Loading...
HomeMy WebLinkAboutProject Stats-JOC 2023 (2)TASK ORDER # 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 DATE (COMPLETED) 3/11/2022 2/22/2022 2/3/2022 2/28/2022 8/18/2022 4/15/2022 4/28/2022 DID NOT COMPLETE 4/11/2022 4/11/2022 DID NOT COMPLETE 3/8/2022 3/31/2022 4/9/2022 4/27/2022 4/22/2023 4/5/2022 4/28/2022 6/13/2022 6/7/2022 6/6/2022 6/24/2022 9/22/2022 11/23/2022 11/30/2022 11/22/2022 2/15/2024 3/16/2023 8/3/2022 WORK NOT COMPLETE Complete WORK NOT COMPLETE 3/21/2023 WORK NOT COMPLETE WORK NOT COMPLETE WORK NOT COMPELTE 3/22/2022 3/21/2022 3/23/2023 5/5/2023 3/23/2023 6/15/2023 6/15/2023 6/8/2023 Totals Trench Patches SF 1961.1 163.6 104 56 1797.25 98 1877 55 190 521.98 2750 3500 881 168.95 14123.88 Sidewalk SF 51 4383.2 73 1010 146 5663.2 C&G LF 24 4.5 24 28 80.5 Potholes EA 3 6 30 16 7 4 6 1 4 5 22 3 3 28 6 144 Driveway SF 338 128 650 Total Cost 31902.8 10750.09 3979.64 1866 20026.09 30101.27 216354.75 5515 11128.69 27822.9 2146.19 49485 29286.16 14664 7636.75 8089 2488 6082 155226.37 7711 25669.17 70777.68 2630 81479.96 36156.06 7780 23341.67 28403.63 3131.02 6836.41 23622.09 8185.39 1013.08 111986.51 7008.67 47488.83 7506.06 17838.34 1153116.27 Comments TRASH RACK WW Patches Olive Street Junction BOX all at force account Oceanaire shoring and Repair-Force Account Emergency Waterline Repair OCEANAIRE DRIVEWAY BROAD DRIVEWAY WATER PATCHES Task Removed- Osos Sidewalk 1235 Chorro Sidewalk 883 Marsh Sidewalk Fredricks Pothole repair @ Force Account Nipomo St Sewer Repair-Force Account Item No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 Task Order Description: Description 2: Account Unit Price Work Aspalt Material Extra Work Total Task Order Cost Item Description Edge Grind 1.75" Thin Maintenance Overlay 2” AC Grind & AC Overlay 6” AC Pavement - Excavation & Restoration 10” AC Pavement - Excavation & Restoration 8” PCC with 3” max AC Cap - Excavation & Restoration Class II Aggregate Trench Backfill Sand AC Dike - Caltrans A24 Pavement Reinforcing Fabric Fog Seal Pavement Marking - Caltrans A24 12-inch White Limit Line Traffic Stripe - Caltrans A20A Detail 1 Traffic Stripe - Caltrans A20A Detail 2 Traffic Stripe - Caltrans A20A Detail 8 Traffic Stripe - Caltrans A20A Detail 9 Traffic Stripe - Caltrans A20A Detail 22 Traffic Stripe - Caltrans A20B Detail 29 Traffic Stripe - Caltrans A20D Detail 38 Traffic Stripe - Caltrans A20D Detail 39 Traffic Stripe - Caltrans A20D Detail 39A Reflective Pavement Marker - All Types Hi-Vis Crosswalk - Std. 7350 Bike Lane Buffer Green Bike Lane Coating - Std. 7360 Remove Traffic Stripe Remove Pavement Marking Remove & Replace Sidewalk - Std. 4110 (Area - Under 60 SQFT) Remove & Replace Sidewalk - Std. 4110 (Area - 60 to 180 SQFT) Remove & Replace Sidewalk - Std. 4110 (Area - Over 180 SQFT) Remove & Replace Boardwalk with Concrete Pavers - Std 4150 (Area - Under 60 SQFT) Remove & Replace Boardwalk with Concrete Pavers - Std 4150 (Area - 60 SQFT to 180 SQFT) Remove & Replace Boardwalk with Concrete Pavers - Std 4150 (Area - Over 180 SQFT) Remove & Replace Curb and Gutter - Std. 4030 Remove & Replace Curb Ramp - Std. 4440 Remove & Replace Cross Gutter - Std. 4310 Remove & Replace Driveway Ramp - Std. 2110,2111,2115,2116 Mission Style PCC Coloring and Salt Finish Mission Style Tile Installation per Std. 4220 Single Mission Tile Installation - Std. 4220 Replace Truncated Domes - Std. 4440 Repaint Curb Furnish & Install Metal Post - Std. 7210 Furnish & Install Metal Post - Std. 7215 Furnish and Install Sign Reconstruct Guardrail - Caltrans A77A1 Furnish and Install Tree Well - Std. 8130, 4'x4' Furnish and Install Tree Well - Std. 8130, 5'x5' Furnish and Install Tree Well - Std. 8130, 6'x6' Enlarge Tree Grate Opening Furnish and Install Stormwater Trash Catchment Device Catch Basin - Std. 3350 Catch Basin - Std. 3355 Catch Basin - Std. 3355A Catch Basin - Std. 3360 Adjust Utility Cover - Std. 6040 Manhole Frame and Cover Replacement - Std. 6040 Manhole Replacement - Std. 3530 or 6610 Manhole Coating Construct Well / Cleanout - G5 - Std. 6710 Potholing (Depth - 0’ to 4') Potholing (Depth - 4' to 8') Potholing (Depth - 8'+) Pipe Excavation & Restoration (Depth - 0’ to 2.5’) Pipe Excavation & Restoration (Depth - 2.5’ to 8.5’) Shoring Required Pipe Excavation & Restoration (Depth - 8.5’+) Shoring Required Traffic Control - Eng. Std. Appendix G – Fig A Traffic Control - Eng. Std. Appendix G – Fig B Traffic Control - Eng. Std. Appendix G – Fig C Traffic Control - Eng. Std. Appendix G – Fig D Traffic Control - Eng. Std. Appendix G – Fig E Traffic Control - Eng. Std. Appendix G – Fig F Traffic Control - Eng. Std. Appendix G – Fig G Traffic Control - Eng. Std. Appendix G – Fig H Traffic Control - Eng. Std. Appendix G – Fig I Traffic Control - Eng. Std. Appendix G – Fig J Traffic Control - Eng. Std. Appendix G – Fig K Traffic Control - Eng. Std. Appendix G – Fig L Traffic Control - Eng. Std. Appendix G – Fig M Traffic Control - Eng. Std. Appendix G – Fig N Traffic Control - Eng. Std. Appendix G – Fig O Traffic Control - Eng. Std. Appendix G – Fig P Minor Traffic Control Abandon and Grout (E) Sanitary Sewer with Flowable Fill 2" SCH 40 Conduit, 2-Sac Concrete Capped 4" SCH 40 Conduit, 2-Sac Concrete Capped 2" SCH 40 Conduit, City Standard 6035 - Trench Detail 4" SCH 40 Conduit, City Standard 6035 - Trench Detail Electrical Pull Box, PG&E Type #2 (17"x30"x26") Total 0 0 0 0 Unit of Measure SQFT SQFT SQFT SQFT SQFT SQFT TON TON SQFT SQYD SQYD SQFT LF LF LF LF LF LF LF LF LF LF EA LF LF SQFT LF SQFT SQFT SQFT SQFT SQFT SQFT SQFT LF SQFT SQFT SQFT SQFT LF EA SQFT LF EA EA EA LF EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA LF LF LF HR HR HR HR HR HR HR HR HR HR HR HR HR HR HR HR HR LF LF LF LF LF EA Unit Price 3.81 11 32 3.3 7.6 17.5 58.48 52.87 26 38 25 19.75 19.8 19.8 19.8 19.8 19.8 19.8 19.8 19.8 19.8 19.8 35 1623 35 79 19.8 19.8 59 52 38 80 101 122 75 19 179 35 5.8 100 98.46 165 5.8 728 747 1060 856 7200 7600 8700 77 900 20300 22900 18900 21600 600 500 4713 1581 1888 622 941 1219 196 383 588 129 244 129 314 129 129 129 129 129 129 149 348 144 337 337 116 135 100 50 60 40 50 500 Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Task Order 1