Loading...
HomeMy WebLinkAbout4/16/2024 Item 6c, Tway - Staff Agenda CorrespondenceCity of San Luis Obispo, Council Memorandum City of San Luis Obispo Council Agenda Correspondence DATE: April 16, 2024 TO: Mayor and Council FROM: Timmi Tway, Community Development Director Prepared By: Callie Taylor, Associate Planner VIA: Derek Johnson, City Manager SUBJECT: ITEM 6C – 2024 ANNUAL MONITORING FOR THE SAN LUIS RANCH DEVELOPMENT AGREEMENT, MITIGATION MEASURES, AND PROJECT CONDITIONS The following memorandum provides City staff responses to questions received from a Council member regarding the San Luis Ranch annual monitoring report. Staff determined it would be helpful to provide this memo to all Council Members and the public, as the responses offer clarification regarding the annual review. The questions are below with staff’s response shown in italics. In addition, it has come to City staff’s attention that the agenda links for Item 6c for Attachments A, B, and C (Summary of Compliance with the San Luis Ranch Development Agreement, MMRP, and Project Conditions) are not linking to the correct documents. The correct attachments for the San Luis Ranch Summary of Compliance are provided with this agenda correspondence. 1. With significant numbers of mitigation measures particularly concerning habitat outstanding, what is the timeline for ensuring compliance? If the developer fails to present an annual report in future years, is there a standard procedure for encouraging compliance? Through the annual review completed in recent months, City staff has identified the outstanding compliance items listed in the report. In meetings and correspondence with the developer, City staff has encouraged the developer to address outstanding items to bring the project into compliance, including submittal of the annual habitat monitoring reports and replanting compliance. The City’s next step will be to send an official letter to the developer, identifying items that are out of compliance, a deadline for compliance, and penalties for non-compliance. City staff and the City Attorney will be working on this compliance letter after Council review of the reports on April 16. It should be noted that the City holds several project bonds, including bonds specifically for habitat restoration. If the developer fails to submit the required annual monitoring reports or fails to complete the habitat restoration in compliance with the EIR, DA, and project conditions, the City can pull the bonds and use those funds to complete the work. Item 6c – San Luis Ranch 2024 Annual Monitoring - Agenda Correspondence Memo Page 2 2. The developer is required to provide a bike share program but there is not a mention of their progress on this requirement. Do we know that status of the bike share? A Travel Demand Management Plan (TDMP) was developed for the project in October 2021. The mitigation measure and the TDMP have requirements for both residential and non-residential portions of the project. So far, San Luis Ranch has only implemented the residential trip reduction strategies, which include providing bus passes and $100 gift cards to local bike shops for residents. Development of Lots 7, 8, and 9 (the office, commercial, and hotel sites) will require bike share to be provided, as well as on-site bike lockers, showers, and bicycle repair station. 3. On page 105, there’s mention of the possibility of up to 7 million in grant funding to the city, some of which would go towards subsidizing the moderate rate units in SLR. Did the city receive that funding? If so, how much went to SLR? SLR Development Agreement Operating Memorandum #2 discusses grant funding for which the City was hoping to apply in 2021. Affordable housing grants at that time were possible if the project could provide 15% affordable housing. San Luis Ranch did not reach this percentage of affordable housing, and the City did not receive the grant funds at that time. ATTACHMENTS A – Summary of Compliance with the San Luis Ranch Development Agreement B – Summary of Compliance with the San Luis Ranch MMRP C – Summary of Compliance with the San Luis Ranch Project Conditions San Luis Ranch Summary of Compliance with Development Agreement March 2024 Development Agreement Item DA ID Summary Description Compliance Status 1 1.03.a.1 Agreement terminates on 20th anniversary of annexation date in compliance 2 1.03.a.2 Agreement terminates on 15th anniversary of annexation if backbone infrastructure not in place in compliance 3 1.03.a.3 Agreement terminates once development and conditions are satisfied in compliance 4 1.03.a.4 Agreement terminates if annexation doesn't occur within 5 years of DA "Vesting Date"in compliance 5 1.04 Agreement must be executed 5 days after Ordinance adoption; to County Recorder within 10 days COMPLETED - in compliance 6 5.02.1 Form Community Facilities District (CFD)COMPLETED - in compliance 7 5.04.3 Reimbursement for developer improvements beyond fair share cost ongoing; in compliance 8 5.04.4 Post $300,000 bond to ensure compliance with Section 5.04.4 ongoing; in compliance 9 5.04.5 Prepay $1.5 million for Prado Interchange; early payment toward full mitigation fee; see notes COMPLETED - in compliance 10 7.08 City to use Fee for grant program to replace existing sewer laterals equivalent to 66,000 gpd ongoing; in compliance 11 11.01; 02 Annual evaluation of the MMRP to ensure compliance ongoing; in compliance 12 11.04 Annual evaluation of the DA to ensure compliance ongoing; in compliance 13 11.05 CDD to issue "Finding of Development Agreement Compliance" based on review ongoing; in compliance 14 12.03 Any DA provision out of compliance must be cured within 60 days ongoing; in compliance 15 6.02.3 Land dedications for ROW or infrastructure ongoing; in compliance 16 7.03 Dedicate 2.8 acres of onsite parkland and build park ongoing; park not yet built 17 7.09 Make Recycled Water facility improvements per Figure 7.2 of SLR SP ongoing; in compliance 18 7.10 Make storm drainage improvements per Figure 7.4 of SLR SP ongoing; in compliance 19 7.11 Make floodplain improvements ongoing; in compliance 20 7.13.01 CC&Rs disclosure statement required Completed 21 7.13.07 City to allow building permits and occupancy for up to 24 model homes prior to Final Map ongoing; in compliance 22 7.08 Pay $300,000 Capacity Offset Fee for sewer improvements In compliance 23 7.03 Dedicate offsite parkland or pay up to $3,175,026 as equivalent partially complete; Multifamily fee still need to be paid with per finals 24 7.04 Secure Ag Easement on 30 acres at APN 067-181-010 In compliance 25 7.06 Implement energy saving measures in development ongoing; in compliance; solar to be installed with commercial developments 26 7.07 Implement water saving measures in development ongoing; in compliance 27 7.13.04 Complete Design Review for all major surface public facilities ongoing 28 5.03.2.b Pay all Development Impact Fees (DIF) to City per terms of agreement ongoing; in compliance 29 5.04.4 Pay Early Residential Development Fee ($262/unit) at time of each annual DA review Annually; in compliance 30 5.04.6 Pay remaining Prado Road Mitigation Fee Completed 31 7.12 Make traffic and circulation improvements Ongoing 32 7.05 Provide Affordable Housing or in lieu payment for commerical per Exhibit F of the DA Approved mixed use project not started San Luis Ranch Summary of Compliance with Mitigation Measures March 2024 Mitigation Measures Item MM ID Summary Description Compliance Status 1 AG-3(a)Agricultural Conflict Avoidance Measures.SP in compliance; installation in progress 2 AG-3(c)Buffer Landscaping.To be installed with Ag site development 3 N-5(c)Froom Ranch Way Noise Barrier.TBD subject to field verification 4 REC-1 Parkland In-lieu Fees.Yes; ongoing with individual projects 5 BIO-2(c)Froom Ranch Way Bridge Design to Avoid Riparian Areas.In compliance; annual reporting for 5 years 6 GEO-1 Earthquake and Ground Acceleration Design and Construction Measures.In compliance; verify with permitting 7 GEO-3 Geotechnical Design.In compliance; verify with permitting 8 HWQ-1(a)Stormwater Pollution Prevention Plan.In compliance; ongoing with each project 9 HWQ-1(b)Berms and Basins.In compliance; ongoing with each project 10 HWQ-1(c)Concept Grading Plan and Master Drainage Plan.In compliance; ongoing with each project 11 HWQ-3(a)Stormwater Quality Treatment Controls.In compliance; ongoing with each project 12 HWQ-3(b)Stormwater BMP Maintenance Manual.In compliance; annually with each project 13 HWQ-3(c)Stormwater BMP Semi-Annual Maintenance Report.In compliance; semi-annually per project 14 AQ-2(e)Construction Activity Management Plan.In compliance 15 BIO-2(a)Habitat Mitigation and Monitoring Plan In compliance; annual report required 16 AG-1 Agricultural Conservation.In compliance 17 AQ-2(a)Fugitive Dust Control Measures.In compliance; ongoing with each project 18 AQ-2(b)Standard Control Measures for Construction Equipment.In compliance; ongoing with each project 19 AQ-2(c)Best Available Control Technology (BACT) for Construction Equipment.In compliance; ongoing with each project 20 AQ-3(a)Standard Operational Mitigation Measures.Some aspects TBD; field verification required 21 AQ-3(b)Off-Site Mitigation.Some aspects TBD; field verification required 22 BIO-1(a)Best Management Practices.In compliance; subject to field verification 23 BIO-1(b)Worker Environmental Awareness Program Training.In compliance; subject to field verification 24 BIO-1(c)Western Pond Turtle and Two-Striped Garter Snake Impact Avoidance and Minimization.Annual reporting needed to verify compliance 25 BIO-1(d)California Red-legged Frog, Western spadefoot, and Coast Range Newt Impact Avoidance/Minimization In compliance; subject to field verification 26 BIO-1(e)Steelhead Impact Avoidance and Minimization.In compliance; subject to field verification 27 BIO-1(f)Great Blue Heron and Monarch Butterfly Impact Avoidance and Minimization.Annual reporting needed to verify compliance 28 BIO-1(g)Nesting Birds Impact Avoidance and Minimization.In compliance; subject to field verification 29 BIO-1(h)Roosting Bats Impact Avoidance and Minimization.In compliance; subject to field verification 30 BIO-2(b)Tree Replacement.In compliance; annual reporting for 3 years 31 CR-2(a)Retain a Qualified Principal Investigator.in compliance 32 CR-2(b)Unanticipated Discovery of Archaeological Resources.In compliance; ongoing with each project 33 HAZ-4 Soil Sampling and Remediation In compliance; ongoing with each project 34 HAZ-6 Naturally Occurring Asbestos Exposure Avoidance and Minimization In compliance; ongoing with each project 35 HWQ-4 Conditional Letter of Map Revision/Letter of Map Revision.In compliance 36 N-1(a)Construction Vehicle Travel Route.In compliance; ongoing with each project 37 N-1(b)Construction Activity Timing.In compliance; ongoing with each project 38 N-1(c)Construction Equipment Best Management Practices (BMPs).In compliance; ongoing with each project 39 N-1(d)Neighbor Property Owner Notification and Construction Noise Complaints In compliance; subject to field verification 40 AG-3(b)Agricultural Fencing.Not completed; requirement of ag owner 41 AQ-2(d)Architectural Coating.In compliance; ongoing with each project 42 CR-1(c)Informational Display of Historic Resources.TBD 43 N-5(a)Interior Noise Reduction.Completed 44 T-1(b); T-8(a); T-9(c)Intersection 3: Madonna Road & Dalidio Drive/Prado Road Intersection (construct various)Completed 45 T-1(c) Intersection 5: Madonna & U.S. 101 Southbound Off Ramp (dedicate ROW; pay fair share cost; TDMP)Completed 46 T-1(e); T-8(b)Intersection 9: LOVR and Froom Ranch Way (construct various)Completed 47 T-1(f); T-8(c)Intersection 10: LOVR and Auto Park Way (dedicate ROW; pay fair share cost; TDMP)Completed 48 T-1(g); T-8(g); T-9(l)Intersection 16: S. Higuera and Tank Farm Road (extend RT pocket to 230'; ROW; pay fair share; TDMP)Completed 49 T-1(h)Intersection 21: Prado/Dalidio and Froom Ranch Way (construct roundabout)Completed 50 T-1(i)Intersection 25: Prado/Dalidio and SC Project Driveway (construct roundabout)Completed 51 T-2(a)Intersection 1: Madonna and LOVR (dedicate ROW; pay fair share cost; TDMP)Completed 52 T-2(b); T-9(b)Intersection 2: Madonna and Oceanaire (dedicate ROW; pay fair share cost; TDMP)Completed 53 T-2(c)Intersection 5: Madonna & U.S. 101 Southbound Off Ramp (extend LT to 150')Completed 54 T-2(d)Intersection 6: Madonna & U.S. 101 Northbound Off Ramp (dedicate ROW; pay fair share cost; TDMP)Completed 55 T-2(e)Intersection 7: Madonna and Higuera (dedicate ROW; pay fair share cost; TDMP)Completed 56 T-2(f); T-9(h)Intersection 9: LOVR and Froom Ranch Way (construct various)Completed 57 T-2(g)Intersection 12: LOVR & U.S. 101 Southbound Off Ramp (extend LT to 320')Completed 58 T-2(h)Intersection 13: LOVR & U.S. 101 Northbound Off Ramp (dedicate ROW; pay fair share cost; TDMP)Completed 59 T-2(i)Intersection 14: LOVR & Higuera (extend EB RT lane to 180')Completed 60 T-2(j); T-9(m)Intersection 18: Prado & Higuera (install 2nd NB LT lane; extend WB RT pocket to 400')Completed/in compliance 61 T-3(a)Segments 1-6: Madonna Road--LOVR to Higuera (construct bikeway; Prado ROW; pay fair share cost; TDMP)Partially Complete 62 T-3(b)Segments 7-8: Higuera--Madonna to Prado (Prado ROW; pay fair share cost; TDMP)Complete 63 T-3(c)Segments 13-17: LOVR--Madonna to Higuera (construct bikeway; Prado ROW; pay fair share cost; TDMP)Complete 64 T-3(d)Segments 18-20: Dalidio/Prado--Froom to Higuera (construct Class I bikepaths)Complete 65 T-5 Froom Ranch Way Bridge Construction Complete 66 T-9(d)Intersecton 4: Madonna and El Mercado (see MM T-1(b))Complete 67 T-11(a)NB US 101 Prado Off Ramp (pay fair share, dedicate ROW for overpass and NB ramps; TDMP)Complete 68 T-11(b)NB US 101 North of Prado (pay fair share, dedicate ROW for overpass and NB ramps; TDMP)Complete 69 T-11(c)NB US 101 North of Madonna (pay fair share, dedicate ROW for overpass and NB ramps; TDMP)Complete 70 HWQ-4 Conditional Letter of Map Revision/Letter of Map Revision.Phase 1 complete; Phase 2 pending 71 CR-1(a)Historical Structure Relocation and Reconstruction Plan.Reconstruction in progress. 72 CR-1(b)Archival Documentation of Historic Buildings.Completed; in compliance 73 N-5(b)Residential Outdoor Activity Area Noise Attenuation.In compliance; subject to field verification 74 N-5(d)U.S. Highway 101 Noise Barrier at Hotel.In compliance; subject to field verification 75 GEO-2 Operational Seismic Safety Requirement.In progress 76 N-4(a)HVAC Equipment.TBD 77 N-4(b)Parking Lot/Loading Dock Orientation and Noise Barrier.TBD 78 AQ-1 Encourage Telecommuting.TBD 79 T-1(a)Intersection 1: Madonna and LOVR (optimize signal timing)Ongoing 80 T-1(d)Intersection 8: Higuera and South Street (signal timing)Ongoing 81 T-4 Construction Traffic Management Plan Ongoing 82 T-5 Froom Ranch Way Bridge Construction Complete 83 T-6 Project Site Intersection Roundabout Control Complete 84 T-7 Traffic Calming and/or Reconfiguration of New Neighborhood Streets Complete 85 T-8(d)Intersection 12: LOVR & U.S. 101 Southbound Off Ramp (construct Prado Road overpass)Complete 86 T-8(e)Intersection 13: LOVR & U.S. 101 Northbound Off Ramp (construct Prado Road overpass)Complete 87 T-8(f)Intersection 14: LOVR & S. Higuera (construct Prado Road overpass)Complete 88 T-9(a)Intersection 1: Madonna and LOVR (extend NB RT on LOVR to 295'; SB LT on Madonna to 395')Complete 89 T-9(b)Intersection 2: Madonna and Oceanaire (extend WB RT on Madonna to 200')Complete 90 T-9(e)Intersection 5: Madonna & U.S. 101 Southbound Off Ramp (construct Prado Road overpass)Complete 91 T-9(f)Intersection 6: Madonna & U.S. 101 Northbound Off Ramp (construct Prado Road overpass)Complete 92 T-9(g)Intersection 8: Higuera and South Street (extend NB Higuera LT to 120')Complete 93 T-9(i)Intersection 11: LOVR and Calle Joaquin (construct Prado Road overpass w/ NB and SB ramps)Complete 94 T-9(j)Intersection 12: LOVR & U.S. 101 Southbound Off Ramp (construct Prado overpass w/ NB and SB ramps)Complete 95 T-9(k)Intersection 14: LOVR & S. Higuera (construct Prado Road overpass w/ NB and SB ramps)Complete 96 T-10(a)Segments 1-6: Madonna Road--LOVR to Higuera (construct Prado Road overpass w/ NB and SB ramps)Complete 97 T-10(b)Segments 15-16: LOVR--Calle Joaquin to US 101 NB ramps (construct Prado overpass w/ NB and SB ramps)Complete 98 T-10(c)Segment 24: Prado/Dalidio--project driveway to Froom (construct Prado overpass w/ NB and SB ramps)Complete 99 T-11(a)NB US 101 Prado Off Ramp (pay fair share, dedicate ROW for overpass and NB ramps; TDMP)Complete 100 T-11(b)NB US 101 North of Prado (pay fair share, dedicate ROW for overpass and NB ramps; TDMP)Complete 101 T-11(c)NB US 101 North of Madonna (pay fair share, dedicate ROW for overpass and NB ramps; TDMP)Complete San Luis Ranch Compliance with Development Agreement, Map Conditions, and Mitigation Measures March 2024 Map Conditions Item Condition Summary Description Compliance Status 1 116 Subdivider to hold City harmless and indemnify Completed 2 117 Map conditional on completing annexation Annexation completed 10-18-18 3 1 Second point of access needed for Multi-Family Completed 4 2 Second point of access whenever more than 30 units Completed 5 3 all streets less than 28 feet to be no parking on both sides; less than 36 feet on one side Completed 6 4 minimum fire flow of 1,500 gpm within 300 feet of homes; hydrants spaced within 500 feet Completed 7 22 Include "knuckle" design at San Luis Ranch Road and Haystack Place Completed 8 23 Include Class I bikeway from Harvest Street to commecial area Completed 9 24 Include Class I bikeway from San Luis Ranch Road to commercial area Completed 10 25 Dedicate multiple easements along various roadways Partial complete - pending east leg of roundabout (Embassy Suites and commercial lot) 11 26 Make all efforts to dedicate 25-foot easement along 101 for maintenance Completed 12 28 Parallel parking prohibited on Froom Ranch Way Completed 13 29 Adjust final map and PIPs to include right turn lane on Dogwood approach to Madonna Completed 14 30, 60 Show all easements on Final Map Partial complete - pending east leg of roundabout (Embassy Suites and commercial lot) 15 31 Show all offers of dedication on Final Map Partial complete - pending east leg of roundabout (Embassy Suites and commercial lot) 16 40 show how secondary access will be provided for developments greater than 30 units Completed 17 41 Fire access to be provided for each building Completed 18 42 City streets to conform to City Engineering Standards Completed 19 43 Road alignments to conform to City Engineering Standards Completed 20 44 Include parking restriction signs within tract Partially complete/ongoing 21 45 Include center median landscaping on Dalidio and Froom Ranch Way Completed 22 46 Final street sections to be approved in context of project drainage report Completed 23 47 Roundabouts to be designed per City Engineering standards Partial complete - pending east leg of roundabout (Embassy Suites and commercial lot) 24 52 Access rights shall be offered for dedication along Madonna, Dalidio, and Froom Ranch Way Partial complete - pending east leg of roundabout (Embassy Suites and commercial lot) 25 59 Plans must show all existing structures and proposed improvements Completed 26 60 Map and PIPs must show all easements Partial complete - pending east leg of roundabout (Embassy Suites and commercial lot) 27 65 Porous concrete and pavers must be used consistent with Specific Plan Partial complete - pending development of commercial lots 28 90 Cut and fill slopes to be protected as recommended by soils engineer Completed 29 93 All plans to show compliance with all regulations Ongoing - pending environmental agency final approvals 30 96 Indicate revised floodplain on PIPs and Final Map Complete for Final Map; pending receipt of record drawings for PIPs 31 111 Developer to submit written report verifying compliance with these conditions and mitigation Ongoing 32 114 Record avigation easements on applicable parcels In progress/ongoing 33 49 Include line-of-sight analysis for area intersections Completed 34 50 Subdivision plans to show frontage improvements as needed Completed 35 51 All resource regulatory permits must be acquired before approval of improvement plans Completed 36 56 Prepare analysis of trees to be removed and retained within Tree Preservation Plan Completed /Ongoing - additiona trees to be removed 2/2024 - need replanting plan 37 61 If new street paving is phased, it must be shown in Public Improvement Plans Completed 38 62 Construction phasing plan, truck routes, and staging areas must be shown in PIPs Completed 39 63 Retaining walls and fences to be approved by Planning Division Ongoing pending remaining site/lot development 40 64 PIPs must show mailboxes Completed 41 66 Common areas, linear parkways and paths must be ADA accessible Completed 42 71 Dry utilities infrastructure to be in place approved by Utilities Engineer 43 72 Utilities to comply with engineering design standards approved by Utilities Engineer 44 74 PW and Utilities must approve all water, sewer and utilities layouts approved by Utilities Director and Public Works Director 45 75 Limit and extent of public utilitites to be approved by City Utilities Dept approved by Utilities Director and Public Works Director 46 76 Gas main to be located in joint trench in accordance with PUC unless otherwise approved by City Engineer 47 77 PIPs to show location of all water meters approved by Utilities Director and Public Works Director 48 78 Sewer report needed for design of sewer main for development on Lot 1 and 2 approved by Utilities Director 49 79 Approval of overwhead wiring facilities approved by Utilities Director 50 80 Street widening to require undergrounding of any overhead wires Completed 51 81 Approval of overhead wiring facilities required in SE portion of site Ongoing. Need to coordinate with City, Caltrans, PG&E, and billboard easement grantee 52 82 approval of plan for undergrounding utilities Partial complete pending response to Condition 81 53 83 provide 3 sets of irrigation plans to city Completed 54 86 PIPs to verify how wetland features to be protected Completed / ongoing 55 87 PIPs to verify how non-native plants to be contained Completed / ongoing 56 94 Improvement Plans must include grading, drainage and erosion control plan.Completed 57 97 Indicate various drainage, well and other features on PIPs verified by City Engineer 58 98 provide final HEC-RAS modeling for drainage verified by City Engineer 59 99 final drainage plans must address Cerro San Luis Channel verified by City Engineer 60 100 final drainage plans must address trash removal verified by City Engineer 61 104 Bio-retention plans or stormwater BMPs to be approved as part of PIPs verified by City Engineer 62 105 Detention basin to be designed per Waterways Mgmt Plan Drainage Design Manual Completed 63 109 Obtain and approve SWPPP Completed 64 115 Enter into affordable housing agreement with the City, included in DA Completed--alredy included in DA 65 7 Dedicate land for Prado Interchange; pay fair share fees for interchange per DA Complete - Payment made per DA requirements 11/17/23 66 8a Complete design for Madonna/Dalidio improvements Complete 67 10a Complete design for roundabout at Dalidio/Froom Ranch Way Partially complete; design of 4th roundabout leg to SLO Promenade pending R/W agreement. 68 12a Complete design for bike path on Madonna between El Mercado and 101 SB Complete 69 15 Froom Ranch Way design speed not to exceed 35 MPH Complete 70 16a Complete design for improvements to Froom Ranch Way/LOVR intersection Complete 71 17 Madonna/Dalidio and LOVR/Froom to be "bicycle protected" per NACTO guidelines Complete 72 27 Complete design for in-tract traffic calming improvements Complete 73 32 Dedicate street tree easements Complted with Final Map 74 33 Dedicate offsite easements as necessary Partial complete - pending east leg of roundabout (Embassy Suites and commercial lot) 75 35 Establish encroachment agreement for privately maintained facilities in public ROW Completed with Final Map 76 37a pay park in-lieu fees with recordation of NG-10 and -23 map consistent with DA SFR completed; multifamily being paid with building permit finals 77 38 Make all reasonable efforts to dedicate land for ROW, and show proof of dedication Partial complete - pending east leg of roundabout (Embassy Suites and commercial lot) 78 39 Demonstrate that land has been acquired as appropriate Partial complete - pending east leg of roundabout (Embassy Suites and commercial lot) 79 48 Record Notice of Requirements that project is ineligible for Parking District or Neigh Tr Mgmt Plan Completed with Final Map 80 57 Improvement Plans (including offsite) must be approved prior to Final Map Completed 81 67 No potable water used during construction; recycled water to be used Utilities Dept to confirm, permit and monitor 82 73 Relocate utilties affected by 101 interchange improvements approved by Utilities Director 83 85 Obtain permits from RWQCB, ACOE and CDFW verified by Community Development or Public Works Dept 84 92 Grading and drainage plans required to show site accessibility verified by City Engineer 85 95a Comply with FEMA and City requirements; CLOMR-F approved before construction or fill placement verified by City Engineer and FEMA 86 108 Verify LID compliance of grading and drainage plans verfied by Project Soils Engineer 87 110 Verify compliance with AQ standards from APCD in progress/ongoing 88 118 Complete plan to stockpile and salvage topsoil Natural Resources Manager to approve 89 119 Complete Habitat Mitigation and Monitoring Plan Natural Resources Manager to approve 90 8b Make Madonna/Dalidio intersection improvements (per Table 4.12-1 #2 in SLR EIR)Construction complete. 91 9a Madonna/Oceanaire pedestrian crossing improvements Construction complete. 92 10b Install roundabout at Dalidio/Froom Ranch Way Partially complete; design of 4th roundabout leg to SLO Promenade pending R/W agreement. 93 11 Construct extention of LOVR/SB 101 ramp Construction complete. 94 12b Construct bike path on Madonna between El Mercado and 101 SB Construction complete. 95 13 Construct Froom Ranch Way bridge over Prefumo Creek Construction complete. 96 14 Design and construct Froom Ranch Way from LOVR to end; also Class I path and signal at Oceanaire Construction complete. 97 16b Make improvements to Froom Ranch Way/LOVR intersection Construction complete. 98 19 Pay Citywide fees per Developent Agreement see Development Agreement for details 99 53 Install street lighting along public streets Completed 100 54 Install private lighting based on ARC approval Ongoing pending development of remaining lots 101 55 Install street trees per condition Partially complete; pending direction from administration on street tree installation 102 68 Recycled water pipeline infrastructure to be in place In Progress; resolution in discussion between City and developer 103 69 Water pipeline infrastructure to be in place Completed 104 70 Sewer infrastructure to be in place Completed 105 84 Landscape Plan must be consistent with drought provisions approved by Utilities Director 106 88 Engineering soils testing may be needed on a lot-by-lot basis Completed 107 89 Soils engineer to certify all grading for finl pads prior to building permit issuance Completed pending receipt of record drawing and soils engineer certification 108 91 Easement agreement needed for Cerro San Luis Channel verified by City 109 95b Comply with FEMA/City reqs; LOMR-F submitted to FEMA within 6 months of grading completion verified by City Engineer and FEMA 110 95c Comply with FEMA/City reqs; LOMR-F approved by FEMA prior to accptance of final building pads verified by City Engineer and FEMA 111 101 Developer to prepare O&M manual for creek maintenance/stormwater BMPs verified by City Engineer 112 18 Fund Highway 101 Mainline Monitoring Pending resolution with Caltrans, who has not responded to inquiries from the City 113 113 Provide written disclosure of of airport safety and noise issues to potential occupants Pending verification by Planning 114 36 Notice of requirements related to map conditions to be completed (lots 1, 2 and commercial)Pending verification by Planning & Engineering 115 37b pay park in-lieu fees with recordation of NG-30 map consistent with DA Being paid with final of Building permits/ ongoing 116 9b Install "hawk" pedestrian signal at Dogwood and Madonna Construction complete. 117 112 Complete relocation of historic buildings consistent with MM CR-1 Partial complete pending development of the ag heritage site; building permits issued 118 37c pay park in-lieu fees with recordation of NC map consistent with DA (if housing)Pending development of NC lot(s), to be collected with building permits 119 20 Pay fairshare mitigation costs as specified in the Development Agreement see Development Agreement for details; pending confirmation from Planning 120 21 Access rights to Prado, Madonna and Froom dedicated to City; private access on Dalidio RT in and out Confirmed with Final Map and PIPs. 121 34 Private improvements to be owned and maintained by HOA and/or through CFD No CFD funds for maintenance. See DA and O&M manual for details 122 58 Demolition permit needed for structure removal, or removal of existing infrastructure Completed 123 102 Homeowners to be notified of BMP requirements In progress/ongoing 124 103 Maintenance responsibilities for stormwater infrastructure to be followed by HOA or CFD as applicable verified by City Engineer and Natural Resources Manager as appropriate 125 106 CC&Rs sall allow for subdivided parcels to be included in HOA verified by City Engineer 126 107 Creek stabilization to be approved by City as needed verified by City Engineer