HomeMy WebLinkAboutCity of SLO 2023 Storm Damage 533 Broad St_Weekly Insp. Report for 4-3 to 4-7-23   WEEKLY INSPECTION REPORT  April 12, 2023    File No.: 305879‐002     Wyatt Banker‐Hix, Engineer III  City of San Luis Obispo  919 Palm Street  San Luis Obispo, CA 93401‐3218    PROJECT:         CITY OF SAN LUIS OBISPO – 2023 STORM DAMAGE 533 BROAD STREET                              533 BROAD STREET, SAN LUIS OBISPO, CALIFORNIA                                                                                    SUBJECT:  Report of Structural Tests and/or Special Inspections for the   Week of April 3 through 7, 2023      Summary of Items Inspected     Earth Systems provided special inspection and/or structural testing services for this project this  week. Attached are our reports documenting the services provided as indicated below, also  attached is an unresolved issues list indicating non‐compliant items unresolved to date.    Epoxied Rebar Piles      Batch Plant  Masonry  Field Welding  Epoxied Rebar        Deep Foundation  Concrete  X  Rebar   Shop Welding  DR‐Meter               Proof Load Test  X  Shotcrete   Proof Load  Soil Nails      Thank you for the opportunity to have been of service. If there are any questions regarding this  report, please feel free to contact the undersigned.     Earth Systems Pacific,    David Burns, Inspection Department Supervisor   Attachments:  Earth Systems reports dated April 4 and 6, 2023 (2 pages)                                  Unresolved Issues List (1 page)                                                                     Doc. No.:    2304‐006.WSI/ns  2049 Preisker Lane, Suite E Santa Maria, CA 93454 Fremont, CA 94539 (805) 928-2991 Phone (510) 353-3833 Phone (888) 567-4292 Fax Tiebacks Masonry Field Welding Epoxied Rebar Deep Foundation High Strength Bolting Fireproofing Post-Installed Anchors Rebar Shop Welding Approved Docs. - Including Relevant RFI's, Etc.: Work Inspected/Tested: Items Requiring Correction, Corrections of Previously Listed Items: Mix Design: Specified Strength:Slump Range: The Work Inspected/Tested X CERTIFICATION # Randy Wimberley, ICC Certified Special Inspector SEE ABOVE DISCREPANCIES Edition Edition Work was Inspected/tested per applicable sections of the AWS ___________ Code Work was Inspected/tested per the applicable sections of Chapter 17 of the CBC __________2019____________ Work was Inspected/tested per applicable sections of Chapter 17A of the CBC ________________________ MET THE REQUIREMENTS OF THE APPROVED DOCUMENTS *DID NOT MEET THE REQUIREMENTS OF THE APPROVED DOCUMENTS,Signature Samples Taken: No Approved Plans For This Work. CalPortland Construction 846RN3140 305879-002 Inspection Date: 2304-006.WSI SPECIAL INSPECTION/STRUCTURAL TESTING REPORT (805) 544-1786 Fax (831) 637-0510 Fax Attn.:Wyatt Banker-Hix, Engineer III Address:919 Palm Street 4/4/2023 Client:City of San Luis Obispo, Public Works ESP File #: San Luis Obispo, CA 93401 Lab Doc. No.: (805) 544-3276 Phone (831) 637-2133 Phone Earth Systems 4378 Old Santa Fe Road San Luis Obispo, CA 93401 Hollister, CA 95023 500 Park Center Drive, Suite 1 48511 Warm Springs Blvd., Suite 210 Project Name:City of San Luis Obispo 2023 Storm Damage N/A Structural Engineer:Smith Structural GroupArchitect: Project Location:533 Broad Street, San Luis Obispo Contractor:Fabricator: Approved Project Plans Case Pacific Type of Inspection/Testing Batch Plant Concrete Shotcrete One Shotcrete Compression Test Panel Total Cubic Yards:4 Cubic Yards 5,000 PSI @28-days 2" to 3" Rebar and shotcrete placement for first lift of lower section of culvert repairs. Additional details below. Material Supplier: Additional Comments Attached. Special Inspection Report [Modified by ESP 11/28/2016]PAGE 1 Print Name/Title PRELIMINARY DAILY REPORT PENDING REVIEW FINAL DAILY REPORT ICC 1033373 2049 Preisker Lane, Suite E Santa Maria, CA 93454 Fremont, CA 94539 (805) 928-2991 Phone (510) 353-3833 Phone (888) 567-4292 Fax Tiebacks Masonry Field Welding Epoxied Rebar Deep Foundation High Strength Bolting Fireproofing Post-Installed Anchors Rebar Shop Welding Approved Docs. - Including Relevant RFI's, Etc.: Work Inspected/Tested: Items Requiring Correction, Corrections of Previously Listed Items: Mix Design: Specified Strength:Slump Range: The Work Inspected/Tested X CERTIFICATION # Special Inspection Report [Modified by ESP 11/28/2016]PAGE 1 Print Name/Title PRELIMINARY DAILY REPORT PENDING REVIEW FINAL DAILY REPORT ICC 1033373 Batch Plant Concrete Shotcrete One Shotcrete Compression Test Panel Total Cubic Yards:9 Cubic Yards 5,000 PSI @28-days 2" to 3" Rebar and shotcrete placement for final lift of culvert repairs. Additional details below. Material Supplier: Additional Comments Attached. Contractor:Case Pacific Fabricator: Approved Project Plans Type of Inspection/Testing Project Name:City of San Luis Obispo 2023 Storm Damage N/A Structural Engineer:Smith Structural GroupArchitect: Project Location:533 Broad Street, San Luis Obispo (805) 544-3276 Phone (831) 637-2133 Phone Earth Systems 4378 Old Santa Fe Road San Luis Obispo, CA 93401 Hollister, CA 95023 500 Park Center Drive, Suite 1 48511 Warm Springs Blvd., Suite 210 305879-002 Inspection Date: 2304-006.WSI SPECIAL INSPECTION/STRUCTURAL TESTING REPORT (805) 544-1786 Fax (831) 637-0510 Fax Attn.:Wyatt Banker-Hix, Engineer III Address:919 Palm Street 4/6/2023 Client:City of San Luis Obispo, Public Works ESP File #: San Luis Obispo, CA 93401 Lab Doc. No.: Samples Taken: No Approved Plans For This Work. CalPortland Construction 846RN3140 Randy Wimberley, ICC Certified Special Inspector SEE ABOVE DISCREPANCIES Edition Edition Work was Inspected/tested per applicable sections of the AWS ___________ Code Work was Inspected/tested per the applicable sections of Chapter 17 of the CBC __________2019____________ Work was Inspected/tested per applicable sections of Chapter 17A of the CBC ________________________ MET THE REQUIREMENTS OF THE APPROVED DOCUMENTS *DID NOT MEET THE REQUIREMENTS OF THE APPROVED DOCUMENTS,Signature Client Lab Doc. #.: Attn:Lab Job #: Address:Report Date: Project Name:Project Address: Date Reported Issue Number 3/3/2023 - Current 1 Unresolved Issue Remarks/Resolution Method Issue Resolved Earth Systems UNRESOLVED ISSUES City of San Luis Obispo 2304-006.WSI Wyatt Banker-Hix, Engineer III 305879-002 Regarding inspection of soil nail drilling,tendon installation and grouting for the new wing wall on the south side of the creek it was noted that there are currently no approved plans for this work.Provide approved plans.No 919 Palm Street April 12, 2023 San Luis Obispo, California 93401-3218 City of San Luis Obispo 2023 Storm Damage 533 Broad Street, San Luis Obispo, California Note: Only unresolved issues and issues that have been resolved within the past two weeks are shown. The numbering sequence reflects all issues for this project.Page 1 of 3