Loading...
HomeMy WebLinkAbout01_20-822 DRAINAGE REPORT Addendum #2 FULLT:\20-822 Avila Ranch Earthwood PIPs\Civil\Drainage\_REPORT\_addendum #2\20-822 DRAINAGE REPORT Addendum #2.docx TRACT 2943 EARTHWOOD PHASE II DRAINAGE STUDY – ADDENDUM 2 – EARHTWOOD LANE, SAN LUIS OBISPO, CA DATE: SEPTEMBER 27, 2021 141 South Elm Street | Arroyo Grande, CA 93420 Phone: (805) 489-1321 | Fax: (805) 489-6723 Prepared for: Mr. Michael Hodge Job # 20-822 William Rebik, RCE 35,337 Exp. 09/30/2023 September 27, 2021 20-822 Tract 2943 ADDENDUM No. 2 141 South Elm Street • Arroyo Grande, CA, 93420 • Telephone 805.489.1321 • Fax 805.489.6723 • garingtaylor.com R. James Garing, PE | Jeffrey J. Emrick, PE | Ronald G. Reilly, PE | William L. Rebik, PE, LS Perry D. McBeth, PE | James A. Cooper, PE Table of Contents I. INTRODUCTION …………………………………………………………………………………………. 3 II. WEIR SIZE DETERMINATION ………………………………………………..……………….. 3 III. SUMMARY AND DISCUSSION………………………………………………………………………. 3 APPENDICIES A. Revised Weir 4 B. Ernie Ball Basin W Spill Way No 3 6 C. Hydraflow 77’ Weir Report 8 D. Hydraflow 100’ Channel report 10 E. Addendum No 1 and Approved Drainage Report 12 September 27, 2021 20-822 Tract 2943 ADDENDUM No. 2 3 I. INTRODUCTION This addendum is to address the revised weir for the Ernie Ball Basin. This Addendum no. 2 is to be incorporated as final steps to the original drainage report titled “Tract 2943 Earthwood Phase II Drainage Study” dated October 23, 2020, with final revision on 02/22/2021 and including Addendum No. 1. Dated 2/24/2021 (Included in Appendix E. The revised calculations presented in this Addendum #2 were executed using AutoDesk Hydraflow Express. Originally the basin weir was designed along the tract boundary. Due to complication with that design the project is going to revert to a weir at the historic location. Avila Ranch was directed to receive the drainage as a condition of approval. The historic weir length was determined from current and past topography to be approximately 40-45’ long. See the included exhibit in Appendix A “Revised Weir” for the data used to determine the historic location. II. WEIR SIZE DETERMINATION From historic and current topographic surveys, it was determined that the overland escape for the Ernie Ball basin would have drained to the south-east from the current basin location. Based on the topographic data it is estimated that the weir was approximately 40-45’ long. To assure the historic flow is not increased the project will install a 77’ trapezoidal shaped weir curb with 4:1 side slopes and a flat sectional length of 69’. See Appendix B for the “Ernie Ball Basin W Spill Way NO. 3” for weir information. The weir will be constructed from an 18” deep flush curb with an invert elevation of 114.23’. It is important to note that the inlets at Earthwood Lane (Sta 39+80 +/-) are set at 114.23’ which would inhibit Earthwood Lanes flows from entering the basin when the WSE is at or above 114.23’. The total out flow from the basin would be the existing Ernie Ball Lots 1 and 2 (DMA 1) development producing a 100-year 10-minute maximum flow under 32 cfs as determined with the approved drainage report (See Appendix B). The flows overtopping the weir will exit the curb section with a depth of 0.32’ and a velocity of 1.46 ft/s. See Appendix C for the Hydraflow output report “Curb Weir L=-77 side slope 4:1”. The flows will spread to 100’ at the property line by flowing over a compacted DG surface with an assumed n- value of 0.030. III. SUMMARY AND DISCUSSION As described the proposed weir design will outlet flows at the historic location is a non-erosive manner. The final depth of flow at weir in the historic location will be 0.32’ with a velocity of 1.46 ft/s and a volume of <32 cfs. GARING, TAYLOR AND ASSOCIATES TR 2943 EARTHWOOD LANE PHASE II PAGE 4 Appendix “A” Revised Weir GARING, TAYLOR & ASSOCIATES, INC. CIVIL ENGINEERS · SURVEYORS · PLANNERS 141 SOUTH ELM STREET · ARROYO GRANDE, CA 93420 · (805) 489-1321 GARING, TAYLOR AND ASSOCIATES TR 2943 EARTHWOOD LANE PHASE II PAGE 6 Appendix “B” Ernie Ball Basin W Spill Way No 3 GARING, TAYLOR & ASSOCIATES, INC. CIVIL ENGINEERS · SURVEYORS · PLANNERS 141 SOUTH ELM STREET · ARROYO GRANDE, CA 93420 · (805) 489-1321 WEIR CROSS SECTION T: \ 2 0 - 8 2 2 A v i l a R a n c h E a r t h w o o d P I P s \ C i v i l \ D r a w i n g s \ S h e e t \ _ R e v i s e d F u l l S e t \ 2 0 2 1 - 1 0 - 1 1 \ 4 & 5 & 6 & 8 R O U G H G R A D I N G P L A N . d w g , 1 0 / 1 1 / 2 0 2 1 1 : 0 5 : 3 7 P M , D W G T o P D F . p c 3 GARING, TAYLOR AND ASSOCIATES TR 2943 EARTHWOOD LANE PHASE II PAGE 8 Appendix “C” Hydraflow 77’ Weir Report Weir Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Wednesday, Oct 6 2021 Curb Weir L=77' side slope 4:1 Rectangular Weir Crest = Broad Bottom Length (ft) = 69.00 Total Depth (ft) = 1.00 Calculations Weir Coeff. Cw = 2.60 Compute by: Known Q Known Q (cfs) = 32.00 Highlighted Depth (ft) = 0.32 Q (cfs) = 32.00 Area (sqft) = 21.85 Velocity (ft/s) = 1.46 Top Width (ft) = 69.00 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 Depth (ft)Depth (ft)Curb Weir L=77' side slope 4:1 -0.50 -0.50 0.00 0.00 0.50 0.50 1.00 1.00 1.50 1.50 2.00 2.00 Length (ft)Weir W.S. GARING, TAYLOR AND ASSOCIATES TR 2943 EARTHWOOD LANE PHASE II PAGE 10 Appendix “D” Hydraflow 100’ Channel Report Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Monday, Sep 27 2021 100' rect channel to PL/Tract Boundary Rectangular Bottom Width (ft) = 100.00 Total Depth (ft) = 1.00 Invert Elev (ft) = 114.23 Slope (%) = 6.00 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 32.00 Highlighted Depth (ft) = 0.12 Q (cfs) = 32.00 Area (sqft) = 12.00 Velocity (ft/s) = 2.67 Wetted Perim (ft) = 100.24 Crit Depth, Yc (ft) = 0.15 Top Width (ft) = 100.00 EGL (ft) = 0.23 0 10 20 30 40 50 60 70 80 90 100 110 120 Elev (ft)Depth (ft)Section 113.50 -0.73 114.00 -0.23 114.50 0.27 115.00 0.77 115.50 1.27 116.00 1.77 Reach (ft) GARING, TAYLOR AND ASSOCIATES TR 2943 EARTHWOOD LANE PHASE II PAGE 12 Appendix “E” Addendum No 1 and Approved Drainage Report T:\20-822 Avila Ranch Earthwood PIPs\Civil\Drainage\_REPORT\_addendum #1\20-822 DRAINAGE REPORT Addendum #1.docx TRACT 2943 EARTHWOOD PHASE II DRAINAGE STUDY –ADDENDUM 1 – EARHTWOOD LANE, SAN LUIS OBISPO, CA DATE: FEBRUARY 24, 2021 141 South Elm Street | Arroyo Grande, CA 93420 Phone: (805) 489-1321 | Fax: (805) 489-6723 Prepared for: Mr. Michael Hodge Job # 20-822 William Rebik, RCE 35,337 Exp. 09/30/2021 February 26, 2021 20-822 Tract 2943 DRAINAGE STUDY 141 South Elm Street • Arroyo Grande, CA, 93420 • Telephone 805.489.1321 • Fax 805.489.6723 • garingtaylor.com R. James Garing, PE | Jeffrey J. Emrick, PE | Ronald G. Reilly, PE | William L. Rebik, PE, LS Perry D. McBeth, PE | James A. Cooper, PE Table of Contents I. INTRODUCTION …………………………………………………………………………………………. 3 II. 85th PERCENTILE STORM EVENT ………………………………………………..……………….. 3 III. PEAK MANAGEMENT 2-100 YEAR………………………………………………………………. 4 IV. PIPE FLOW IN AND OUT …………………………………………………………………………….. 6 V. SUMMARY AND DISCUSSION………………………………………………………………………. 7 TABLES 1. Incremental Basin Volumes – Hydraflow Express 2. Outfall Pipe Properties – Hydraflow Express 3. Outfall Pipe Discharge Table – Hydraflow Express 4. Pre-Vs.-Post 5. 100-YEAR SCS Basin Hydroghraph Report – Hydraflow Express 5a. SCS 24-Hour Rainfall Totals 6. Tract 2943 100-Year Flows 7. Culvert Report – Hydraflow Express APPENDICIES A. 2-100-YEAR SCS Basin Hydroghraph Report – Hydraflow Express 8 B. Tract 2943 Earthwood Phase II Drainage Study 19 February 26, 2021 20-822 Tract 2943 DRAINAGE STUDY 3 I. INTRODUCTION This addendum is to address the raising of the basin bottom and the additional calculations performed using the SCS method to verify the modified basin will perform as intended. This Addendum is to be incorporated as final steps to the original drainage report titled “Tract 2943 Earthwood Phase II Drainage Study” dated October 23, 2020 with final revision on 02/22/2021 (Included as Appedix B to this Addendum). The revised calculations presented in this Addendum #1 were executed using AutoDesk Hydraflow Express. Originally the basin was lowered to accommodate the sag location at the track boundary. Through the redesign process it was determined that the basin bottom could be adjusted to better match the requirements of the site. II. 85th PERCENTILE STORM EVENT The basin will store the 85th Percentile Run-off volume (37442 CF) below the 110.6’ elevation. The basin storage volume at the 110.6 elevation is 38,893 CF. TABLE 1 provides the complete revised volumetric breakdown of the basin in incremental steps as report by Hydraflow. TABLE 1 Incremental Basin Volumes – Hydraflow Express The outfall pipe will be set at the 110.6’ elevation and run to the existing inlet at the sag location near the tract boundary at an invert elevation of 108.47’. See TABLE 2 for specific pipe properties. TABLE 2 Outfall Pipe Properties – Hydraflow Express February 26, 2021 20-822 Tract 2943 DRAINAGE STUDY 4 The outflow will initially be much lower than the allowable pre-construction flow rate of 19 cfs and would build to 14.19 cfs at an elevation of 114’. TABLE 3 provides the staged discharge available from the 18” outfall pipe. TABLE 3 Outfall Pipe Discharge Table – Hydraflow Express III. PEAK MANAGEMENT 2-100 YEAR The project will provide peak management for the 2 through 100-year storm events. The project will mitigate the 100-year post construction run-off flow rates to a 10-year 10-minutes pre- construction run-off rate. The maximum flow off the site was determined as the 10-year 10-minute pre-construction run-off rate of 19 cfs. The “Combined” site (12.64 AC) calculation is provided in TABLE 4 for the 2 through 100-year analysis. "c" pre-con 0.42 "c" post-con 0.68 EB 1/2 PHASE I/II area (SF) 550621 12.64 area (AC) minutes 2 year in/hr inflow 2yr post- con CFS inflow 10yr post- con CFS inflow 50yr post- con CFS inflow 100yr post-con CFS outflow 2 yr pre release CFS outflow 10 yr pre release CFS outflow 50 yr pre release CFS outflow 100 yr pre release CFS 10 2.09 17.9 30.7 39.5 42.9 11.1 19.0 24.5 26.5 15 1.81 15.5 25.7 33.4 36.8 9.6 19.0 20.7 22.8 30 1.18 10.1 17.9 22.3 25.0 6.3 19.0 13.8 15.5 60 0.75 6.4 11.1 14.5 15.9 4.0 19.0 9.0 9.8 120 0.55 4.7 7.8 11.1 11.8 2.9 19.0 6.9 7.3 180 0.47 4.1 7.1 9.8 10.5 2.5 19.0 6.1 6.5 360 0.36 3.1 5.4 7.8 8.4 1.9 19.0 4.8 5.2 600 0.28 2.4 4.1 6.1 6.4 1.5 19.0 3.8 4.0 TABLE 4 Pre-Vs.-Post The rational method Q=C*I*A was used to determine the run-off flow rates from post and pre- construction conditions. These calculations are used to determine the curb inlet and initial pipe flow requirements. The difference in flow rates from the 100-year event of varying durations and the 10- year-10-minute event was calculated. The flow rates were then used to determine preliminary storage volumes by multiplying the flow rate by the time of concentration in seconds. Complete February 26, 2021 20-822 Tract 2943 DRAINAGE STUDY 5 calculations for the 2-100-year events are included in the original report. The original report is included as Appendix B of this Addendum. Additional calculations have now been performed on the basin using the SCS method in Hydraflow Express. The CN number was determined by averaging Industrial Sites CN = 93 (Ernie Ball Lots 1 & 2) and Commercial Sites CN = 95 (Earthwood Phase I & II) for a composite CN = 94. The 24-hour event for the 2-100-year return periods were run through the basin to determine the maximum water surface elevation (WSE). TABLE 5 provides the results of the 100-year analysis. TABLE 5a provides the rainfall depth entered for each return period. The reports for the 2-100-year return periods are included in Appendix A of this Addendum. TABLE 5 100-YEAR SCS Basin Hydroghraph Report – Hydraflow Express Return Fequency 2 - YR 10 - YR 25 - YR 50 - YR 100- YR Total p (in) 2.57 4.01 4.85 5.48 6.11 TABLE 5a SCS 24-Hour Rainfall Totals In the 100-year event the basin will fill to an elevation of 113.74’ and have a maximum outflow through the 18” outfall pipe of 13.73 cfs. The basin overland escape will be set at the track February 26, 2021 20-822 Tract 2943 DRAINAGE STUDY 6 boundary at the 114.0’ elevation with a basin rim elevation of 115.0’. The basin should never reach the spill way as the maximum elevation in a 100-year event is 113.74’ as reported in TABLE 5. IV. PIPE FLOW IN AND OUT To determine the flows-in from Earthwood Lane DMAs 2-5 (Earthwood Lane Tract 2943 Phase I and II) were combined and evaluated for the 100-year 10-minute storm event in the post-construction conditions. TABLE 6 provides the results of the maximum 100-year flow. Calculations were performed using the Rational Method: Q=C x I x A = 0.65 x I in/hr x 5.43 AC. minutes 100 year in/hr inflow 100yr post-con CFS 10 5.00 17.6 15 4.29 15.1 30 2.91 10.3 60 1.85 6.5 120 1.38 4.9 180 1.22 4.3 360 0.98 3.5 600 0.75 2.6 TABLE 6 Tract 2943 100-Year Flows The design flow to the basin from Earthwood Lane will be 17.7 CFS. Symmetric inlet configurations will be installed on the East and West side of Earthwood Lane near the upstream property lines of lots 14 and 17. 14.5’ of curb inlets will be installed. The East side of Earthwood Lane will drain across Earthwood. The East side flow (DMA 2 and 5) for the 100-year event is 8.85 CFS. The Phase I and Phase II East and West (DMA 2-5) flows will combine at the west inlet structure to be routed in the 24” pipe. The 24” pipe will be required to run 189’ at 0.53% from the West inlet (Invert 109.0’) at Earthwood Lane to the Basin (Outfall Invert 108.0’). TABLE 7 provides the culvert report from Hydraflow Express. TABLE 7 Culvert Report – Hydraflow Express February 26, 2021 20-822 Tract 2943 DRAINAGE STUDY 7 As reported in TABLE 7, the 24” pipe from Earthwood Lane to the basin will require 2.61’ of head to push the flow. The invert of the 24” pipe at Earthwood Lane is 109.00’ + 2.61’ HW = 111.61 < Flow line elevation of 114.06’ at curb inlet. OK The 18” outfall pipe from the basin back to Earthwood Lane (at the tract boundary) will have the flow capacities as identified in TABLE 1 and will reach a maximum flow rate of 13.73 cfs at a WSE of 113.74’ as shown in TABLE 5. VI. SUMMARY AND DISCUSSION The project will capture the 85th Percentile storm event for DMAs 1-5 and mitigate the post- construction run-off rates to a 10-year 10-minute pre-construction run-off rate for the entire site. As stated previously, DMA 6 will release without treatment into the sag inlets at the tract boundary. DMA 6 is 1.01 AC and will have a post construction run-off rate of 3.28 cfs. (0.65 x 5 in/hr x 1.01 AC = 3.28 cfs). The bypass flow from the inlets at lots 14 and 17 will also need to be collected at the tract boundary. The total flow from Earthwood Phase I and II to be collected at the sag inlet at the tract boundary should be 1.32 cfs x 2 inlets + 3.28 cfs = 5.92 cfs. GARING, TAYLOR AND ASSOCIATES TR 2943 EARTHWOOD LANE PHASE II PAGE 8 Appendix “A” 2-100-YEAR SCS Basin Hydroghraph Report – Hydraflow Express Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 02 / 26 / 2021 Hyd. No. 2 Runoff Hydrograph Hydrograph type = Reservoir Peak discharge = 13.73 cfs Storm frequency = 100 yrs Time to peak = 10.27 hrs Time interval = 2 min Hyd. volume = 216,632 cuft Inflow hyd. No. = 1 - post construction Max. Elevation = 113.74 ft Reservoir name = Ernie Ball Basin Max. Storage = 96,180 cuft Storage Indication method used. 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 Q (cfs) Time (hrs) Runoff Hydrograph Hyd. No. 2 -- 100 Year Hyd No. 2 Hyd No. 1 Total storage used = 96,180 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 02 / 26 / 2021 Hyd. No. 2 Runoff Hydrograph Hydrograph type = Reservoir Peak discharge = 13.73 cfs Storm frequency = 100 yrs Time to peak = 10.27 hrs Time interval = 2 min Hyd. volume = 216,632 cuft Inflow hyd. No. = 1 - post construction Max. Elevation = 113.74 ft Reservoir name = Ernie Ball Basin Max. Storage = 96,180 cuft Storage Indication method used. 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 Elev (ft) 108.00 108.00 109.00 109.00 110.00 110.00 111.00 111.00 112.00 112.00 113.00 113.00 114.00 114.00 115.00 115.00 Elev (ft) Time (hrs) Runoff Hydrograph Hyd. No. 2 -- 100 Year 1. Ernie Ball Basin Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 02 / 26 / 2021 Hyd. No. 2 Runoff Hydrograph Hydrograph type = Reservoir Peak discharge = 12.91 cfs Storm frequency = 50 yrs Time to peak = 10.27 hrs Time interval = 2 min Hyd. volume = 187,128 cuft Inflow hyd. No. = 1 - post construction Max. Elevation = 113.30 ft Reservoir name = Ernie Ball Basin Max. Storage = 87,446 cuft Storage Indication method used. 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 Q (cfs) Time (hrs) Runoff Hydrograph Hyd. No. 2 -- 50 Year Hyd No. 2 Hyd No. 1 Total storage used = 87,446 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 02 / 26 / 2021 Hyd. No. 2 Runoff Hydrograph Hydrograph type = Reservoir Peak discharge = 12.91 cfs Storm frequency = 50 yrs Time to peak = 10.27 hrs Time interval = 2 min Hyd. volume = 187,128 cuft Inflow hyd. No. = 1 - post construction Max. Elevation = 113.30 ft Reservoir name = Ernie Ball Basin Max. Storage = 87,446 cuft Storage Indication method used. 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 Elev (ft) 108.00 108.00 109.00 109.00 110.00 110.00 111.00 111.00 112.00 112.00 113.00 113.00 114.00 114.00 115.00 115.00 Elev (ft) Time (hrs) Runoff Hydrograph Hyd. No. 2 -- 50 Year 1. Ernie Ball Basin Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 02 / 26 / 2021 Hyd. No. 2 Runoff Hydrograph Hydrograph type = Reservoir Peak discharge = 11.53 cfs Storm frequency = 25 yrs Time to peak = 10.27 hrs Time interval = 2 min Hyd. volume = 157,697 cuft Inflow hyd. No. = 1 - post construction Max. Elevation = 112.82 ft Reservoir name = Ernie Ball Basin Max. Storage = 78,186 cuft Storage Indication method used. 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 Q (cfs) Time (hrs) Runoff Hydrograph Hyd. No. 2 -- 25 Year Hyd No. 2 Hyd No. 1 Total storage used = 78,186 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 02 / 26 / 2021 Hyd. No. 2 Runoff Hydrograph Hydrograph type = Reservoir Peak discharge = 11.53 cfs Storm frequency = 25 yrs Time to peak = 10.27 hrs Time interval = 2 min Hyd. volume = 157,697 cuft Inflow hyd. No. = 1 - post construction Max. Elevation = 112.82 ft Reservoir name = Ernie Ball Basin Max. Storage = 78,186 cuft Storage Indication method used. 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 Elev (ft) 108.00 108.00 109.00 109.00 110.00 110.00 111.00 111.00 112.00 112.00 113.00 113.00 114.00 114.00 Elev (ft) Time (hrs) Runoff Hydrograph Hyd. No. 2 -- 25 Year 1. Ernie Ball Basin Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 02 / 26 / 2021 Hyd. No. 2 Runoff Hydrograph Hydrograph type = Reservoir Peak discharge = 8.296 cfs Storm frequency = 10 yrs Time to peak = 10.27 hrs Time interval = 2 min Hyd. volume = 118,618 cuft Inflow hyd. No. = 1 - post construction Max. Elevation = 112.11 ft Reservoir name = Ernie Ball Basin Max. Storage = 64,990 cuft Storage Indication method used. 0 4 8 12 16 20 24 28 32 Q (cfs) 0.00 0.00 5.00 5.00 10.00 10.00 15.00 15.00 20.00 20.00 25.00 25.00 30.00 30.00 35.00 35.00 Q (cfs) Time (hrs) Runoff Hydrograph Hyd. No. 2 -- 10 Year Hyd No. 2 Hyd No. 1 Total storage used = 64,990 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 02 / 26 / 2021 Hyd. No. 2 Runoff Hydrograph Hydrograph type = Reservoir Peak discharge = 8.296 cfs Storm frequency = 10 yrs Time to peak = 10.27 hrs Time interval = 2 min Hyd. volume = 118,618 cuft Inflow hyd. No. = 1 - post construction Max. Elevation = 112.11 ft Reservoir name = Ernie Ball Basin Max. Storage = 64,990 cuft Storage Indication method used. 0 4 8 12 16 20 24 28 32 Elev (ft) 108.00 108.00 109.00 109.00 110.00 110.00 111.00 111.00 112.00 112.00 113.00 113.00 114.00 114.00 Elev (ft) Time (hrs) Runoff Hydrograph Hyd. No. 2 -- 10 Year 1. Ernie Ball Basin Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 02 / 26 / 2021 Hyd. No. 2 Runoff Hydrograph Hydrograph type = Reservoir Peak discharge = 1.635 cfs Storm frequency = 2 yrs Time to peak = 12.20 hrs Time interval = 2 min Hyd. volume = 52,475 cuft Inflow hyd. No. = 1 - post construction Max. Elevation = 111.14 ft Reservoir name = Ernie Ball Basin Max. Storage = 48,138 cuft Storage Indication method used. 0 4 8 12 16 20 24 28 32 36 40 Q (cfs) 0.00 0.00 3.00 3.00 6.00 6.00 9.00 9.00 12.00 12.00 15.00 15.00 18.00 18.00 Q (cfs) Time (hrs) Runoff Hydrograph Hyd. No. 2 -- 2 Year Hyd No. 2 Hyd No. 1 Total storage used = 48,138 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 02 / 26 / 2021 Hyd. No. 2 Runoff Hydrograph Hydrograph type = Reservoir Peak discharge = 1.635 cfs Storm frequency = 2 yrs Time to peak = 12.20 hrs Time interval = 2 min Hyd. volume = 52,475 cuft Inflow hyd. No. = 1 - post construction Max. Elevation = 111.14 ft Reservoir name = Ernie Ball Basin Max. Storage = 48,138 cuft Storage Indication method used. 0 4 8 12 16 20 24 28 32 36 40 Elev (ft) 108.00 108.00 109.00 109.00 110.00 110.00 111.00 111.00 112.00 112.00 113.00 113.00 Elev (ft) Time (hrs) Runoff Hydrograph Hyd. No. 2 -- 2 Year 1. Ernie Ball Basin GARING, TAYLOR AND ASSOCIATES TR 2943 EARTHWOOD LANE PHASE II PAGE 19 Appendix “B” Tract 2943 Earthwood Phase II Drainage Study TRACT 2943 EARTHWOOD PHASE II DRAINAGE STUDY EARHTWOOD LANE, SAN LUIS OBISPO, CA DATE: OCTOBER 23, 2020 REVISED 11/23/2020, 02/22/2021. 141 South Elm Street | Arroyo Grande, CA 93420 Phone: (805) 489-1321 | Fax: (805) 489-6723 Prepared for: Mr. Michael Hodge Job # 20-822 William Rebik, RCE 35,337 Exp. 09/30/2021 February 22, 2021 20-822 Tract 2943 DRAINAGE STUDY 141 South Elm Street • Arroyo Grande, CA, 93420 • Telephone 805.489.1321 • Fax 805.489.6723 • garingtaylor.com R. James Garing, PE | Jeffrey J. Emrick, PE | Ronald G. Reilly, PE | William L. Rebik, PE, LS Perry D. McBeth, PE | James A. Cooper, PE Table of Contents I. INTRODUCTION …………………………………………………………………………………………. 3 II. 85th PERCENTILE STORM EVENT ………………………………………………..……………….. 4 III. PEAK MANAGEMENT 2-100 YEAR………………………………………………………………. 5 IV. PIPE FLOW IN AND OUT …………………………………………………………………………….. 6 V. GUTTER SPREAD AND DEPTH………………………………………………………………………. 9 VI. SUMMARY AND DISCUSSION………………………………………………………………………. 9 TABLES 1. 85th PERCENTILE STORM EVENT DATA 2. INCREMENTAL BASIN VOLUMES 3. PRE-Vs.-POST 4. 100-YEAR RUN-OFF VOLUMES TRACT 2943 100-YEAR FLOW RATES FIGURES 1. INLET STUCTURE ELEVATIONS APPENDICIES A. DMA EXHIBIT 10 B. PRE-Vs.-POST CALCULATIONS 12 C. BASIN -STORMDRAIN PLAN AND PROFILE EXHIBIT 18 D. INCREMENTAL BASIN VOLUME CHART 20 E. HYDRAFLOW REPORT INLET 2-YEAR 22 F. HYDRAFLOW REPORT INLET 100-YEAR 24 G. HYDRAFLOW REPORT 18” PIPE CROSSING EARTHWOOD 26 H. HYDRAFLOW REPORT 24” PIPE EARTHWOOD LANE TO BASIN 36 I. HYDRAFLOW REPORT 18” OUTFALL PIPE FROM BASIN 38 February 22, 2021 20-822 Tract 2943 DRAINAGE STUDY 3 I. INTRODUCTION Tract 2943 is located near Los Osos Valley Road and South Higuera, off Suburban Road in the City of San Luis Obispo. The Phase I portion of the tract has already been completed. The public infrastructure for Phase II will be installed with the Avila Ranch development currently under construction. The tentative tract map was approved with Resolution No. 10046 (2008 Series). The Tract received entitlement with an approved drainage strategy, prepared by Keith Crowe, which utilized a pumping system to help mitigate peak management from an onsite basin. The basin also had historically provided fire water storage for the Ernie Ball lots prior to being annexed into the City. The project has opted to negate the pump system and design a gravity treatment system. The project with capture the 85th percentile storm event and provided peak management, as required at the time of approval. This approach has been granted approval by the City’s Engineering and Development Review Department. The project will meet the treatment requirement by utilizing detention, infiltration and settling. The following discussions, narratives and calculations was prepared for the revised drainage system. The project watershed is approximately 13.67 acres with a gradual slope of 1-2% in a general north to south direction. The project site will be divided into 6 Drainage Management Areas. See APPENDIX A – “DMA Exhibit” for exact locations. • DMA 1 - Ernie Ball Lots 1 & 2 - 314,113 SF (7.2 AC) • DMA 2 - Earthwood Phase I West - 48,714 SF (1.15 AC) • DMA 3 - Earthwood Phase I East – 49,885 SF (1.1 AC) • DMA 4 – Earthwood Phase II West – 68,602 SF (1.57 AC) • DMA 5 – Earthwood Phase II East – 69,307 SF (1.59 AC) • DMA 6 – Earthwood Lots 14-17 & ROW – 44,100 SF (1.01 AC) *DMA 6a – ROW Area ONLY – 9,168 SF (0.21 AC) *Note Earthwood Tract 2943 total watershed area is 6.45 AC. Earthwood East total area is 141,030 sf (3.23 AC) Earthwood East -minus portion DMA 6 = 119,385 SF Earthwood West total area is 140,328 (3.22 AC) Earthwood West -minus portion DMA 6 = 117,553 SF The project in located in the south portion of the City of San Luis Obispo, producing an average rainfall depth of 22”-24” (WMP III Drainage Design Manual). The soil type is Class D with an assumed infiltration rate of 0.25 in/hr. The post-construction “c” values have been selected as “Neighborhood Commercial Soil Group D <2%” = 0.65 for DMAs 2-6. For the Ernie Ball Lots 1 & 2, DMA 1, a run-off coefficient, “c”, of 0.7 was selected. For certain calculations, a composite run-off coefficient was developed to determine combined flow and run-off volumes. The composite “c” value was calculated at 0.68. The project will capture and retain the 85th percentile storm event, producing 1.2” of rain, across the total site with DMA 6 bypassing the collection system. The ROW area in DMA 6 (DMA 6A - 0.21 AC) will be treated by a mechanized inlet filter system at the tract boundary inets. The ROW treatment volume is 9,168 SF x 1.2”/12 x 0.9 = 825.12 cf. The 100 year flow rate for the ROW- DMA 6A is determined from the rational method Q = CIA: 0.9 x 5 x 0.21 = 0.945 cfs. Lots 14-17 will need to provide storage for the 85th percentile event at the time of development. February 22, 2021 20-822 Tract 2943 DRAINAGE STUDY 4 The project will provide peak management for the total 13.67 acres for the 2-100-year storm events for local regions producing 22”-24” of rain annually. The maximum post-construction run- off rate in a 100-year event will be set at the 10-year pre-construction run-off rate of 19 cfs for the entire site. The pre-construction run-off rate was determined from the Drainage Design Manual using run-off coefficient of 0.42. Earthwood Lane Phase I and II (DMAs 2-5) drainage will flow down Earthwood Lane to a series of inlets (located near the upstream property lines of lots 14 and 17) where flow will be captured and directed to the modified basin at the Ernie Ball site. The Ernie Ball site (DMA 1) will continue to have the existing drainage courses direct run-off to the on-site basin. The basin bottom will be set at 106.50. The basin will retain the run-off, from all sites, up to the 109.5 elevation (Basin Volume 41,269. See TABLE 2). The invert of the 18” outfall pipe from the basin to Earthwood Lane will be set at 109.5. The outflow will initially be much lower than the 10- year pre-con allowable outflow rate of 19 CFS and would reach the maximum outflow rate of 17 cfs with 5.55’ of headwater at an elevation of 115.05 (Basin Volume 142,252 CF. See TABLE 2). The basin spill way safe over-flow will be set at 114.20’. The time to fill the basin to the elevation of 114.2 takes 100-year flows approximately 210 minutes, at which time the 100-year storm event will be producing run-off at a rate of 10.1 CFS -- free release at less than the 10-year pre-construction run-off rate will be met. Additionally, the basin should never reach the 114.20 elevation (Basin volume 125,605) as release starts occurring at the 109.5 elevation (Basin volume 41,269). II. 85th PERCENTILE STORM EVENT The project will capture and retain the 85th percentile storm event producing 1.2” of rain across DMAs 1-5. The volume of storage to retain the 85th event was determined using the composite run- off coefficient of 0.68. The following table provides the inputs and results for the 85th volume requirement. 85TH PERCENTILE 24-HOUR RAIN EVENT TOATL AREA SF TOTAL AREA AC DEPTH INCH COMPOSITE "c" RUN-OFF VOL. CF 550621 12.641 1.2 0.68 37442 TABLE 1 The basin will store the 85th Percentile Run-off volume (37442 CF) below the 109.25’ elevation. The basin storage volume at the 109.25’ elevation is 37,526 CF. TABLE 2 provides the complete volumetric breakdown of the basin in incremental steps. This table is also included as APPENDIX D. February 22, 2021 20-822 Tract 2943 DRAINAGE STUDY 5 TABLE 2 Incremental Basin Volumes III. PEAK MANAGEMENT 2-100 YEAR The project will provide peak management for the 2 through 100-year storm events. The project will mitigate the 100-year post construction run-off flow rates to a 10-year 10-minutes pre- construction run-off rate. The maximum flow off the site was determined as the 10-year 10-minute pre-construction run-off rate of 19 cfs. The “Combined” site calculation is provided in TABLE 3 for the 2 through 100-year analysis. minutes 2 year in/hr 10 year in/hr 50 year in/hr 100 year in/hr inflow 2yr post- con CFS inflow 10yr post- con CFS inflow 50yr post- con CFS inflow 100yr post-con CFS 100yr Total Vol CF 10 2.09 3.58 4.61 5.00 17.9 30.7 39.5 42.9 25731 15 1.81 2.99 3.90 4.29 15.5 25.7 33.4 36.8 33126 24.3 3.43 29.4 42893 30 1.18 2.09 2.60 2.91 10.1 17.9 22.3 25.0 44978 49.7 2.22 19.0 56661 60 0.75 1.30 1.69 1.85 6.4 11.1 14.5 15.9 57134 120 0.55 0.91 1.30 1.38 4.7 7.8 11.1 11.8 85094 180 0.47 0.83 1.14 1.22 4.1 7.1 9.8 10.5 113053 210.00 1.18 10.1 127640 360 0.36 0.63 0.91 0.98 3.1 5.4 7.8 8.4 182343 600 0.28 0.47 0.71 0.75 2.4 4.1 6.1 6.4 230968 TABLE 3 Pre-Vs.-Post February 22, 2021 20-822 Tract 2943 DRAINAGE STUDY 6 The rational method Q=C*I*A was used to determine the run-off flow rates from post and pre- construction conditions. The difference in flow rates from the 100-year event of varying durations and the 10-year-10-minute event was calculated. The flow rates were used to determine the required storage volumes by multiplying the flow rate by the time of concentration in seconds. Complete calculations and analysis for each DMA and the “Combined” site are included as APPENDIX B. TABLE 4 provides the time and storage volume (unadjusted) requirements in a 100- year event to mitigate run-off to the 10-year pre-construction run-off rates. minutes 100 year in/hr inflow 100yr post-con CFS 100yr Total Vol CF 10 5.00 42.9 25731 15 4.29 36.8 33126 24.3 3.43 29.4 42893 30 2.91 25.0 44978 49.7 2.22 19.0 56661 60 1.85 15.9 57134 120 1.38 11.8 85094 180 1.22 10.5 113053 210.00 1.18 10.1 127640 360 0.98 8.4 182343 600 0.75 6.4 230968 TABLE 4 100-YEAR RUN-OFF VOLUMES IV. PIPE FLOW IN AND OUT To determine the flows-in from Earthwood Lane DMAs 2-5 (Earthwood Lane Tract 2943 Phase I and II) were combined and evaluated for the 100-year 10-minute storm event in the post-construction conditions. TABLE 5 provides the results of the maximum 100-year flow. Calculations were performed using the Rational Method: Q=C x I x A = 0.65 x I in/hr x 5.43 AC. minutes 100 year in/hr inflow 100yr post-con CFS 10 5.00 17.6 15 4.29 15.1 30 2.91 10.3 60 1.85 6.5 120 1.38 4.9 180 1.22 4.3 360 0.98 3.5 600 0.75 2.6 TABLE 5 Tract 2943 100-Year Flows February 22, 2021 20-822 Tract 2943 DRAINAGE STUDY 7 The design flow to the basin from Earthwood Lane will be 17.6 CFS. Symmetric inlet configurations will be installed on the East and West side of Earthwood Lane near the upstream property lines of lots 14 and 17. 14.5’ of curb inlets will be installed. The East side of Earthwood Lane will drain across Earthwood in an 18” pipe at 2.22%. The East side flow (DMA 2 and 5) for the 100-year event is 8.85 CFS. See APPENDIX G for Hydraflow Express Culvert Report for the 18” pipe crossing Earthwood Lane. The Phase I and Phase II East and West (DMA 2-5) flows will combine at the west inlet structure to be routed in the 24” pipe. The 24” pipe will be required to run 189’ at 0.53% from the West inlet (Invert 108.0’) at Earthwood Lane to the Basin (Outfall Invert 107.0’). The 24” pipe will require 2.6’ of head to push 17.7 CFS to the basin. Please see APPENDIX H for Hydraflow Express Culvert Report for the 24” pipe from Earthwood Lane to the Basin. FIGURE 1 provides the associated elevations for the system. See APPENDIX C “Basin Stormdrain Plan & Profile” exhibit for complete design elevations. FIGURE 1 The basin will continue to fill with Combined flows from the Ernie Ball lots and Earthwood Lane development. When the basin fills to elevation 114.20 (Tc approx. 210 minutes in the 100 year storm) the headwater depth reaches 4.7’ and the 18” outfall pipe will be flowing at maximum design outflow of 15.4 CFS (< 10-year 10-minute pre-construction flow rate). See APPENDIX I for Hydraflow Express Culvert Report for the 18” pipe from the basin to Earthwood Lane. The report provides the staged flows in the outfall pipe based on the WSE in the basin. At a Tc of 49.7 minutes the 100-year post-construction run-off rates have diminished to less than the 10-year pre- construction run-off rate of 19 cfs. In the 100-year storm event the system will be able to free release run-off at 49.7 minutes with a flow rate of 19 CFS. February 22, 2021 20-822 Tract 2943 DRAINAGE STUDY 8 minutes 100 year in/hr inflow 100yr post-con CFS 100yr Total Vol CF 10 5.00 42.9 25731 15 4.29 36.8 33126 24.3 3.43 29.4 42893 30 2.91 25.0 44978 49.7 2.22 19.0 56661 60 1.85 15.9 57134 120 1.38 11.8 85094 180 1.22 10.5 113053 210.00 1.18 10.1 127640 360 0.98 8.4 182343 600 0.75 6.4 230968 TABLE 6 Combined Flows The basin elevation at 49.7 minutes is just below 110.5’, See TABLE 2. Based on the report from Hydraflow the 18” outfall pipe from the basin to Earthwood Lane will be flowing at approximately 4 cfs with 1.1’ of headwater. The headwater will continue to build with increasing outflow as described in APPENDIX I. A Summary of the data reported by Hydraflow is provided in TABLE 7. Hw/D D (ft) Hw (ft) Basin WSE Pipe Flow cfs 3.7 1.5 5.6 115.1 17 3.36 1.5 5.0 114.5 16 3.13 1.5 4.7 114.2 15.4 2.98 1.5 4.5 114.0 15 2.01 1.5 3.0 112.5 14 1.83 1.5 2.7 112.2 13 1.66 1.5 2.5 112.0 12 1.51 1.5 2.3 111.8 11 1.36 1.5 2.0 111.5 10 1.24 1.5 1.9 111.4 9 1.14 1.5 1.7 111.2 8 1.03 1.5 1.5 111.0 7 0.93 1.5 1.4 110.9 6 0.83 1.5 1.2 110.7 5 0.72 1.5 1.1 110.6 4 0.61 1.5 0.9 110.4 3 0.49 1.5 0.7 110.2 2 0.33 1.5 0.5 110.0 1 0.16 1.5 0.2 109.7 0.25 TABLE 7 Hydraflow data for 18” outfall pipe February 22, 2021 20-822 Tract 2943 DRAINAGE STUDY 9 V. GUTTER SPREAD AND DEPTH The project was simulated in Hydraflow 2020 for the determination of gutter spread and depth. See APPENDIX E and F for the complete Hydraflow output reports for the 2-year and 100-year events, respectively, for the post-construction conditions. The spread in a two-year 10-minute event is 7.95’ and the depth at the curb is 0.55’ with a 4” local depression. For the 100-year 10- minute event the spread is 14.32’ and the depth of flow at the curb inlet is 0.68’ with a 4” local depression. For the 100-year event there is a 1.32 cfs by-pass flow that will need to be captured and treated with the ROW run-off from lots 14-17. VI. SUMMARY AND DISCUSSION The project will capture the 85th Percentile storm event for DMAs 1-5 and mitigate the post- construction run-off rates to a 10-year 10-minute pre-construction run-off rate for the entire site. As stated previously, DMA 6 will release without treatment into the sag inlets at the tract boundary. DMA 6 is 1.01 AC and will have a post construction run-off rate of 3.28 cfs. (0.65 x 5 in/hr x 1.01 AC = 3.28 cfs). The bypass flow from the inlets at lots 14 and 17 will also need to be collected at the tract boundary. The total flow from Earthwood Phase I and II to be collected at the sag inlet at the tract boundary should be 1.32 cfs x 2 inlets + 3.28 cfs = 5.92 cfs. GARING, TAYLOR AND ASSOCIATES TR 2943 EARTHWOOD LANE PHASE II PAGE 10 Appendix “A” DMA EXHIBIT ST O P GA R I N G , T A Y L O R & A S S O C I A T E S , I N C . CI V I L E N G I N E E R S · S U R V E Y O R S · P L A N N E R S 14 1 S O U T H E L M S T R E E T · A R R O Y O G R A N D E , C A 9 3 4 2 0 · ( 8 0 5 ) 4 8 9 - 1 3 2 1 DRAINAGE MANAGEMENT AREA EXHIBIT ERNIE BALL LOT 1, LOT 2, EARTHWOOD PHASE I AND PAHSE II T: \ 2 0 - 8 2 2 A v i l a R a n c h E a r t h w o o d P I P s \ C i v i l \ D r a w i n g s \ S h e e t \ 6 S W C P s t o r m s e w e r 2 0 2 1 - 0 2 - 0 8 . d w g , A u t o C A D P D F ( H i g h Q u a l i t y P r i n t ) . p c 3 GARING, TAYLOR AND ASSOCIATES TR 2943 EARTHWOOD LANE PHASE II PAGE 12 Appendix “B” PRE-Vs-POST CALCULATIONS 141 South Elm Street • Arroyo Grande, CA, 93420 • Telephone 805.489.1321 • Fax 805.489.6723 • garingtaylor.com Ronald G. Reilly, PE | Perry D McBeth, PE | James A. Cooper, PE, LS William Rebik, PE, LS | Jeffrey J. Emrick, PE Combined "c" pre-con precon c 0.42 "c" post-con postcon c 0.68 EB 1/2 PHASE I/II area (SF) 550621 12.64 area (AC) minutes 2 year in/hr 10 year in/hr 50 year in/hr 100 year in/hr inflow 2yr post-con CFS inflow 10yr post-con CFS inflow 50yr post-con CFS inflow 100yr post- con CFS outflow 10 yr pre release CFS 100yr Total Vol CF 10 2.09 3.58 4.61 5.00 17.9 30.7 39.5 42.9 19.0 25731 15 1.81 2.99 3.90 4.29 15.5 25.7 33.4 36.8 19.0 33126 24.3 3.43 29.4 19.0 42893 30 1.18 2.09 2.60 2.91 10.1 17.9 22.3 25.0 19.0 44978 49.7 2.22 19.0 19.0 56661 60 0.75 1.30 1.69 1.85 6.4 11.1 14.5 15.9 19.0 57134 120 0.55 0.91 1.30 1.38 4.7 7.8 11.1 11.8 19.0 85094 180 0.47 0.83 1.14 1.22 4.1 7.1 9.8 10.5 19.0 113053 210.00 1.18 10.1 19.0 127640 360 0.36 0.63 0.91 0.98 3.1 5.4 7.8 8.4 19.0 182343 600 0.28 0.47 0.71 0.75 2.4 4.1 6.1 6.4 19.0 230968 DMA 1 ERNIE BALL Lots 1 & 2 "c" pre-con precon c 0.42 "c" post-con postcon c 0.7 DMA 1 area (SF) 314113 7.2 area (AC) minutes 2 year in/hr 10 year in/hr 50 year in/hr 100 year in/hr inflow 2yr post-con CFS inflow 10yr post-con CFS inflow 50yr post-con CFS inflow 100yr post-con CFS outflow 2 yr pre release CFS outflow 10 yr pre release CFS outflow 50 yr pre release CFS outflow 100 yr pre release CFS 10 2.09 3.58 4.61 5.00 10.5 18.1 23.3 25.2 6.3 10.9 14.0 15.1 15 1.81 2.99 3.90 4.29 9.1 15.1 19.7 21.7 6.3 10.9 11.8 13.0 30 1.18 2.09 2.60 2.91 6.0 10.5 13.1 14.7 6.3 10.9 7.9 8.8 60 0.75 1.30 1.69 1.85 3.8 6.6 8.5 9.3 6.3 10.9 5.1 5.6 120 0.55 0.91 1.30 1.38 2.8 4.6 6.6 7.0 6.3 10.9 3.9 4.2 180 0.47 0.83 1.14 1.22 2.4 4.2 5.8 6.2 6.3 10.9 3.5 3.7 360 0.36 0.63 0.91 0.98 1.8 3.2 4.6 5.0 6.3 10.9 2.7 3.0 600 0.28 0.47 0.71 0.75 1.4 2.4 3.6 3.8 6.3 10.9 2.1 2.3 141 South Elm Street • Arroyo Grande, CA, 93420 • Telephone 805.489.1321 • Fax 805.489.6723 • garingtaylor.com Ronald G. Reilly, PE | Perry D McBeth, PE | James A. Cooper, PE, LS William Rebik, PE, LS | Jeffrey J. Emrick, PE West "c" pre-con precon c 0.42 "c" post-con postcon c 0.65 west area (SF) 117316 2.69 area (AC) minutes 2 year in/hr 10 year in/hr 50 year in/hr 100 year in/hr inflow 2yr post-con CFS inflow 10yr post- con CFS inflow 50yr post-con CFS inflow 100yr post- con CFS outflow 2 yr pre release CFS outflow 10 yr pre release CFS outflow 50 yr pre release CFS outflow 100 yr pre release CFS 10 2.09 3.58 4.61 5.00 3.7 6.3 8.1 8.8 2.4 4.1 5.2 5.7 15 1.81 2.99 3.90 4.29 3.2 5.2 6.8 7.5 5.7 9.7 4.4 4.9 30 1.18 2.09 2.60 2.91 2.1 3.7 4.5 5.1 5.7 9.7 2.9 3.3 60 0.75 1.30 1.69 1.85 1.3 2.3 3.0 3.2 5.7 9.7 1.9 2.1 120 0.55 0.91 1.30 1.38 1.0 1.6 2.3 2.4 5.7 9.7 1.5 1.6 180 0.47 0.83 1.14 1.22 0.8 1.4 2.0 2.1 5.7 9.7 1.3 1.4 360 0.36 0.63 0.91 0.98 0.6 1.1 1.6 1.7 5.7 9.7 1.0 1.1 600 0.28 0.47 0.71 0.75 0.5 0.8 1.2 1.3 5.7 9.7 0.8 0.8 East "c" pre-con precon c 0.42 "c" post-con postcon c 0.65 east area (SF) 119192 2.74 minutes 2 year in/hr 10 year in/hr 50 year in/hr 100 year in/hr inflow 2yr post-con CFS inflow 10yr post- con CFS inflow 50yr post-con CFS inflow 100yr post- con CFS outflow 2 yr pre release CFS outflow 10 yr pre release CFS outflow 50 yr pre release CFS outflow 100 yr pre release CFS 10 2.09 3.58 4.61 5.00 3.7 6.4 8.2 8.9 2.4 4.1 5.3 5.7 15 1.81 2.99 3.90 4.29 3.2 5.3 6.9 7.6 1.0 1.7 4.5 4.9 30 1.18 2.09 2.60 2.91 2.1 3.7 4.6 5.2 1.0 1.7 3.0 3.3 60 0.75 1.30 1.69 1.85 1.3 2.3 3.0 3.3 1.0 1.7 1.9 2.1 120 0.55 0.91 1.30 1.38 1.0 1.6 2.3 2.5 1.0 1.7 1.5 1.6 180 0.47 0.83 1.14 1.22 0.8 1.5 2.0 2.2 1.0 1.7 1.3 1.4 360 0.36 0.63 0.91 0.98 0.6 1.1 1.6 1.8 1.0 1.7 1.0 1.1 600 0.28 0.47 0.71 0.75 0.5 0.8 1.3 1.3 1.0 1.7 0.8 0.9 141 South Elm Street • Arroyo Grande, CA, 93420 • Telephone 805.489.1321 • Fax 805.489.6723 • garingtaylor.com Ronald G. Reilly, PE | Perry D McBeth, PE | James A. Cooper, PE, LS William Rebik, PE, LS | Jeffrey J. Emrick, PE DMA 2 Earthwood Phase I West "c" pre-con precon c 0.42 "c" post-con postcon c 0.65 DMA 2 area (SF) 48714 1.12 area (AC) minutes 2 year in/hr 10 year in/hr 50 year in/hr 100 year in/hr inflow 2yr post- con CFS inflow 10yr post-con CFS inflow 50yr post-con CFS inflow 100yr post-con CFS outflow 2 yr pre release CFS outflow 10 yr pre release CFS outflow 50 yr pre release CFS outflow 100 yr pre release CFS 10 2.09 3.58 4.61 5.00 1.5 2.6 3.3 3.6 1.0 1.7 2.2 2.3 15 1.81 2.99 3.90 4.29 1.3 2.2 2.8 3.1 5.7 9.7 1.8 2.0 30 1.18 2.09 2.60 2.91 0.9 1.5 1.9 2.1 5.7 9.7 1.2 1.4 60 0.75 1.30 1.69 1.85 0.5 0.9 1.2 1.3 5.7 9.7 0.8 0.9 120 0.55 0.91 1.30 1.38 0.4 0.7 0.9 1.0 5.7 9.7 0.6 0.6 180 0.47 0.83 1.14 1.22 0.3 0.6 0.8 0.9 5.7 9.7 0.5 0.6 360 0.36 0.63 0.91 0.98 0.3 0.5 0.7 0.7 5.7 9.7 0.4 0.5 600 0.28 0.47 0.71 0.75 0.2 0.3 0.5 0.5 5.7 9.7 0.3 0.4 DMA 3 Earthwood Phase I East "c" pre-con precon c 0.42 "c" post-con postcon c 0.65 DMA 3 area (SF) 49885 1.15 area (AC) minutes 2 year in/hr 10 year in/hr 50 year in/hr 100 year in/hr inflow 2yr post- con CFS inflow 10yr post-con CFS inflow 50yr post-con CFS inflow 100yr post-con CFS outflow 2 yr pre release CFS outflow 10 yr pre release CFS outflow 50 yr pre release CFS outflow 100 yr pre release CFS 10 2.09 3.58 4.61 5.00 1.6 2.7 3.4 3.7 1.0 1.7 2.2 2.4 15 1.81 2.99 3.90 4.29 1.3 2.2 2.9 3.2 1.0 1.7 1.9 2.1 30 1.18 2.09 2.60 2.91 0.9 1.6 1.9 2.2 1.0 1.7 1.2 1.4 60 0.75 1.30 1.69 1.85 0.6 1.0 1.3 1.4 1.0 1.7 0.8 0.9 120 0.55 0.91 1.30 1.38 0.4 0.7 1.0 1.0 1.0 1.7 0.6 0.7 180 0.47 0.83 1.14 1.22 0.4 0.6 0.8 0.9 1.0 1.7 0.5 0.6 360 0.36 0.63 0.91 0.98 0.3 0.5 0.7 0.7 1.0 1.7 0.4 0.5 600 0.28 0.47 0.71 0.75 0.2 0.4 0.5 0.6 1.0 1.7 0.3 0.4 141 South Elm Street • Arroyo Grande, CA, 93420 • Telephone 805.489.1321 • Fax 805.489.6723 • garingtaylor.com Ronald G. Reilly, PE | Perry D McBeth, PE | James A. Cooper, PE, LS William Rebik, PE, LS | Jeffrey J. Emrick, PE DMA 4 Earthwood Phase II West "c" pre-con precon c 0.42 "c" post-con postcon c 0.65 DMA 4 area (SF) 68602 1.57 area (AC) minutes 2 year in/hr 10 year in/hr 50 year in/hr 100 year in/hr inflow 2yr post-con CFS inflow 10yr post-con CFS inflow 50yr post-con CFS inflow 100yr post-con CFS outflow 2 yr pre release CFS outflow 10 yr pre release CFS outflow 50 yr pre release CFS outflow 100 yr pre release CFS 10 2.09 3.58 4.61 5.00 2.1 3.7 4.7 5.1 1.4 2.4 3.0 3.3 15 1.81 2.99 3.90 4.29 1.9 3.1 4.0 4.4 1.8 3.2 2.6 2.8 30 1.18 2.09 2.60 2.91 1.2 2.1 2.7 3.0 1.8 3.2 1.7 1.9 60 0.75 1.30 1.69 1.85 0.8 1.3 1.7 1.9 1.8 3.2 1.1 1.2 120 0.55 0.91 1.30 1.38 0.6 0.9 1.3 1.4 1.8 3.2 0.9 0.9 180 0.47 0.83 1.14 1.22 0.5 0.8 1.2 1.2 1.8 3.2 0.8 0.8 360 0.36 0.63 0.91 0.98 0.4 0.6 0.9 1.0 1.8 3.2 0.6 0.7 600 0.28 0.47 0.71 0.75 0.3 0.5 0.7 0.8 1.8 3.2 0.5 0.5 DMA 5 Earthwood Phase II East "c" pre-con precon c 0.42 "c" post-con postcon c 0.65 DMA 5 area (SF) 69307 1.59 area (AC) minutes 2 year in/hr 10 year in/hr 50 year in/hr 100 year in/hr inflow 2yr post-con CFS inflow 10yr post-con CFS inflow 50yr post-con CFS inflow 100yr post-con CFS outflow 2 yr pre release CFS outflow 10 yr pre release CFS outflow 50 yr pre release CFS outflow 100 yr pre release CFS 10 2.09 3.58 4.61 5.00 2.2 3.7 4.8 5.2 1.4 2.4 3.1 3.3 15 1.81 2.99 3.90 4.29 1.9 3.1 4.0 4.4 1.8 3.1 2.6 2.9 30 1.18 2.09 2.60 2.91 1.2 2.2 2.7 3.0 1.8 3.1 1.7 1.9 60 0.75 1.30 1.69 1.85 0.8 1.3 1.8 1.9 1.8 3.1 1.1 1.2 120 0.55 0.91 1.30 1.38 0.6 0.9 1.3 1.4 1.8 3.1 0.9 0.9 180 0.47 0.83 1.14 1.22 0.5 0.9 1.2 1.3 1.8 3.1 0.8 0.8 360 0.36 0.63 0.91 0.98 0.4 0.7 0.9 1.0 1.8 3.1 0.6 0.7 600 0.28 0.47 0.71 0.75 0.3 0.5 0.7 0.8 1.8 3.1 0.5 0.5 141 South Elm Street • Arroyo Grande, CA, 93420 • Telephone 805.489.1321 • Fax 805.489.6723 • garingtaylor.com Ronald G. Reilly, PE | Perry D McBeth, PE | James A. Cooper, PE, LS William Rebik, PE, LS | Jeffrey J. Emrick, PE Earthwood Phase I & II DMA 2-5 "c" pre-con precon c 0.42 "c" post-con postcon c 0.65 DMA 2-5 area (SF) 236508 5.429477 area (AC) minutes 100 year in/hr inflow 2yr post- con CFS inflow 10yr post-con CFS inflow 50yr post- con CFS inflow 100yr post-con CFS outflow 2 yr pre release CFS outflow 10 yr pre release CFS outflow 50 yr pre release CFS outflow 100 yr pre release CFS 10 5.00 7.4 12.6 16.3 17.6 4.8 8.2 10.5 11.4 15 4.29 6.4 10.6 13.8 15.1 1.8 3.2 8.9 9.8 30 2.91 4.2 7.4 9.2 10.3 1.8 3.2 5.9 6.6 60 1.85 2.6 4.6 6.0 6.5 1.8 3.2 3.9 4.2 120 1.38 1.9 3.2 4.6 4.9 1.8 3.2 3.0 3.1 180 1.22 1.7 2.9 4.0 4.3 1.8 3.2 2.6 2.8 360 0.98 1.3 2.2 3.2 3.5 1.8 3.2 2.1 2.2 600 0.75 1.0 1.7 2.5 2.6 1.8 3.2 1.6 1.7 DMA 6 Earthwood Phase I & II "c" pre-con precon c 0.42 "c" post-con postcon c 0.65 DMA 6 area (SF) 44410 1.02 area (AC) basin area SF 16404 minutes 2 year in/hr 100 year in/hr inflow 2yr post- con CFS inflow 10yr post- con CFS inflow 50yr post- con CFS inflow 100yr post- con CFS outflow 2 yr pre release CFS outflow 10 yr pre release CFS outflow 50 yr pre release CFS outflow 100 yr pre release CFS 10 2.09 5.00 1.4 2.4 3.1 3.3 0.9 1.5 2.0 2.1 15 1.81 4.29 1.2 2.0 2.6 2.8 1.8 3.2 1.7 1.8 30 1.18 2.91 0.8 1.4 1.7 1.9 1.8 3.2 1.1 1.2 60 0.75 1.85 0.5 0.9 1.1 1.2 1.8 3.2 0.7 0.8 120 0.55 1.38 0.4 0.6 0.9 0.9 1.8 3.2 0.6 0.6 180 0.47 1.22 0.3 0.5 0.8 0.8 1.8 3.2 0.5 0.5 360 0.36 0.98 0.2 0.4 0.6 0.7 1.8 3.2 0.4 0.4 600 0.28 0.75 0.2 0.3 0.5 0.5 1.8 3.2 0.3 0.3 DMA 6A Earthwood Phase I & II "c" pre-con precon c 0.42 "c" post-con postcon c 0.9 DMA 6A area (SF) 9168 0.21 area (AC) minutes 2 year in/hr 100 year in/hr inflow 2yr post- con CFS inflow 10yr post-con CFS inflow 50yr post-con CFS inflow 100yr post-con CFS outflow 2 yr pre release CFS outflow 10 yr pre release CFS outflow 50 yr pre release CFS outflow 100 yr pre release CFS 10 2.09 5.00 0.4 0.7 0.9 0.9 0.2 0.3 0.4 0.4 GARING, TAYLOR AND ASSOCIATES TR 3211 1598 EL CAMINO REAL PAGE 18 Appendix “C” BASIN STORMDRAIN PLAN & PROFILE 6 GA R I N G , T A Y L O R & A S S O C I A T E S , I N C . CI V I L E N G I N E E R S · S U R V E Y O R S · P L A N N E R S 14 1 S O U T H E L M S T R E E T · A R R O Y O G R A N D E , C A 9 3 4 2 0 · ( 8 0 5 ) 4 8 9 - 1 3 2 1 STORM DRAIN & BASIN PROFILE EARTHWOOD LANE TO BASIN STORM DRAIN AND BASIN PLAN STORM DRAIN & BASIN PROFILE BASIN TO EARTHWOOD LANE T: \ 2 0 - 8 2 2 A v i l a R a n c h E a r t h w o o d P I P s \ C i v i l \ D r a w i n g s \ S h e e t \ 6 S W C P s t o r m s e w e r 2 0 2 1 - 0 2 - 0 8 . d w g , A u t o C A D P D F ( H i g h Q u a l i t y P r i n t ) . p c 3 GARING, TAYLOR AND ASSOCIATES TR 2943 EARTHWOOD LANE PHASE II PAGE 20 Appendix “D” INCREMENTAL BASIN VOLUME Site:Ernie Ball Basin @ Earthwood Description:Onsite Retention Volume GTA Project No. 20-822 Computed: ajc Date: 2/16/2021 Basin New Incremental Accumulated Area Volume Volume* Elevation (ft2) (ft 3) (ft 3) 106.50 12321 00 107.00 12869 6,297 6,297 108.00 13877 3,428 19,628 109.00 14575 14,225 33,853 109.25 14809 3,673 37,526 109.50 15138 3,743 41,269 110.00 15966 7,775 49,044 110.48 16076 7,690 56,734 111.00 17,064 8,615 65,349 112.00 18,211 17,634 82,984 113.00 19,381 8,585 101,740 114.00 20,161 13,950 121,551 114.20 20,376 4,054 125,605 Top 114.23 20,408 612 126,217 *Volume is calculated using conic method Total Volume = 126,217 cu.ft. GARING, TAYLOR AND ASSOCIATES TR 2943 EARTHWOOD LANE PHASE II PAGE 22 Appendix “E” HYDRAFLOW REPORT EARTHWOOD LANE INLET 2-YEAR Inlet Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Wednesday, Feb 17 2021 INLETS LOTS 14 & 17 (2-YEAR) Curb Inlet Location = On grade Curb Length (ft) = 14.50 Throat Height (in) = 4.50 Grate Area (sqft) = -0- Grate Width (ft) = -0- Grate Length (ft) = -0- Gutter Slope, Sw (ft/ft) = 0.050 Slope, Sx (ft/ft) = 0.020 Local Depr (in) = 4.00 Gutter Width (ft) = 2.00 Gutter Slope (%) = 1.00 Gutter n-value = 0.012 Calculations Compute by: Known Q Q (cfs) = 2.10 Highlighted Q Total (cfs) = 2.10 Q Capt (cfs) = 2.10 Q Bypass (cfs) = -0- Depth at Inlet (in) = 6.63 Efficiency (%) = 100 Gutter Spread (ft) = 7.95 Gutter Vel (ft/s) = 3.04 Bypass Spread (ft) = -0- Bypass Depth (in) = -0- GARING, TAYLOR AND ASSOCIATES TR 2943 EARTHWOOD LANE PHASE II PAGE 24 Appendix “F” HYDRAFLOW REPORT EARTHWOOD LANE INLET 100-YEAR Inlet Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Wednesday, Feb 17 2021 INLETS LOTS 14 & 17 (100-YEAR) Curb Inlet Location = On grade Curb Length (ft) = 14.50 Throat Height (in) = 4.50 Grate Area (sqft) = -0- Grate Width (ft) = -0- Grate Length (ft) = -0- Gutter Slope, Sw (ft/ft) = 0.050 Slope, Sx (ft/ft) = 0.020 Local Depr (in) = 4.00 Gutter Width (ft) = 2.00 Gutter Slope (%) = 1.00 Gutter n-value = 0.012 Calculations Compute by: Known Q Q (cfs) = 8.85 Highlighted Q Total (cfs) = 8.85 Q Capt (cfs) = 7.53 Q Bypass (cfs) = 1.32 Depth at Inlet (in) = 8.16 Efficiency (%) = 85 Gutter Spread (ft) = 14.32 Gutter Vel (ft/s) = 4.20 Bypass Spread (ft) = 6.45 Bypass Depth (in) = 2.27 GARING, TAYLOR AND ASSOCIATES TR 2943 EARTHWOOD LANE PHASE II PAGE 26 Appendix “G” HYDRAFLOW REPORT 18” PIPE CROSSING EARTHWOOD Culvert Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Friday, Feb 19 2021 18 INCH PIPE CROSSING EARTHWOOD Invert Elev Dn (ft) = 108.10 Pipe Length (ft) = 45.00 Slope (%) = 2.22 Invert Elev Up (ft) = 109.10 Rise (in) = 18.0 Shape = Circular Span (in) = 18.0 No. Barrels = 1 n-Value = 0.012 Culvert Type = Circular Concrete Culvert Entrance = Groove end projecting (C) Coeff. K,M,c,Y,k = 0.0045, 2, 0.0317, 0.69, 0.2 Embankment Top Elevation (ft) = 114.80 Top Width (ft) = 5.00 Crest Width (ft) = 6.00 Calculations Qmin (cfs) = 0.00 Qmax (cfs) = 9.00 Tailwater Elev (ft) = (dc+D)/2 Highlighted Qtotal (cfs) = 8.85 Qpipe (cfs) = 8.85 Qovertop (cfs) = 0.00 Veloc Dn (ft/s) = 5.36 Veloc Up (ft/s) = 6.09 HGL Dn (ft) = 109.43 HGL Up (ft) = 110.25 Hw Elev (ft) = 110.92 Hw/D (ft) = 1.21 Flow Regime = Inlet Control GARING, TAYLOR AND ASSOCIATES TR 2943 EARTHWOOD LANE PHASE II PAGE 28 Appendix “H” HYDRAFLOW REPORT 24” PIPE EARTHWOOD LANE TO BASIN Culvert Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Friday, Feb 19 2021 24 INCH PIPE FROM EARTHWOOD LANE TO BASIN Invert Elev Dn (ft) = 107.00 Pipe Length (ft) = 189.00 Slope (%) = 0.53 Invert Elev Up (ft) = 108.00 Rise (in) = 24.0 Shape = Circular Span (in) = 24.0 No. Barrels = 1 n-Value = 0.012 Culvert Type = Circular Concrete Culvert Entrance = Square edge w/headwall (C) Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 Embankment Top Elevation (ft) = 114.70 Top Width (ft) = 144.00 Crest Width (ft) = 6.00 Calculations Qmin (cfs) = 0.00 Qmax (cfs) = 18.00 Tailwater Elev (ft) = (dc+D)/2 Highlighted Qtotal (cfs) = 17.75 Qpipe (cfs) = 17.75 Qovertop (cfs) = 0.00 Veloc Dn (ft/s) = 6.07 Veloc Up (ft/s) = 6.94 HGL Dn (ft) = 108.76 HGL Up (ft) = 109.52 Hw Elev (ft) = 110.61 Hw/D (ft) = 1.30 Flow Regime = Inlet Control GARING, TAYLOR AND ASSOCIATES TR 2943 EARTHWOOD LANE PHASE II PAGE 30 Appendix “I” HYDRAFLOW REPORT 18” OUTFALL FROM BASIN TO EARTHWOOD Culvert Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Monday, Feb 22 2021 18 INCH OUTFLOW FROM BASIN Invert Elev Dn (ft) = 108.47 Pipe Length (ft) = 164.00 Slope (%) = 0.63 Invert Elev Up (ft) = 109.50 Rise (in) = 18.0 Shape = Circular Span (in) = 18.0 No. Barrels = 1 n-Value = 0.012 Culvert Type = Circular Concrete Culvert Entrance = Groove end projecting (C) Coeff. K,M,c,Y,k = 0.0045, 2, 0.0317, 0.69, 0.2 Embankment Top Elevation (ft) = 115.00 Top Width (ft) = 16.00 Crest Width (ft) = 6.00 Calculations Qmin (cfs) = 0.00 Qmax (cfs) = 17.00 Tailwater Elev (ft) = (dc+D)/2 Highlighted Qtotal (cfs) = 17.00 Qpipe (cfs) = 16.84 Qovertop (cfs) = 0.16 Veloc Dn (ft/s) = 9.58 Veloc Up (ft/s) = 9.53 HGL Dn (ft) = 109.94 HGL Up (ft) = 113.36 Hw Elev (ft) = 115.05 Hw/D (ft) = 3.70 Flow Regime = Outlet Control Culvert Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Monday, Feb 22 2021 18 INCH OUTFLOW FROM BASIN Invert Elev Dn (ft) = 108.47 Pipe Length (ft) = 164.00 Slope (%) = 0.63 Invert Elev Up (ft) = 109.50 Rise (in) = 18.0 Shape = Circular Span (in) = 18.0 No. Barrels = 1 n-Value = 0.012 Culvert Type = Circular Concrete Culvert Entrance = Groove end projecting (C) Coeff. K,M,c,Y,k = 0.0045, 2, 0.0317, 0.69, 0.2 Embankment Top Elevation (ft) = 115.00 Top Width (ft) = 16.00 Crest Width (ft) = 6.00 Calculations Qmin (cfs) = 0.00 Qmax (cfs) = 17.00 Tailwater Elev (ft) = (dc+D)/2 Highlighted Qtotal (cfs) = 16.00 Qpipe (cfs) = 16.00 Qovertop (cfs) = 0.00 Veloc Dn (ft/s) = 9.12 Veloc Up (ft/s) = 9.05 HGL Dn (ft) = 109.93 HGL Up (ft) = 113.01 Hw Elev (ft) = 114.54 Hw/D (ft) = 3.36 Flow Regime = Outlet Control Culvert Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Monday, Feb 22 2021 18 INCH OUTFLOW FROM BASIN Invert Elev Dn (ft) = 108.47 Pipe Length (ft) = 164.00 Slope (%) = 0.63 Invert Elev Up (ft) = 109.50 Rise (in) = 18.0 Shape = Circular Span (in) = 18.0 No. Barrels = 1 n-Value = 0.012 Culvert Type = Circular Concrete Culvert Entrance = Groove end projecting (C) Coeff. K,M,c,Y,k = 0.0045, 2, 0.0317, 0.69, 0.2 Embankment Top Elevation (ft) = 115.00 Top Width (ft) = 16.00 Crest Width (ft) = 6.00 Calculations Qmin (cfs) = 0.00 Qmax (cfs) = 17.00 Tailwater Elev (ft) = (dc+D)/2 Highlighted Qtotal (cfs) = 15.40 Qpipe (cfs) = 15.40 Qovertop (cfs) = 0.00 Veloc Dn (ft/s) = 8.79 Veloc Up (ft/s) = 8.71 HGL Dn (ft) = 109.93 HGL Up (ft) = 112.77 Hw Elev (ft) = 114.19 Hw/D (ft) = 3.13 Flow Regime = Outlet Control Culvert Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Monday, Feb 22 2021 18 INCH OUTFLOW FROM BASIN Invert Elev Dn (ft) = 108.47 Pipe Length (ft) = 164.00 Slope (%) = 0.63 Invert Elev Up (ft) = 109.50 Rise (in) = 18.0 Shape = Circular Span (in) = 18.0 No. Barrels = 1 n-Value = 0.012 Culvert Type = Circular Concrete Culvert Entrance = Groove end projecting (C) Coeff. K,M,c,Y,k = 0.0045, 2, 0.0317, 0.69, 0.2 Embankment Top Elevation (ft) = 115.00 Top Width (ft) = 16.00 Crest Width (ft) = 6.00 Calculations Qmin (cfs) = 0.00 Qmax (cfs) = 17.00 Tailwater Elev (ft) = (dc+D)/2 Highlighted Qtotal (cfs) = 15.00 Qpipe (cfs) = 15.00 Qovertop (cfs) = 0.00 Veloc Dn (ft/s) = 8.57 Veloc Up (ft/s) = 8.49 HGL Dn (ft) = 109.92 HGL Up (ft) = 112.62 Hw Elev (ft) = 113.97 Hw/D (ft) = 2.98 Flow Regime = Outlet Control Culvert Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Monday, Feb 22 2021 18 INCH OUTFLOW FROM BASIN Invert Elev Dn (ft) = 108.47 Pipe Length (ft) = 164.00 Slope (%) = 0.63 Invert Elev Up (ft) = 109.50 Rise (in) = 18.0 Shape = Circular Span (in) = 18.0 No. Barrels = 1 n-Value = 0.012 Culvert Type = Circular Concrete Culvert Entrance = Groove end projecting (C) Coeff. K,M,c,Y,k = 0.0045, 2, 0.0317, 0.69, 0.2 Embankment Top Elevation (ft) = 115.00 Top Width (ft) = 16.00 Crest Width (ft) = 6.00 Calculations Qmin (cfs) = 0.00 Qmax (cfs) = 17.00 Tailwater Elev (ft) = (dc+D)/2 Highlighted Qtotal (cfs) = 14.00 Qpipe (cfs) = 14.00 Qovertop (cfs) = 0.00 Veloc Dn (ft/s) = 8.03 Veloc Up (ft/s) = 7.92 HGL Dn (ft) = 109.91 HGL Up (ft) = 112.26 Hw Elev (ft) = 112.52 Hw/D (ft) = 2.01 Flow Regime = Inlet Control Culvert Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Monday, Feb 22 2021 18 INCH OUTFLOW FROM BASIN Invert Elev Dn (ft) = 108.47 Pipe Length (ft) = 164.00 Slope (%) = 0.63 Invert Elev Up (ft) = 109.50 Rise (in) = 18.0 Shape = Circular Span (in) = 18.0 No. Barrels = 1 n-Value = 0.012 Culvert Type = Circular Concrete Culvert Entrance = Groove end projecting (C) Coeff. K,M,c,Y,k = 0.0045, 2, 0.0317, 0.69, 0.2 Embankment Top Elevation (ft) = 115.00 Top Width (ft) = 16.00 Crest Width (ft) = 6.00 Calculations Qmin (cfs) = 0.00 Qmax (cfs) = 17.00 Tailwater Elev (ft) = (dc+D)/2 Highlighted Qtotal (cfs) = 13.00 Qpipe (cfs) = 13.00 Qovertop (cfs) = 0.00 Veloc Dn (ft/s) = 7.50 Veloc Up (ft/s) = 7.36 HGL Dn (ft) = 109.90 HGL Up (ft) = 111.93 Hw Elev (ft) = 112.25 Hw/D (ft) = 1.83 Flow Regime = Inlet Control Culvert Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Monday, Feb 22 2021 18 INCH OUTFLOW FROM BASIN Invert Elev Dn (ft) = 108.47 Pipe Length (ft) = 164.00 Slope (%) = 0.63 Invert Elev Up (ft) = 109.50 Rise (in) = 18.0 Shape = Circular Span (in) = 18.0 No. Barrels = 1 n-Value = 0.012 Culvert Type = Circular Concrete Culvert Entrance = Groove end projecting (C) Coeff. K,M,c,Y,k = 0.0045, 2, 0.0317, 0.69, 0.2 Embankment Top Elevation (ft) = 115.00 Top Width (ft) = 16.00 Crest Width (ft) = 6.00 Calculations Qmin (cfs) = 0.00 Qmax (cfs) = 17.00 Tailwater Elev (ft) = (dc+D)/2 Highlighted Qtotal (cfs) = 12.00 Qpipe (cfs) = 12.00 Qovertop (cfs) = 0.00 Veloc Dn (ft/s) = 6.97 Veloc Up (ft/s) = 6.79 HGL Dn (ft) = 109.88 HGL Up (ft) = 111.62 Hw Elev (ft) = 111.99 Hw/D (ft) = 1.66 Flow Regime = Inlet Control Culvert Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Monday, Feb 22 2021 18 INCH OUTFLOW FROM BASIN Invert Elev Dn (ft) = 108.47 Pipe Length (ft) = 164.00 Slope (%) = 0.63 Invert Elev Up (ft) = 109.50 Rise (in) = 18.0 Shape = Circular Span (in) = 18.0 No. Barrels = 1 n-Value = 0.012 Culvert Type = Circular Concrete Culvert Entrance = Groove end projecting (C) Coeff. K,M,c,Y,k = 0.0045, 2, 0.0317, 0.69, 0.2 Embankment Top Elevation (ft) = 115.00 Top Width (ft) = 16.00 Crest Width (ft) = 6.00 Calculations Qmin (cfs) = 0.00 Qmax (cfs) = 17.00 Tailwater Elev (ft) = (dc+D)/2 Highlighted Qtotal (cfs) = 11.00 Qpipe (cfs) = 11.00 Qovertop (cfs) = 0.00 Veloc Dn (ft/s) = 6.45 Veloc Up (ft/s) = 6.22 HGL Dn (ft) = 109.85 HGL Up (ft) = 111.33 Hw Elev (ft) = 111.76 Hw/D (ft) = 1.51 Flow Regime = Inlet Control Culvert Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Monday, Feb 22 2021 18 INCH OUTFLOW FROM BASIN Invert Elev Dn (ft) = 108.47 Pipe Length (ft) = 164.00 Slope (%) = 0.63 Invert Elev Up (ft) = 109.50 Rise (in) = 18.0 Shape = Circular Span (in) = 18.0 No. Barrels = 1 n-Value = 0.012 Culvert Type = Circular Concrete Culvert Entrance = Groove end projecting (C) Coeff. K,M,c,Y,k = 0.0045, 2, 0.0317, 0.69, 0.2 Embankment Top Elevation (ft) = 115.00 Top Width (ft) = 16.00 Crest Width (ft) = 6.00 Calculations Qmin (cfs) = 0.00 Qmax (cfs) = 17.00 Tailwater Elev (ft) = (dc+D)/2 Highlighted Qtotal (cfs) = 10.00 Qpipe (cfs) = 10.00 Qovertop (cfs) = 0.00 Veloc Dn (ft/s) = 5.94 Veloc Up (ft/s) = 5.66 HGL Dn (ft) = 109.83 HGL Up (ft) = 111.07 Hw Elev (ft) = 111.55 Hw/D (ft) = 1.36 Flow Regime = Inlet Control Culvert Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Monday, Feb 22 2021 18 INCH OUTFLOW FROM BASIN Invert Elev Dn (ft) = 108.47 Pipe Length (ft) = 164.00 Slope (%) = 0.63 Invert Elev Up (ft) = 109.50 Rise (in) = 18.0 Shape = Circular Span (in) = 18.0 No. Barrels = 1 n-Value = 0.012 Culvert Type = Circular Concrete Culvert Entrance = Groove end projecting (C) Coeff. K,M,c,Y,k = 0.0045, 2, 0.0317, 0.69, 0.2 Embankment Top Elevation (ft) = 115.00 Top Width (ft) = 16.00 Crest Width (ft) = 6.00 Calculations Qmin (cfs) = 0.00 Qmax (cfs) = 17.00 Tailwater Elev (ft) = (dc+D)/2 Highlighted Qtotal (cfs) = 9.00 Qpipe (cfs) = 9.00 Qovertop (cfs) = 0.00 Veloc Dn (ft/s) = 5.43 Veloc Up (ft/s) = 5.90 HGL Dn (ft) = 109.80 HGL Up (ft) = 110.71 Hw Elev (ft) = 111.36 Hw/D (ft) = 1.24 Flow Regime = Inlet Control Culvert Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Monday, Feb 22 2021 18 INCH OUTFLOW FROM BASIN Invert Elev Dn (ft) = 108.47 Pipe Length (ft) = 164.00 Slope (%) = 0.63 Invert Elev Up (ft) = 109.50 Rise (in) = 18.0 Shape = Circular Span (in) = 18.0 No. Barrels = 1 n-Value = 0.012 Culvert Type = Circular Concrete Culvert Entrance = Groove end projecting (C) Coeff. K,M,c,Y,k = 0.0045, 2, 0.0317, 0.69, 0.2 Embankment Top Elevation (ft) = 115.00 Top Width (ft) = 16.00 Crest Width (ft) = 6.00 Calculations Qmin (cfs) = 0.00 Qmax (cfs) = 17.00 Tailwater Elev (ft) = (dc+D)/2 Highlighted Qtotal (cfs) = 8.00 Qpipe (cfs) = 8.00 Qovertop (cfs) = 0.00 Veloc Dn (ft/s) = 4.92 Veloc Up (ft/s) = 5.79 HGL Dn (ft) = 109.77 HGL Up (ft) = 110.59 Hw Elev (ft) = 111.20 Hw/D (ft) = 1.14 Flow Regime = Inlet Control Culvert Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Monday, Feb 22 2021 18 INCH OUTFLOW FROM BASIN Invert Elev Dn (ft) = 108.47 Pipe Length (ft) = 164.00 Slope (%) = 0.63 Invert Elev Up (ft) = 109.50 Rise (in) = 18.0 Shape = Circular Span (in) = 18.0 No. Barrels = 1 n-Value = 0.012 Culvert Type = Circular Concrete Culvert Entrance = Groove end projecting (C) Coeff. K,M,c,Y,k = 0.0045, 2, 0.0317, 0.69, 0.2 Embankment Top Elevation (ft) = 115.00 Top Width (ft) = 16.00 Crest Width (ft) = 6.00 Calculations Qmin (cfs) = 0.00 Qmax (cfs) = 17.00 Tailwater Elev (ft) = (dc+D)/2 Highlighted Qtotal (cfs) = 7.00 Qpipe (cfs) = 7.00 Qovertop (cfs) = 0.00 Veloc Dn (ft/s) = 4.41 Veloc Up (ft/s) = 5.45 HGL Dn (ft) = 109.73 HGL Up (ft) = 110.52 Hw Elev (ft) = 111.05 Hw/D (ft) = 1.03 Flow Regime = Inlet Control Culvert Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Monday, Feb 22 2021 18 INCH OUTFLOW FROM BASIN Invert Elev Dn (ft) = 108.47 Pipe Length (ft) = 164.00 Slope (%) = 0.63 Invert Elev Up (ft) = 109.50 Rise (in) = 18.0 Shape = Circular Span (in) = 18.0 No. Barrels = 1 n-Value = 0.012 Culvert Type = Circular Concrete Culvert Entrance = Groove end projecting (C) Coeff. K,M,c,Y,k = 0.0045, 2, 0.0317, 0.69, 0.2 Embankment Top Elevation (ft) = 115.00 Top Width (ft) = 16.00 Crest Width (ft) = 6.00 Calculations Qmin (cfs) = 0.00 Qmax (cfs) = 17.00 Tailwater Elev (ft) = (dc+D)/2 Highlighted Qtotal (cfs) = 6.00 Qpipe (cfs) = 6.00 Qovertop (cfs) = 0.00 Veloc Dn (ft/s) = 3.89 Veloc Up (ft/s) = 5.12 HGL Dn (ft) = 109.69 HGL Up (ft) = 110.45 Hw Elev (ft) = 110.90 Hw/D (ft) = 0.93 Flow Regime = Inlet Control Culvert Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Monday, Feb 22 2021 18 INCH OUTFLOW FROM BASIN Invert Elev Dn (ft) = 108.47 Pipe Length (ft) = 164.00 Slope (%) = 0.63 Invert Elev Up (ft) = 109.50 Rise (in) = 18.0 Shape = Circular Span (in) = 18.0 No. Barrels = 1 n-Value = 0.012 Culvert Type = Circular Concrete Culvert Entrance = Groove end projecting (C) Coeff. K,M,c,Y,k = 0.0045, 2, 0.0317, 0.69, 0.2 Embankment Top Elevation (ft) = 115.00 Top Width (ft) = 16.00 Crest Width (ft) = 6.00 Calculations Qmin (cfs) = 0.00 Qmax (cfs) = 17.00 Tailwater Elev (ft) = (dc+D)/2 Highlighted Qtotal (cfs) = 5.00 Qpipe (cfs) = 5.00 Qovertop (cfs) = 0.00 Veloc Dn (ft/s) = 3.35 Veloc Up (ft/s) = 4.77 HGL Dn (ft) = 109.65 HGL Up (ft) = 110.36 Hw Elev (ft) = 110.75 Hw/D (ft) = 0.83 Flow Regime = Inlet Control Culvert Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Monday, Feb 22 2021 18 INCH OUTFLOW FROM BASIN Invert Elev Dn (ft) = 108.47 Pipe Length (ft) = 164.00 Slope (%) = 0.63 Invert Elev Up (ft) = 109.50 Rise (in) = 18.0 Shape = Circular Span (in) = 18.0 No. Barrels = 1 n-Value = 0.012 Culvert Type = Circular Concrete Culvert Entrance = Groove end projecting (C) Coeff. K,M,c,Y,k = 0.0045, 2, 0.0317, 0.69, 0.2 Embankment Top Elevation (ft) = 115.00 Top Width (ft) = 16.00 Crest Width (ft) = 6.00 Calculations Qmin (cfs) = 0.00 Qmax (cfs) = 17.00 Tailwater Elev (ft) = (dc+D)/2 Highlighted Qtotal (cfs) = 4.00 Qpipe (cfs) = 4.00 Qovertop (cfs) = 0.00 Veloc Dn (ft/s) = 2.79 Veloc Up (ft/s) = 4.42 HGL Dn (ft) = 109.60 HGL Up (ft) = 110.26 Hw Elev (ft) = 110.59 Hw/D (ft) = 0.72 Flow Regime = Inlet Control Culvert Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Monday, Feb 22 2021 18 INCH OUTFLOW FROM BASIN Invert Elev Dn (ft) = 108.47 Pipe Length (ft) = 164.00 Slope (%) = 0.63 Invert Elev Up (ft) = 109.50 Rise (in) = 18.0 Shape = Circular Span (in) = 18.0 No. Barrels = 1 n-Value = 0.012 Culvert Type = Circular Concrete Culvert Entrance = Groove end projecting (C) Coeff. K,M,c,Y,k = 0.0045, 2, 0.0317, 0.69, 0.2 Embankment Top Elevation (ft) = 115.00 Top Width (ft) = 16.00 Crest Width (ft) = 6.00 Calculations Qmin (cfs) = 0.00 Qmax (cfs) = 17.00 Tailwater Elev (ft) = (dc+D)/2 Highlighted Qtotal (cfs) = 3.00 Qpipe (cfs) = 3.00 Qovertop (cfs) = 0.00 Veloc Dn (ft/s) = 2.20 Veloc Up (ft/s) = 4.02 HGL Dn (ft) = 109.55 HGL Up (ft) = 110.16 Hw Elev (ft) = 110.42 Hw/D (ft) = 0.61 Flow Regime = Inlet Control Culvert Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Monday, Feb 22 2021 18 INCH OUTFLOW FROM BASIN Invert Elev Dn (ft) = 108.47 Pipe Length (ft) = 164.00 Slope (%) = 0.63 Invert Elev Up (ft) = 109.50 Rise (in) = 18.0 Shape = Circular Span (in) = 18.0 No. Barrels = 1 n-Value = 0.012 Culvert Type = Circular Concrete Culvert Entrance = Groove end projecting (C) Coeff. K,M,c,Y,k = 0.0045, 2, 0.0317, 0.69, 0.2 Embankment Top Elevation (ft) = 115.00 Top Width (ft) = 16.00 Crest Width (ft) = 6.00 Calculations Qmin (cfs) = 0.00 Qmax (cfs) = 17.00 Tailwater Elev (ft) = (dc+D)/2 Highlighted Qtotal (cfs) = 2.00 Qpipe (cfs) = 2.00 Qovertop (cfs) = 0.00 Veloc Dn (ft/s) = 1.57 Veloc Up (ft/s) = 3.56 HGL Dn (ft) = 109.49 HGL Up (ft) = 110.03 Hw Elev (ft) = 110.23 Hw/D (ft) = 0.49 Flow Regime = Inlet Control Culvert Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Monday, Feb 22 2021 18 INCH OUTFLOW FROM BASIN Invert Elev Dn (ft) = 108.47 Pipe Length (ft) = 164.00 Slope (%) = 0.63 Invert Elev Up (ft) = 109.50 Rise (in) = 18.0 Shape = Circular Span (in) = 18.0 No. Barrels = 1 n-Value = 0.012 Culvert Type = Circular Concrete Culvert Entrance = Groove end projecting (C) Coeff. K,M,c,Y,k = 0.0045, 2, 0.0317, 0.69, 0.2 Embankment Top Elevation (ft) = 115.00 Top Width (ft) = 16.00 Crest Width (ft) = 6.00 Calculations Qmin (cfs) = 0.00 Qmax (cfs) = 17.00 Tailwater Elev (ft) = (dc+D)/2 Highlighted Qtotal (cfs) = 1.00 Qpipe (cfs) = 1.00 Qovertop (cfs) = 0.00 Veloc Dn (ft/s) = 0.86 Veloc Up (ft/s) = 2.92 HGL Dn (ft) = 109.41 HGL Up (ft) = 109.87 Hw Elev (ft) = 110.00 Hw/D (ft) = 0.33 Flow Regime = Inlet Control Culvert Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Monday, Feb 22 2021 18 INCH OUTFLOW FROM BASIN Invert Elev Dn (ft) = 108.47 Pipe Length (ft) = 164.00 Slope (%) = 0.63 Invert Elev Up (ft) = 109.50 Rise (in) = 18.0 Shape = Circular Span (in) = 18.0 No. Barrels = 1 n-Value = 0.012 Culvert Type = Circular Concrete Culvert Entrance = Groove end projecting (C) Coeff. K,M,c,Y,k = 0.0045, 2, 0.0317, 0.69, 0.2 Embankment Top Elevation (ft) = 115.00 Top Width (ft) = 16.00 Crest Width (ft) = 6.00 Calculations Qmin (cfs) = 0.00 Qmax (cfs) = 17.00 Tailwater Elev (ft) = (dc+D)/2 Highlighted Qtotal (cfs) = 0.25 Qpipe (cfs) = 0.25 Qovertop (cfs) = 0.00 Veloc Dn (ft/s) = 0.24 Veloc Up (ft/s) = 2.02 HGL Dn (ft) = 109.31 HGL Up (ft) = 109.68 Hw Elev (ft) = 109.74 Hw/D (ft) = 0.16 Flow Regime = Inlet Control