner shall install the appropriate valve or device. It shall be the responsibility of the property owner to maintain the backflow valve or overflow devise in proper operating condition (RMC 12.17.050). 9/30/2011  Sewer Lateral Compliance Plan ‐ 12  Section 6 – Fee, Permits and Inspections ● Permits The property owner, or property owner’s contractor, must obtain a Sewer Permit from the COR before any work is done on sewer laterals. Failure to obtain the Permit shall subject the property owner to a monetary penalty as set forth in the Richmond Municipal Code and/or such further and different penalties as set forth by the City Engineer. The property owner is responsible for obtaining permits. Encroachment Permits from the City Engineer may also be needed if any work is performed in the public right-of-way. ● Inspection Inspection procedures and requirements shall be according to standards issued by the City Engineer and the COR’s Standard Specifications. The City Engineer can require the inspection of a lateral at any time in order to protect, sewage from entering receiving waters. ● Right of entry The City Engineer will give written note to property owner and occupants ten (10) business days to prior entering the property in order to conduct an inspection, or collect wastewater samples and test any buildings, structures, or premises to secure compliance or prevent a violation. (RMC 12.17.120) ● Fees Fees and charges for the Permit, inspection, penalties, and issuance of “Certificates Lateral of Compliance” shall be in accordance with the City’s fee and rate schedule. This lists of all city services, penalty associations, interest, permit fees, and hourly personnel and equipment rates and is kept on file with the City Clerk. 9/30/2011  Sewer Lateral Compliance Plan ‐ 13  Section 7 – Certification of Sewer Laterals ● Certificate of Lateral Compliance A Certificate of Lateral Compliance will be issued by the City Engineer when a lateral complies with Specifications as determined upon completion of a successful test. The City will maintain a record of all certificates issued, including the date of issuance. A Certificate will be valid until subsequent testing is performed and a new Certificate issued for the following periods of time: ● Point of Sale Not to exceed fifteen (15) years or more if constructed before this period of time. The COR has no intentions of holding up the escrow process, and will allow extension of up to 60 days past the close of escrow. ● General Requirements All properties shall be tested by the property owner at a minimum fifteen (15) years unless the dwelling was a new construction within the previous two years. A Certificate of Lateral Compliance will be issued after a sewer lateral has been satisfactorily tested, without repair, or repaired and/or replaced. This Certificate will be valid until a subsequent inspection is performed and a new Certificate issued, or fifteen (15) years which ever comes first. Certificates will be filed with the COR Engineering Services Department. ● Exceptions If the property construction was completed and signed off within the last two (2) years the certificate is issued at no cost since the fees were collected with the construction permit. 9/30/2011  Sewer Lateral Compliance Plan ‐ 14  Section 8 – Long Term Compliance It is the intent of the COR that the testing, repair, and replacement of the sewer laterals are a continual and ongoing program. The COR may, at any time, evaluate the level of infiltration and inflow from properties and, if it is determined that excessive infiltration and inflow exists, all sewer laterals within the property requires compliance with applicable RMC. Section 9 – Appeal of City Engineer’s Assessment All decisions of the City Engineer can be challenged in writing to the City Engineer within two (2) days prior to the date required to complete the inspection and or repairs and or subsequent citations. The appeal must be in writing and must state the basis of the appeal. Section 10 – Failure to Comply ● General Should any property owner(s) fail to repair or replace their sanitary sewer lateral within the time limits set forth by Section 7, the City Engineer is hereby authorized to proceed with all necessary work to bring the lateral in compliance, including but not limited to hiring of contractors, and entering upon private property. Section 11 - Notification to Property Owner Prior to proceeding with the necessary work, the City Engineer shall notify the owner of the intent to proceed with such work. Such notice shall be served personally on the owner or by mailing such notice to the owner addressed to the post office address last shown on the Contra Costa County secured assessment rolls, and by positing a copy of such notice on the property. Notice shall be given at least ten (10) days prior to the commencement of the work. No further notice need be given. (RMC 12.17.120) Chapter 18 SEWER AND WATER Section 18-5 ABATEMENT OF IMPROPER SEWER CONNECTIONS. Subsection 18 -5-1 Improper Sewer Connections. Subsection 18 -5-2 Resolution Declaring Nuisance. Subsection 18 -5-3 Protests; Filing and Hearing. Subsection 18 -5-4 Resolution Ordering Work. Subsection 18 -5-5 Account and Report of Cost. Subsection 18 -5-6 Notice of Hearing and Confirmation of Report. Subsection 18 -5-7 Hearing and Confirmation of Assessment. Subsection 18 -5-8 Collection on Tax Roll. Subsection 18 -5-9 Payment of Assessments, Annual Installments, Interest. Subsection 18 -5-10 Lateral Testing Upon Sale Subsection 18 -5-11 Private Sewer Lateral Testing Procedure and Requirements. Subsection 18 -5-12 Failure of Test. Subsection 18 -5-13 Lateral Certification. Subsection 18 -5-14 Condominium and Cooperative Apartment Buildings. Page 1 of 1Section 18-5 ABATEMENT OF IMPROPER SEWER CONNECTIONS. 7/13/2005file://F:\Operations\Jobs\2004\04 -102 Morgan Hill I&I Study & Flow Mon 3 Sites 3 Mos\... Section 18-5 ABATEMENT OF IMPROPER SEWER CONNECTIONS. Subsection 18 -5-10 Lateral Testing Upon Sale a. Whenever any property is to be transferred to or vested in any other person or entity by deed, instrument or writing, by which any lands are sold, located in the City, are or is granted, assigned, transferred or otherwise conveyed to, or vested in, a purchaser or purchasers thereof, or any other person or persons and the property includes any buildings or structures constructed more than twenty -five (25) years prior to the sale of the property the sewer lateral(s) to the property shall be tested for infiltration and all necessary repairs or replacements performed to prevent all infiltration. All testing procedures must be approved by the Public Works Director, or authorized representative, and all repair or replacement work completed and approved by the City prior to transfer of title. The property owner shall retain the inspection card, signed by a City Inspector as approved, as proof of compliance. b. Exceptions. This subsection shall not apply to: 1. Condominium or cooperative apartment buildings; 2. To all buildings where the Public Works Director, or authorized representative, determines that testing and/or repairs have been performed to City standards within the last five (5) years; 3. To all buildings where the Public Works Director, or authorized representative, determines that testing and replacement of lateral has been performed to City standards within the last twenty -five (25) years; 4. If the Public Works Director, or authorized representative, otherwise determines testing is unnecessary. (Ord. No. 2404 N.S.; Ord. No. 2537 N.S. §13) Page 1 of 1Subsection 18 -5-10 Lateral Testing Upon Sale 7/13/2005file://F:\Operations\Jobs\2004\04 -102 Morgan Hill I&I Study & Flow Mon 3 Sites 3 Mos\... Section 18-5 ABATEMENT OF IMPROPER SEWER CONNECTIONS. Subsection 18 -5-11 Private Sewer Lateral Testing Procedure and Requirements. The property owner, or his/her appointed contractor shall obtain a plumbing permit for sewer lateral testing prior to commencing with the testing procedure. The test procedure shall be performed as follows: a. Each lateral is to have a two -way cast iron clean-out, as shown on Standard Drawing 8396-34 or 8397-34, located in the City right-of-way, on private property adjacent to the City right -of-way, or on a Public Utility Easement. If one does not exist, a clean-out shall be installed prior to performing any testing. Installation of the clean-out, if necessary, shall require a plumbing permit; shall be run to grade and covered by a meter box and lid as detailed on standard drawing 8396-34. A clean-out located adjacent to, (within 30" inches), the building will be a help in the test and repair of the lateral and is required by the Uniform Plumbing Code for any new construction. b. The test must be witnessed by a City Inspector. All arrangements and set up should be completed by the time the City Inspector arrives to witness the test. c. Testing may be accomplished by either a water exfiltration test or an air test. 1. Water Exfiltration Test. The owner's contractor shall furnish all materials and equipment at owner's expense, except the calibrated bucket. The contract shall plug the lateral and riser at the City clean-out, and surcharge the line with water to a point equal to the foundation grade (floor joist level) or slab floor level. The minimum height of the water level shall be two (2') feet above the lateral invert at the City clean -out. If there is any fixture inside the structure lower than the testing water level, the contractor will have to either plug the fixture or the lateral at the building. An approved backwater valve must be installed if there are any plumbing fixtures whose level is below the City clean-out. A plumbing permit is required for this work. The lateral shall be surcharged for thirty (30) minutes and the amount of water lost shall be measured. The lateral shall be considered acceptable if the amount of water lost is less than four (4) gallons for a four (4") inch lateral. On an individual basis, the amount of allowable water loss may be adjusted by the City Engineer for a six (6") inch diameter lateral, or unusually long lateral lengths. See Standard Drawing 8277-32, available from the City Engineer, for a visual procedure reference. 2. Air testing shall be conducted in accordance to Section 306-1.4.4 of the Standard Specifications for Public Works Construction, American Public Works Association, latest edition, with the exception that "Engineer" shall be replaced with "City Inspector" and "Contractor" with "Owner's Contractor" respectively. (Ord. No. 2404 N.S.; Ord. No. 2533 N.S. §21) Page 1 of 1Subsection 18 -5-11 Private Sewer Lateral Testing Procedure and Requirements. 7/13/2005file://F:\Operations\Jobs\2004\04 -102 Morgan Hill I&I Study & Flow Mon 3 Sites 3 Mos\... Section 18-5 ABATEMENT OF IMPROPER SEWER CONNECTIONS. Subsection 18 -5-12 Failure of Test. Should the lateral fail the test as outlined in subsection 18-5.11, the lateral shall be either repaired or replaced and retested; a plumbing permit will be required in order to perform the necessary repairs or replacement. This process shall continue until the lateral passes the required test. (Ord. No. 2404 N.S.) Page 1 of 1Subsection 18 -5-12 Failure of Test. 7/13/2005file://F:\Operations\Jobs\2004\04 -102 Morgan Hill I&I Study & Flow Mon 3 Sites 3 Mos\... Section 18-5 ABATEMENT OF IMPROPER SEWER CONNECTIONS. Subsection 18 -5-13 Lateral Certification. Once the lateral has successfully passed the testing procedure in subsection 18-5.11 the City Inspector witnessing the test will sign the permit inspection card as approved. (Ord. No. 2404 N.S.) Page 1 of 1Subsection 18 -5-13 Lateral Certification. 7/13/2005file://F:\Operations\Jobs\2004\04 -102 Morgan Hill I&I Study & Flow Mon 3 Sites 3 Mos\... http://homesinoaklandhills.com/2010/10/oakland-ca-sewer-lateral-ebmud-waste-water- control-ordinance/ Oakland CA sewer lateral EBMUD waste water control ordinance October 21st, 2010 Update as of May 2011 As a home seller in Oakland or Piedmont California you will soon be obligated to conduct a sewer lateral scope inspection and upon transfer of the home to a new Buyer someone will be obligated to make any repairs needed to comply with the new city of Oakland sewer lateral ordinance and the EBMUD waste water ordinance. If you are a Buyer considering a home prior to January 1, 2011 you would be well advised to perform your own camera inspection to make sure that you are not unwittingly assuming someone else’s very expensive problem. A number of East Bay Cities and Sanitary Districts require that sewer laterals be inspected and brought into conformance as a part of the sale of property. A recent court order will require the cities of Oakland, Emeryville, Piedmont, Berkeley, Alameda, Albany, Kensington, El Cerrito and the Richmond Annex of the City of Richmond to require homeowners to fix or upgrade their sewer lines when a home is sold or upgraded. The East Bay Municipal Utility District (“EBMUD”) Wastewater Control Ordinance will require property owners in certain areas of the EBMUD wastewater service area to obtain a compliance certificate that shows their private sewer laterals are without defects and have proper connections. The private sewer lateral program requirements for property owners will be in effect on January 1, 2011. The ordinance specifies three conditions which require property owners to test and, if needed, repair or replace their private sewer laterals: 1-Prior to selling the property 2-When obtaining any permit from the construction or modification of the property estimated to be greater than $100,000 3-When increasing or decreasing EBMUD water service that requires a change in meter size. These EBMUD requirements will only affect properties in the EBMUD wastewater service area in Emeryville, Oakland, and Piedmont. The cities of Alameda, Albany, Berkeley and the Stege Sanitary District (which serves KensiSellers and Buyers are advised to check with the local Building Inspection Department or Sanitary District for more information. City of San Luis Obispo Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 09-0578 SLO 2010-2011 FM and II Final Report.docx Appendix E APPENDIX E SAMPLE: I/I REHABILITATION EFFECTIVENESS STUDY SPRING STREET PHASE I AND II LATERAL REHABILITATION PROJECT INFLOW / INFILTRATION REDUCTION EFFECTIVENESS STUDY Napa Sanitation District June 2009 NAPA SANITATION DISTRICT Spring Street Phase I and II Lateral Rehabilitation Project Inflow / Infiltration Reduction Effectiveness Study Prepared For: WINZLER & KELLY 495 Tesconi Circle Santa Rosa, CA 95401-4696 Prepared By: V&A Lake Merritt Tower 155 Grand Ave, Suite 700 Oakland, CA 94612 June 2009 Spring Street Phase I and II Lateral Rehabilitation: I&I Reduction Effectiveness Study TOC TABLE OF CONTENTS DESCRIPTION PAGE NO. 1 EXECUTIVE SUMMARY.................................................................................................................1 1.1 Results Summary..................................................................................................................2 2 INTRODUCTION.............................................................................................................................6 3 RESULTS........................................................................................................................................7 3.1 Rainfall ..................................................................................................................................7 3.2 Flow Monitoring and I&I Results ...........................................................................................8 3.3 Synthetic Hydrographs..........................................................................................................9 3.4 Design Storm.......................................................................................................................11 3.5 Synthetic Hydrograph Comparison: Reduction of I&I .........................................................12 TABLES Table 1-1 I&I Reduction Summary, Normalized to 10-Year, 24-Hour Storm Event...............................2 Table 1-2 Estimated 2009 Season Total I&I Reduction .........................................................................2 Table 3-1 I&I Reduction Summary, Normalized to 10-Year, 24-Hour Storm Event.............................12 Table 3-2 Estimated 2009 Season Total I&I Reduction .......................................................................12 FIGURES Figure 1-1. East Spring Street Project Limits and Flow Monitoring Locations......................................1 Figure 1-2. I&I Reduction Summary Figure: Site 1................................................................................3 Figure 1-3. I&I Reduction Summary Figure: Site 2................................................................................4 Figure 1-4. I&I Reduction Summary Figure: Site 3................................................................................5 Figure 3-1. Rainfall Activity over Flow Monitoring Period......................................................................7 Figure 3-2. Rainfall Accumulation Plot ..................................................................................................8 Figure 3-3. Site 1 Post-Construction Synthetic Hydrograph .................................................................9 Figure 3-4. Site 1 Pre-Construction Synthetic Hydrograph.................................................................10 Figure 3-5. 10-Year, 24-Hour Design Storm Values ...........................................................................11 Figure 3-6. I&I Reduction Summary Figure: Site 1..............................................................................13 Figure 3-7. I&I Reduction Summary Figure: Site 2..............................................................................14 Figure 3-8. I&I Reduction Summary Figure: Site 3..............................................................................15 APPENDIX A. FLOW MONITORING SITES: DATA, GRAPHS, INFORMATION Spring Street Phase I and II Lateral Rehabilitation: I&I Reduction Effectiveness Study Page 1 1 EXECUTIVE SUMMARY V&A has completed an Infiltration and Inflow (I&I) Reduction Effectiveness Study for the East Spring Phase 1 and Phase 2 Lateral Rehabilitation and Replacement Project. The District performed improvements to lateral sewers in the neighborhoods around East Spring Street during the summer of 2007. The purpose of this pilot study was to measure and analyze the pre-construction and post- construction dry weather and wet weather flows at three locations immediately downstream from the majority of the targeted construction zones. V&A was tasked to perform I&I analysis to differentiate base flows from I&I flows, and conduct synthetic hydrograph analysis to determine the I&I response factors at the three locations. These pre-construction and post-construction response factors were compared to determine the percentage of I&I reduction achieved by the East Spring Street Phase 1 and 2 I&I Reduction Projects. Pre-construction flow monitoring was conducted over a 3.5-month period from December 1, 2006 through March 15, 2007. Post-construction flow monitoring was conducted over a 2.5-month period from December 18, 2008 through March 10, 2009. The East Spring Street Project limits and the three flow monitoring sites are shown below in Figure 1-1. Figure 1-1. East Spring Street Project Limits and Flow Monitoring Locations Site 1 Site 2 Site 3 Legend V&A Flow Meter Site Location Rain Gauge Location Metering Basin Boundary Phase 1 Rehabilitation Phase 2 Rehabilitation Pipes not Rehabilitated Site 2 Rain Gauge Spring Street Phase I and II Lateral Rehabilitation: I&I Reduction Effectiveness Study Page 2 1.1 Results Summary The flow metering data and rainfall data acquisition was successful. Flows and rain data were obtained and precise I&I hydrograph response components were calculated. For this analysis, the I&I components were applied to a 10-year, 24-hour storm event as a means for determining a metric standard by which to estimate total I&I reduction. The results from the synthetic I&I hydrograph and 10-year design storm event are shown in Table 1-1, and are illustrated in Figure 1-2, Figure 1-3 and Figure 1-4. Table 1-1 I&I Reduction Summary, Normalized to 10-Year, 24-Hour Storm Event Pre- Construction Post- Construction Pre- Construction Post- Construction Site ADWF (gpm)Peak Flow (gpm) PF Peak Flow (gpm) PF % Reduction Peak Flow Total Infiltration (gallons) Total Infiltration (gallons) % Reduction in Total I&I Site 1 8.2 92 11.2 62 7.7 33% 201,000 86,000 57% Site 2 11.2 354 31.6 354 31.6 negl. 887,000 446,000 50% Site 3 21.7 470 21.5 159 7.4 66% 918,000 346,000 62% PF = Peaking Factor, negl. = negligible Total Seasonal Effects: Over the course of the flow monitoring period, which spanned a majority of the wet weather season, approximately 15.8 inches of rainfall was measured in the East Spring Street region between December 18, 2008 and March 4, 2009. The total gallons of I&I that did not enter the collection systems as a result of the East Spring Phase 1 and Phase 2 Lateral Rehabilitation and Replacement Project is estimated in Table 1-2. Note: the 2008/2009 rainfall season totals were less than seasonal averages. Table 1-2 Estimated 2009 Season Total I&I Reduction Site Estimated Total I&I Reduction during 2008/2009 Season Site 1 426,000 gallons Site 2 1,827,000 gallons Site 3 2,280,000 gallons Total: 4,563,000 gallons Spring Street Phase I and II Lateral Rehabilitation: I&I Reduction Effectiveness Study Page 3 Figure 1-2. I&I Reduction Summary Figure: Site 1 0 10 20 30 40 50 60 70 80 90 100 110 Day 1 Day 2 Day 3 Day 4 Day 5 Day 6I/I (gpm)0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 Rain (in/hr)10 Year Model Storm 10 Year Model Storm Response, 2007 (pre-construction) 10 Year Model Storm Response, 2009 (post-construction) Estimated I/I Reduction Estimated Total I&I Reduction: 115,000 gallons (57%) Difference in Peak Flows: 30 gpm (33% reduction) Spring Street Phase I and II Lateral Rehabilitation: I&I Reduction Effectiveness Study Page 4 Figure 1-3. I&I Reduction Summary Figure: Site 2 0 50 100 150 200 250 300 350 400 Day 1 Day 2 Day 3 Day 4 Day 5 Day 6I/I (gpm)0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 Rain (in/hr)10 Year Model Storm 10 Year Model Storm Response, 2007 (pre-construction) 10 Year Model Storm Response, 2009 (post-construction) Estimated I/I Reduction Difference in Peak Flows: negligible Estimated Total I&I Reduction: 441,000 gallons (50%) Spring Street Phase I and II Lateral Rehabilitation: I&I Reduction Effectiveness Study Page 5 Figure 1-4. I&I Reduction Summary Figure: Site 3 0 100 200 300 400 500 600 Day 1 Day 2 Day 3 Day 4 Day 5 Day 6I/I (gpm)0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 Rain (in/hr)10 Year Model Storm 10 Year Model Storm Response, 2007 (pre-construction) 10 Year Model Storm Response, 2009 (post-construction) Estimated I/I Reduction Difference in Peak Flows: 310 gpm (66% reduction) Estimated Total I&I Reduction: 572,000 gallons (62%) Spring Street Phase I and II Lateral Rehabilitation: I&I Reduction Effectiveness Study Page 6 2 INTRODUCTION V&A was retained by Winzler & Kelly Consulting Engineers (W&K) to perform post-construction sanitary sewer flow monitoring and inflow and infiltration (I/I) analysis for the East Spring Phase 1 and Phase 2 Lateral Rehabilitation and Replacement Project. The post-construction flow monitoring and analysis completed an Infiltration and Inflow (I&I) Reduction Effectiveness Study for the East Spring Phase 1 and Phase 2 Lateral Rehabilitation and Replacement Project that started in 2007. Pre-construction flow monitoring was conducted during the 2006/2007 wet weather season to establish I&I response curves specific to the three site locations shown in Figure 1-1. The District performed improvements to lateral sewers in the neighborhoods around East Spring Street during the summer of 2007. V&A was tasked to perform post-construction flow monitoring and I&I analysis at the same flow monitoring locations to establish the new (post-construction) I&I response curves. The pre-construction and post-construction response factors would be normalized to a 10-year, 24-hour design storm event and compared to determine the percentage of I&I reduction achieved by the East Spring Street Phase 1 and 2 I&I Reduction Projects. The post-construction flow monitoring was conducted over a 2.5-month period from December 18, 2008 through March 10, 2009. Detailed descriptions of the individual flow monitoring sites, including photographs, are included in Appendix A. Spring Street Phase I and II Lateral Rehabilitation: I&I Reduction Effectiveness Study Page 7 3 RESULTS 3.1 Rainfall Rainfall information was taken from a centrally located rain gauge that V&A installed within the Alta Heights Elementary School (Refer to Figure 1-1 for rain gauge location). Figure 3-1 graphically displays the rainfall events recorded over the flow monitoring period (December 18, 2008 through March 8, 2009). Napa Storm Events (December 18, 2008 - March 8, 2009) 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 18-Dec20-Dec22-Dec24-Dec26-Dec28-Dec30-Dec1-Jan3-Jan5-Jan7-Jan9-Jan11-Jan13-Jan15-Jan17-Jan19-Jan21-Jan23-Jan25-Jan27-Jan29-Jan31-Jan2-Feb4-Feb6-Feb8-Feb10-Feb12-Feb14-Feb16-Feb18-Feb20-Feb22-Feb24-Feb26-Feb28-Feb2-Mar4-Mar6-MarRain (inches per hour)3.68 Total Rainfall during Period - 16.06 inches 5.03 Figure 3-1. Rainfall Activity over Flow Monitoring Period Figure 3-2 shows the rain accumulation plot of the rain gauges, as well as the historical average rainfall for the City of Napa during this project duration. Spring Street Phase I and II Lateral Rehabilitation: I&I Reduction Effectiveness Study Page 8 Napa (December 18, 2008 - March 8, 2009): Rain Accumulation Chart 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 12.0 13.0 14.0 15.0 16.0 17.0 18-Dec20-Dec22-Dec24-Dec26-Dec28-Dec30-Dec1-Jan3-Jan5-Jan7-Jan9-Jan11-Jan13-Jan15-Jan17-Jan19-Jan21-Jan23-Jan25-Jan27-Jan29-Jan31-Jan2-Feb4-Feb6-Feb8-Feb10-Feb12-Feb14-Feb16-Feb18-Feb20-Feb22-Feb24-Feb26-Feb28-Feb2-Mar4-Mar6-Mar8-MarRain (inches)Historical Average Napa: Alta Heights Elem. 16.06 13.32 Figure 3-2. Rainfall Accumulation Plot The historical average rainfall is shown for comparison to the rainfall that occurred over the course of the flow monitoring period (December 18, 2008 through March 8, 2009). The historical data was taken from the Western Regional Climate Center (WRCC) at Station 046074 in Napa, California. Rainfall data from the years 1970 through 2000 were used to determine these averages. The historical average over the monitoring period is 13.32 inches. The rain gauge indicated a rainfall total of 16.06 inches, approximately 121% of normal levels for this period of time. It is noted that a majority of the rainfall for the year occurred within the monitoring period. The total rainfall for the entire season (July 1, 2008 through June 30, 2009) was less than average. 3.2 Flow Monitoring and I&I Results Baseline flow determination and I&I analysis to differentiate base flows from I/I flows was conducted per the methods described in the Flow Monitoring and I&I Study Final Report that was submitted in conjunction with this document. Flow monitoring results are presented in Appendix A for the three flow monitoring sites that are included in this study. Spring Street Phase I and II Lateral Rehabilitation: I&I Reduction Effectiveness Study Page 9 3.3 Synthetic Hydrographs In order to model design storms, synthetic hydrographs were developed to approximate the actual rainfall dependent I&I (RDI&I) hydrograph shape in terms of parameters representing time to the peak and the recession coefficient. The actual RDI&I hydrograph was best matched with a synthetic hydrograph by separating the synthetic hydrograph into seven volume components (R1, R2, R3, R4, R5, R6, R7). The seven components represent different response times to the rainfall event and different infiltration or inflow paths into the sewer system. R1 is characterized by a short response time and is assumed to consist of mainly inflow. R7 represents slower response and longer recession times and consists of mostly infiltration. Levels of soil saturation are also considered. Using synthetic hydrograph analysis, appropriate time and recession parameters were estimated by a trial-and-error procedure until a good match was obtained. A sample synthetic hydrograph and its component hydrographs for the period of February 14 to 28, 2009 for Site 1 is shown in Figure 3-3 (post- construction). The pre-construction synthetic hydrograph and its component hydrographs for the period of February 8 through March 3, 2007 for Site 1 is shown in Figure 3-4. 0 10 20 30 40 50 60 14- Feb 15- Feb 16- Feb 17- Feb 18- Feb 19- Feb 20- Feb 21- Feb 22- Feb 23- Feb 24- Feb 25- Feb 26- Feb 27- Feb 28- FebFlow (gpm)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 Rain (in/hr)0 5 10 15 20 14- Feb 15- Feb 16- Feb 17- Feb 18- Feb 19- Feb 20- Feb 21- Feb 22- Feb 23- Feb 24- Feb 25- Feb 26- Feb 27- Feb 28- FebFlow (gpm)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 Rain (in/hr)Figure 3-3. Site 1 Post-Construction Synthetic Hydrograph Rain Realtime I&I Hydrograph Synthetic Hydrograph R1 Component R2 Component R3 Component R4 Component R5 Component R6 Component R7 Component Spring Street Phase I and II Lateral Rehabilitation: I&I Reduction Effectiveness Study Page 10 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 8- Feb 9- Feb 10- Feb 11- Feb 12- Feb 13- Feb 14- Feb 15- Feb 16- Feb 17- Feb 18- Feb 19- Feb 20- Feb 21- Feb 22- Feb 23- Feb 24- Feb 25- Feb 26- Feb 27- Feb 28- Feb 1- Mar 2- Mar 3- MarFlow (gpm)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 8- Feb 9- Feb 10- Feb 11- Feb 12- Feb 13- Feb 14- Feb 15- Feb 16- Feb 17- Feb 18- Feb 19- Feb 20- Feb 21- Feb 22- Feb 23- Feb 24- Feb 25- Feb 26- Feb 27- Feb 28- Feb 1- Mar 2- Mar 3- MarFlow (gpm)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)Figure 3-4. Site 1 Pre-Construction Synthetic Hydrograph Rain Realtime I/I Hydrograph Synthetic Hydrograph R1 Component R2 Component R3 Component R4 Component R5 Component R6 Component R7 Component Spring Street Phase I and II Lateral Rehabilitation: I&I Reduction Effectiveness Study Page 11 3.4 Design Storm With I&I components defined, design storms can be applied and the resulting I&I flows can be predicted. The design storm used for this analysis was a 10-year storm event taken from the NOAA Western U.S. Precipitation Frequency Maps. Figure 3-5 summarizes the design storms per hour and shows the storm profile for the 10-year event. This particular profile distribution also fits the criterion for a 2-hour, 6-hour and 24-hour event. 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 123456789101112131415161718192021222324 HourRainfall (in/hr)Figure 3-5. 10-Year, 24-Hour Design Storm Values Hour Rainfall (inches per hour) 1 0.010 2 0.026 3 0.260 4 0.156 5 0.052 6 0.016 7 0.208 8 0.119 9 0.167 10 0.060 11 0.030 12 0.012 13 0.110 14 0.309 15 0.037 16 0.168 17 0.168 18 0.381 19 0.707 20 0.335 21 0.168 22 0.088 23 0.147 24 0.044 Total:3.78 Spring Street Phase I and II Lateral Rehabilitation: I&I Reduction Effectiveness Study Page 12 3.5 Synthetic Hydrograph Comparison: Reduction of I&I The 10-year design storm event was applied to both sets (pre- and post-construction) of I&I components to obtain an appropriate comparison between 2007 and 2009 storm event responses and determine the effectiveness of the I&I rehabilitation. The results from the synthetic I&I hydrograph and 10-year design storm event are shown in Table 3-1, and are illustrated in Figure 3-6, Figure 3-7 and Figure 3-8. Table 3-1 I&I Reduction Summary, Normalized to 10-Year, 24-Hour Storm Event Pre- Construction Post- Construction Pre- Construction Post- Construction Site ADWF (gpm)Peak Flow (gpm) PF Peak Flow (gpm) PF % Reduction Peak Flow Total Infiltration (gallons) Total Infiltration (gallons) % Reduction in Total I&I Site 1 8.2 92 11.2 62 7.7 33% 201,000 86,000 57% Site 2 11.2 354 31.6 354 31.6 negl. 887,000 446,000 50% Site 3 21.7 470 21.5 159 7.4 66% 918,000 346,000 62% PF = Peaking Factor, negl. = negligible Total Seasonal Effects: Over the course of the flow monitoring period, which spanned a majority of the wet weather season, approximately 16.06 inches of rainfall was measured in the East Spring Street region between December 18, 2008 and March 4, 2009. The total gallons of I&I that did not enter the collection systems as a result of the East Spring Phase 1 and Phase 2 Lateral Rehabilitation and Replacement Project is estimated in Table 3-2. Note: the 2008/2009 rainfall season totals were less than seasonal averages. Table 3-2 Estimated 2009 Season Total I&I Reduction Site Estimated Total I&I Reduction during 2008/2009 Season Site 1 426,000 gallons Site 2 1,827,000 gallons Site 3 2,280,000 gallons Total: 4,563,000 gallons Spring Street Phase I and II Lateral Rehabilitation: I&I Reduction Effectiveness Study Page 13 Figure 3-6. I&I Reduction Summary Figure: Site 1 0 10 20 30 40 50 60 70 80 90 100 110 Day 1 Day 2 Day 3 Day 4 Day 5 Day 6I/I (gpm)0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 Rain (in/hr)10 Year Model Storm 10 Year Model Storm Response, 2007 (pre-construction) 10 Year Model Storm Response, 2009 (post-construction) Estimated I/I Reduction Estimated Total I&I Reduction: 115,000 gallons (57%) Difference in Peak Flows: 30 gpm (33% reduction) Spring Street Phase I and II Lateral Rehabilitation: I&I Reduction Effectiveness Study Page 14 Figure 3-7. I&I Reduction Summary Figure: Site 2 0 50 100 150 200 250 300 350 400 Day 1 Day 2 Day 3 Day 4 Day 5 Day 6I/I (gpm)0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 Rain (in/hr)10 Year Model Storm 10 Year Model Storm Response, 2007 (pre-construction) 10 Year Model Storm Response, 2009 (post-construction) Estimated I/I Reduction Difference in Peak Flows: negligible Estimated Total I&I Reduction: 441,000 gallons (50%) Spring Street Phase I and II Lateral Rehabilitation: I&I Reduction Effectiveness Study Page 15 Figure 3-8. I&I Reduction Summary Figure: Site 3 0 100 200 300 400 500 600 Day 1 Day 2 Day 3 Day 4 Day 5 Day 6I/I (gpm)0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 Rain (in/hr)10 Year Model Storm 10 Year Model Storm Response, 2007 (pre-construction) 10 Year Model Storm Response, 2009 (post-construction) Estimated I/I Reduction Difference in Peak Flows: 310 gpm (66% reduction) Estimated Total I&I Reduction: 572,000 gallons (62%) Spring Street Phase I and II Lateral Rehabilitation: I&I Reduction Effectiveness Study Appendix A Appendix A Flow Monitoring Sites: Data, Graphs, Information 0.000 0.005 0.010 0.015 0.020 0.025 0.030 0.035 0.040 0.045 0.050 1-Dec Mon 2-Dec Tue 3-Dec Wed 4-Dec Thu 5-Dec Fri 6-Dec Sat 7-Dec Sun 8-Dec Mon 9-Dec Tue 10-Dec Wed 11-Dec Thu 12-Dec Fri 13-Dec Sat 14-Dec Sun 15-Dec MonFlow (mgd)0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 Rainfall (in/hr)Rain Flow BLFlow Site 01 Monitoring Site:Period Flow Summary December, 2008 0.0150.0160.0150.0150.0160.00 0.01 0.02 0.03 0.04 0.05 0.06 12/112/212/312/412/512/612/712/812/912/1012/1112/1212/1312/1412/1512/1612/1712/1812/1912/2012/2112/2212/2312/2412/2512/2612/2712/2812/2912/3012/31Flow (MGal)0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Rainfall (in/day)0.000 0.005 0.010 0.015 0.020 0.025 0.030 0.035 0.040 0.045 0.050 16-Dec Tue 17-Dec Wed 18-Dec Thu 19-Dec Fri 20-Dec Sat 21-Dec Sun 22-Dec Mon 23-Dec Tue 24-Dec Wed 25-Dec Thu 26-Dec Fri 27-Dec Sat 28-Dec Sun 29-Dec Mon 30-Dec Tue 31-Dec WedFlow (mgd)0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 Rainfall (in/hr)0.0160.0160.0150.0140.00 0.01 0.02 0.03 0.04 0.05 0.06 12/112/212/312/412/512/612/712/812/912/1012/1112/1212/1312/1412/1512/1612/1712/1812/1912/2012/2112/2212/2312/2412/2512/2612/2712/2812/2912/3012/310.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.00.0160.0170.0160.0130.00 0.01 0.02 0.03 0.04 0.05 0.06 12/112/212/312/412/512/612/712/812/912/1012/1112/1212/1312/1412/1512/1612/1712/1812/1912/2012/2112/2212/2312/2412/2512/2612/2712/2812/2912/3012/310.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Total Monthly Rainfall: 1.65 inches Avg Flow: 0.015 mgd Peak Flow: 0.036 mgd Min Flow: 0.007 mgd 0.000 0.005 0.010 0.015 0.020 0.025 0.030 0.035 0.040 0.045 0.050 1-Jan Thu 2-Jan Fri 3-Jan Sat 4-Jan Sun 5-Jan Mon 6-Jan Tue 7-Jan Wed 8-Jan Thu 9-Jan Fri 10-Jan Sat 11-Jan Sun 12-Jan Mon 13-Jan Tue 14-Jan Wed 15-Jan ThuFlow (mgd)0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 Rainfall (in/hr)Rain Flow BLFlow Site 01 Monitoring Site:Period Flow Summary January, 2009 0.0130.0140.0130.0130.0130.0110.0100.0090.0100.0110.0120.0120.0130.0130.0130.0130.0120.0120.0120.00 0.01 0.02 0.03 0.04 0.05 0.06 1/11/21/31/41/51/61/71/81/91/101/111/121/131/141/151/161/171/181/191/201/211/221/231/241/251/261/271/281/291/301/31Flow (MGal)0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Rainfall (in/day)0.000 0.005 0.010 0.015 0.020 0.025 0.030 0.035 0.040 0.045 0.050 16-Jan Fri 17-Jan Sat 18-Jan Sun 19-Jan Mon 20-Jan Tue 21-Jan Wed 22-Jan Thu 23-Jan Fri 24-Jan Sat 25-Jan Sun 26-Jan Mon 27-Jan Tue 28-Jan Wed 29-Jan Thu 30-Jan Fri 31-Jan SatFlow (mgd)0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 Rainfall (in/hr)0.0150.0150.0130.0130.0130.0120.0140.0140.0120.00 0.01 0.02 0.03 0.04 0.05 0.06 1/11/21/31/41/51/61/71/81/91/101/111/121/131/141/151/161/171/181/191/201/211/221/231/241/251/261/271/281/291/301/310.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.00.0130.0140.0130.00 0.01 0.02 0.03 0.04 0.05 0.06 1/11/21/31/41/51/61/71/81/91/101/111/121/131/141/151/161/171/181/191/201/211/221/231/241/251/261/271/281/291/301/310.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Total Monthly Rainfall: 1.09 inches Avg Flow: 0.013 mgd Peak Flow: 0.03 mgd Min Flow: 0.001 mgd 0.000 0.005 0.010 0.015 0.020 0.025 0.030 0.035 0.040 0.045 0.050 1-Feb Sun 2-Feb Mon 3-Feb Tue 4-Feb Wed 5-Feb Thu 6-Feb Fri 7-Feb Sat 8-Feb Sun 9-Feb Mon 10-Feb Tue 11-Feb Wed 12-Feb Thu 13-Feb Fri 14-Feb Sat 15-Feb SunFlow (mgd)0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 Rainfall (in/hr)Rain Flow BLFlow Site 01 Monitoring Site:Period Flow Summary February, 2009 0.0130.0120.0120.0120.0120.0130.0130.0140.0130.0170.0480.0340.0250.0200.0390.0320.0240.0220.0180.00 0.01 0.02 0.03 0.04 0.05 0.06 2/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/28Flow (MGal)0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Rainfall (in/day)0.000 0.010 0.020 0.030 0.040 0.050 0.060 0.070 0.080 0.090 16-Feb Mon 17-Feb Tue 18-Feb Wed 19-Feb Thu 20-Feb Fri 21-Feb Sat 22-Feb Sun 23-Feb Mon 24-Feb Tue 25-Feb Wed 26-Feb Thu 27-Feb Fri 28-Feb SatFlow (mgd)0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 Rainfall (in/hr)0.0130.0130.0130.0170.0240.0170.0380.0170.00 0.01 0.02 0.03 0.04 0.05 0.06 2/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/280.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.00.0370.00 0.01 0.02 0.03 0.04 0.05 0.06 2/12/22/32/42/52/62/72/82/92/102/112/122/132/142/152/162/172/182/192/202/212/222/232/242/252/262/272/280.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Total Monthly Rainfall: 11.09 inches Avg Flow: 0.021 mgd Peak Flow: 0.081 mgd Min Flow: 0.003 mgd 0.000 0.005 0.010 0.015 0.020 0.025 0.030 0.035 0.040 0.045 0.050 1-Mar Sun 2-Mar Mon 3-Mar Tue 4-Mar Wed 5-Mar Thu 6-Mar Fri 7-Mar Sat 8-Mar Sun 9-Mar Mon 10-Mar Tue 11-Mar Wed 12-Mar Thu 13-Mar Fri 14-Mar Sat 15-Mar SunFlow (mgd)0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 Rainfall (in/hr)Rain Flow BLFlow Site 01 Monitoring Site:Period Flow Summary March, 2009 0.0160.0150.0130.0120.0100.00 0.01 0.02 0.03 0.04 0.05 0.06 3/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/283/293/303/31Flow (MGal)0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Rainfall (in/day)0.000 0.005 0.010 0.015 0.020 0.025 0.030 0.035 0.040 0.045 0.050 16-Mar Mon 17-Mar Tue 18-Mar Wed 19-Mar Thu 20-Mar Fri 21-Mar Sat 22-Mar Sun 23-Mar Mon 24-Mar Tue 25-Mar Wed 26-Mar Thu 27-Mar Fri 28-Mar Sat 29-Mar Sun 30-Mar Mon 31-Mar TueFlow (mgd)0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 Rainfall (in/hr)0.0180.0090.0080.00 0.01 0.02 0.03 0.04 0.05 0.06 3/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/283/293/303/310.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.00.00 0.01 0.02 0.03 0.04 0.05 0.06 3/13/23/33/43/53/63/73/83/93/103/113/123/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/283/293/303/310.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Total Monthly Rainfall: 1.97 inches Avg Flow: 0.013 mgd Peak Flow: 0.038 mgd Min Flow: 0.004 mgd Site 01 Monitoring Site:Average Dry Weather Flow 0.000 0.005 0.010 0.015 0.020 0.025 0:001:002:003:004:005:006:007:008:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:0023:00Flow (mgd)Weekday WeekendAverage Dry Weather Flow:mgd0.012 Site 01 Monitoring Site:I/I Summary 0.00 0.01 0.02 0.03 0.04 0.05 0.06 0.07 0.08 0.09 02/1002/1102/1202/1302/1402/1502/1602/1702/1802/1902/2002/2102/22Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.081 0.068 Storm Event #1 I/I Analysis Rainfall: Peak Flow: Peak I/I Rate: Total I/I: PF: Pk I/I:ADWF: 6.53 inches mgd mgd gallons 6.97 5.87 139,000 Storm Event #1 Detail I/I Graph 1.8I/I per ADWF:per in-rain Storm Event 1 Site 01 Monitoring Site:I/I Summary 0.00 0.01 0.02 0.03 0.04 0.05 0.06 0.07 02/2202/2302/2402/2502/2602/2702/2803/0103/0203/0303/0403/0503/0603/0703/0803/09Flow (mgd)0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Rain (in/hr)0.064 0.050 Storm Event #2 I/I Analysis Rainfall: Peak Flow: Peak I/I Rate: Total I/I: PF: Pk I/I:ADWF: 5.91 inches mgd mgd gallons 5.48 4.34 119,000 Storm Event #2 Detail I/I Graph 1.7I/I per ADWF:per in-rain Storm Event 2 Oakland 155 Grand Avenue, Suite 700 Oakland, CA 94612 510.903.6600 Tel 510.903.6601 Fax San Diego 11011 Via Frontera, Suite C San Diego, CA 92127 858.576.0226 Tel 858.576.0004 Fax Houston 8220 Jones Road, Suite 500 Seattle 14900 Interurban Avenue, Suite 268 8220 Jones Road, Suite 500 Houston, TX 77065 713.840.6490 Tel 713.840.6491 Fax 14900 Interurban Avenue, Suite 268 Seattle, WA 96818 206.674.4560 Tel 206.674.4561 Fax vaengineering.com