Loading...
HomeMy WebLinkAboutJob 4. 2001015 - Bid Results - Buchon Street Traffic CalmingBuchon Street Traffic Calming, SPEC# 2001015 Bid Opening: August 1st, 2023 at 2:00pm UNIT TOTAL UNIT TOTAL UNIT TOTAL No. ITEM UNIT QUAN PRICE PRICE PRICE PRICE PRICE PRICE 1 Temporary Traffic Control and Implementation LS 1 $10,000.00 $10,000.00 $28,500.00 $28,500.00 $64,000.00 $64,000.00 2 Remove and Dispose Striping and Markings LS 1 $5,000.00 $5,000.00 $991.00 $991.00 $14,200.00 $14,200.00 3 Clear and Grub SQFT 4 $100.00 $400.00 $377.00 $1,508.00 $1,000.00 $4,000.00 4 Remove and Dispose Entire Sign and Post Assembly EA 4 $200.00 $800.00 $291.00 $1,164.00 $300.00 $1,200.00 5 Adjust Monument Lid to Finished Grade EA 1 $1,700.00 $1,700.00 $396.00 $396.00 $3,300.00 $3,300.00 6 Clean and Coat existing SS Manhole EA 1 $8,000.00 $8,000.00 $22,800.00 $22,800.00 $25,000.00 $25,000.00 7 Speed Hump Removal and Install AC Cap LS 1 $8,800.00 $8,800.00 $26,000.00 $26,000.00 $21,000.00 $21,000.00 8 Curb Ramp 1 - Buchon St/Toro St - West Corner LS 1 $31,500.00 $31,500.00 $46,500.00 $46,500.00 $42,000.00 $42,000.00 9 Curb Ramp 2 - Buchon St/ Toro St - South Corner LS 1 $33,000.00 $33,000.00 $36,000.00 $36,000.00 $42,000.00 $42,000.00 10 Cross Gutter Per Eng. Std. 4310 LS 1 $25,600.00 $25,600.00 $15,400.00 $15,400.00 $22,300.00 $22,300.00 11 Traffic Circle LS 1 $20,000.00 $20,000.00 $34,592.00 $34,592.00 $18,000.00 $18,000.00 12 Concrete Base Repair Allowance per Datail C, Sheet 6 SQFT 50 $75.00 $3,750.00 $81.00 $4,050.00 $70.00 $3,500.00 13 Sidewalk Allowance SQFT 50 $40.00 $2,000.00 $62.00 $3,100.00 $30.00 $1,500.00 14 Curb and Gutter Allowance LF 15 $40.00 $600.00 $75.00 $1,125.00 $80.00 $1,200.00 15 R1-1 Stop Sign EA 2 $300.00 $600.00 $591.00 $1,182.00 $650.00 $1,300.00 16 New Street Name Sign EA 2 $250.00 $500.00 $591.00 $1,182.00 $620.00 $1,240.00 17 W2-6 Sign EA 2 $300.00 $600.00 $591.00 $1,182.00 $620.00 $1,240.00 18 W11-2 Sign EA 8 $300.00 $2,400.00 $591.00 $4,728.00 $620.00 $4,960.00 19 W16-7P (L or R)EA 8 $150.00 $1,200.00 $540.00 $4,320.00 $600.00 $4,800.00 20 Punch Post (SLO Std. Plan 7210 EA 6 $350.00 $2,100.00 $480.00 $2,880.00 $500.00 $3,000.00 21 Fog Seal LS 1 $10,000.00 $10,000.00 $18,656.00 $18,656.00 $4,500.00 $4,500.00 22 Striping and Markings LS 1 $7,500.00 $7,500.00 $17,143.00 $17,143.00 $19,000.00 $19,000.00 23 Neon-reflective White Raised Pavement Markers LS 1 $50.00 $50.00 $65.00 $65.00 $650.00 $650.00 24 OM Type Q Flex Post EA 1 $100.00 $100.00 $591.00 $591.00 $600.00 $600.00 25 Replace Hydrant Markers (SLO Std. Plan 7920)EA 2 $50.00 $100.00 $66.00 $132.00 $35.00 $70.00 26 Paint Curb - Red LF 190 $10.00 $1,900.00 $10.00 $1,900.00 $10.00 $1,900.00 $178,200.00 $276,087.00 $306,460.00TOTAL PROJECT BID Engineer's Estimate Taylor Jane Construction R. Burke Corporation BASE BID