Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Job 2. North Chorro Neighborhood Greenway Bid Results 1000036
Project: North Chorro Neighborhood Greenway Spec.No.: 1000036 Bid Opening: January 31, 2023 ‐ Pre‐job: John Madonna Souza Construction Papich Construction BID ITEM & DESCRIPTION UNIT TOTAL UNIT TOTAL UNIT TOTAL No. ITEM UNIT QUAN PRICE PRICE PRICE PRICE PRICE PRICE 1 TRAFFIC CONTROL PLAN AND IMPLEMENTATION LS 1 450,000.00$ 450,000.00$ 538,600.00$ 538,600.00$ 848,213.84$ 848,213.84$ 2 CONSTRUCTION SURVEY LS 1 95,000.00$ 95,000.00$ 60,000.00$ 60,000.00$ 72,000.00$ 72,000.00$ 3 COMPLY WITH CALTRANS ENCROACHMENT PERMIT LS 1 2,000.00$ 2,000.00$ 3,400.00$ 3,400.00$ 2,500.00$ 2,500.00$ 4 COMPLY WITH GRANT DEED AND RIGHT OF WAY AGREEMENT – BIKE PATH LS 1 5,000.00$ 5,000.00$ 2,300.00$ 2,300.00$ 30,000.00$ 30,000.00$ 5 CLEARING, GRUBBING, AND LIMB REMOVAL LS 1 40,000.00$ 40,000.00$ 50,000.00$ 50,000.00$ 35,000.00$ 35,000.00$ 6 CHORRO STREET RECONSTRUCTION SQFT 10,000 18.00$ 180,000.00$ 17.80$ 178,000.00$ 25.30$ 253,000.00$ 7 CLASS I BIKE PATH (OPTION 2) SQFT 6,600 23.00$ 151,800.00$ 21.00$ 138,600.00$ 30.25$ 199,650.00$ 8 MINOR CONCRETE (SIDEWALK) SQFT 1700 22.00$ 37,400.00$ 14.00$ 23,800.00$ 25.50$ 43,350.00$ 9 MINOR CONCRETE (CURB AND GUTTER) LF 2355 75.00$ 176,625.00$ 98.00$ 230,790.00$ 48.50$ 114,217.50$ 10 MINOR CONCRETE (CROSS GUTTER) LF 250 280.00$ 70,000.00$ 275.00$ 68,750.00$ 180.25$ 45,062.50$ 11 MINOR CONCRETE (DRIVEWAY RAMPS) SQFT 800 43.00$ 34,400.00$ 38.00$ 30,400.00$ 30.00$ 24,000.00$ 12 MINOR CONCRETE (1.25' CONCRETE BIKE MEDIAN) LF 1600 39.00$ 62,400.00$ 66.40$ 106,240.00$ 37.50$ 60,000.00$ 13 MINOR CONCRETE (3' CONCRETE BIKE MEDIAN) LF 1650 40.00$ 66,000.00$ 150.40$ 248,160.00$ 59.50$ 98,175.00$ 14 MINOR CONCRETE (SIDEWALK UNDERDRAIN) EA 1 14,000.00$ 14,000.00$ 10,800.00$ 10,800.00$ 10,150.00$ 10,150.00$ 15 MINOR CONCRETE (ENERGY DISSIPATION STRUCTURE AND COBBLE) EA 1 7,000.00$ 7,000.00$ 5,900.00$ 5,900.00$ 12,750.00$ 12,750.00$ 16 STRUCTURE CONCRETE (CURB & GUTTER RETAINING WALL ‐ BROAD ST ‐ STA 21+40 TO 23+12) LF 172 600.00$ 103,200.00$ 528.00$ 90,816.00$ 430.00$ 73,960.00$ 17 STRUCTURE CONCRETE (RETAINING WALL ‐ BIKE PATH ‐ STA 1+00 TO 2+80) LF 180 800.00$ 144,000.00$ 760.00$ 136,800.00$ 520.00$ 93,600.00$ 18 STRUCTURE CONCRETE (LANDSCAPE HIGH CURB ‐ CHORRO/101) LF 123 600.00$ 73,800.00$ 393.00$ 48,339.00$ 550.00$ 67,650.00$ 19 STRUCTURE CONCRETE (CMU PILASTER ‐ BIKE PATH) EA 1 6,000.00$ 6,000.00$ 7,150.00$ 7,150.00$ 34,000.00$ 34,000.00$ 20 TYPE II SLURRY SEAL SQYD 30,440 6.00$ 182,640.00$ 4.20$ 127,848.00$ 7.20$ 219,168.00$ 21 BIKE LANE AND EXISTING CURB RAMP EDGE GRIND LS 1 20,000.00$ 20,000.00$ 53,200.00$ 53,200.00$ 145,000.00$ 145,000.00$ 22 TEMPORARY STRIPING AND PAVEMENT MARKINGS LS 1 102,000.00$ 102,000.00$ 155,070.00$ 155,070.00$ 180,000.00$ 180,000.00$ 23 MINOR HOT MIX ASPHALT (CASE 1 – 10” THICK) SQFT 2,330 27.00$ 62,910.00$ 20.60$ 47,998.00$ 54.60$ 127,218.00$ 24 MINOR HOT MIX ASPHALT (SPEED HUMP – TYPE 2) EA 7 7,800.00$ 54,600.00$ 5,440.00$ 38,080.00$ 10,500.00$ 73,500.00$ 25 ADJUST STORMDRAIN MANHOLE TO GRADE EA 6 850.00$ 5,100.00$ 1,310.00$ 7,860.00$ 2,500.00$ 15,000.00$ 26 ADJUST SANITARY SEWER MANHOLE TO GRADE EA 3 850.00$ 2,550.00$ 1,310.00$ 3,930.00$ 2,500.00$ 7,500.00$ 27 ADJUST COMMUNICATION VAULT/MANHOLE/BOX TO GRADE EA 36 600.00$ 21,600.00$ 1,310.00$ 47,160.00$ 2,250.00$ 81,000.00$ 28 ADJUST WATER VALVE TO GRADE EA 12 600.00$ 7,200.00$ 800.00$ 9,600.00$ 2,000.00$ 24,000.00$ 29 ADJUST WATER METER TO GRADE EA 11 600.00$ 6,600.00$ 788.00$ 8,668.00$ 1,750.00$ 19,250.00$ 30 18" HDPE STORM DRAIN PIPE LF 63 450.00$ 28,350.00$ 230.00$ 14,490.00$ 210.00$ 13,230.00$ 31 MINOR CONCRETE (STORMDRAIN CATCH BASIN) EA 1 20,000.00$ 20,000.00$ 24,000.00$ 24,000.00$ 3,000.00$ 3,000.00$ 32 MINOR CONCRETE (STORMDRAIN MANHOLE) EA 2 20,500.00$ 41,000.00$ 8,880.00$ 17,760.00$ 3,250.00$ 6,500.00$ 33 6" PERFORATED UNDERDRAIN PIPE LF 62 275.00$ 17,050.00$ 132.00$ 8,184.00$ 30.50$ 1,891.00$ 34 MINOR CONCRETE (12" MIDSTATE STORMDRAIN CATCH BASIN) EA 3 3,600.00$ 10,800.00$ 1,870.00$ 5,610.00$ 5,500.00$ 16,500.00$ 35 MINOR CONCRETE (24” MIDSTATE STORMDRAIN CATCH BASIN) EA 1 4,900.00$ 4,900.00$ 3,030.00$ 3,030.00$ 7,000.00$ 7,000.00$ 36 REMOVE AND REPLACE STORMDRAIN INLET GRATE AND INSTALL FILTEREXX STORMEXX FILTER EA 17 2,640.00$ 44,880.00$ 6,160.00$ 104,720.00$ 1,500.00$ 25,500.00$ 37 12' PUNCH POST EA 45 228.00$ 10,260.00$ 138.00$ 6,210.00$ 85.00$ 3,825.00$ 38 14' PUNCH POST EA 3 312.00$ 936.00$ 150.00$ 450.00$ 95.00$ 285.00$ 39 R1‐1 SIGN 18"EA 2 170.00$ 340.00$ 126.00$ 252.00$ 200.00$ 400.00$ 40 R1‐1 SIGN 30"EA 4 200.00$ 800.00$ 174.00$ 696.00$ 300.00$ 1,200.00$ 41 R1‐2 SIGN 25"EA 1 200.00$ 200.00$ 174.00$ 174.00$ 250.00$ 250.00$ 42 R1‐3P PLAQUE EA 4 115.00$ 460.00$ 51.00$ 204.00$ 150.00$ 600.00$ 43 R4‐11 SIGN EA 7 200.00$ 1,400.00$ 168.00$ 1,176.00$ 350.00$ 2,450.00$ 44 R5‐3 SIGN EA 2 200.00$ 400.00$ 162.00$ 324.00$ 300.00$ 600.00$ 45 R7‐9 SIGN EA 18 140.00$ 2,520.00$ 75.00$ 1,350.00$ 250.00$ 4,500.00$ 46 R10‐15 (MODIFIED) "YIELD TO BIKE" SIGN EA 5 200.00$ 1,000.00$ 168.00$ 840.00$ 350.00$ 1,750.00$ 47 R81 (CA) SIGN EA 3 140.00$ 420.00$ 75.00$ 225.00$ 350.00$ 1,050.00$ 48 R81A (CA) SIGN EA 2 115.00$ 230.00$ 17.00$ 34.00$ 200.00$ 400.00$ 49 R81B (CA) SIGN EA 5 115.00$ 575.00$ 17.00$ 85.00$ 200.00$ 1,000.00$ 50 W1‐1 SIGN EA 2 230.00$ 460.00$ 162.00$ 324.00$ 350.00$ 700.00$ 51 W1‐2L SIGN EA 2 230.00$ 460.00$ 162.00$ 324.00$ 350.00$ 700.00$ 52 W4‐4P SIGN EA 1 170.00$ 170.00$ 78.00$ 78.00$ 350.00$ 350.00$ 53 W11‐2 SIGN EA 8 230.00$ 1,840.00$ 162.00$ 1,296.00$ 350.00$ 2,800.00$ 54 W16‐7P SIGN EA 8 170.00$ 1,360.00$ 75.00$ 600.00$ 300.00$ 2,400.00$ 55 W84 (CA) SIGN EA 3 230.00$ 690.00$ 210.00$ 630.00$ 350.00$ 1,050.00$ 56 GREENWAY ARROW PLAQUE EA 8 140.00$ 1,120.00$ 51.00$ 408.00$ 300.00$ 2,400.00$ 57 GREENWAY SIGN EA 19 285.00$ 5,415.00$ 216.00$ 4,104.00$ 500.00$ 9,500.00$ 58 PEXCO CITY POST MODEL EAC, 36" WHITE WITH 2 GREY WRAPS EA 23 400.00$ 9,200.00$ 450.00$ 10,350.00$ 250.00$ 5,750.00$ 59 72" WHEEL STOP EA 8 140.00$ 1,120.00$ 180.00$ 1,440.00$ 400.00$ 3,200.00$ 60 6" YELLOW TACTILE GUIDE STRIP, VANGUARD ADA SYSTEMS OR APPROVED EQUAL LF 82 228.00$ 18,696.00$ 163.00$ 13,366.00$ 370.00$ 30,340.00$ 61 INSTALL EXISTING / RELOCATED SIGN EA 16 285.00$ 4,560.00$ 300.00$ 4,800.00$ 150.00$ 2,400.00$ 62 CURB PAINT LF 200 1.00$ 200.00$ 3.00$ 600.00$ 6.00$ 1,200.00$ 63 PREFORMED THERMOPLASTIC SHEETS (BROAD/MURRAY) SQFT 120 58.00$ 6,960.00$ 13.00$ 1,560.00$ 96.00$ 11,520.00$ 64 ZICLA ZEBRA CYCLE TRACK LANE SEPARATORS EA 48 230.00$ 11,040.00$ 240.00$ 11,520.00$ 150.00$ 7,200.00$ 65 4" YELLOW STRIPING LF 1,300 1.70$ 2,210.00$ 1.30$ 1,690.00$ 2.94$ 3,822.00$ 66 DETAIL 1 LF 2,750 1.40$ 3,850.00$ 1.10$ 3,025.00$ 1.50$ 4,125.00$ 67 DETAIL 8 LF 50 2.30$ 115.00$ 1.00$ 50.00$ 1.50$ 75.00$ 68 DETAIL 22 LF 2,450 2.00$ 4,900.00$ 3.40$ 8,330.00$ 2.50$ 6,125.00$ 69 DETAIL 39 LF 3,750 1.70$ 6,375.00$ 1.60$ 6,000.00$ 0.85$ 3,187.50$ 70 BIKE BUFFER LF 1,360 3.40$ 4,624.00$ 3.80$ 5,168.00$ 10.00$ 13,600.00$ 71 BIKE BUFFER AT DRIVEWAY SQFT 1,140 3.15$ 3,591.00$ 3.50$ 3,990.00$ 10.00$ 11,400.00$ 72 HI‐VIS CROSSWALK EA 35 1,140.00$ 39,900.00$ 1,320.00$ 46,200.00$ 500.00$ 17,500.00$ 73 STOP BAR LF 465 5.70$ 2,650.50$ 4.40$ 2,046.00$ 3.00$ 1,395.00$ 74 STOP LEGEND EA 32 230.00$ 7,360.00$ 384.00$ 12,288.00$ 125.00$ 4,000.00$ 75 STOP LEGEND (1/2 SCALE)EA 7 170.00$ 1,190.00$ 1,470.00$ 10,290.00$ 562.38$ 3,936.66$ 76 BIKE / PED DIRECTIONAL SYMBOL EA 2 400.00$ 800.00$ 840.00$ 1,680.00$ 600.00$ 1,200.00$ 77 TYPE II ARROW EA 1 285.00$ 285.00$ 378.00$ 378.00$ 150.00$ 150.00$ 78 TYPE IV ARROW EA 1 170.00$ 170.00$ 300.00$ 300.00$ 85.00$ 85.00$ 79 HUMP LEGEND EA 12 285.00$ 3,420.00$ 420.00$ 5,040.00$ 200.00$ 2,400.00$ 80 PED LEGEND EA 2 285.00$ 570.00$ 330.00$ 660.00$ 200.00$ 400.00$ 81 XING LEGEND EA 4 285.00$ 1,140.00$ 360.00$ 1,440.00$ 200.00$ 800.00$ 82 SLOW LEGEND EA 2 285.00$ 570.00$ 384.00$ 768.00$ 200.00$ 400.00$ 83 SCHOOL LEGEND EA 4 400.00$ 1,600.00$ 570.00$ 2,280.00$ 250.00$ 1,000.00$ 84 TURNING BIKE BOX EA 3 1,400.00$ 4,200.00$ 426.00$ 1,278.00$ 1,400.00$ 4,200.00$ 85 BIKE SYMBOL & ARROW EA 23 300.00$ 6,900.00$ 210.00$ 4,830.00$ 200.00$ 4,600.00$ 86 GREENBACK CHEVRON EA 25 650.00$ 16,250.00$ 360.00$ 9,000.00$ 650.00$ 16,250.00$ 87 GREENBACK SHARROW EA 2 900.00$ 1,800.00$ 366.00$ 732.00$ 650.00$ 1,300.00$ 88 GREENWAY SYMBOL EA 22 3,400.00$ 74,800.00$ 450.00$ 9,900.00$ 850.00$ 18,700.00$ 89 GREEN BIKE LANE MARKINGS (CASE 1) LF 118 91.00$ 10,738.00$ 3.60$ 424.80$ 50.00$ 5,900.00$ 90 GREEN BIKE LANE MARKINGS (CASE 2) LF 286 91.00$ 26,026.00$ 2.50$ 715.00$ 50.00$ 14,300.00$ 91 GREEN BIKE LANE MARKINGS (CASE 3) LF 364 91.00$ 33,124.00$ 3.00$ 1,092.00$ 50.00$ 18,200.00$ 92 GREEN SEALMASTER COLOR SAFE PAVEMENT MARKING SQFT 5640 11.00$ 62,040.00$ 5.20$ 29,328.00$ 7.25$ 40,890.00$ 93 YIELD LINE EA 5 450.00$ 2,250.00$ 45.00$ 225.00$ 150.00$ 750.00$ 94 RELOCATE RRFB SOLAR CROSSWALK (RAMONA) LS 1 3,000.00$ 3,000.00$ 3,400.00$ 3,400.00$ 2,782.00$ 2,782.00$ 95 RRFB SOLAR CROSSWALK (CHORRO/MILL) LS 1 39,000.00$ 39,000.00$ 38,000.00$ 38,000.00$ 31,664.00$ 31,664.00$ 96 FOOTHILL TO RAMONA BIKE PATH LIGHTING / CHORRO LIGHTING / CHORRO PG&E SERVICE LS 1 604,000.00$ 604,000.00$ 637,000.00$ 637,000.00$ 530,954.00$ 530,954.00$ 97 BENCHES (BIKE PATH & CHORRO/MOUNTAIN VIEW) EA 3 3,500.00$ 10,500.00$ 5,540.00$ 16,620.00$ 5,000.00$ 15,000.00$ 98 TRASH CONTAINER (BIKE PATH) EA 2 3,400.00$ 6,800.00$ 3,000.00$ 6,000.00$ 3,500.00$ 7,000.00$ 99 METAL PICKET FENCING (BIKE PATH) LF 136 134.00$ 18,224.00$ 255.00$ 34,680.00$ 213.00$ 28,968.00$ 100 CHAINLINK FENCE (CHORRO /101) LF 297 62.00$ 18,414.00$ 76.00$ 22,572.00$ 64.00$ 19,008.00$ 101 CHAINLINK GATES (CHORRO /101) EA 6 970.00$ 5,820.00$ 1,068.00$ 6,408.00$ 890.00$ 5,340.00$ 102 SOIL PREPARATION (NON‐BIORETENTION & TREE PITS) CY 130 220.00$ 28,600.00$ 230.00$ 29,900.00$ 150.00$ 19,500.00$ 103 BIORETENTION SOIL MIX CY 90 185.00$ 16,650.00$ 148.00$ 13,320.00$ 300.00$ 27,000.00$ 104 CLASS II DRAIN ROCK TON 200 165.00$ 33,000.00$ 76.00$ 15,200.00$ 110.00$ 22,000.00$ 105 ENERGY DISSIPATOR ROCK TON 5 320.00$ 1,600.00$ 724.00$ 3,620.00$ 450.00$ 2,250.00$ 106 IRRIGATION LS 1 145,900.00$ 145,900.00$ 158,000.00$ 158,000.00$ 144,400.00$ 144,400.00$ 107 TREE WATERING BAGS (NON‐IRRIGATED TREES) EA 35 165.00$ 5,775.00$ 174.00$ 6,090.00$ 96.00$ 3,360.00$ 108 PLANTING (SHRUBS ‐ ALL AREAS) SQFT 10,672 19.00$ 202,768.00$ 20.00$ 213,440.00$ 7.00$ 74,704.00$ 109 PLANTING (TREES ‐ ALL AREAS) EA 63 450.00$ 28,350.00$ 468.00$ 29,484.00$ 760.00$ 47,880.00$ 110 GREENWAY PLANTERS/SOIL/PLANTS EA 285 775.00$ 220,875.00$ 810.00$ 230,850.00$ 872.00$ 248,520.00$ 111 MULCH (BIORETENTION AREAS) CY 9 120.00$ 1,080.00$ 132.00$ 1,188.00$ 164.00$ 1,476.00$ 112 MULCH (CONVENTIONAL PLANTING AREAS & TREES) CY 96 120.00$ 11,520.00$ 132.00$ 12,672.00$ 130.00$ 12,480.00$ 113 GREENWAY PLANTERS MAINT/WATERING (1‐YR) LS 1 6,300.00$ 6,300.00$ 7,800.00$ 7,800.00$ 72,480.00$ 72,480.00$ 114 ESTABLISHMENT/MAINTENANCE ALL TREES & PLANTS (1 YR) LS 1 39,400.00$ 39,400.00$ 41,400.00$ 41,400.00$ 42,000.00$ 42,000.00$ 115 HAND WATER NON‐IRRIGATED TREES (1‐YR) EA 35 8,550.00$ 299,250.00$ 258.00$ 9,030.00$ 470.00$ 16,450.00$ 116 HAND WATER NON‐IRRIGATED UNDERSTORY PLANTINGS (1‐YR) LS 1 6,800.00$ 6,800.00$ 7,200.00$ 7,200.00$ 7,500.00$ 7,500.00$ 117 CURB RAMP ALMOND‐MISSION (E) C‐4.17 LS 1 27,000.00$ 27,000.00$ 29,050.00$ 29,050.00$ 41,000.00$ 41,000.00$ 118 CURB RAMP BROAD‐MISSION (E) C‐4.16 LS 1 21,000.00$ 21,000.00$ 47,700.00$ 47,700.00$ 82,000.00$ 82,000.00$ 119 CURB RAMP BROAD‐MISSION (N) C‐4.15 LS 1 21,000.00$ 21,000.00$ 34,970.00$ 34,970.00$ 66,000.00$ 66,000.00$ 120 CURB RAMP CENTER‐CHORRO (NE) C‐4.26 LS 1 26,500.00$ 26,500.00$ 24,300.00$ 24,300.00$ 48,000.00$ 48,000.00$ 121 CURB RAMP CENTER‐CHORRO (NW) C‐4.25 LS 1 23,600.00$ 23,600.00$ 27,270.00$ 27,270.00$ 53,500.00$ 53,500.00$ 122 CURB RAMP CENTER‐CHORRO (SE) C‐4.27 LS 1 23,700.00$ 23,700.00$ 22,360.00$ 22,360.00$ 40,000.00$ 40,000.00$ 123 CURB RAMP CENTER‐CHORRO (SW) C‐4.28 LS 1 23,700.00$ 23,700.00$ 25,390.00$ 25,390.00$ 47,000.00$ 47,000.00$ 124 CURB RAMP CERRO ROMAULDO‐FERRINI (NW) C‐4.4 LS 1 22,500.00$ 22,500.00$ 35,510.00$ 35,510.00$ 87,000.00$ 87,000.00$ 125 CURB RAMP CERRO ROMAULDO‐FERRINI (SE) C‐4.3 LS 1 20,250.00$ 20,250.00$ 21,670.00$ 21,670.00$ 40,000.00$ 40,000.00$ 126 CURB RAMP FELTON‐FERRINI (NW) C‐4.2 LS 1 20,000.00$ 20,000.00$ 21,650.00$ 21,650.00$ 39,000.00$ 39,000.00$ 127 CURB RAMP FELTON‐FERRINI (SW) C‐4.1 LS 1 20,000.00$ 20,000.00$ 19,410.00$ 19,410.00$ 38,000.00$ 38,000.00$ 128 CURB RAMP LINCOLN‐CHORRO (NE) C‐4.35 LS 1 22,500.00$ 22,500.00$ 30,110.00$ 30,110.00$ 47,000.00$ 47,000.00$ 129 CURB RAMP LINCOLN‐CHORRO (NW) C‐4.34 LS 1 26,000.00$ 26,000.00$ 27,410.00$ 27,410.00$ 50,000.00$ 50,000.00$ 130 CURB RAMP LINCOLN‐CHORRO (SE) C‐4.36 LS 1 23,000.00$ 23,000.00$ 29,170.00$ 29,170.00$ 61,000.00$ 61,000.00$ 131 CURB RAMP LINCOLN‐CHORRO (SW) C‐4.37 LS 1 22,500.00$ 22,500.00$ 24,680.00$ 24,680.00$ 45,000.00$ 45,000.00$ 132 CURB RAMP MEINEKE‐BROAD (N) C‐4.8 LS 1 24,900.00$ 24,900.00$ 27,110.00$ 27,110.00$ 58,000.00$ 58,000.00$ 133 CURB RAMP MEINEKE‐BROAD (S) C‐4.9 LS 1 20,700.00$ 20,700.00$ 22,130.00$ 22,130.00$ 46,000.00$ 46,000.00$ 134 CURB RAMP MEINEKE C‐4.10 LS 1 22,000.00$ 22,000.00$ 21,030.00$ 21,030.00$ 43,000.00$ 43,000.00$ 135 CURB RAMP MILL‐CHORRO (NW) C‐4.46 LS 1 20,300.00$ 20,300.00$ 22,240.00$ 22,240.00$ 42,000.00$ 42,000.00$ 136 CURB RAMP MILL‐CHORRO (NE) C‐4.49 LS 1 26,000.00$ 26,000.00$ 39,600.00$ 39,600.00$ 76,000.00$ 76,000.00$ 137 CURB RAMP MILL‐CHORRO (SE) C‐4.48 LS 1 23,000.00$ 23,000.00$ 36,060.00$ 36,060.00$ 90,000.00$ 90,000.00$ 138 CURB RAMP MILL‐CHORRO (SW) C‐4.47 LS 1 26,000.00$ 26,000.00$ 38,450.00$ 38,450.00$ 75,000.00$ 75,000.00$ 139 CURB RAMP MISSION‐CHORRO (NE) C‐4.20 LS 1 24,500.00$ 24,500.00$ 22,500.00$ 22,500.00$ 42,000.00$ 42,000.00$ 140 CURB RAMP MISSION‐CHORRO (NW) C‐4.19 LS 1 26,000.00$ 26,000.00$ 23,180.00$ 23,180.00$ 45,000.00$ 45,000.00$ 141 CURB RAMP MISSION‐CHORRO (SE) C‐4.21 LS 1 25,000.00$ 25,000.00$ 21,710.00$ 21,710.00$ 40,000.00$ 40,000.00$ 142 CURB RAMP MISSION‐CHORRO (SW) C‐4.22 LS 1 25,000.00$ 25,000.00$ 28,680.00$ 28,680.00$ 53,000.00$ 53,000.00$ 143 CURB RAMP MISSION BULBOUT C‐4.18 LS 1 20,000.00$ 20,000.00$ 28,280.00$ 28,280.00$ 76,000.00$ 76,000.00$ 144 CURB RAMP MOUNTAIN VIEW‐CHORRO (NE) C‐4.30 LS 1 26,000.00$ 26,000.00$ 28,800.00$ 28,800.00$ 50,000.00$ 50,000.00$ 145 CURB RAMP MOUNTAIN VIEW‐CHORRO (NW) C‐4.29 LS 1 23,000.00$ 23,000.00$ 23,410.00$ 23,410.00$ 42,000.00$ 42,000.00$ 146 CURB RAMP MOUNTAIN VIEW‐CHORRO (SE) C‐4.31 LS 1 39,700.00$ 39,700.00$ 52,160.00$ 52,160.00$ 83,000.00$ 83,000.00$ 147 CURB RAMP MOUNTAIN VIEW‐CHORRO (SW) C‐4.33 LS 1 24,000.00$ 24,000.00$ 24,610.00$ 24,610.00$ 43,000.00$ 43,000.00$ 148 CURB RAMP MURRAY‐BROAD (E) C‐4.12 LS 1 22,500.00$ 22,500.00$ 21,270.00$ 21,270.00$ 45,000.00$ 45,000.00$ 149 CURB RAMP MURRAY‐BROAD (N) C‐4.11 LS 1 20,700.00$ 20,700.00$ 19,040.00$ 19,040.00$ 42,000.00$ 42,000.00$ 150 CURB RAMP MURRAY‐BROAD (S) C‐4.13 LS 1 20,000.00$ 20,000.00$ 19,990.00$ 19,990.00$ 40,000.00$ 40,000.00$ 151 CURB RAMP MURRAY‐BROAD (W) C‐4.14 LS 1 20,400.00$ 20,400.00$ 18,200.00$ 18,200.00$ 39,000.00$ 39,000.00$ 152 CURB RAMP PEACH‐CHORRO (SE) C‐4.43 LS 1 28,700.00$ 28,700.00$ 39,670.00$ 39,670.00$ 56,000.00$ 56,000.00$ 153 CURB RAMP PEACH‐CHORRO (NW) C‐4.45 LS 1 28,700.00$ 28,700.00$ 37,050.00$ 37,050.00$ 56,000.00$ 56,000.00$ 154 CURB RAMP PEACH‐CHORRO (SW) C‐4.44 LS 1 28,800.00$ 28,800.00$ 29,010.00$ 29,010.00$ 49,000.00$ 49,000.00$ 155 CURB RAMP PEACH‐CHORRO (NE) C‐4.42 LS 1 30,500.00$ 30,500.00$ 38,320.00$ 38,320.00$ 51,000.00$ 51,000.00$ 156 CURB RAMP RAMONA‐BROAD (E) C‐4.6 LS 1 20,250.00$ 20,250.00$ 20,170.00$ 20,170.00$ 40,000.00$ 40,000.00$ 157 CURB RAMP RAMONA‐BROAD (W) C‐4.7 LS 1 33,700.00$ 33,700.00$ 45,450.00$ 45,450.00$ 83,000.00$ 83,000.00$ 158 CURB RAMP RAMONA CROSSING C‐4.5 LS 1 23,000.00$ 23,000.00$ 37,770.00$ 37,770.00$ 87,000.00$ 87,000.00$ 159 CURB RAMP VENABLE‐CHORRO (NE) C‐4.23 LS 1 22,000.00$ 22,000.00$ 20,940.00$ 20,940.00$ 44,000.00$ 44,000.00$ 160 CURB RAMP WALNUT‐CHORRO (SE) C‐4.40 LS 1 44,200.00$ 44,200.00$ 116,370.00$ 116,370.00$ 110,000.00$ 110,000.00$ 161 CURB RAMP WALNUT‐CHORRO (SE) C‐4.24 LS 1 22,000.00$ 22,000.00$ 23,940.00$ 23,940.00$ 44,000.00$ 44,000.00$ 162 CURB RAMP WALNUT‐CHORRO (N) C‐4.38 LS 1 41,500.00$ 41,500.00$ 57,970.00$ 57,970.00$ 144,000.00$ 144,000.00$ 163 ROUGH GRADING CUT (BIKE PATH) CY 300 99.00$ 29,700.00$ 75.90$ 22,770.00$ 152.00$ 45,600.00$ 164 ROUGH GRADING CUT (STORM WATER MITIGATION AREAS) CY 200 99.00$ 19,800.00$ 38.00$ 7,600.00$ 155.00$ 31,000.00$ 165 REMOVE EXISTING MANHOLE AND INSTALL (N) SEWER MANHOLE EA 1 53,000.00$ 53,000.00$ 13,550.00$ 13,550.00$ 25,000.00$ 25,000.00$ 166 INSTALL COATING ON (N) SEWER MANHOLE EA 1 11,000.00$ 11,000.00$ 12,000.00$ 12,000.00$ 4,502.00$ 4,502.00$ 167 REMOVE EXISTING CLEANOUT AND INSTALL (N) SEWER CLEANOUT EA 1 1,000.00$ 1,000.00$ 1,950.00$ 1,950.00$ 4,000.00$ 4,000.00$ 168 REMOVE EXISTING 12" CMP AND INSTALL (N) 12" PVC STORMDRAIN LF 45 440.00$ 19,800.00$ 318.00$ 14,310.00$ 248.00$ 11,160.00$ 169 ABANDON EXISTING SEWERLINE AND INSTALL (N) 6" HDPE SEWERLINE LF 275 305.00$ 83,875.00$ 280.00$ 77,000.00$ 109.00$ 29,975.00$ 170 CONNECT TO EXISTING SDMH PER ENG. STD. 3540 EA 1 3,400.00$ 3,400.00$ 2,770.00$ 2,770.00$ 5,500.00$ 5,500.00$ 171 CONNECT EXISTING SEWER LATERAL TO SEWER MAIN EA 4 1,000.00$ 4,000.00$ 4,900.00$ 19,600.00$ 5,000.00$ 20,000.00$ 172 RE‐GRADE SEWER LATERAL BEYOND 6 FEET LF 10 275.00$ 2,750.00$ 210.00$ 2,100.00$ 150.00$ 1,500.00$ 173 REMOVE EXISTING CONCRETE OUTLET STRUCTURE LS 1 3,200.00$ 3,200.00$ 1,680.00$ 1,680.00$ 8,000.00$ 8,000.00$ 174 INSTALL (N) CATCH BASIN EA 1 15,600.00$ 15,600.00$ 25,150.00$ 25,150.00$ 11,500.00$ 11,500.00$ 175 REMOVE AND REPLACE SIDEWALK SQFT 60 36.00$ 2,160.00$ 40.90$ 2,454.00$ 300.00$ 18,000.00$ 176 BYPASS PUMPING LS 1 39,000.00$ 39,000.00$ 2,900.00$ 2,900.00$ 30,000.00$ 30,000.00$ 177 POTHOLING LS 1 14,700.00$ 14,700.00$ 12,850.00$ 12,850.00$ 20,000.00$ 20,000.00$ 5,959,996.50$ 6,076,938.80$ 7,650,000.00$