HomeMy WebLinkAboutJob 3. Arterials 2023, 2001001-1 Bid ResultsItem No. SS Item Description Unit of Measure Estimated Quantity Item Price Total Unit Price Total Unit Price Total 1 7, 12 TRAFFIC CONTROL PLAN AND IMPLEMENTATION LS 1 $ 290,000.00 290,000.00$ - 2,334,756.70$ ‐360,000.00$ 2 30 COLD PLANE (12.5")SQYD 13,358 $ 25.00 333,950.00$ 31.00$ 414,098.00$ 18.00$ 240,444.00$ 3 30 COLD PLANE (6")SQYD 2,140 $ 13.00 27,820.00$ 56.55$ 121,017.00$ 8.00$ 17,120.00$ 4 39 3/4 MIX HOT MIX ASPHALT TON 8,066 $ 180.00 1,451,880.00$ 230.00$ 1,855,180.00$ 161.00$ 1,298,626.00$ 5 39 1/2 MIX HMA SURFACE COURSE TON 3,282 $ 175.00 574,350.00$ 276.00$ 905,832.00$ 180.00$ 590,760.00$ 6 39 3/8 MIX LEVELING COURSE TON 490 $ 225.00 110,250.00$ 450.00$ 220,500.00$ 203.00$ 99,470.00$ 7 37 FOG SEAL SQFT 8,040 $ 4.35 34,974.00$ 1.15$ 9,246.00$ 0.40$ 3,216.00$ 8 60 METHACRYLATE SQFT 12,660 $ 8.00 101,280.00$ 15.00$ 189,900.00$ 2.70$ 34,182.00$ 9 15 MILL AC SQYD 11,621 $ 12.00 139,452.00$ 14.50$ 168,504.50$ 8.50$ 98,778.50$ 10 39, 96 PAVING GRID SQYD 7,632 $ 11.00 83,952.00$ 15.80$ 120,585.60$ 18.00$ 137,376.00$ 11 20 TREE TRIMMING AND REMOVAL LS 1 $ 20,000.00 20,000.00$ - 46,300.00$ ‐5,500.00$ 12 14 ARCHAELOGICAL MONITORING AT MONTEREY AND TORO LS 1 $ 5,000.00 5,000.00$ - 20,000.00$ ‐5,500.00$ 13 12 TEMPORARY STRIPING AND PAVEMENT MARKINGS LS 1 $ 73,000.00 73,000.00$ - 43,000.00$ ‐15,400.00$ 14 77 POTHOLING LS 1 $ 25,000.00 25,000.00$ - 50,000.00$ ‐24,000.00$ 15 7 COMPLY WITH OSHA LS 1 $ 1,500.00 1,500.00$ - 16,000.00$ ‐5,500.00$ 16 84 WHITE/YELLOW PAVEMENT MARKINGS/LEGENDS (ARROWS, WORDS, SYMBOLS, ETC.) SQFT 2,706 $ 5.00 13,530.00$ 6.00$ 16,236.00$ 5.50$ 14,883.00$ 17 84 GREEN BIKE LANE MARKINGS CASE 1 LF 309 $ 130.00 40,170.00$ 84.00$ 25,956.00$ 66.00$ 20,394.00$ 18 84 GREEN BIKE LANE MARKINGS CASE 2 LF 880 $ 48.00 42,240.00$ 65.00$ 57,200.00$ 44.00$ 38,720.00$ 19 84 GREEN BIKE LANE MARKINGS CASE 3 LF 546 $ 50.00 27,300.00$ 65.00$ 35,490.00$ 44.00$ 24,024.00$ 20 84 GREEN BIKE LANE COATING SQFT 637 $ 10.00 6,370.00$ 9.00$ 5,733.00$ 13.00$ 8,281.00$ 21 84 4" DOUBLE WHITE LF 27 $ 1.00 27.00$ 10.00$ 270.00$ 17.00$ 459.00$ 22 84 12" WHITE/YELLOW LF 3,571 $ 3.00 10,713.00$ 5.00$ 17,855.00$ 6.00$ 21,426.00$ 23 84 24" WHITE/YELLOW LF 2,636 $ 6.00 15,816.00$ 9.00$ 23,724.00$ 9.00$ 23,724.00$ 24 84 DETAIL 2 LF 127 $ 1.00 127.00$ 1.00$ 127.00$ 11.00$ 1,397.00$ 25 84 DETAIL 8 LF 55 $ 1.00 55.00$ 1.00$ 55.00$ 11.00$ 605.00$ 26 84 DETAIL 22 LF 1,455 $ 1.00 1,455.00$ 1.50$ 2,182.50$ 5.00$ 7,275.00$ 27 84 DETAIL 24 LF 485 $ 1.00 485.00$ 1.25$ 606.25$ 11.00$ 5,335.00$ 28 84 DETAIL 27B LF 3,293 $ 1.00 3,293.00$ 1.25$ 4,116.25$ 5.00$ 16,465.00$ 29 84 DETAIL 29 LF 221 $ 1.00 221.00$ 3.00$ 663.00$ 11.00$ 2,431.00$ 30 84 DETAIL 32 LF 5,548 $ 1.00 5,548.00$ 2.50$ 13,870.00$ 5.50$ 30,514.00$ 31 84 DETAIL 38 LF 626 $ 1.00 626.00$ 1.50$ 939.00$ 5.50$ 3,443.00$ 32 84 DETAIL 39 LF 1,631 $ 1.00 1,631.00$ 1.25$ 2,038.75$ 6.00$ 9,786.00$ 33 84 BIKE BUFFER LF 523 $ 6.00 3,138.00$ 5.00$ 2,615.00$ 11.00$ 5,753.00$ 34 84 WHITE/BLUE PARKING "L" OR "T"EA 130 $ 3.00 390.00$ 35.00$ 4,550.00$ 55.00$ 7,150.00$ 35 84 ADA SPACE MARKING EA 4 $ 25.00 100.00$ 450.00$ 1,800.00$ 550.00$ 2,200.00$ 36 84 BLUE/YELLOW/RED/WHITE CURB PAINT LF 930 $ 2.00 1,860.00$ 3.00$ 2,790.00$ 16.00$ 14,880.00$ 37 84 BOTS DOTS LF 192 $ 55.00 10,560.00$ 5.00$ 960.00$ 11.00$ 2,112.00$ 38 82 ADA SIGN AND POST EA 4 $ 450.00 1,800.00$ 300.00$ 1,200.00$ 440.00$ 1,760.00$ 39 82 FLEX POST EA 4 $ 40.00 160.00$ 225.00$ 900.00$ 550.00$ 2,200.00$ 40 82 REMOVE (E) POST EA 2 $ 50.00 100.00$ 100.00$ 200.00$ 220.00$ 440.00$ 41 82 INSTALL (N) 12' PUNCH POST EA 15 $ 300.00 4,500.00$ 265.00$ 3,975.00$ 330.00$ 4,950.00$ 42 82 INSTALL (N) 14' PUNCH POST EA 3 $ 350.00 1,050.00$ 275.00$ 825.00$ 385.00$ 1,155.00$ 43 82 RELOCATE (E) SIGN EA 1 $ 300.00 300.00$ 300.00$ 300.00$ 275.00$ 275.00$ 44 82 NEIGHBORHOOD GREENWAY SIGN EA 4 $ 150.00 600.00$ 300.00$ 1,200.00$ 440.00$ 1,760.00$ 45 82 25 MPH SIGN EA 7 $ 150.00 1,050.00$ 195.00$ 1,365.00$ 275.00$ 1,925.00$ 46 82 R4-11 SIGN EA 7 $ 150.00 1,050.00$ 180.00$ 1,260.00$ 275.00$ 1,925.00$ 47 82 R7-9 SIGN EA 1 $ 150.00 150.00$ 100.00$ 100.00$ 275.00$ 275.00$ 48 82 R10-15 SIGN EA 2 $ 150.00 300.00$ 195.00$ 390.00$ 275.00$ 550.00$ 49 82 R13A SIGN EA 1 $ 150.00 150.00$ 150.00$ 150.00$ 275.00$ 275.00$ 50 82 W11-2 SIGN EA 2 $ 150.00 300.00$ 195.00$ 390.00$ 275.00$ 550.00$ 51 82 W11-15 SIGN EA 8 $ 150.00 1,200.00$ 180.00$ 1,440.00$ 275.00$ 2,200.00$ 52 82 W16-7P SIGN EA 2 $ 150.00 300.00$ 125.00$ 250.00$ 220.00$ 440.00$ 53 85 BLUE HYDRANT REFLECTORS - ENG. STD. 7920 EA 15 $ 20.00 300.00$ 20.00$ 300.00$ 22.00$ 330.00$ 54 73 NE CURB RAMP: SANTA BARBARA AND RAIL STATION LS 1 $ 31,980.00 31,980.00$ - 48,785.00$ ‐37,500.00$ 55 73 S CURB RAMP RETROFIT (DOME AND SW GRIND): MONTEREY AND MORROLS 1 $ 2,500.00 2,500.00$ - 30,500.00$ ‐4,403.00$ 56 73 CROSS GUTTER PER ENG. STD. 4310 SQFT 53 $ 55.00 2,915.00$ 615.00$ 32,595.00$ 126.00$ 6,678.00$ 57 73 N CURB RAMP: CALFORNIA AND MILL LS 1 $ 40,000.00 40,000.00$ - 45,000.00$ ‐37,000.00$ 58 73 E CURB RAMP: CALIFORNIA AND MILL LS 1 $ 40,000.00 40,000.00$ - 45,000.00$ ‐36,000.00$ 59 73 S CURB RAMP: CALIFORNIA AND MILL LS 1 $ 40,000.00 40,000.00$ - 45,000.00$ ‐42,000.00$ 60 73 W CURB RAMP: CALIFORNIA AND MILL LS 1 $ 40,000.00 40,000.00$ - 45,000.00$ ‐37,000.00$ 61 73 N CURB RAMP: CALIFORNIA AND PALM LS 1 $ 40,000.00 40,000.00$ - 45,000.00$ ‐34,365.00$ 62 73 E CURB RAMP: CALIFORNIA AND PALM LS 1 $ 40,000.00 40,000.00$ - 45,000.00$ ‐33,952.00$ 63 73 S CURB RAMP: CALIFORNIA AND PALM LS 1 $ 40,000.00 40,000.00$ - 45,000.00$ ‐37,870.00$ 64 73 W CURB RAMP: CALIFORNIA AND PALM LS 1 $ 40,000.00 40,000.00$ - 45,000.00$ ‐32,177.00$ 65 73 N CURB RAMP: MONTEREY AND TORO LS 1 $ 40,000.00 40,000.00$ - 45,000.00$ ‐26,377.00$ 66 73 S CURB RAMP: MONTEREY AND TORO LS 1 $ 40,000.00 40,000.00$ - 45,000.00$ ‐32,615.00$ 67 73 W CURB RAMP: MONTEREY AND TORO LS 1 $ 40,000.00 40,000.00$ - 45,000.00$ ‐39,980.00$ 68 73 NE CURB RAMP: FUNSTON AND LAWTON LS 1 $ 37,860.00 37,860.00$ - 45,000.00$ ‐39,982.00$ 69 73 SE CURB RAMP: FUNSTON AND LAWTON LS 1 $ 20,220.00 20,220.00$ - 45,000.00$ ‐38,000.00$ 70 73 SW CURB RAMP: FUNSTON AND LAWTON LS 1 $ 32,400.00 32,400.00$ - 45,000.00$ ‐34,067.00$ 71 73 NW CURB RAMP: FUNSTON AND LAWTON LS 1 $ 23,400.00 23,400.00$ - 45,000.00$ ‐33,582.00$ 72 73 MONTEREY CONCRETE REPAIR SECTION 1 LS 1 $ 40,000.00 40,000.00$ - 55,350.00$ ‐50,350.00$ 73 73 MONTEREY CONCRETE REPAIR SECTION 2 LS 1 $ 40,000.00 40,000.00$ - 48,000.00$ ‐25,099.00$ 74 73 MONTEREY CONCRETE REPAIR SECTION 3 LS 1 $ 40,000.00 40,000.00$ - 55,350.00$ ‐49,329.00$ 75 73 MONTEREY CONCRETE REPAIR SECTION 4 LS 1 $ 20,000.00 20,000.00$ - 48,000.00$ ‐32,569.00$ 76 73 MONTEREY CONCRETE REPAIR SECTION 5 LS 1 $ 40,000.00 40,000.00$ - 63,000.00$ ‐77,933.00$ 77 39 12.5" AC BASE REPAIR SQFT 14,004 $ 20.00 280,080.00$ 44.75$ 626,679.00$ 28.00$ 392,112.00$ 78*15, 40, 90 CONCRETE BASE REPAIR ALLOWANCE SQFT 5,310 $ 20.00 106,200.00$ 46.00$ 244,260.00$ 23.00$ 122,130.00$ 79 73 CONCRETE MEDIAN SQFT 3,313 $ 40.00 132,520.00$ 78.00$ 258,414.00$ 63.00$ 208,719.00$ 80 15 UPGRADE/ADJUST COMMUNICATIONS MANHOLE TO FINISHED SURFACE EA 8 $ 800.00 6,400.00$ 6,380.00$ 51,040.00$ 1,197.00$ 9,576.00$ 81 15 REMOVE € AND INSTALL NEW COMMUNICATION MANHOLE PER ENG. STD. 9030 EA 2 $ 10,000.00 20,000.00$ 6,380.00$ 12,760.00$ 1,741.00$ 3,482.00$ 82 15 UPGRADE/ADJUST MANHOLE OR CLEANOUT TO FINISHED SURFACE EA 27 $ 2,000.00 54,000.00$ 2,965.00$ 80,055.00$ 1,288.00$ 34,776.00$ 83 77 REPLACE FRAME AND COVER PER ENG. STD. 6610 EA 3 $ 4,000.00 12,000.00$ 4,875.00$ 14,625.00$ 1,325.00$ 3,975.00$ 84 77 COAT SEWER MANHOLE EA 4 $ 5,000.00 20,000.00$ 15,000.00$ 60,000.00$ 3,600.00$ 14,400.00$ 85 15 UPGRADE/ADJUST GAS OR WATER VALVE TO FINISHED SURFACE PER ENG. STD. 6040 EA 70 $ 1,500.00 105,000.00$ 2,000.00$ 140,000.00$ 756.00$ 52,920.00$ 86 15 UPGRADE/ADJUST AND RESET CENTERLINE MONUMENT PER ENG. STD. 9020 EA 17 $ 1,500.00 25,500.00$ 2,350.00$ 39,950.00$ 1,342.00$ 22,814.00$ 87 15 RESET BENCHMARK EA 2 $ 1,500.00 3,000.00$ 1,630.00$ 3,260.00$ 2,200.00$ 4,400.00$ 88 15 UPGRADE/ADJUST STORM DRAIN VENT TO FINISHED SURFACE EA 8 $ 2,000.00 16,000.00$ 2,525.00$ 20,200.00$ 727.00$ 5,816.00$ 89 86 RAPID RECTANGULAR FLASHING BEACONS (RRFB) SYSTEM: SANTA BARBARA AND HIGH LS 1 $ 10,000.00 10,000.00$ - 50,200.00$ ‐44,220.00$ 90 86 RAPID RECTANGULAR FLASHING BEACONS (RRFB) SYSTEM: MONTEREY AND TORO LS 1 $ 30,000.00 30,000.00$ - 56,195.00$ ‐50,815.00$ 91 86 RAPID RECTANGULAR FLAHSING BEACONS (RRFB) SYSTEM: MONTEREY AND PEPPER LS 1 $ 30,000.00 30,000.00$ - 56,195.00$ ‐50,815.00$ 92 77 CONNECT TO € SD CULVERT EA 4 $ 10,000.00 40,000.00$ 9,500.00$ 38,000.00$ 3,100.00$ 12,400.00$ 93 77 CONNECT TO € DRAINAGE STRUCTURE EA 1 $ 4,000.00 4,000.00$ 14,000.00$ 14,000.00$ 3,154.00$ 3,154.00$ 94 77 REPAIR BOX CULVERT PENETRATION PER DETAIL A, SHEET C8 EA 4 $ 5,000.00 20,000.00$ 12,000.00$ 48,000.00$ 3,154.00$ 12,616.00$ 95 15 REMOVE € STORM DRAIN PIPE/CONCRETE BOX DRAIN LF 394 $ 75.00 29,550.00$ 170.00$ 66,980.00$ 66.00$ 26,004.00$ 96 15 REMOVE € STORM DRAIN MANHOLE EA 4 $ 2,000.00 8,000.00$ 4,930.00$ 19,720.00$ 1,859.00$ 7,436.00$ 97 15 REMOVE € DRAINAGE INLET EA 10 $ 2,000.00 20,000.00$ 3,355.00$ 33,550.00$ 1,960.00$ 19,600.00$ 98 77 INSTALL (N) 12” PVC (SDR 35) STORM DRAIN PIPE LF 152 $ 300.00 45,600.00$ 580.00$ 88,160.00$ 250.00$ 38,000.00$ 99 77 INSTALL (N) 12” DIP STORM DRAIN PIPE LF 107 $ 350.00 37,450.00$ 625.00$ 66,875.00$ 279.00$ 29,853.00$ 100 77 INSTALL (N) 18” HDPE STORM DRAIN PIPE LF 140 $ 250.00 35,000.00$ 640.00$ 89,600.00$ 274.00$ 38,360.00$ 101 77 INSTALL (N) 24” HDPE STORM DRAIN PIPE LF 50 $ 275.00 13,750.00$ 890.00$ 44,500.00$ 311.00$ 15,550.00$ 102 77 INSTALL (N) 24” X 6” CONCRETE BOX LF 20 $ 1,000.00 20,000.00$ 2,075.00$ 41,500.00$ 468.00$ 9,360.00$ 103 77 INSTALL (N) CATCH BASIN PER ENG. STD. 3350 EA 3 $ 15,000.00 45,000.00$ 7,800.00$ 23,400.00$ 23,557.00$ 70,671.00$ 104 77 INSTALL (N) CATCH BASIN PER ENG. STD. 3355 EA 5 $ 16,000.00 80,000.00$ 7,800.00$ 39,000.00$ 23,867.00$ 119,335.00$ 105 77 INSTALL (N) CATCH BASIN PER ENG. STD. 3360 EA 1 $ 18,000.00 18,000.00$ 7,800.00$ 7,800.00$ 30,666.00$ 30,666.00$ 106 77 INSTALL (N) CATCH BASIN PER CALTRANS STD. D72E (TYPE GO) EA 1 $ 15,000.00 15,000.00$ 7,800.00$ 7,800.00$ 15,503.00$ 15,503.00$ 107 77 REPLACE DRAINAGE GRATES EA 2 $ 1,500.00 3,000.00$ 1,005.00$ 2,010.00$ 5,870.00$ 11,740.00$ 108 77 INSTALL (N) STORM DRAIN MANHOLE PER ENG. STD. 3520 EA 2 $ 10,000.00 20,000.00$ 15,000.00$ 30,000.00$ 9,685.00$ 19,370.00$ 109 77 INSTALL (N) STORM DRAIN MANHOLE PER ENG. STD. 3530 EA 1 $ 15,000.00 15,000.00$ 15,000.00$ 15,000.00$ 8,517.00$ 8,517.00$ 110 77 RELOCATE € FIRE HYDRANT EA 1 $ 10,000.00 10,000.00$ 18,875.00$ 18,875.00$ 6,500.00$ 6,500.00$ 111 77 ADJUST FIRE HYDRANT TO PROVIDE PROPER CLEARANCE PER ENG. STD. 6310 EA 2 $ 5,000.00 10,000.00$ 3,970.00$ 7,940.00$ 1,452.00$ 2,904.00$ 112 77 BYPASS PUMPING LS 1 $ 1,500.00 1,500.00$ - 87,500.00$ ‐7,500.00$ 113 77 REMOVE EXISTING SEWERLINE AND INSTALL NEW 8” HDPE SEWERLINE BY OPEN TRENCH LF 248 $ 315.00 78,120.00$ 725.00$ 179,800.00$ 251.00$ 62,248.00$ 114 77 REMOVE EXISTING AND INSTALL NEW CLEANOUT EA 1 $ 5,000.00 5,000.00$ 9,435.00$ 9,435.00$ 2,693.00$ 2,693.00$ 115 77 CONNECT EXISTING SEWER LATERAL TO SEWER MAIN EA 5 $ 2,500.00 12,500.00$ 10,065.00$ 50,325.00$ 1,700.00$ 8,500.00$ 116 77 CONNECT TO EXISTING SEWER MANHOLE EA 1 $ 5,000.00 5,000.00$ 10,065.00$ 10,065.00$ 3,000.00$ 3,000.00$ 117*73 ADDITIONAL SIDEWALK ALLOWANCE SQFT 900 $ 30.00 27,000.00$ 65.00$ 58,500.00$ 14.00$ 12,600.00$ 118*73 ADDITIONAL CURB AND GUTTER ALLOWANCE LF 360 $ 50.00 18,000.00$ 135.00$ 48,600.00$ 106.00$ 38,160.00$ 119*73 ADDITIONAL MISSION STYLE SIDEWALK ALLOWANCE SQFT 300 $ 50.00 15,000.00$ 170.00$ 51,000.00$ 40.00$ 12,000.00$ 120*73 ADDITIONAL DRIVEWAY ALLOWANCE SQFT 300 $ 50.00 15,000.00$ 90.00$ 27,000.00$ 25.00$ 7,500.00$ 121 84 REPLACE LOOP DETECTORS EA 1 $ 2,500.00 2,500.00$ 1,200.00$ 1,200.00$ 1,320.00$ 1,320.00$ 122 86 PEDESTRIAN PUSH BUTTON ASSEMBLY (CALIFORNIA AND MILL) LS 1 $ 30,000.00 30,000.00$ - 91,639.00$ ‐90,000.00$ 123*77 WATER SERVICE REPAIR ALLOWANCE EA 5 $ 5,000.00 25,000.00$ 5,000.00$ 25,000.00$ 1,453.00$ 7,265.00$ 124 30 COLD PLANE (12.5”)SQYD 6,826 $ 25.00 170,650.00$ 25.00$ 170,650.00$ 13.00$ 88,738.00$ 125 39 ¾ MIX HOT MIX ASPHALT TON 3,840 $ 180.00 691,200.00$ 205.00$ 787,200.00$ 155.00$ 595,200.00$ 126 39 ½ MIX HMA SURFACE COURSE TON 1,222 $ 175.00 213,850.00$ 201.00$ 245,622.00$ 168.00$ 205,296.00$ ADDITIVE ALTERNATIVE A BID ITEMS Engineer's Estimate Papich Construction Souza Construction 5,817,318.00$ 10,862,128.55$ 5,808,262.50$ BASE BID ITEMS BASE BID TOTAL 127 39 3/8 MIX LEVELING COURSE TON 112 $ 225.00 25,200.00$ 522.00$ 58,464.00$ 222.00$ 24,864.00$ 128 15 MILL AC SQYD 2,659 $ 12.00 31,908.00$ 22.00$ 58,498.00$ 11.00$ 29,249.00$ 129 39, 96 PAVING GRID SQYD 2,659 $ 11.00 29,249.00$ 18.00$ 47,862.00$ 19.50$ 51,850.50$ 130 37 FOG SEAL SQFT 25,417 $ 4.35 110,563.95$ 0.35$ 8,895.95$ 0.20$ 5,083.40$ 131 73 TRAFFIC CONTROL PLAN AND IMPLEMENTATION LS 1 $ 50,000.00 50,000.00$ - 120,765.00$ - 68,000.00$ 132 12 TEMPORARY STRIPING AND PAVEMENT MARKINGS LS 1 $ 15,000.00 15,000.00$ - 31,600.00$ - 2,200.00$ 133 73 WHITE/YELLOW PAVEMENT MARKINGS/LEGENDS (ARROWS, WORDS, SYMBOLS, ETC.) SQFT 487 $ 5.00 2,435.00$ 6.00$ 2,922.00$ 11.00$ 5,357.00$ 134 GREEN BIKE LANE MARKINGS CASE 1 LF 93 $ 130.00 12,090.00$ 84.00$ 7,812.00$ 66.00$ 6,138.00$ 135 86 GREEN BIKE LANE MARKINGS CASE 2 LF 496 $ 48.00 23,808.00$ 65.00$ 32,240.00$ 44.00$ 21,824.00$ 136 86 GREEN BIKE LANE MARKINGS CASE 3 LF 144 $ 50.00 7,200.00$ 65.00$ 9,360.00$ 44.00$ 6,336.00$ 137 84 12” WHITE/YELLOW LF 923 $ 3.00 2,769.00$ 9.00$ 8,307.00$ 5.50$ 5,076.50$ 138 84 24” WHITE/YELLOW LF 473 $ 6.00 2,838.00$ 10.00$ 4,730.00$ 9.00$ 4,257.00$ 139 84 DETAIL 22 LF 596 $ 1.00 596.00$ 5.00$ 2,980.00$ 5.50$ 3,278.00$ 140 84 DETAIL 27B LF 2,569 $ 1.00 2,569.00$ 1.50$ 3,853.50$ 5.50$ 14,129.50$ 141 84 DETAIL 29 LF 313 $ 1.00 313.00$ 1.25$ 391.25$ 11.00$ 3,443.00$ 142 84 DETAIL 32 LF 1,683 $ 1.00 1,683.00$ 3.00$ 5,049.00$ 5.50$ 9,256.50$ 143 84 DETAIL 38 LF 257 $ 1.00 257.00$ 2.50$ 642.50$ 5.50$ 1,413.50$ 144 84 DETAIL 39 LF 174 $ 1.00 174.00$ 1.50$ 261.00$ 5.50$ 957.00$ 145 84 DETAIL 39A LF 100 $ 0.33 33.00$ 1.25$ 125.00$ 5.50$ 550.00$ 146 84 BIKE BUFFER LF 2,767 $ 6.00 16,602.00$ 1.25$ 3,458.75$ 11.00$ 30,437.00$ 147 84 BLUE/YELLOW/RED/WHITE CURB PAINT LF 223 $ 2.00 446.00$ 3.00$ 669.00$ 2.00$ 446.00$ 148 85 BLUE HYDRANT REFLECTORS – ENG. STD. 7920 EA 8 $ 20.00 160.00$ 20.00$ 160.00$ 22.00$ 176.00$ 149 15 UPGRADE/ADJUST COMMUNICATIONS MANHOLE TO FINISHED SURFACE EA1 $ 800.00 800.00$ 6,360.00$ 6,360.00$ 1,197.00$ 1,197.00$ 150 15 UPGRADE/ADJUST MANHOLE OR CLEANOUT TO FINISHED SURFACE EA 8 $ 2,000.00 16,000.00$ 2,965.00$ 23,720.00$ 940.00$ 7,520.00$ 151 15 UPGRADE/ADJUST WATER VALVE TO FINISHED SURFACE PER ENG. STD. 6040 EA 11 $ 1,500.00 16,500.00$ 2,000.00$ 22,000.00$ 756.00$ 8,316.00$ 152 15 UPGRADE/ADJUST AND RESET CENTERLINE MONUMENT PER ENG. STD. 9020 EA 1 $ 1,500.00 1,500.00$ 2,350.00$ 2,350.00$ 1,717.00$ 1,717.00$ 153 77 REPLACE FRAME AND COVER PER ENG. STD. 6610 EA 6 $ 4,000.00 24,000.00$ 4,875.00$ 29,250.00$ 1,312.00$ 7,872.00$ 154 77 POTHOLING LS 1 $ 10,000.00 10,000.00$ - 50,200.00$ - 8,000.00$ 155 77 CONNECT TO € DRAINAGE STRUCTURE EA 2 $ 4,000.00 8,000.00$ 14,000.00$ 28,000.00$ 3,200.00$ 6,400.00$ 156 15 REMOVE € STORM DRAIN PIPE/CONCRETE BOX DRAIN LF 140 $ 75.00 10,500.00$ 140.00$ 19,600.00$ 75.25$ 10,535.00$ 157 77 INSTALL (N) 14” DIP STORM DRAIN PIPE LF 140 $ 350.00 49,000.00$ 530.00$ 74,200.00$ 400.00$ 56,000.00$ 158 73 SIDEWALK (JOHNSON AND ORCUTT STORM DRAIN IMPROVEMENT) SQFT 70 $ 30.00 2,100.00$ 160.00$ 11,200.00$ 20.00$ 1,400.00$ 159 73 CURB AND GUTTER (JOHNSON AND ORCUTT STORM DRAIN IMPROVEMENT) LF 10 $ 50.00 500.00$ 715.00$ 7,150.00$ 105.00$ 1,050.00$ 160 77 € STORM DRAIN TO BE GROUTED SOLID WITH CLSM (SHEET C8) LS 1 $ 5,000.00 5,000.00$ - 25,000.00$ ‐6,000.00$ 161 15 MILL PCC PAVEMENT SQYD 5,630 $ 14.00 78,820.00$ 23.75$ 133,712.50$ 7.00$ 39,410.00$ 162 39, 96 PAVING GRID SQYD 3,910 $ 11.00 43,010.00$ 18.05$ 70,575.50$ 18.00$ 70,380.00$ 163 39 3/8 MIX LEVELING COURSE TON 240 $ 225.00 54,000.00$ 515.00$ 123,600.00$ 197.00$ 47,280.00$ 164 39 ½ MIX HMA SURFACE COURSE TON 560 $ 175.00 98,000.00$ 206.00$ 115,360.00$ 175.00$ 98,000.00$ 165 7, 12 TRAFFIC CONTROL PLAN AND IMPLEMENTATION LS 1 $ 40,000.00 40,000.00$ - 105,205.00$ ‐39000 166 12 TEMPORARY STRIPING AND PAVEMENT MARKINGS LS 1 $ 5,000.00 5,000.00$ - 31,600.00$ ‐4400 167 84 WHITE/YELLOW PAVEMENT MARKINGS/LEGENDS (ARROWS, WORDS, SYMBOLS, ETC.) SQFT 68 $ 5.00 340.00$ 6.00$ 408.00$ 11.00$ 748.00$ 168 84 12” WHITE/YELLOW LF 745 $ 3.00 2,235.00$ 10.00$ 7,450.00$ 5.50$ 4,097.50$ 169 84 24” WHITE/YELLOW LF 610 $ 6.00 3,660.00$ 5.00$ 3,050.00$ 11.00$ 6,710.00$ 170 84 DETAIL 22 LF 295 $ 1.00 295.00$ 1.50$ 442.50$ 5.50$ 1,622.50$ 171 84 WHITE/BLUE PARKING “L” OR “T”EA 36 $ 3.00 108.00$ 35.00$ 1,260.00$ 55.00$ 1,980.00$ 172 84 ADA SPACE MARKING EA 2 $ 25.00 50.00$ 450.00$ 900.00$ 550.00$ 1,100.00$ 173 82 ADA SIGN AND POST EA 2 $ 450.00 900.00$ 5.00$ 10.00$ 440.00$ 880.00$ 174 84 BLUE/YELLOW/RED/WHITE CURB PAINT LF 44 $ 2.00 88.00$ 5.00$ 220.00$ 2.00$ 88.00$ 175 85 BLUE HYDRANT REFLECTORS – ENG. STD. 7920 EA 3 $ 20.00 60.00$ 10.00$ 30.00$ 22.00$ 66.00$ 176 73 CROSS GUTTER PER ENG. STD. 4310 SQFT 221 $ 55.00 12,155.00$ 230.00$ 50,830.00$ 93.00$ 20,553.00$ 177 73 N CURB RAMP: SANTA ROSA AND PALM LS 1 $ 30,240.00 30,240.00$ - 45,000.00$ ‐55000 178 73 E CURB RAMP: SANTA ROSA AND PALM LS 1 $ 24,900.00 24,900.00$ - 45,000.00$ ‐54000 179 73 S CURB RAMP: SANTA ROSA AND PALM LS 1 $ 34,920.00 34,920.00$ - 45,000.00$ ‐48000 180 73 W CURB RAMP: SANTA ROSA AND PALM LS 1 $ 30,480.00 30,480.00$ - 45,000.00$ ‐49171 181*15, 40, 90 CONCRETE BASE REPAIR ALLOWANCE SQFT 2,540 $ 20.00 50,800.00$ 45.50$ 115,570.00$ 22.00$ 55,880.00$ 182 15 UPGRADE/ADJUST MANHOLE OR CLEANOUT TO FINISHED SURFACE EA 1 $ 2,000.00 2,000.00$ 2,965.00$ 2,965.00$ 1,053.00$ 1,053.00$ 183 15 UPGRADE/ADJUST WATER VALVE TO FINISHED SURFACE PER ENG. STD. 6040 EA 5 $ 1,500.00 7,500.00$ 1,990.00$ 9,950.00$ 756.00$ 3,780.00$ 184 77 REPLACE FRAME AND COVER PER ENG. STD. 6610 EA 1 $ 4,000.00 4,000.00$ 4,870.00$ 4,870.00$ 1,053.00$ 1,053.00$ 185 86 PEDESTRIAN PUSH BUTTON ASSEMBLY (PALM AND SANTA ROSA LS 1 $ 30,000.00 30,000.00$ - 86,270.00$ ‐84000 186 77 ADJUST FIRE HYDRANT TO PROVIDE PROPER CLEARANCE PER ENG. STD. 6310 EA 2 $ 5,000.00 10,000.00$ 4,060.00$ 8,120.00$ 1,164.00$ 2,328.00$ ADDITIVE ALTERNATE "B" TOTAL TOTAL PROJECT BID ADDITIVE ALTERNATE "A" TOTAL 1,911,547.95$ 1,299,562.90$ 563,561.00$ 690,580.00$ 1,052,398.50$ ADDITIVE ALTERNATIVE B BID ITEMS 1,299,562.90$ 1,555,493.95$ 563,561.00$ 7,936,372.95$ 690,580.00$ 7,798,405.40$ 1,911,547.95$ 1,052,398.50$ 13,826,075.00$ 5,817,318.00$ 10,862,128.55$ BASE BID TOTAL 5,808,262.50$ ADDITIVE ALTERNATVE "A" TOTAL ADDITIVE ALTERNATE B TOTAL 1,555,493.95$