HomeMy WebLinkAboutItem 6i. Authorization to advertise Roadway Sealing 2024 Project (Spec. 2000615) Item 6i Department: Public Works Cost Center: 5006 For Agenda of: 5/21/2024 Placement: Consent Estimated Time: N/A FROM: Matt Horn, Public Works Director Prepared By: Nathan Garcia Nava, Engineer I SUBJECT: AUTHORIZATION TO ADVERTISE ROADWAY SEALING 2024 PROJECT, SPECIFICATION NO. 2000615 RECOMMENDATION 1. Approve the project plans and special provisions for the Roadway Sealing 2024, Specification Number 2000615; and 2. Authorize staff to advertise for bids; and 3. Authorize the City Manager to award the construction contract pursuant to Section 3.24.190 of the Municipal Code for the bid total, if the lowest responsible bid is within the publicly disclosed funding amount of $5,400,000; and 4. Approve the transfer of $5,131,008 from the Streets Reconstruction and Resurfacing account (2001001) to the project account (2000615); and 5. Approve the transfer of $130,000 from the Parking Lots Maintenance account (2000031-08.01) to the project account (2000615); and 6. Approve the transfer of $40,000 from the Parking Lots Maintenance account (2000031-08.04) to the project account (2000615); and 7. Approve the transfer of $50,000 from the Parking Lots Maintenance account (2000031-08.05) to the project account (2000615); and 8. Approve the transfer of $130,775 from the Pedestrian and Bicycle Pathway account (2000032-00) to the project account (2000615); and 9. Approve the transfer of $200,000 from the Active Transportation Plan Implementation account (200608) to the project account (2000615); and 10. Appropriate $1,060,000 in LRM funds pending approval of the 2024 -2025 Supplemental Budget CIP True-up to the project account (2000615); and 11. Authorize the City Engineer to approve Contract Change Orders up to available project budget and up to any amended budget subsequently approved by the City Manager up to $200,000. REPORT -IN-BRIEF Following the City of San Luis Obispo's (City) Pavement Management Plan (PMP), staff recommends advertisement of a slurry sealing project to provide maintenance and striping improvements to the streets shown in Attachment A. Also included in this bid package are maintenance and striping plans for the Johnson Park Parking Lot, Mitchell Park Parking Lot, Damon Garcia Park Parking Lot, and the Railroad Safety Trail along California Blvd. Page 637 of 888 Item 6i Pavement maintenance projects often involve complete removal and replacement of roadway striping and pavement markings, which provides excellent opportunities to incorporate planned safety and complete street improvements as part of these larger roadway maintenance efforts. The Roadway Sealing 2024 project (Project) will implement several street modifications from the recently adopted Active Transportation Plan to improve safety and mobility for all road users. These strategies include design elements intended to improve pedestrian crossing safety, increase separation between bicyclists and motor vehicle traffic, and measures to calm traffic and reduce speeds on certain streets. This Project will be funded in Fiscal Year 2024 -25. Allocated funds per the recommendations of this staff report are estimated to be sufficient for this project. The Project will be advertised during the summer and construction is slated to begin in the early fall POLICY CONTEXT On May 17, 2022, Council approved a Purchasing Policy Update to the Financial Management Manual that required Council approval for Public Projects that cost over $200,000. Implementation of the project aligns directly with several City plans, policies and goals, including the application of various elements identified in the City’s Active Transportation Plan aimed at promoting walking and cycling infrastructure, as well as safety improvements identified in the City’s Traffic Safety Report, such as modifications to the Grand Avenue/Loomis intersection. Additionally, the project contributes to the City's ma jor goals of Climate Action, Open Space, and Sustainable Transportation. The project also supports the ongoing maintenance of City streets as outlined in the Pavement Management Plan, ensuring safe and efficient mobility for residents while reducing the environmental impact of transportation systems. DISCUSSION Background The Roadway Sealing 2024 (Project) is part of the Pavement Management Plan (PMP) that is an ongoing effort to provide ongoing and routine maintenance of City roadways for increased roadway life. The City’s PMP, adopted in 1998, established nine pavement maintenance zones within the City, and a plan in which each of these areas received maintenance on an eight-year rotation. In 2009, City Council approved a modified PMP that provided priority for arterial streets while maintaining the eight-year rotation for maintenance work on local streets. The City implements this rotation by performing maintenance in two neighborhood Pavement Areas in one year, and then focusing on arterial street work in the second year, thereby alternating between neighborhood areas and arterials biennially to maintain the current 143 miles of roadways in the City. Page 638 of 888 Item 6i Roadway Sealing 2024 The Project will focus on sealing local streets in pavement management areas 8 an d 1. Apart from those pavement areas, the Project also includes pavement maintenance and striping on Johnson Avenue, Broad Street, and several parking lots, including the Damon Garcia Parking lot, Johnson Park Parking lot, and Mitchell Park Parking lot. The Project is structured with a Base Bid and one Additive Alternative A to maximize the scope of work within available funding. The Project’s base bid includes street sealing in Area 8 and 1, Johnson Avenue improvements and the sealing of the three parking lots included in the Project. The Project’s Additive Alternative A includes work on Grand Avenue , as described further below. The strategy is to award the contract with the Base Bid and Additive Alternative A as funding will allow, up to the Publicly Disclosed Funding amount of $5,400,000 in compliance with Public Contract Code Section 20103.8(c). If the lowest responsive total bid is in excess of the Publicly Disclosed Funding Amount but the base bid is within the funding amount, then the base bid will be recommended for award without the additive alternative. If the total bid is in excess of the Publicly Disclosed Funding Amount, another option would be to return to Council to award both the Base Bid and Bid Alternative with an additional funding request. Active Transportation Elements In developing the Project plans (Attachment B) and special provisions (Attachment C), staff identified several improvements recommended in the City’s Active Transportation Plan (ATP) and Traffic Safety Report (TSR) that could be included in the Project, as funding resources allow. These active transportation and safety improvements are discussed in further detail below.  Grand Avenue Complete street improvements are proposed for Grand Avenue to improve active transportation facilities and safety for all road users as a pilot program that will be made permanent at a future time. These improvements are part of a Tier 2 1project identified in the ATP. The most prominent modification proposed for Grand Avenue is a five -lane to three-lane road diet between Monterey Street and just south of Slack Street. A road diet, which includes the narrowing or removal of auto lanes along a roadway where excess width or capacity exists, is a U.S. Department of Transportation proven safety countermeasure and consistently demonstrates effectiveness in reducing illegal speeding, crash frequency, and crash severity. The City has implemented several successful road diets on other streets, such as South Street and Laurel Lane, where traffic demand did not require the excess lane capacity that was previously provided. Similar to what was implemented on Johnson Avenue in 2023, improvements will be installed on Grand Avenue as a quick-build pilot project, with paint striping and temporary materials only (i.e., flex posts, rubber bumps, and traffic paint). No permanent thermoplastic striping, slurry seal, or concrete work are included. 1 A tier Two Project is identified as a Page 639 of 888 Item 6i In addition to the road diet, other active transportation and safety elements proposed for Grand Avenue include: 1. Installation of protected bike lanes where on-street parking does not currently exist using quick-build materials, such as flex posts and Zicla Zebras (rubber lane separators). This is generally limited to southbound Grand between Slack Street and US 101 where no on-street parking exists. 2. Addition of striped buffers on both sides of bike lanes where on -street parking exists. 3. Installation of bike lane crossing enhancements at intersections, including green conflict markings, additional warning signage, and setback corners where feasible. 4. Restriction of turning maneuvers (westbound through and left -turn) at the Grand Avenue/Loomis Street intersection to address ongoing broadside collision trends identified in the Traffic Safety Report. 5. Installation of an enhanced pedestrian/bicycle crossing at McCollum Street with high-visibility crosswalks and Rectangular Rapid Flashing Beacons (RRFBs) to improve crossing opportunities and access to existing SLO Transit stops. Figure 1 below shows the proposed cross-section of Grand Avenue between Slack Street & the US 101 Ramps, facing northbound. Figure 1: Grand Avenue Cross Section between Slack Street & US 101 Ramps Initial plans for Grand included (a) extending the road diet on southbound Grand Avenue through the Slack Street intersection, reducing the number of southbound through lanes exiting the Cal Poly Campus from two to one; (b) installing concrete curb-protected protected bicycle lanes where on-street parking does not currently exist and concrete median islands at several intersections; and (c) installing a slurry seal and thermoplastic striping on Grand Avenue. Page 640 of 888 Item 6i During project development, the City received comments from Cal Poly expressing concerns about access to and from campus during special events. Traffic analysis prepared for Cal Poly’s campus wide circulation study indicated that a roundabout or new signal installation is required to alleviate congestion with the initial plans. However, these major intersection improvements are outside the scope of the Pavement Management Plan. Through collaboration with Cal Poly and review of the traffic analysis , the project design was refined slightly to retain two southbound lanes exiting Cal Poly, which quickly narrow to one lane south of Slack Street. The configuration of the northbound lanes remains as originally proposed, which includes one travel lane, which widens to two travel lanes just south of the Slack Street intersection to retain capacity entering the Cal Poly campus. Further, the improvements will be implemented as a pilot project temporary quick -build materials only. This approach will advance safety improvements in the short -term while providing additional opportunity to monitor effectiveness, refine design details, and explore sufficient funding to complete the ultimate improvements in a more permanent way in the future. At the earliest, permanent improvements on Grand Avenue could be included as part of the 2026 or 2027 pavement management projects, if funded by subsequent Financial Plans. While the ATP ultimately plans for protected bicycle lanes on both sides of Grand Avenue, this would require removing all on-street parking to provide adequate lines-of-sight at intersections/driveways and to maintain width needed for fire access. Full removal of on - street parking would require significant public outreach, consideration for commercial deliveries/loading, and analysis of potential parking spillover.  Johnson Avenue Repaving Johnson Avenue between San Luis Drive and Laurel Lane was initially part of the 2023 Arterials Paving project. However, this segment was deferred (a) due to a conflicting utility project north of Bishop Street, and (b) to allow more time to monitor the effectiveness of the Johnson Avenue Road Diet Pilot Project installed summer 2023 between Bishop Street and Laurel Lane. Johnson Avenue north of Bishop Street remains deferred for pavement maintenance until the planned utility proj ect is complete. Johnson Avenue between Bishop Street and Orcutt Road is now proposed for resealing as part of this year’s pavement project. The Johnson Avenue Road Diet Pilot Project included reducing the number of lanes from two in each direction (four total) to one in each direction plus a new center turn lane (three total lanes). The Pilot Project identified goals of (a) reducing driving speeds, and (b) increasing comfort and safety for all travelers. After installing the Pilot Project in 2023, prevailing speeds have decreased from 43 miles per hour (mph) to 37 mph, and less than 1% of vehicles are traveling 10 mph or more above the 35 mph speed limit (93% reduction with road diet). Two traffic collisions (one with minor injuries) were reported within t he road diet limits in the four months since installation, compared to 13 collisions in the previous five years (6 injuries; 3 severe injuries). Following a successful pilot installation, the road diet between Bishop Street and Laurel Lane is proposed to b e made permanent with thermoplastic pavement markings. Page 641 of 888 Item 6i In addition to a permanent road diet, additional active transportation elements proposed for Johnson Avenue include: 1. Installation of a permanent concrete median refuge at the Sydney Street school crossing on both sides across the Johnson intersection. 2. Installation of traffic calming measures to reduce turning speeds, shorten pedestrian crossing exposure, and improve pedestrian visibility.  Project Limits – All Streets All streets within the Roadway Sealing 2024 project limits will incorporate elements such as the addition of high visibility “ladder style” crosswalks at all existing and proposed new marked pedestrian crosswalks, and crosswalk daylighting at as many intersections as practicable, particularly at intersections near schools, along arterial and collector streets, and areas with high pedestrian activity.  Pavement Area 1 (East City Neighborhoods) The project will include several features identified in the ATP within Pavement Area 1: 1. Toro Street Neighborhood Greenway (ATP Tier 2 Project): Greenway pavement legends, guide signage, and traffic calming measures will be installed along Toro Street between Phillips Lane and Pacific Street to encourage a low- stress, comfortable environment for those walking and biking. The existing enhanced crossing at Toro Street/Marsh Street will be modified to allow bicyclists to activate the Rectangular Rapid Flashing Beacon (RRFB) system without the need to dismount. A quick-build traffic circle will also be constructed at Toro Street/Mill Street to promote slow vehicular speeds. 2. Mill Street Neighborhood Greenway (ATP Tier 3 Project): Greenway pavement legends, guide signage, and speed cushions will be installed along Mill Street between Pepper Street and Grand Avenue to encourage a low-stress, comfortable environment for those walking and biking. A second portion of the Mill Street Neighborhood Greenway between Chorro Street and Pepper Street is identified in the ATP as a Tier 1 Project. This section was originally included in the Project but was deferred due to a conflicting sewer line replacement project planned for 2025. The ATP identifies installing an on-street, two-way protected bikeway on the east side of Pepper Street parallel to the railroad tracks between Mill Street and Marsh Street as a Tier 1 project. The ATP identifies a goal to complete all Tier 1 projects by 2030 because these projects are most likely to encourage walking and biking. However, staff recommends deferring this project on Pepper Street from the Roadway Sealing 2024 project because (a) streetlighting is limited and should be improved before or along with the two-way bikeway; and (b) the segment between Mill and Palm Streets is narrower than the rest of the route, requiring either roadway widening or parking removal on both sides of the street to provide a two-way bikeway. Page 642 of 888 Item 6i Public input during and after the January 2024 Community Meeting revealed a desire for traffic calming in the neighborhood north of San Luis Obispo High School, generally including San Luis Drive, Andrews Street, Cazadero Street, and Corralitos Avenue. While there was insufficient time and resources to conduct the necessary focused outreach and planning for more substantive traffic calming measures in this neighborhood, such as traffic circles or speed humps, the plans include several measures requested by community members, such as addition of stop signs (where warranted), striped corner extensions (“bulbouts”) to slow speeds and reduce pedestrian crossing distances, and high-visibility bike route markings.  Pavement Area 7 (Northwest of Downtown) Resurfacing sections of Broad Street, Chorro Street, and Murray Avenue was initially part of the 2022 Roadway Sealing project. However, these facilities were deferred due to conflicts with construction of a new sewer main and the North Chorro Neighborhood Greenway. The Roadway Sealing 2024 project includes installing a new northbound bicycle lane on Chorro Street between Mission Street and Meinecke Avenue. The ATP identifies this as a Tier 2 project.  Pavement Area 8 (University Neighborhoods) The ATP has identified one project within Pavement Area 8 that will be implemented as part of the Roadway Sealing 2024 project. Along Highland Drive, the project will install an eastbound bike lane on a short stretch just west of Ferrini Road where the roadway climbs a steep grade. The ATP identifies this as a Tier 2 project. Neighborhood Traffic Management Requests Various Neighborhood Traffic Management (NTM) requests have been received from residents for streets included in the Project at the following locations: 1. Highland Drive between Patricia Drive and Santa Rosa Street 2. Patricia Drive between Twin Ridge Drive and Highland Drive 3. Jeffrey Drive between Highland Drive and Westmont Avenue 4. Rancho Drive between Westmont Avenue and Rancho Drive cul-de-sac 5. Westmont Avenue between Patricia Drive and Jeffrey Drive 6. Broad Street between Mission and Lincoln Streets City staff collected speed and traffic volume data on these neighborhood streets to evaluate if traffic calming measures are warranted based the Circulation Element’s adopted volume/speed thresholds. For Highland Drive, Patricia Drive, Jeffery Drive, Westmont Avenue, and Broad Street that met volume/speed thresholds2, staff mailed out ballots to adjacent properties to inform residents and gauge support for proposed measures. Typical elements included with NTM projects include speed humps, speed 2 Volume/speed thresholds are set based on street classification as identified in the City's Circulation Element. For Local Residential Streets, traffic calming is warranted when daily traffic volume over 1,800 vehicles and/or prevailing speed is more than 27.5 miles per hour. For Residential Collectors, traffic calming is warranted when daily traffic volume is over 3,600 vehicles and/or prevailing speed is more than 27.5 miles per hour. Based on 2024 traffic data, all streets except Rancho Drive met traffic calming warrants based on prevailing speeds. Rancho Drive had neither excessive prevailing speeds or excessive traffic volumes and was removed from the NTM queue. Page 643 of 888 Item 6i tables, traffic circles, and traffic diverters. Staff did not receive a sufficient number of responses or clear majority support from neighboring residents/property owners to justify installation of traffic calming elements as part of the paving project at this time. The current NTM Guidelines require a response rate of 51% and support rate of 67% to proceed with traffic calming and staff was unable to meet those requirements. All streets with NTM requests where adopted volume/speed thresholds were met (i.e . all streets but Rancho Drive) will remain in the NTM queue for further consideration and community input at a future date. The City is currently able to address one to two NTM requests per year and has a queue of approximately 15 requests. Table 1 below shows the speed and traffic volume data collected along with the results of the NTM ballots. Table 1: Neighborhood Traffic Management Data & Ballot Results Street 85th Percentile Speed* (MPH) Traffic Volume* (vehicles) Ballots Sent Ballots Received Ballots in Favor of NTM Highland Drive 32 N/A 236 9 5 Patricia Drive 30 N/A 116 9 4 Jeffrey Drive 30 938 41 2 1 Rancho Drive 26 370 Does not meet warrants for traffic calming Westmont Avenue 29 522 68 11 6 Broad Street 31 N/A 97 8 5 *Note: Underlined values meet adopted thresholds, and italicized values do not meet adopted thresholds. Previous Council or Advisory Body Action In June 2023 City Council adopted the 2023-25 Financial plan that included the approval of the project along with allocating funds during the 2024-25 Fiscal Year. The project was presented to the City’s Active Transportation Committee (ATC) three times during project development: in fall 2023 to provide input on preliminary scope of improvements; in February 2024 to review 90% design drawings; and again in April 2024 to provide final input on Grand Avenue designs. The ATC provided helpful input to guide design refinements, with the following primary themes:  Explore opportunities to improve pedestrian/bicycle crossing comfort and safety at the Johnson/Southwood intersection.  Retain a full road diet (one lane in each direction) on Grand Avenue between Slack and Monterey Streets and continue to coordinate with SLO Fire to explore opportunities for further street narrowing as feasible to further encourage safe speeds. Page 644 of 888 Item 6i  Explore opportunities for centerline hardening (placing flexible objects along side-street centerlines) to encourage safer auto left-turning speeds.  Increase daylighting (restricting parking and adding flex posts) at intersection approaches to improve sight lines for pedestrians and bicycles.  Increase protected bike lane widths where possible to allow for safe passing and side-by-side riding. Ultimately, staff was able to incorporate many of these suggestions into the final plans. The remaining substantive recommendations from the ATC that are not reflected in the final plans are:  The plans for Grand Avenue retain 20’ clear width between fixed objects along the full corridor, as requested by SLO Fire for efficient emergency response. Staff will continue to discuss with SLO Fire to explore opportunities to test “pinch points” along the route, where additional mountable features could be placed within the 20’ clear area to further narrow the roadway and reduce vehicle speeds.  The ATC recommended retaining one southbound lane on Grand exiting the Cal Poly campus, suggesting that Cal Poly invest in more substantial temporary traffic control strategies to manage egress traffic during their regular special events. Cal Poly expressed significant concern regarding this recommendation, as this would cause the intersection to fail operationally for the 4 0-50 regular special events scheduled throughout the year. The final plans retain two lanes exiting the campus, which quickly narrow to one lane south of Slack Street, but have added a wide protected bike lane exiting campus to reduce pedestrian crossing exposure and slow turning speeds. Public Engagement In addition to the multiple presentations to the ATC, public engagement was conducted through a community workshop at the City/County Library Community Room on January 11, 2024, and through a project website, which provided information on the project and community input opportunities throughout project development. CONCURRENCE This project has been reviewed and has concurrence from the Public Works Department, the Fire Department, and the Community Development Department. ENVIRONMENTAL REVIEW The Project qualifies for an Exemption to the California Environmental Quality Act pursuant to State CEQA Guidelines Sections 15301(Existing Facilities) because the Project consists of the repair and maintenance of existing roadways, and minimally disruptive surface improvements within an existing built urban environment (pavement markings sign posts, etc.). A Notice of Exemption will be filed through the Community Development Department upon Council approval of the project. Page 645 of 888 Item 6i FISCAL IMPACT Budgeted: Yes Budget Year: 2024-25 Funding Identified: Yes Fiscal Analysis: Funding Sources Total Budget Available Current Funding Request Remaining Balance Annual Ongoing Cost General Fund $3,908,000 $3,908,000 $0 N/A State $0 $0 $0 N/A Federal $0 $0 $0 N/A Fees $0 $0 $0 N/A Other: SB1 Fund: $1,092,000 $1,092,000 $0 N/A Capital Outlay Fund LRM – Damon Garcia (2000031- 08.01) $130,000 $130,000 $0 N/A Capital Outlay Fund LRM – Mitchell Park (2000031-08.04) $45,000 $45,000 $0 N/A Capital Outlay Fund LRM – Johnson Park (2000031- 08.05) $50,000 $50,000 $0 N/A Capital Outlay Fund LRM – Roadway Safety Trail (2000032) $130,755 $130,755 $0 N/A Capital Outlay Fund LRM – Active Transportation Plan (2000608-03) $200,000 $200,000 $0 N/A Supplemental Budget Allocation*: Capital Outlay Fund LRM $0 $1,060,000 $0 N/A Total $ 5,550,775 $1,060,000 $0 N/A *FY 24-25 Supplemental Budget has yet to be approved. Project funding pending budget approval. See fiscal impact section. Page 646 of 888 Item 6i Roadway Sealing 2024 (2000615) Active Transportatio n Plan Implementatio n (2000608- 03) Parking Lot Maintenance (2000031- 08.01) Damon Parking Lot Maintenance (2000031- 08.04) Mitchell Parking Lot Maintenance (2000031- 08.05) Johnson Railroad Saftey Trail (2000032) Capital Outlay Fund - LRM/SB1 Capital Outlay Fund - LRM Capital Outlay Fund - LRM Capital Outlay Fund - LRM Capital Outlay Fund - LRM Capital Outlay Fund - LRM Base Bid $4,741,000 $200,000 $86,000 $17,000 $23,000 $33,000 $5,100,000 Additive Alternative A $300,000 $0 $0 $0 $0 $0 $300,000 Contingency (17%)$873,000 $0 $14,000 $3,000 $4,000 $6,000 $900,000 Total Construction Estimate $5,914,000 $200,000 $100,000 $20,000 $27,000 $39,000 $6,300,000 Construction Management:$160,225 $0 $30,000 $25,000 $23,000 $91,775 $330,000 Communication Consultant $87,411 $0 $0 $0 $0 $0 $87,411 Material Testing $27,500 $0 $0 $0 $0 $0 $27,500 Printing Plans $500 $0 $0 $0 $0 $0 $500 Total Project Cost $6,191,008 $200,000 $130,000 $45,000 $50,000 $130,775 $6,746,783 Total Available Account Balance $0 $0 $0 $10,000 $0 $130,775 $140,775 Allocated Funding FY 24- 25: $5,131,008 $200,000 $130,000 $35,000 $50,000 $0 $5,546,008 Additional Supplemental Budget Request $1,060,000 $0 $0 $0 $0 $0 $1,060,000 Total Project Balance $6,191,008 $200,000 $130,000 $45,000 $50,000 $130,775 $6,746,783 Post Project Balance $0 $0 $0 $0 $0 $0 ---- Fiscal Impact Summary Roadway Sealing 2024 Specification No. 2000615 Project Total Costs The Project will be awarded after July 1, 2024, when the funding allocation shown in the 2023-25 Financial Plan will be available to support the construction cost. The pr oject is expected to receive $5,131,008 from the Street Reconstruction & Resurfacing project account (2001001-03). The $5,131,008 is split between two funding sources: Local Revenue Measure funding will provide $3,908,000 and SB1 will provide the remaining $1,223,008. Staff created a new project account for tracking and accounting purpose s which will incorporate all elements of the project funding. The Project has multiple funding sources in various project accounts that would lead to having to pull funds from various accounts. Creating a new project account allows for the opportunity to transfer all the funding to a Page 647 of 888 Item 6i single account. The new Project account is 2000615 and the funding allocated from the Street Reconstruction & Resurfacing account (2001001 -03) will be transferred to the project account (2000615). In addition to the funds expected from the Streets Reconstruction & Resurfacing account, there is also an additional allocation on July 1, 2024 of $200,000 to the Active Transportation Plan account (2000608-03) for elements from the ATP that have been included in the Project. Staff is recommending transferring the $200,000 to the project account. Staff is recommending transferring funding from the Parking Lot Maintenance Account (2000031) to cover the cost of improvements made to the various parking lots included in the Project. The Damon Garcia Parking Lot project account (2000031 -08.01) will be allocated $130,000 on July 1, 2024. The Mitchell Park Parking Lot improvements project account (2000031-8.04) has a current balance of $10,000 and will be allocated $35,000 on July 1, 2024. The Johnson Park Parking Lot project account (2000031 -08.05) will be allocated $50,000 on July 1, 2024. Staff is recommending transferring all available budget out of these three tasks to support the Roadway Sealing 2024 project budget. The cost for improvements made to the section of the Railroad Safety Trail included in the Project will be covered by the Pedestrian and Bicycle Pathway project account (2000032). Staff is recommending the current account balance of $130,755 be transferred to the Project account (2000615) for construction. Upon allocation of the 2024-25 fiscal year budget, the Project will have an available balance of $5,550,775 from all funding sources to expend on construction. The estimated total project cost is $6,610,775. Therefore, an additional $1,060,000 is required to fund the total project cost. Staff is currently in the process of finalizing the 2024 -2025 Supplemental Budget, which is scheduled for presentation to City Council on June 4th, 2024. A preview of the recommendations included in the Supplemental Budget was presented to Council on May 7th. One of the recommendations is to allocate additional funding to the Roadway Sealing 2024 project as part of the Capital Improvement Program (CIP) True-up process. This process considers projects with urgent funding requirements due to cost escalations and proposes allocating funding from projects not slated for construction before July 2025. By following this approach, staff can ensure that projects like the Roadway Sealing 2024 project receive sufficient funding for construction without tying up funds in accounts that will not be utilized during the current financial plan. Staff is proposing an additional allocation of $1,060,000 from Local Revenue Measure funds to support both the base bid and bid alternative for Grand Avenue, contingent upon favorable bid outcomes. Should Council approve this recommendation, these additional funds would be available to the Project on July 1, 2024. Page 648 of 888 Item 6i If Council does not approve the recommendation to allocate $1,060,000 in LRM funds to the project during the Supplemental Budget at the June 4th Council Meeting, it will necessitate a re-evaluation of the project's funding strategy. Alternatively, staff could refrain from awarding the bid alternative and only proceeding with the base bid if bids fall within the project budget. However, if bids do not align with the budget or if deemed necessary, the second option would be to reject all bids and seek an alternative funding source. This would require staff to return to Council for further direction and guidance on how to proceed effectively with the project. ALTERNATIVES 1. Deny the approval to advertise the project. City Council could choose to deny the authorization to advertise this project. Staff does not recommend this alternative as the Project is part of the City Pavement Management Plan and maintenance needs to be completed on the City streets identified in the Project. 2. Award the Base Bid and proceed without awarding the Bid Alternate. City Council could choose to award the Base bid if it falls within project budget and procced without awarding the Bid alternate. Staff does not recommend this option as the Bid altern ative contains ATP elements that have been reviewed and discussed with the public for approval. ATTACHMENTS A - 2000615 Roadway Sealing 2024 Vicinity Map B - 2000615 Roadway Sealing 2024 Plans C - 2000615 Roadway Sealing 2024 Special Provision Page 649 of 888 Page 650 of 888 PUBLIC WORKS DEPARTMENT 919 Palm Street, San Luis Obispo, CA 93401 Roadway Sealing 2024 Location Map N Page 651 of 888 Page 652 of 888 Reference Documents: City Standard Specifications - August 2020 Edition City Engineering Standards - August 2020 Edition CalTrans Standard Plans and Specifications - 2015 Edition index to plans sheet no.description san luis obispo county, california ROADWAY SEALING 2024 APPROVED BY SPECIFICATION NO.DATE SHEET Brian A. Nelson, City Engineer R.C.E. C79870 Approved Date 0$<2000615 T1of G: \ P r o j e c t s \ A c t i v e P r o j e c t s \ S t r e e t I m p r o v e m e n t s \ 2 0 0 0 6 0 8 - R o a d w a y S e a l i n g 2 0 2 4 \ 4 5 0 D e s i g n W o r k i n g D o c u m e n t s \ 4 5 4 C A D \ 4 5 4 . 2 D r a w i n gs 0 1000 2000 N T1 COVER PAGE T2 LEGEND AND NOTES D1-2 DETAILS S01 PATRICIA S02 JEFFREY, DARTMOUTH S03 CASA S04 MURRAY S05 MONTALBAN, LEMON S06 OLIVE S07 FOOTHILL S08 FOOTHILL, CRANDALL, CARPENTER S09 HATHWAY S10 HATHWAY, LONGVIEW S11 SLACK S12 SLACK, HATHWAY S13 HATHWAY, STAFFORD, TAFT S14 BOND, FREDERICKS S15 FREDERICKS, KENTUCKY S16 FREDERICKS, HOPE S17 HAYS, McCOLLUM S18 HOPE, LOOMIS S19 LOOMIS S20 LOOMIS, BUENA VISTA AREA 8 S21 ABBOT, WILSON S22 GARFIELD S23 GROVE, PHILLIPS S24 WALNUT, TORO S25 PEACH S26 PEACH S27 PALM S28 PALM S29 ANDREWS, SAN LUIS S30 SAN LUIS DRIVE, ANDREWS S31 SAN LUIS DRIVE, ANDREWS S32 PEPPER S33 TORO, PACIFIC S34 PEEPER, PALM S35 TORO S36 TORO, PACIFIC, PISMO S37 PISMO, BUCHON S38 BUCHON, TORO S39 ISLAY, LEFF S40 LIZZIE S41 IRIS, WOODLAND S42 ELLA, FIXLINI AREA 1 S43-45 HIGHLAND S46 CHORRO S47 MURRAY S48-49 BROAD S50-51 MILL S52-57 JOHNSON S58 RAILROAD SAFETY TRAIL S59 MITCHELL PARK PARKING LOT S60 JOHNSON PARK PARKING LOT S61 DAMON GARCIA PARKING LOT OTHER LOCATIONS C I V I L BR IA N A . NEL S O N No. C 79870 ADDITIVE ALTERNATE A S62-69 GRAND - SLACK TO MONTEREY Page 653 of 888 1. ALL WORK SHALL BE PERFORMED IN CONFORMANCE WITH THESE PLANS, SPECIAL PROVISIONS PREPARED FOR THIS PROJECT AND THE 2020 CITY OF SAN LUIS OBISPO STANDARD SPECIFICATIONS AND ENGINEERING STANDARDS, IN CONJUNCTION WITH THE STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS AND STANDARD PLANS, 2015 EDITION (UNREVISED). 2. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR OR PERMITTEE TO CONTACT "UNDERGROUND SERVICE ALERT OF NORTHERN/CENTRAL CALIFORNIA" BY PHONE AT 8-1-1 FORTY-EIGHT (48) HOURS PRIOR TO START OF CONSTRUCTION FOR LOCATION OF POWER, TELEPHONE, OIL AND NATURAL GAS UNDERGROUND FACILITIES. CONTRACTOR OR PERMITTEE SHALL ALSO CONTACT THE APPROPRIATE AGENCY FOR THE LOCATION OF CABLE T.V., WATER, SEWER, DRAINAGE OR UNDERGROUND FACILITIES. 3. THE CONTRACTOR SHALL POSSESS A CLASS "A" OR "C12" LICENSE AT THE TIME THE BIDS OPEN AND DURING THE ENTIRE LENGTH OF THE CONTRACT. 4. THESE PLANS DO NOT INDICATE ALL EXISTING FACILITIES IN THE VICINITY OF THE PROPOSED WORK SUCH AS EXISTING IRRIGATION HEADS AND LINES, SHRUBBERY AND VEGETATION, ETC. THE CONTRACTOR MUST USE CARE TO AVOID DAMAGE TO ANY EXISTING IMPROVEMENTS OR VEGETATION IN THE VICINITY OF THE WORK, AND MUST REPAIR ANY FACILITIES DAMAGE DURING CONSTRUCTION TO THE SATISFACTION OF THE ENGINEER. 5. WHERE TRIMMING OF EXISTING VEGETATION IS REQUIRED DURING CONSTRUCTION IT MUST BE DONE IN A MANNER TO REMOVE THE MINIMUM POSSIBLE AMOUNT OF VEGETATION AND LEAVE THE REMAINING IN AN ATTRACTIVE CONDITION. CONTRACTOR MUST COORDINATE WITH CITY ARBORIST PRIOR TO TRIMMING OF ANY VEGETATION. 6. THESE PLANS DO NOT INDICATE ALL OVERHEAD LINES. CONTRACTOR SHALL TAKE CARE DURING CONSTRUCTION TO AVOID CONTACT WITH OR DAMAGE TO EXISTING OVERHEAD LINES. 7. ANY EXISTING UTILITIES AND IMPROVEMENTS THAT BECOME DAMAGED DURING CONSTRUCTION SHALL BE COMPLETELY RESTORED TO THE SATISFACTION OF THE ENGINEER AT THE CONTRACTOR'S SOLE EXPENSE. 8. CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES AND AGENCIES WITH SERVICES IN THE AREA PRIOR TO COMMENCING CONSTRUCTION ACTIVITIES AND COORDINATE WITH THE UTILITY COMPANIES AFFECTED BY CONSTRUCTION. 9. PRIOR TO THE START OF CONSTRUCTION, THE CONTRACTOR'S LICENSED LAND SURVEYOR SHALL FILE A CORNER RECORD IN THE OFFICE OF THE SAN LUIS OBISPO COUNTY SURVEYOR FOR EACH EXISTING MONUMENT WITHIN THE PROJECT AREA THAT HAS THE POTENTIAL TO BE DISTURBED. PROTECT BENCHMARKS AND PROPERTY CORNERS IN PLACE PER CITY STD SECTION 5-1.26. 10. PROTECT SURVEY MONUMENTS IN PLACE DURING CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH THE REPLACEMENT OF DAMAGED OR DISPLACED SURVEY MONUMENTS AND SHALL NOTIFY THE CITY FIVE (5) WORKING DAYS PRIOR TO RESTORING MONUMENTS. MONUMENTS SHALL BE RESET BY A CALIFORNIA LICENSED LAND SURVEYOR AND SHALL INCLUDE PREPARING AND FILING A CORNER RECORD WITH SAN LUIS OBISPO COUNTY. 11. UNLESS OTHERWISE SHOWN HEREIN, ALL STRIPING AND MARKINGS SHALL BE PER CALTRANS REVISED STANDARD PLANS 2015 - A20A, A20B, A20C, A20D, A24A, A24B, A24C, A24D, AND A24E. ANY STRIPING NOT MARKED FOR REMOVAL SHALL BE PROTECTED IN PLACE. SEE SPECIAL PROVISIONS SECTION 84. 12. GREEN BIKE LANE MARKINGS SHALL BE SEALMASTER SAFE RIDE OR CITY APPROVED EQUIVALENT PER SECTION 84-6.01. INSTALLATION ON AC AND/OR CONCRETE SURFACE SHALL BE PER MANUFACTURER'S SPECIFICATIONS. 13. CROSSWALKS SHALL BE 10' WIDE UNLESS OTHERWISE NOTED. 14. THERMOPLASTIC STRIPING PLACE ON CONCRETE REQUIRES A PRIMER COAST PRIOR TO APPLICATION. 15. FLEX POST MUST BE PEXCO CITY POST MODEL EAC OR APPROVED EQUAL. FLEX POST SPECIFICATIONS SHALL BE APPROVED BY ENGINEER PRIOR TO PROCUREMENT. 16. RECTANGULAR RAPID FLASHING BEACONS (RRFB) EQUIPMENT SUBMITTALS SHALL BE APPROVED BY THE ENGINEER PRIOR TO PROCUREMENT 17. HYDRANT MARKERS MUST BE INSTALLED PER STD. 7920. DO NOT INSTALL IN BIKE LANES general notes:legend: FIRE HYDRANT HYDRANT MARKER DRIVEWAY SIGN POST RRFB SYSTEM STORM DRAIN PIPE GAS LINE SLURRY SEAL PROTECT IN PLACE UTILITY COVERS STORM or SEWER MANHOLE (PER 6040) WATER VALVE (PER 6040) MONUMENT (PER 9020) TRAFFIC BOX COMMUNICATIONS (PER 9030) GAS COVER TREE PROTECTION 1. PROTECT TREE BRANCHES, TRUNK, ROOTS AND FOLIAGE THROUGH PROPER TRIMMING AND CONSTRUCTION TECHNIQUES WHENEVER POSSIBLE PER CITY STANDARD SECTION 20. CONTRACTOR TO HIRE CERTIFIED ARBORIST FOR TREE TRIMMING TO ALLOW NECESSARY EQUIPMENT CLEARANCE AT NO ADDITIONAL COST TO THE CITY. NOTIFY THE ENGINEER 48 HRS IN ADVANCE OF THE WORK. 2. WHERE TREES CANNOT BE TRIMMED TO AVOID CONFLICT WITH CONSTRUCTION EQUIPMENT, THE FOLLOWING TECHNIQUES MAY BE UTILIZED TO MINIMIZE DAMAGE DURING CONSTRUCTION ACTIVITIES: a. USE EQUIPMENT THAT IS SHORTER IN HEIGHT OR WIDTH TO AVOID CONTACT WITH TREES b. BACK EQUIPMENT UNDER LIMBS AND FOLIAGE TO MINIMIZE CONTACT WITH CONSTRUCTION EQUIPMENT c. EMPLOY HAND TECHNIQUES TO AVOID USING EQUIPMENT UNDER VULNERABLE TREES d. UNDER COORDINATION WITH THE CITY ARBORIST, PUSH INTERFERING TREE LIMBS TEMPORARILY OUT OF THE WAY LAYOUT APPROVAL 1. ALL STRIPING LAYOUTS, PLACEMENT OF VERTICAL ROADWAY ELEMENTS (I.E. FLEX POSTS, MEDIANS, ETC.), PARKING STALL TEES AND CURB PAINTING LIMITS SHALL BE MARKED BY THE CONTRACTOR AND APPROVED BY THE ENGINEER IN THE FIELD PRIOR TO INSTALLATION. 2. NEW SIGN POSTS MUST BE INSTALLED PER ENG. STD. 7210 & 7215. ALL PUNCH POSTS IN DOWNTOWN CORE MUST BE POWDER COATED DARK GREEN PER ENG. STD. 7210 & 7215. 3. UNLESS OTHERWISE NOTED HEREIN, ALL LANE WIDTH DIMENSIONS ARE MEASURED FROM CENTER OF STRIPE TO FACE OF CURB (OR EDGE OF PAVEMENT WHERE NO CURB EXISTS AT OUTSIDE EDGE OF ROADWAY). C I V I L BRI A N A . NEL S O N No. C 79870 2 2000615 DATE BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. NTS NO T E S T MAY 2024 Page 654 of 888 CASE 1 SOLID GREEN BIKE LANE CASE 2 DASHED GREEN BIKE LANE EXTENSION APPROACHING INTERSECTION RIGHT TURN CONFLICT AREAS CASE 3 DASHED GREEN BIKE LANE EXTENSION THROUGH INTERSECTIONS AND ACROSS DRIVEWAYS GREEN BIKE LANE MARKINGS SHALL BE SEALMASTER SAFE RIDE OR APPROVED EQUIVALENT SEE GENERAL NOTES AND SPECIAL PROVISIONS FOR ADDITIONAL REFERENCE NOT TO SCALEACA MUTCD CHAPTER 9, FIGURE 9C-2 NOT TO SCALE BIKE BUFFER - SOLIDC NOT TO SCALE MODIFIED CITY STD 7360D NOT TO SCALE STRIPED BULBOUT PER MUTCD FIGURE 3J-6BF NOT TO SCALE MODIFIED DETAIL 22H AREA = 45.5 SQFT WHITE MARKINGS NOTE: (1) GREEN WAY STENCIL FURNISHED BY CITY 8" GRIDSIGN VARIES PER STREET, CITY WILL PROVIDE GRAPHIC FILES NOT TO SCALE GREENWAY SYMBOLJ NOT TO SCALE GREENWAY SIGNI NOT TO SCALE GREENBACK SHARROWG NOT TO SCALE ZICLA ZEBRA 9B NOT TO SCALE TRAFFIC CIRCLE SIGNK NOT TO SCALE BIKE LANE ENDS SIGNL BIKE LANE ENDS 3'9' 6" YELLOW STRIPE DIMENSIONS PER PLAN 8" WHITE PAINT 12" WHITE PAINT 10' O.C.WHITE SHARROW GREEN BIKE LANE COATING PER SPECIAL PROVISIONS DIRECTION OF TRAVEL EDGE OF PAVEMENT 10' 5' 9'3" (4) OM1-3 ON SINGLE POST. ONE SIGN FACING EACH DIRECTION 21" 48" 26" 26" 16" 16" 3'3"4' 6.5" 30.5" TRAVEL PARKING 45°' 12' WIDTH PER PLAN 6" WHITE PAINT WHITE BIKE LANE SYMBOL WITH PERSON AND BIKE ARROW PER CALTRANS STANDARD 6" WHITE STRIPE GREEN BIKE LANE PAVEMENT COATING 6" WHITE STRIPE GREEN BIKE LANE PAVEMENT COATING 6" WHITE STRIPE GREEN BIKE LANE PAVEMENT COATING TYPE D TWO-WAY YELLOW RETROREFLECTIVE MARKER YELLOW BOTS DOTS, TYPEAY MARKER PER 2015 CALTRANS STANDARD PLAN A20A 6" YELLOW 6" OFFSET4' 24' 6" 8" C I V I L BR IA N A . NEL S O N No. C 79870 1 2000608 DATE BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. NTS DE T A I L S D MAY 2024 Page 655 of 888 INSTALLATION NOTES: MEDIAN WORK SHALL CONFORM TO TO THE PROVISIONS IN SECTION 73, OF THE STANDARD SPECIFICATIONS. TYPE A3 CURB PER CALTRANS 2015 RSP A87A, DOWELLED IN TO EXISTING PAVEMENT SURFACE. CLASS 3 CONCRETE. EXPANSION JOINTS AND WEAKENED PLANE JOINTS PER CITY STD 4110. #4 REBAR AT 4'-0" OC, 12" MIN. LENGTH, DRIVEN IN PLACE #4 LONGITUDINAL BAR 1 2 3 4 5 NOT TO SCALE CONCRETE BIKE MEDIAN DETAIL (MODIFIED CITY STD. 4940)A AA NOT TO SCALE SPEED CUSHIONB CENTER OF TRAVEL LANE AA CL 12" WHITE PAINT 12" OFFSET SIDEWALK GUTTER LIP CURB FACE DI R E C T I O N O F T R A V E L 12" MIN GAP FOR DRAINAGE ON BIKE MEDIANS EVERY 25' OR WHERE UTILITY COLLARS CONFLICT WITH MEDIAN. LAYOUTS AND GAPS TO BE CONFIRMED IN FIELD BY THE ENGINEER PRIOR TO INSTALLATION PEXCO CITY POST MODEL EAC, 18” WHITE WITH 3 YELLOW WRAP PEXCO CITY POST MODEL EAC, 18” WHITE WITH 3 YELLOW WRAP PER PLAN PER PLAN PER PLAN LAYOUT SECTION A-A LAYOUT MEDIAN MEDIAN 10'10' DRIVEWAY 3' .5'PAVEMENT #4 LONGITUDINAL BAR 6" CLASS 3 CONCRETE 7 #4 REBAR AT 4'-0" OC, 12" MIN LENGTH, DRIVEN IN PLACE 3 4 3 SECTION A-A LAYOUT 3' 6.5' 12' 1' 6.5' 1'3' 3" 36" WHITE PEXCO POST DETAIL 39 45° 8' O.C. STREET SIDEWALK 20' RED CURB 8' STOP BAR NOT TO SCALE DAYLIGHTING BUFFERC STAMPED CONCRETE NOTES: 1. 6" THICK STAMPED CONCRETE, COLORED DAVIS COLORS SAN DIEGO BUFF (#5237) (OR APPROVED EQUAL). 2. RIVER ROCK PATTERN. 3. INSTALL PER MANUFACTURER RECOMMENDATIONS. NOT TO SCALE STAMPED CONCRETE DETAILD 7' WIDTH PER PLAN ZICLA ZEBRA CYCLE TRACK LANE SEPARATORS SIZE: ZEBRA9, COLOR: WHITE BIKE BUFFER PER DETAIL C PEXCO CITY POST MODEL EAC, 36" WHITE WITH 2 LIGHT GREY WRAP NOTE: FLEX POSTS & ZICLA ZEBRAS MUST BE MOUNTED TO ROADWAY PER MANUFACTURER'S INSTRUCTIONS 7' 28' (TYP) NOTE: FLEX POSTS & ZICLA ZEBRAS MUST BE MOUNTED TO ROADWAY PER MANUFACTURER'S INSTRUCTIONS NOT TO SCALE CENTER MEDIAN REFUGE CONFIGURATIONF NOT TO SCALE FLEX POST & ZICLA ZEBRA CONFIGURATIONSE ZICLA ZEBRA SEPARATORS SIZE: ZEBRA9, COLOR: YELLOW PEXCO CITY POST MODEL EAC, 36" YELLOW WITH 2 YELLOW WRAPS DOUBLE YELLOW STRIPE WITH REFLECTORS (DETAIL 22) DIMENSIONS AND RADIUS PER PLAN SHEETS C I V I L BR IA N A .NEL S O N No. C 79870 2 2000608 DATE BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. NTS DE T A I L S D DETAIL 39 MAY 2024 Page 656 of 888 12" WHITE 16 LF "STOP" LEGEND 22 SQFT, Typ. 12" WHITE 15 LF N RED CURB 76 LF 20 LF FROM E.O.C. RED CURB 76 LF 20 LF FROM E.O.C. "STOP" LEGEND 22 SQFT 12" WHITE 19.5 LF N 18.5' 18.5' "STOP" LEGEND 22 SQFT, Typ. 12" WHITE 17.5 LF 12" WHITE 16 LF DETAIL 22 50 LF N MATCHLINE SEE BELOW "STOP" LEGEND 22 SQFT 12" WHITE 16.5 LF N MATCHLINE SEE ABOVE 18 . 5 ' 18 . 5 ' N RED CURB 80 LF 20 LF FROM E.O.C. RED CURB 83 LF 20 LF FROM E.O.C. RED CURB 85 LF 20 LF FROM E.O.C. RED CURB 78 LF 20 LF FROM E.O.C. DETAIL 22 68 LF DETAIL 22 128 LF "STOP" LEGEND 22 SQFT, Typ. 12" WHITE 19.5 LF DETAIL 22 50 LF 12" WHITE 24 LF RED CURB 81 LF 20 LF FROM E.O.C. RED CURB 83 LF 20 LF FROM E.O.C. 12" WHITE 16.5 LF N 80400 C I V I L BRI A N A . NEL S O N No. C 79870 01 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. PA T R I C I A S MAY 2024 Page 657 of 888 3 0 ' 18 ' 18 ' DETAIL 22 219 LF DETAIL 22 50 LF "STOP" LEGEND 22 SQFT 12" WHITE 16 LF N 20 ' 20 ' DETAIL 22 50 LF 12" WHITE 16 LF "STOP" LEGEND 22 SQFT, Typ. 12" WHITE 16 LF 12" WHITE 24.5 LF N 80400 C I V I L BRI A N A . NEL S O N No. C 79870 02 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. JE F F R E Y , D A R T M O U T H S MAY 2024 Page 658 of 888 M A T C H L I N E S E E A B O V E MA T C H L I N E SE E SH E E T S 0 4 20 . 5 ' 20 . 5 ' REFRESH RED CURB 851 LF, Cont. GREENBACK SHARROW SYMBOL PER DETAIL G, SHEET D1 36 SQFT, Typ. DETAIL 2 1052 LF, Cont. N MA T C H L I N E SE E BE L O W 17 . 5 ' 17 . 5 ' 11 . 5 ' 11 ' 12 ' REFRESH RED CURB 851 LF REFRESH RED CURB 266 LF GREENBACK SHARROW SYMBOL PER DETAIL G, SHEET D1 36 SQFT, Typ. DETAIL 2 1052 LF DETAIL 38 106 LF DETAIL 22 171 LF TYPE III ARROW 42 SQFT, Typ. "STOP" LEGEND 22 SQFT, Typ. 12" WHITE 23 LF HI-VIS CROSSWALK 50 LF N REPLACE R26(S) SIGN ON (E) PUNCH POST 80400 C I V I L BRI A N A . NEL S O N No. C 79870 03 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. CA S A S MAY 2024 Page 659 of 888 MATCHLINE SEE SHEET S03 INSTALL R1-3P ON (E) POST INSTALL R1-3P ON (E) POST INSTALL R1-3P ON (E) POST DETAIL 22 50 LF 12" WHITE 17.5 LF "STOP" LEGEND 22 SQFT, Typ. 12" WHITE 19.5 LF 12" WHITE 14.5 LF 12" WHITE 21.5 LF N DETAIL 22 50 LF DETAIL 22 50 LF 80400 C I V I L BR IA N A . NEL S O N No. C 79870 04 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. MU R R A Y S MAY 2024 Page 660 of 888 M A T C H L I N E S E E S H E E T S 0 6 MA T C H L I N E SE E SH E E T S 0 6 MATCHLINE SEE ABOVE R28.5' R17.9' 45 . 5 ' 19' 20' 19 . 5 ' 19 . 5 ' BULBOUT PER DETAIL F, SHEET D1 8" WHITE 102 LF 12" WHITE 63 LF DETAIL 41 71 LF DETAIL 22 323 LF "STOP" LEGEND 22 SQFT DETAIL 22 301 LF 12" WHITE 23 LF N MA T C H L I N E SE E BE L O W 19 19 . 5 ' 20 ' RED CURB 20 LF DETAIL 22 428 LF "STOP" LEGEND 22 SQFT HI-VIS CROSSWALK 45 LF N 80400 C I V I L BRI A N A . NEL S O N No. C 79870 05 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. MO N T A L B A N , L E M O N S MAY 2024 Page 661 of 888 MATCHLINE SEE SHEET S05 5.8 ' 5.6 ' 20 ' 20 ' INSTALL R26 SIGN BELOW R1-1 ON (E) POST BIKE LOOP SYMBOL 2 SQFT NOTE: USE CAUTION WHEN REMOVING (E) STRIPING TO PROTECT IN PLACE (E) TRAFFIC SIGNAL LOOP DETECTORS RED CURB 20 LF RED CURB 20 LF "STOP" LEGEND 22 SQFT 12" WHITE 17.5 LF DETAIL 22 439 LF CROSSWALK 47 LF N MA T C H L I N E SE E SH E E T S 0 5 20 ' 20 ' TYPE VII ARROW 27 SQFT, Typ. TYPE IV (B) ARROW 27 SQFT DETAIL 22 191 LF 12" WHITE 16 LF 12" WHITE 15.5 LF "STOP" LEGEND 22 SQFT, Typ. 12" WHITE 16 LF 12" WHITE 15.5 LF N 80400 C I V I L BRI A N A . NEL S O N No. C 79870 06 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. OL I V E S MAY 2024 Page 662 of 888 M A T C H L I N E S E E S H E E T S 0 8 MATCHLINE SEE SHEET S08 R15' 11' 13.5' 19 . 5 ' 19.5' 5. 5 ' 9' 9. 5 ' 10 . 5 ' NOTE: USE CAUTION WHEN REMOVING (E) STRIPING TO PROTECT IN PLACE (E) TRAFFIC SIGNAL LOOP DETECTORS BIKE LOOP SYMBOL 2 SQFT, Typ. BULBOUT PER DETAIL F, SHEET D1 8" WHITE 62 LF 12" WHITE 26 LF BIKE ARROW 3.5 SQFT, Typ. BIKE RIDER 7 SQFT, Typ. "STOP" LEGEND 22 SQFT 12" WHITE 17 LF DETAIL 39A 124 LF DETAIL 39 308 LF DETAIL 22 397 LF GREENBACK SHARROW SYMBOL PER DETAIL G, SHEET D1 36 SQFT, Typ. DETAIL 38 80 LF TYPE IV ARROW 15 SQFT, Typ. TYPE VII ARROW 27 SQFT, Typ. 12" WHITE 10 LF 12" WHITE 9 LF CROSSWALK 43 LF N "STOP" LEGEND 22 SQFT 12" WHITE 13 LF N 80400 C I V I L BRI A N A . NEL S O N No. C 79870 07 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. FO O T H I L L S MAY 2024 Page 663 of 888 M A T C H L I N E S E E R I G H T MA T C H L I N E SE E SH E E T S 0 7 9 ' 6 ' GREENBACK SHARROW SYMBOL PER DETAIL G, SHEET D1 36 SQFT, Typ. DETAIL 39A 148 LF DETAIL 27B 209 LF DETAIL 22 262 LF N 1 7 . 5 ' M A T C H L I N E S E E B E L O W MA T C H L I N E SEE LE F T 1 9 ' 9 . 5 ' 5 . 5 ' RED CURB 21 LF DETAIL 41 64 LF DETAIL 27B 246 LF DETAIL 22 292 LF BIKE ARROW 3.5 SQFT, Typ. BIKE RIDER 7 SQFT, Typ. SHARROW 11.5 SQFT, Typ. N "STOP" LEGEND 22 SQFT 12" WHITE 14.5 LF MA T C H L I N E SE E SH E E T S 0 7 MA T C H L I N E SE E SH E E T S 1 2 16 . 5 ' 17 ' DETAIL 22 342 LF N MA T C H L I N E SE E AB O V E 19 ' 9. 5 ' 5. 5 ' GREENBACK SHARROW SYMBOL PER DETAIL G, SHEET D1 36 SQFT, Typ. DETAIL 39A 40 LF DETAIL 27B 246 LF DETAIL 22 292 LF N 80400 C I V I L BRI A N A . NEL S O N No. C 79870 08 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. FO O T H I L L , C R A N D A L L , C A R P E N T E R S MAY 2024 Page 664 of 888 MA T C H L I N E SE E SH E E T S 1 2 MA T C H L I N E SE E BE L O W 6' 3' 10 . 5 ' 20 ' 14.5'15' 20 ' 20 ' INSTALL "BIKE LANE ENDS" SIGN PER DETAIL L, SHEET D1 ON (N) 12' PUNCH POST INSTALL R81(CA) AND R81B(CA) SIGNS ON (N) 12' PUNCH POST BIKE ARROW 3.5 SQFT, Typ. BIKE RIDER 7 SQFT, Typ. DETAIL 39A 64 LF BIKE BUFFER PER DETAIL C SHEET D1 771 LF 12" WHITE 26.5 LF "STOP" LEGEND 22 SQFT, Typ. DETAIL 22 244 LF 12" WHITE 15 LF DETAIL 22 207 LF SHARROW 11.5 SQFT, Typ. N MA T C H L I N E SE E AB O V E MA T C H L I N E SE E S H E E T S 1 0 6. 5 ' 3' 10 ' 1 0 ' 10 ' 14. 5 ' 15' BIKE BUFFER PER DETAIL C SHEET D1 771 LF, Cont. N DETAIL 22 620 LF DETAIL 27B 595 LF 12" WHITE 12 LF SHARROW 11.5 SQFT, Typ. "STOP" LEGEND 22 SQFT, Typ. 12" WHITE 23 LF DETAIL 22 62 LF 80400 C I V I L BRI A N A . NEL S O N No. C 79870 09 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. HA T H W A Y S MAY 2024 Page 665 of 888 MATC H L I N E SEE BELO W M A T C H L I N E S E E S H E E T S 0 9 6. 5 ' 3' 10 ' 10 ' 10 ' 8' 5' 2'10 ' 10 ' 8. 5 ' 6 ' BIKE BUFFER PER DETAIL C SHEET D1 771 LF, Cont. RED CURB 40 LF DETAIL 39A 40 LF 12" WHITE 23.5 LF 12" WHITE 33 LF "STOP" LEGEND 22 SQFT SHARROW 11.5 SQFT, Typ. BIKE ARROW 3.5 SQFT, Typ. BIKE RIDER 7 SQFT, Typ.DETAIL 27B 380 LF DETAIL 22 620 LF, Con.t DETAIL 27B 595 LF, Cont. N MATCHLINE SEE SHEET S11 MA T C H L I N E SE E AB O V E 8' 6' 2. 5 ' 10 ' 10 ' 2' 6' 8' DETAIL 38 42 LF DETAIL 39A 79 LF DETAIL 22 68 LF 12" WHITE 28.5 LF12" WHITE 25.5 LF 12" WHITE 30.5 LF "STOP" LEGEND 22 SQFT, Typ. DETAIL 39A 76 LF BIKE BUFFER PER DETAIL C SHEET D1 312 LFDETAIL 27B 323 LF DETAIL 22 390 LF BIKE ARROW 3.5 SQFT, Typ. BIKE RIDER 7 SQFT, Typ. BIKE BUFFER PER DETAIL C SHEET D1 331 LF DETAIL 27B 374 LF N 80400 C I V I L BRI A N A . NEL S O N No. C 79870 10 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. HA T H W A Y , L O N G V I E W S MAY 2024 Page 666 of 888 MA T C H L I N E SE E BE L O W MA T C H L I N E SE E SH E E T S 1 0 7. 5 ' 1. 5 ' 8' 6. 5 ' 10 ' 10 ' 8' 6. 5 ' 10 ' 10 ' 6. 5 ' 8. 5 ' BIKE BUFFER PER DETAIL C SHEET D1 1219 LF DECONSTRUCT AND RECONSTRUCT 3" HIGH SPEED HUMP PER STD 7320 & 7321 WITH (4) 36" WHITE PEXCO FLEX POST, EAC MODEL WITH 2 LIGHT GREY WRAPSCASE 2 BIKE LANE PER DETAIL D, SHEET D1 40 LF "HUMP" LEGEND 25 SQFT, Typ. DETAIL 22 420 LF DETAIL 22 254 LF BIKE ARROW 3.5 SQFT, Typ. BIKE RIDER 7 SQFT, Typ. DETAIL 39 1333 LFDETAIL 27B 670 LF DETAIL 39 122 LF DETAIL 27B 126 LF N MA T C H L I N E SE E SH E E T S 1 2 MA T C H L I N E SE E AB O V E 8' 5. 5 ' 10 ' 10 ' 2' 5' 8' 5. 5 ' 10 ' 10 ' 2' 5. 5 ' 7' 10 ' 10 ' 10 '2' 6. 5 ' 8' 6' 10 ' 10 ' 1. 5 ' 5' BIKE BUFFER PER DETAIL C SHEET D1 1219 LF, Cont. DECONSTRUCT AND RECONSTRUCT 3" HIGH SPEED HUMP PER STD 7320 & 7321 WITH (4) 36" WHITE PEXCO FLEX POST, EAC MODEL WITH 2 LIGHT GREY WRAPS DECONSTRUCT AND RECONSTRUCT 3" HIGH SPEED HUMP PER STD 7320 & 7321 WITH (4) 36" WHITE PEXCO FLEX POST, EAC MODEL WITH 2 LIGHT GREY WRAPS "HUMP" LEGEND 25 SQFT, Typ. "HUMP" LEGEND 25 SQFT, Typ. DETAIL 27B 1333 LF, Cont.DETAIL 22 77 LF"SCHOOL" LEGEND 35 SQFT, Typ. DETAIL 22 251 LF TYPE IV ARROW 15 SQFT, Typ.DETAIL 38 60 LF BIKE ARROW 3.5 SQFT, Typ. BIKE RIDER 7 SQFT, Typ. N 80400 C I V I L BR IA N A . NEL S O N No. C 79870 11 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. SL A C K S MAY 2024 Page 667 of 888 MA T C H L I N E SE E SH E E T S 1 1 BIKE BUFFER PER DETAIL C SHEET D1 1219 LF, Cont. "SCHOOL" LEGEND 35 SQFT, Typ. DETAIL 22 367 LF DETAIL 39 1333 LF, Cont.DETAIL 27B 418 LF N YELLOW HI-VIS CROSSWALK 20 LF "STOP" LEGEND 22 SQFT 12" WHITE 9.5 LF DETAIL 39A 40 LF BIKE ARROW 3.5 SQFT BIKE SYMBOL 7 SQFT 10 ' 2' 6. 5 ' 8' 5. 5 ' 10 ' 10 ' 2' 5. 5 ' MA T C H L I N E SE E SH E E T S 1 3 MAT C H L I N E SEE SHE E T S 0 9 MATCHLIN E SEE SHEET S0 8 19'21' 21 . 5 ' 21 . 5 ' RED CURB 20 LF RED CURB 20 LFRED CURB 20 LF 12" WHITE 19 LF DETAIL 22 50 LF DETAIL 22 50 LF DETAIL 22 50 LF GREENBACK SHARROW SYMBOL PER DETAIL G, SHEET D1 36 SQFT, Typ. DETAIL 2 199 LF "STOP" LEGEND 22 SQFT, Typ. 12" WHITE 20 LF 12" WHITE 17.5 LF 12" WHITE 19 LF N 80400 C I V I L BRI A N A . NEL S O N No. C 79870 12 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. SL A C K , H A T H W A Y S MAY 2024 Page 668 of 888 MATCHLINE SEE SHEET S14 M A T C H L I N E S E E MA T C H L I N E SE E SH E E T S 1 2 R23.4'R16.6' 21 . 5 ' 21 . 5 ' 12" WHITE 18 LF BULBOUT PER DETAIL F, SHEET D1 8" WHITE 89 LF 12" WHITE 54 LFRED CURB 20 LF RED CURB 20 LF 12" WHITE 54 LF TYPE IV ARROW 15 SQFT, Typ. "STOP" LEGEND 22 SQFT, Typ. DETAIL 27B 66 LF 12" WHITE 5' O.C. 45 LF GREENBACK SHARROW SYMBOL PER DETAIL G, SHEET D1 36 SQFT, Typ. DETAIL 22 211 LF DETAIL 22 50 LF DETAIL 2 199 LF N R63.7' R14.9' R64.6' 2 2 . 5 ' R15' .5' BULBOUT PER DETAIL F, SHEET D1, 8" WHITE 57 LF 12" WHITE 17 LF BULBOUT PER DETAIL F, SHEET D1, 8" WHITE 100 LF 12" WHITE 81 LF DETAIL 22 63 LF "STOP" LEGEND 22 SQFT 12" WHITE 26.5 LF N 8' 15 ' 23 ' RED CURB 47 LF RED CURB 48 LF 11 . 5 ' 10 . 5 ' 24 ' 12" WHITE 21 LF RED CURB 252 LF HI-VIS CROSSWALK 92 LF BULBOUT PER DETAIL F, SHEET D1, 8" WHITE 31 LF 12" WHITE 13 LF BULBOUT PER DETAIL F, SHEET D1, 8" WHITE 46 LF, 12" WHITE 27 LF "STOP" LEGEND 22 SQFT, Typ. DETAIL 22 246 LF DETAIL 27B 101 LF 12" WHITE 31.5 LF N RED CURB 65 LF 80400 C I V I L BR IA N A . NEL S O N No. C 79870 13 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. HA T H W A Y , S T A F F O R D , T A F T S MAY 2024 Page 669 of 888 12" WHITE 16 LF N "STOP" LEGEND 22 SQFT 12" WHITE 19 LF 12" WHITE 19 LF "STOP" LEGEND 22 SQFT N 12" WHITE 16 LF 12" WHITE 16 LF "STOP" LEGEND 22 SQFT N MA T C H L I N E SE E SH E E T S 1 3 MA T C H L I N E SE E SH E E T S 1 5 20 ' 20 ' DETAIL 22 600 LF N 80400 C I V I L BRI A N A . NEL S O N No. C 79870 14 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. BO N D , F R E D E R I C K S S MAY 2024 Page 670 of 888 MATCHLINE SEE SHEET S14 12" WHITE 21 LF 12" WHITE 18.5 LF "STOP" LEGEND 22 SQFT, Typ.12" WHITE 23 LF 12" WHITE 19 LF N MA T C H L I N E SE E SH E E T S 1 6 13 ' 24 . 5 ' 22 ' DETAIL 22 775 LF12" WHITE 21 LF 12" WHITE 21.5 LF DETAIL 22 283 LFDETAIL 22 13.5 LF 12" WHITE 22.5 LF 12" WHITE 21 LF "STOP" LEGEND 22 SQFT, Typ. N 80400 C I V I L BRI A N A . NEL S O N No. C 79870 15 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. FR E D E R I C K S , K E N T U C K Y S MAY 2024 Page 671 of 888 MA T C H L I N E SE E SH E E T S 1 5 23 ' 23 ' DETAIL 22 775 LF, Cont. MA T C H L I N E SE E BE L O W MA T C H L I N E SE E AB O V E INSTALL STREET NAME SIGNS ON (E) PUNCH POST DAYLIGHTING BUFFER PER DETAIL C, SHEET D2 "STOP" LEGEND 22 SQFT, Typ. 12" WHITE 19.5 LF DETAIL 20 50 LFDAYLIGHTING BUFFER PER DETAIL C, SHEET D2 HI-VIS CROSSWALK 44 LF DETAIL 29 44 LF 12" YELLOW 22 LF (7) YELLOW FLEX POSTS (4) ZICLA ZEBRA PER DETAIL B, SHEET D1 DAYLIGHTING BUFFER PER DETAIL C, SHEET D2 HI-VIS CROSSWALK 34 LF INSTALL STREET NAME SIGNS ON (E) PUNCH POST DAYLIGHTING BUFFER PER DETAIL C, SHEET D2 12" WHITE 22 LF N 8' 14 . 5 ' 14 . 5 ' 8' 8' 12 . 5 ' 12 . 5 ' 8' 11 ' 7' 11 ' IF ADD. ALT. A IS AWARDED, SEE SHEET 60 80400 C I V I L BRI A N A . NEL S O N No. C 79870 16 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. FR E D E R I C K S , H O P E S MAY 2024 Page 672 of 888 "STOP" LEGEND 22 SQFT, Typ. 12" WHITE 21 LF 12" WHITE 19.5 LF N TYPE IV ARROW 15 SQFT HI-VIS CROSSWALK 37 LF INSTALL R3-5(R) SIGN ON (E) PUNCH POST 12" WHITE 16.5 LF DAYLIGHTING BUFFER PER DETAIL C, SHEET D2 "STOP" LEGEND 22 SQFT "ONLY" LEGEND 22 SQFTDETAIL 20 50 LF 6 LF 30° DAYLIGHTING BUFFER PER DETAIL C, SHEET D2 N HI-VIS CROSSWALK 37 LF 8' 12 ' 12 ' 8' IF ADD. ALT. A IS AWARDED, SEE SHEET S59 12" WHITE 20 LF 12" WHITE 19.5 LF N 12" WHITE 22.5 LF "STOP" LEGEND 22 SQFT, Typ. 12" WHITE 20.5 LF N 12" WHITE 20 LF 12" WHITE 17.5 LF N HI-VIS CROSSWALK 34 LF DETAIL 20 50 LF DAYLIGHTING BUFFER PER DETAIL C, SHEET D2 12" WHITE 15 LF DAYLIGHTING BUFFER PER DETAIL C, SHEET D2 DAYLIGHTING BUFFER PER DETAIL C, SHEET D2 HI-VIS CROSSWALK 44 LF DETAIL 20 50 LF DAYLIGHTING BUFFER PER DETAIL C, SHEET D2 12" WHITE 23 LF "STOP" LEGEND 22 SQFT, Typ. 7' 10 ' 10 ' 7' 11 ' 12 ' 12 ' 11 ' N IF ADD. ALT. A IS AWARDED, SEE SHEET S59 & 60 80400 C I V I L BRI A N A . NEL S O N No. C 79870 17 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. HA Y S , M c C O L L U M S MAY 2024 Page 673 of 888 MA T C H L I N E SE E SH E E T S 1 9 23 ' 21 ' 23 . 5 ' 23 . 5 ' DETAIL 2 199 LF DETAIL 22 50 LF "STOP" LEGEND 22 SQFT12" WHITE 22.5 LF DETAIL 22 50 LF DETAIL 2 199 LF DAYLIGHTING BUFFER PER DETAIL C, SHEET D2 DETAIL 22 50 LF 6 LF 30° DAYLIGHTING BUFFER PER DETAIL C, SHEET D2 "STOP" LEGEND 22 SQFT 12" WHITE 23 LF N IF ADD. ALT. A IS AWARDED, SEE SHEET 61 "DIP" LEGEND 15 SQFT, Typ. "STOP" LEGEND 22 SQFT, Typ. 12" WHITE 21.5 LF 12" WHITE 23 LF 12" WHITE 20 LF 12" WHITE 19 LF N 80400 C I V I L BR IA N A . NEL S O N No. C 79870 18 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. HO P E , L O O M I S S MAY 2024 Page 674 of 888 MA T C H L I N E SE E SH E E T S 2 0 MA T C H L I N E SE E AB O V E 16. 5 ' 22' DETAIL 22 50 LF DETAIL 22 80 LF 12" WHITE 17.5 LF DETAIL 22 50 LF DETAIL 2 192 LF "STOP" LEGEND 22 SQFT DETAIL 22 618 LF 12" WHITE 25.5 LF N MA T C H L I N E SE E BE L O W MATC H L I N E SEE SHEE T S 2 0 MA T C H L I N E SE E SH E E T S 1 8 23 ' 22 ' 12" WHITE 18.5 LF DETAIL 22 30 LF "POLY" LEGEND 20 SQFT 12" WHITE 21 LF DETAIL 2 175 LF "STOP" LEGEND 22 SQFT, Typ. 12" WHITE 22 LF 12" WHITE 14 LF DETAIL 22 50 LF DETAIL 22 50 LF DETAIL 22 50 LF N 80400 C I V I L BR IA N A .NEL S O N No. C 79870 19 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. LO O M I S S MAY 2024 Page 675 of 888 M A T C H L I N E S E E S H E E T S 2 2 MA T C H L I N E SE E SH E E T S 1 9 15 . 5 ' 14 . 5 ' "STOP" LEGEND 22 SQFT DETAIL 22 117 LF DETAIL 2 319 LF 12" WHITE 50 LF 12" WHITE 14 LF N MA T C H L I N E SE E SH E E T S 1 9 1 3 . 5 ' 9. 5 ' 10 ' 11 ' DETAIL 22 618 LF, Cont. DETAIL 22 54 LF "STOP" LEGEND 22 SQFT, Typ. 12" WHITE 25 LF N 80400 C I V I L BRI A N A . NEL S O N No. C 79870 20 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. LO O M I S , B U E N A V I S T A S MAY 2024 Page 676 of 888 DETAIL 29 134 LF 12" YELLOW 54 LF (7) YELLOW FLEX POSTS (4) ZICLA ZEBRA PER DETAIL B, SHEET D1 DAYLIGHTING BUFFER PER DETAIL C, SHEET D2 DAYLIGHTING BUFFER PER DETAIL C, SHEET D2 12" WHITE 16 LF "STOP" LEGEND 22 SQFT, Typ. N HI-VIS CROSSWALK 55 LF 8' 12 ' 10 . 5 ' 12 ' 8' IF ADD. ALT. A IS AWARDED, SEE SHEET 62 DAYLIGHTING BUFFER PER DETAIL C, SHEET D2 DETAIL 22 50 LF DAYLIGHTING BUFFER PER DETAIL C, SHEET D2 MODIFIED: NO RED CURB HI-VIS CROSSWALK 40 LF N IF ADD. ALT. A IS AWARDED, SEE SHEET 62 19 ' 20 ' 18'17.5' DETAIL 22 185 LF N 80400 C I V I L BRI A N A . NEL S O N No. C 79870 21 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. AB B O T , W I L S O N S MAY 2024 Page 677 of 888 MA T C H L I N E SE E AB O V E MATCHLINE SEESHEET S20 23 ' 23 . 5 ' 24 ' 22 ' DETAIL 2 199 LF REMOVE (E) R1-2, REPLACE WITH (N) R1-1 DETAIL 40, 29 LF DETAIL 22 50 LF HI-VIS CROSSWALK 20.5 LF TYPE VII ARROW, 27 SQFT, Typ. 12" WHITE, 24.5 LF 6" WHITE 45°, 5' O.C. HI-VIS CROSSWALK 13 LF TYPE IV ARROW 15 SQFT, Typ. DETAIL 22, 38 LF "CLEAR" LEGEND, 27 SQFT, Typ. "KEEP" LEGEND, 24 SQFT, Typ.DETAIL 41, 29 LF "STOP" LEGEND 22 SQFT, Typ. 12" WHITE 35 LF CROSSWALK 39 LF 12" WHITE 31 LF DETAIL 22 177 LF DETAIL 38 30 LF N MA T C H L I N E SE E BE L O W 22 ' 23 . 5 ' DETAIL 2 199 LF DETAIL 22 50 LF DETAIL 22 50 LF N DAYLIGHTING BUFFER PER DETAIL C, SHEET D2 12" WHITE 16 LF "STOP" LEGEND 22 SQFT, Typ. DAYLIGHTING BUFFER PER DETAIL C, SHEET D2 DETAIL 22 50 LF 6 LF 30° HI-VIS CROSSWALK 50 LF TYPE IV ARROW 15 SQFT, Typ. 23 ' 23 . 5 ' IF ADD. ALT. A IS AWARDED, SEE SHEET 63 80400 C I V I L BRI A N A . NEL S O N No. C 79870 22 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. GA R F I E L D S MAY 2024 Page 678 of 888 M A T C H L I N E S E E R I G H T 9 . 5 ' 1 0 . 5 ' 1 1 ' 9 . 5 ' 10 ' 12 . 5 ' 12 ' 11 ' 12'12'11.5'12.5' DETAIL 27B 583 LF DETAIL 22 554 LF DETAIL 27B 540 LF N 12" WHITE 15.5 LF "STOP" LEGEND 22 SQFT, Typ. 12" WHITE 23.5 LF N MA T C H L I N E SE E LE F T 12" WHITE 19.5 LF 12" WHITE 18 LF "STOP" LEGEND 22 SQFT, Typ. N "STOP" LEGEND 22 SQFT, Typ. 12" WHITE 20.5 LF 12" WHITE 23.5 LF N RED CURB 20 LF RED CURB 20 LF N RED CURB 20 LF RED CURB 20 LF 12" WHITE 20 LF "STOP" LEGEND 22 SQFT, Typ. 12" WHITE 20 LF 80400 C I V I L BRI A N A . NEL S O N No. C 79870 23 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. GR O V E , P H I L L I P S S MAY 2024 Page 679 of 888 MA T C H L I N E SE E AB O V E 18 . 5 ' 20 ' DETAIL 22 MODIFIED PER DETAIL H, SHEET D1 50 LF N "STOP" LEGEND 22 SQFT, Typ. 12" WHITE 18 LF 12" WHITE 28 LF, 45° 5' O.C. DETAIL 27B 30 LF 12" WHITE 15 LF DETAIL 22 292 LF MATCHLINE SEE SHEET S25 M A T C H L I N E SE E BE L O W 18 ' 10 ' 13 . 5 ' 19.5'21' 18 . 5 ' 21 . 5 ' 20'20.5' NOTE: USE CAUTION WHEN REMOVING (E) STRIPING TO PROTECT IN PLACE (E) TRAFFIC SIGNAL LOOP DETECTORS RED CURB 76 LF RED CURB 60 LF RED CURB 87 LF INSTALL W84(CA) ON (N) 12' PUNCH POST INSTALL W84(CA) ON (N) 12' PUNCH POST "HUMP" LEGEND 25 SQFT, Typ. (N) SPEED HUMP (TYPE 1) PER CITY STD 7320 GREENWAY SYMBOL PER DETAIL J, SHEET D1 45.5 SQFT INSTALL (N) "TORO GREENWAY" SIGN PER DETAIL I, SHEET D1 ON (N) PUNCH POST DETAIL 41 36 LF BIKE LOOP SYMBOL 2 SQFT HI-VIS CROSSWALK 65 LF "STOP" LEGEND 22 SQFT 12" WHITE 19 LF DETAIL 22 50 LF 12" WHITE 18 LF DETAIL 22 427 LFDETAIL 38 98 LF TYPE IV ARROW 15 SQFT, Typ. TYPE VII ARROW 27 SQFT, Typ. N 80400 C I V I L BRI A N A . NEL S O N No. C 79870 24 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. WA L N U T , T O R O S MAY 2024 Page 680 of 888 7. 5 ' MEET (E) CURB) 6" WHITE 54 LF 6" WHITE 45° 10' O.C. (N) HMA DIKE PER CITY STD. 7120 PAINTED RED 94 LF (N) HMA DIKE PER CITY STD. 7120 PAINTED RED 39 LF (N) HMA DIKE PER CITY STD. 7120 PAINTED RED 39 LF MEET (E) AC BERM "STOP" LEGEND 22 SQFT, Typ. 12" WHITE 15 LF N MATCHLINE SEE SHEET S24 20 . 5 ' 20 ' 19.5'21' 20 ' 20 ' HI-VIS CROSSWALK 37 LF 12" WHITE 19 LF RED CURB 20 LF RED CURB 22 LF HI-VIS CROSSWALK 39 LF DETAIL 22 50 LF DETAIL 22 50 LF HI-VIS CROSSWALK 37 LF HI-VIS CROSSWALK 37 LF DETAIL 22 50 LFDETAIL 2 271 LF DETAIL 22 76 LF 12" WHITE 19.5 LF N MA T C H L I N E SE E SH E E T S 2 6 DETAIL 22 50 LF 12" WHITE 19.5 LF "STOP" LEGEND 22 SQFT N 80400 C I V I L BRI A N A . NEL S O N No. C 79870 25 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. PE A C H S MAY 2024 Page 681 of 888 M A T C H L I N E S E E S H E E T S 2 5 MA T C H L I N E SE E SH E E T S 5 0 "STOP" LEGEND 22 SQFT 12" WHITE 26 LFTYPE I 10' ARROW 14 SQFT, Typ N MA T C H L I N E SE E SH E E T S 2 6 25'12.5' 12.5'25' 12'12' 12'12' 12'12' 12'12'INSTALL R6-5P SIGN ON (N) 12' PUNCH POST INSTALL R6-5P SIGN ON (N) 12' PUNCH POST INSTALL PUNCH POST WITH SURFACE MOUNTED BASE IN CENTER OF CIRCLE. INSTALL 4 OM1-3 OBJECT MARKERS ON POST, ONE FACING EACH DIRECTION PER DETAIL K, SHEET D1 INSTALL (8) 6" PEXCO CITY POST, EAC MOUNT, YELLOW POST W/ 2 YELLOW WRAPS 4" YELLOW STRIPE WITH (10) TYPE D TWO-WAY RETROREFLECTIVE MARKERS 18' DIAMETER CIRCLE 6" YELLOW 47 LF 45° 4' O.C. DETAIL 24, 47 LF, 4' O.C. DETAIL 27B 7 LF DETAIL 22, 71 LF DETAIL 24, 10.5 LF, 4' O.C. DETAIL 27B 7 LF DETAIL 22, 71 LF DETAIL 24, 10.5 LF, 4' O.C. REMOVE EXISTING "BIKE MAY USE FULL LANE" SIGN AND REPLACE WITH "TORO GREENWAY" PER DETAIL I, SHEET D1 SIGN ON SAME POST REMOVE EXISTING "BIKE MAY USE FULL LANE" SIGN AND REPLACE WITH "TORO GREENWAY" SIGN PER DETAIL I, SHEET D1 ON SAME POST N GREENWAY SYMBOL PER DETAIL J, SHEET D1 45.5 SQFT DETAIL 27B, 53 LF 12" WHITE, 37 LF, 10' O.C. (18) BOTS DOTS ON STRIPES, 2' O.C. DETAIL 27B, 50 LF 12" WHITE, 34 LF, 10' O.C. (17) BOTS DOTS ON STRIPES, 2' O.C. DETAIL 27B, 48 LF 12" WHITE, 35 LF, 10' O.C. (17) BOTS DOTS ON STRIPES, 2' O.C. DETAIL 27B, 49 LF 12" WHITE, 34 LF, 10' O.C. (16) BOTS DOTS ON STRIPES, 2' O.C. 12" WHITE 18 LF 12" WHITE 19 LF "STOP" LEGEND 22 SQFT, Typ. 80400 C I V I L BRI A N A . NEL S O N No. C 79870 26 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. PE A C H S MAY 2024 Page 682 of 888 MATCHLINE SEE SHEET S28 MA T C H L I N E SE E AB O V E MA T C H L I N E SE E SH E E T S 2 8 28 . 5 ' 28 ' RED CURB 20 LF RED CURB 20 LF RED CURB 20 LF RED CURB 20 LF "STOP" LEGEND 22 SQFT, Typ. 12" WHITE 17.5 LF 12" WHITE 18 LF DETAIL 22 50 LFDETAIL 22 50 LF N DETAIL 2 607 LF MA T C H L I N E SE E BE L O W 27 . 5 ' 28 ' DETAIL 2 247 LF RED CURB 20 LF RED CURB 20 LF RED CURB 40 LF RED CURB 20 LF "STOP" LEGEND 22 SQFT, Typ. 12" WHITE 26 LF DETAIL 22 50 LF 12" WHITE 17.5 LF DETAIL 22 50 LF N 80400 C I V I L BRI A N A . NEL S O N No. C 79870 27 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. PA L M S MAY 2024 Page 683 of 888 MA T C H L I N E SE E SH E E T S 2 7 27 . 5 ' 28 ' MATCHLIN E SEE SHEET S2 9 DAYLIGHTING BUFFER PER DETAIL C, SHEET D2 12" WHITE 20 LF "STOP" LEGEND 22 SQFT DETAIL 22 50 LF 6LF 30° DAYLIGHTING BUFFER PER DETAIL C, SHEET D2 HI-VIS CROSSWALK 54 LF DETAIL 2 607 LF, Cont. TYPE IV ARROW 15 SQFT IF ADD. ALT. A IS AWARDED, SEE SHEET 65 MA T C H L I N E SE E SH E E T S 2 7 RED CURB 20 LF RED CURB 20 LF "STOP" LEGEND 22 SQFT 12" WHITE 17 LF N 12" WHITE 14.5 LF "STOP" LEGEND 22 SQFT N 80400 C I V I L BRI A N A . NEL S O N No. C 79870 28 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. PA L M S MAY 2024 Page 684 of 888 MA T C H L I N E SE E SH E E T S 3 0 1 9 . 5 ' 3 . 5 ' 1 0 . 5 ' 1 1 . 5 ' 20 ' 20 ' TYPE I 10' ARROW 14 SQFT, Typ YELLOW HI-VIS CROSSWALK 45 LF YELLOW HI-VIS CROSSWALK 52 LF GREENBACK SHARROW SYMBOL PER DETAIL G, SHEET D1 36 SQFT, Typ. DETAIL 2 511 LF DETAIL 29 130 LF YELLOW HI-VIS CROSSWALK 48 LF 12" WHITE 24 LF "STOP" LEGEND 22 SQFT, Typ. TYPE IV ARROW 15 SQFT, Typ. DETAIL 38 50 LF N 10 ' 10 ' 13 ' 12 ' HI-VIS CROSSWALK 25 LF 9'8'8' 4" BLUE 8.5'7.5'7.5'7.5'7.5'7'7.5'8'9' 9.5' 8'8'8'8'BIKE LOOP 2 SQFT, Typ. ADA MARKING 23 SQFT, Typ. N DETAIL 22 17 LF 4" BLUE 3' O.C. 4" WHITE 3' O.C. 4" WHITE, Typ. MA T C H L I N E SE E SH E E T S 2 8 80400 C I V I L BRI A N A . NEL S O N No. C 79870 29 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. AN D R E W S , S A N L U I S S MAY 2024 Page 685 of 888 N "STOP" LEGEND 22 SQFT 12" WHITE 15.5 LF INSTALL R1-1 SIGN ON (N) 12' PUNCH POST MA T C H L I N E SE E SH E E T S 2 9 12 ' 8' 20 . 5 ' 12 . 5 ' 8' 8'12.5' 12.5'8' 20 ' 20 ' INSTALL R1-1 SIGN ON (N) 12' PUNCH POST BULBOUT PER DETAIL F, SHEET D1 8" WHITE 133 LF 12" WHITE 107 LFBULBOUT PER DETAIL F, SHEET D1 8" WHITE 143 LF 12" WHITE 115 LF DETAIL 22 50 LF GREENBACK SHARROW SYMBOL PER DETAIL G, SHEET D1 36 SQFT, Typ. DETAIL 22 50 LF N N "STOP" LEGEND 22 SQFT 12" WHITE 15.5 LF INSTALL R1-1 SIGN ON (N) 12' PUNCH POST N "STOP" LEGEND 22 SQFT 12" WHITE 15.5 LF INSTALL R1-1 SIGN ON (N) 12' PUNCH POST 80400 C I V I L BRI A N A . NEL S O N No. C 79870 30 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. SA N L U I S D R I V E , A N D R E W S S MAY 2024 Page 686 of 888 N "STOP" LEGEND 22 SQFT 12" WHITE 15.5 LF INSTALL R1-1 SIGN ON (N) 12' PUNCH POST N "STOP" LEGEND 22 SQFT 12" WHITE 15.5 LF INSTALL R1-1 SIGN ON (N) 12' PUNCH POST N "STOP" LEGEND 22 SQFT 12" WHITE 15.5 LF INSTALL R1-1 SIGN ON (N) 12' PUNCH POST INSTALL (N) R1-1 ON (N) 12" PUNCH POST INSTALL (N) R1-1 ON (N) 12" PUNCH POST 12" WHITE 17 LF "STOP" LEGEND 22 SQFT, Typ. 12" WHITE 17.5 LF N 12" WHITE 17 LF 12" WHITE 17 LF INSTALL R1-3p BELOW (E) R1-1 INSTALL R1-3p BELOW (E) R1-1 TURN SHARROW PER DETAIL? INSTALL R1-1 SIGN ABOVE R1-3p ON (N) 12' PUNCH POST INSTALL R1-1 SIGN ABOVE R1-3p ON (N) 12' PUNCH POST RED CURB 60 LF RED CURB 85 LF RED CURB 81 LF RED CURB 67 LF 12" WHITE 17.5 LF "STOP" LEGEND 22 SQFT, Typ. 12" WHITE 27 LF GREENBACK SHARROW SYMBOL PER DETAIL G, SHEET D1 36 SQFT, Typ. N INSTALL R1-1 SIGN ON (N) 12' PUNCH POST 12" WHITE 17 LF INSTALL R1-1 SIGN ON (N) 12' PUNCH POST "STOP" LEGEND 22 SQFT 12" WHITE 17 LF N 80400 C I V I L BRI A N A . NEL S O N No. C 79870 31 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. SA N L U I S D R I V E , A N D R E W S S MAY 2024 Page 687 of 888 MA T C H L I N E SE E SH E E T S 3 3 MA T C H L I N E SE E AB O V E DETAIL 22 50 LF BIKE BUFFER PER DETAIL C SHEET D1, 25 LF WITH (3) WHITE 36" PEXCO CITY POST W/ EAC MOUNT PER GENERAL NOTES CASE 1 BIKE LANE PER DETAIL D, SHEET D1 25 LF HI-VIS CROSSWALK 41 LF 12" WHITE 18 LF "STOP" LEGEND 22 SQFT SHARROW 11.5 SQFT, Typ. N MA T C H L I N E SE E BE L O W MA T C H L I N E SE E SH E E T S 5 0 20 ' 20 ' 6' 2' DETAIL 22 50 LF CASE 1 BIKE LANE PER DETAIL D, SHEET D1 25 LF BIKE BUFFER PER DETAIL C SHEET D1, 25 LF WITH (3) WHITE 36" PEXCO CITY POST W/ EAC MOUNT PER GENERAL NOTES "STOP" LEGEND 22 SQFT 12" WHITE 18 LF SHARROW 11.5 SQFT, Typ. N 80400 C I V I L BRI A N A .NEL S O N No. C 79870 32 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. PE P P E R S MAY 2024 Page 688 of 888 DETAIL 22 50 LF 12" WHITE 15.5 LF "STOP" LEGEND 22 SQFT N MA T C H L I N E SE E SH E E T S 3 6 MA T C H L I N E SE E SH E E T S 3 4 12 . 5 ' 2' 6' 1 2 ' 1 2 ' 7' 13 ' 13 ' 7' 2' 6' RED CURB 30 LF RED CURB 40 LF REMOVE (E) PARKING METER REMOVE (E) PARKING METER 12" WHITE 20.5 LF REMOVE EXISTING SIGN POST. REINSTALL NEW 14' PUNCH POST AND R1-1 SIGN. FURNISH AND INSTALL RECTANGULAR RAPID FLASHING BEACON (RRFB) SYSTEM, CARMANAH MODEL R920-F (MODIFIED TO INCLUDE SOLAR KIT AND PUSH BUTTON ONLY, EXCLUDE FLASHER AND PEDESTRIAN SIGNS). ORIENT PUSH BUTTON TO FACE BIKE LANE ON TOR STREET. SYNC WITH EXISTING RRFB SYSTEM INSTALLED AT THIS INTERSECTION. REMOVE (E) BIKE TURN BOX INCLUDE IN SLURRY LIMITS REMOVE EXISTING "BIKE MAY USE FULL LANE" SIGN AND REPLACE WITH "TORO GREENWAY" SIGN PER DETAIL I, SHEET D1 ON SAME POST REMOVE (E) POST AND INSTALL R1-3P SIGN ON (N) 12' PUNCH POST CASE 3 BIKE LANE PER DETAIL D, SHEET D1 57 LF CASE 3 BIKE LANE PER DETAIL D, SHEET D1 57 LF CASE 1 BIKE LANE PER DETAIL D, SHEET D1, 25 LF CASE 1 BIKE LANE PER DETAIL D, SHEET D1 25 LF RED CURB 20 LF REMOVE EXISTING SIGN POST. REINSTALL NEW 14' PUNCH POST AND R1-1 SIGN. FURNISH AND INSTALL RECTANGULAR RAPID FLASHING BEACON (RRFB) SYSTEM, CARMANAH MODEL R920-F (MODIFIED TO INCLUDE SOLAR KIT AND PUSH BUTTON ONLY, EXCLUDE FLASHER AND PEDESTRIAN SIGNS). ORIENT PUSH BUTTON TO FACE BIKE LANE ON TOR STREET. SYNC WITH EXISTING RRFB SYSTEM INSTALLED AT THIS INTERSECTION. BIKE BUFFER PER DETAIL C SHEET D1, 25 LF BIKE BUFFER PER DETAIL C SHEET D1, 25 LF WITH (3) WHITE 36" PEXCO CITY POST W/ EAC MOUNT PER GENERAL NOTES REMOVE EXISTING "BIKE MAY USE FULL LANE" SIGN AND REPLACE WITH "TORO GREENWAY" SIGN PER DETAIL I, SHEET D1 ON SAME POSTGREENWAY SYMBOL PER DETAIL J, SHEET D1 45.5 SQFT DETAIL 22 642 LF 12" WHITE 19.5 LF "STOP" LEGEND 22 SQFT, Typ. N 80400 C I V I L BRI A N A . NEL S O N No. C 79870 33 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. TO R O , P A C I F I C S MAY 2024 Page 689 of 888 MA T C H L I N E SE E AB O V E 18 ' 10 . 5 ' 12 ' 20 . 5 ' 20 ' 20 ' 20 ' TYPE VII ARROW 27 SQFT TYPE IV ARROW 15 SQFT BIKE LOOP 2 SQFT, Typ. HI-VIS CROSSWALK 37.5 LF 12" WHITE 24.5 LF DETAIL 38 40 LF DETAIL 22 339 LF 12" WHITE 17.5 LF HI-VIS CROSSWALK 37 LF HI-VIS CROSSWALK 37 LF "STOP" LEGEND 22 SQFT, Typ. 12" WHITE 17.5 LF DETAIL 22 50 LF DETAIL 2 175 LF, Cont. N MA T C H L I N E SE E SH E E T S 3 2 RED CURB 45 LF "STOP" LEGEND 22 SQFT, Typ. 12" WHITE 17.5 LF 12" WHITE 19.5 LF N MA T C H L I N E SE E BE L O W 20 . 5 ' 19 . 5 ' N DETAIL 2 175 LF "STOP" LEGEND 22 SQFT, Typ. 12" WHITE 19.5 LF DETAIL 22 50 LF 80400 C I V I L BR IA N A . NEL S O N No. C 79870 34 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. PE E P E R , P A L M S MAY 2024 Page 690 of 888 MA T C H L I N E SE E SH E E T S 3 5 MA T C H L I N E SE E AB O V E 7' 13 ' 13 ' 7' 20 ' 20 ' 6' 2' 12" WHITE 20.5 LF RED CURB 56 LF RED CURB 21 LF RED CURB 25 LF BLUE CURB (22 LF), INTERNATIONAL SYMBOL O F ACCESSIBILITY PAVEMENT MARKING, INSTALL R99 (CA) AND R99B (CA) SIGNS ON 12' PUNCH POST PER CALTRANS STD PLAN A90B BLUE CURB (22 LF), INTERNATIONAL SYMBOL O F ACCESSIBILITY PAVEMENT MARKING, INSTALL R99 (CA) AND R99B (CA) SIGNS ON 12' PUNCH POST PER CALTRANS STD PLAN A90B INSTALL FLOURESCENT YELLOW/GREEN PED/BIKE CROSSING SIGNS (W11-15) ON (N) 12' PUNCH POST INSTALL FLOURESCENT YELLOW/GREEN PED/BIKE CROSSING SIGNS (W11-15) ON (N) 12' PUNCH POST GREENBACK SHARROW 40 SQFT, Typ. CASE 1 BIKE LANE PER DETAIL D, SHEET D1 25 LF RED CURB 40 LF PARKING "T"s PER CITY STD 7410, Typ. BIKE BUFFER PER DETAIL C SHEET D1, 25 LF WITH (3) WHITE 36" PEXCO CITY POST W/ EAC MOUNT PER GENERAL NOTES GREENWAY SYMBOL PER DETAIL J, SHEET D1 45.5 SQFT DETAIL 22 264 LF DETAIL 22 213 LF 12" WHITE 19.5 LF "STOP" LEGEND 22 SQFT, Typ. 12" WHITE 20 LF N MA T C H L I N E SE E SH E E T S 3 4 MA T C H L I N E SE E BE L O W 2' 6' 20 ' 20 ' RED CURB 13 LF RED CURB 20 LF RED CURB 10 LF RED CURB 25 LF RED CURB 25 LF CASE 1 BIKE LANE PER DETAIL D, SHEET D1 25 LF PARKING "T"s PER CITY STD 7410, Typ. BIKE BUFFER PER DETAIL C SHEET D1, 25 LFDETAIL 22 50 LF DETAIL 22 50 LF GREENWAY SYMBOL PER DETAIL J, SHEET D1 45.5 SQFT 12" WHITE 18 LF DETAIL 22 50 LF"STOP" LEGEND 22 SQFT, Typ. 12" WHITE 18 LF 12" WHITE 20 LF HI-VIS CROSSWALK 46 LF HI-VIS CROSSWALK 46 LF N 80400 C I V I L BRI A N A . NEL S O N No. C 79870 35 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. TO R O S MAY 2024 Page 691 of 888 "STOP" LEGEND 22 SQFT 12" WHITE 18.5 LF N MATCHLINE SEE SHEET S37 MA T C H L I N E SE E SH E E T S 3 8 BIKE ARROW 3.5 SQFT, Typ. BIKE RIDER 7 SQFT, Typ. INSTALL FLUORESCENT YELLOW/GREEN (N) W11-15 AND W16-7P SIGNS ON (N) 12' PUNCH POST GREENWAY SYMBOL PER DETAIL J, SHEET D1 45.5 SQFT (E) BRIDGE 12" WHITE 18 LF "STOP" LEGEND 22 SQFT, Typ. 12" WHITE 19 LF DETAIL 22 642 LF, Cont. N DETAIL 22 50 LF "STOP" LEGEND 22 SQFT 12" WHITE 18.5 LF N 80400 C I V I L BRI A N A . NEL S O N No. C 79870 36 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. TO R O , P A C I F I C , P I S M O S MAY 2024 Page 692 of 888 MA T C H L I N E SE E SH E E T S 3 6 N BIKE ARROW 3.5 SQFT, Typ. BIKE RIDER 7 SQFT, Typ. CHEVRON 24 SQFT DETAIL 27B 455 LF DETAIL 27B 455 LF DETAIL 27B 583 LF DETAIL 39A 52 LF DETAIL 39A 52 LF TYPE IV ARROW 15 SQFT, Typ. TYPE VII ARROW 27 SQFT "STOP" LEGEND 22 SQFT, Typ. HI-VIS CROSSWALK 31 LF MA T C H L I N E SE E SH E E T S 3 8 N DETAIL 27B 603 LF DETAIL 2 487 LF DETAIL 27B 583 LF DETAIL 22 50 LF "STOP" LEGEND 22 SQFT HI-VIS CROSSWALK 35 LF 80400 C I V I L BRI A N A . NEL S O N No. C 79870 37 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. PI S M O , B U C H O N S MAY 2024 Page 693 of 888 MA T C H L I N E SE E SH E E T S 3 9 MATCHLINE SEE SHEET S37 MATCHLINE SEE ABOVEMA T C H L I N E SE E SH E E T S 3 6 DETAIL 22 46 LF INSTALL (N) "ISLAY GREENWAY" SIGN PER DETAIL I, SHEET D1 AND W16-7P (right) SIGN ON (N) 12" PUNCH POST REMOVE EXISTING "BIKE MAY USE FULL LANE" SIGN AND REPLACE WITH "TORO GREENWAY" SIGN PER DETAIL I, SHEET D1 ON SAME POST GREENWAY SYMBOL PER DETAIL J, SHEET D1 45.5 SQFT DETAIL 22 50 LF DETAIL 22 50 LF N MA T C H L I N E SE E BE L O W 8' 12 ' 12 ' 8' REMOVE AND REPLACE TRUNCATED DOMES PER CITY STD 4440 "STOP" LEGEND 22 SQFT 12" WHITE 18.5 LF HI-VIS CROSSWALK 18 LF HI-VIS CROSSWALK 14.5 LF DETAIL 22 111 LF DETAIL 27B 81 LF DETAIL 27B 334 LF DETAIL 27B 194 LF DETAIL 2 79 LF "HUMP" LEGEND 26 SQFT, Typ. DETAIL 22 45 LF MATCH (E) DECONSTRUCT AND RECONSTRUCT SPEED HUMP PER CITY STD 7320, TYPE 1 N 80400 C I V I L BRI A N A . NEL S O N No. C 79870 38 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. BU C H O N , T O R O S MAY 2024 Page 694 of 888 MA T C H L I N E SE E SH E E T S 3 8 RED CURB 62 LF 12" WHITE 50 LF GREENWAY SYMBOL PER DETAIL J, SHEET D1 45.5 SQFT "STOP" LEGEND 22 SQFT N BULBOUT PER DETAIL F, SHEET D1 8" WHITE 42 LF 12" WHITE 80 LF INSTALL (N) "TORO GREENWAY" SIGN PER DETAIL I, SHEET D1 AND W16-7p (L) ON (N) 12" PUNCH POST DETAIL 22 190 LF DETAIL 22 50 LF REMOVE (E) R4-11 SIGN. INSTALL (N) "ISLAY GREENWAY" SIGN PER DETAIL I, SHEET D1 N GREENWAY SYMBOL PER DETAIL J, SHEET D1 45.5 SQFT 12" WHITE 19 LF "STOP" LEGEND 22 SQFT 80400 C I V I L BRI A N A . NEL S O N No. C 79870 39 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. IS L A Y , L E F F S MAY 2024 Page 695 of 888 MATCHLINE SEE ABOVE NOTE: USE CAUTION WHEN REMOVING (E) STRIPING TO PROTECT IN PLACE (E) TRAFFIC SIGNAL LOOP DETECTORS BIKE LOOP SYMBOL 2 SQFT 12" WHITE 14 LF "STOP" LEGEND 22 SQFT, Typ.12" WHITE 15.5 LF DETAIL 22 291 LF DETAIL 38 29 LF TYPE IV ARROW 15 SQFT, Typ. CROSSWALK 40 LF N 12" WHITE 19 LF "STOP" LEGEND 22 SQFT N MATCHLINE SEE BELOW TYPE IV ARROW 15 SQFT, Typ. TYPE I 10' ARROW 14 SQFT, Typ. "ONLY" LEGEND 22 SQFT, Typ. N 18 ' 17 . 5 ' "STOP" LEGEND 22 SQFT 12" WHITE 8.5 LF DETAIL 22 55 LF N 80400 C I V I L BR IA N A . NEL S O N No. C 79870 40 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. LI Z Z I E S MAY 2024 Page 696 of 888 17 ' 17 ' DETAIL 22 89 LF 12" WHITE 11 LF "STOP" LEGEND 22 SQFT, Typ. 12" WHITE 17 LF N 17.5'17' 17'17.5' BIKE ARROW 3.5 SQFT, Typ. BIKE RIDER 7 SQFT, Typ. TYPE IV ARROW 15 SQFT, Typ. "ONLY" LEGEND 22 SQFT, Typ.DETAIL 22 50 LF DETAIL 27B 33 LF DETAIL 27B 26 LF DETAIL 22 50 LFTYPE VII 27 SQFT, Typ. DETAIL 27B 11 LF DETAIL 22 50 LF "STOP" LEGEND 22 SQFT, Typ. 12" WHITE 8.5 LF N 80400 C I V I L BRI A N A . NEL S O N No. C 79870 41 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. IR I S , W O O D L A N D S MAY 2024 Page 697 of 888 DETAIL 22 50 LF "STOP" LEGEND 22 SQFT 12" WHITE 8.5 LF N 10 ' 10 ' 20 ' BIKE LOOP SYMBOL 2 SQFT DETAIL 22 50 LF 12" WHITE 19 LF "STOP" LEGEND 22 SQFT CROSSWALK 37 LF DETAIL 22 57 LF DETAIL 388 57 LF TYPE IV ARROW 15 SQFT, Typ. TYPE VII ARROW 27 SQFT, Typ. N 80400 C I V I L BRI A N A . NEL S O N No. C 79870 42 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. EL L A , F I X L I N I S MAY 2024 Page 698 of 888 MA T C H L I N E SE E AB O V E MA T C H L I N E SE E SH E E T S 4 4 8. 5 ' 11 . 5 ' 11 . 5 ' 8' 8' 10 ' 10 ' 8' RED CURB 20 LF FROM E.O.C. Typ. THIS INTERSECTION DETAIL 2 247 LF 12" WHITE 21 LF 12" WHITE 25.5 LF DETAIL 22 50 LFDETAIL 22 50 LF DETAIL 2 607 LF, Cont. SHARROW 11.5 SQFT, Typ. "STOP" LEGEND 22 SQFT, Typ. 12" WHITE 15 LF N MA T C H L I N E SE E BE L O W 8' 10 ' 10 ' 8' "HUMP" LEGEND 25 SQFT, Typ. INSTALL W84(CA) ON (N) 12' PUNCH POST INSTALL W84(CA) ON (N) 12' PUNCH POST DETAIL 2 607 LF YELLOW HI-VIS CROSSWALK 40 LF RED CURB 20 LF FROM E.O.C. Typ. THIS INTERSECTION GREENBACK SHARROW SYMBOL PER DETAIL G, SHEET D1 36 SQFT, Typ."STOP" LEGEND 22 SQFT, Typ. DETAIL 22 50 LF 12" WHITE 15 LF YELLOW HI-VIS CROSSWALK 30 LF 12" WHITE 17 LF N 80400 C I V I L BR IA N A . NEL S O N No. C 79870 43 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. HI G H L A N D S MAY 2024 Page 699 of 888 MA T C H L I N E SE E AB O V E MA T C H L I N E SE E SH E E T S 4 5 8' 12 ' 12 ' 8' 8' 12 . 5 ' 12 . 5 ' 8' INSTALL W84(CA) ON (N) 12' PUNCH POST DETAIL 2 343 LF 12" WHITE 18.5 LF YELLOW HI-VIS CROSSWALK 47 LF 12" WHITE 32.5 LF 12" WHITE 18 LF DETAIL 2 151 LF DETAIL 22 50 LF DETAIL 22 50 LF "STOP" LEGEND 22 SQFT, Typ. SHARROW 11.5 SQFT, Typ. N MA T C H L I N E SE E SH E E T S 4 3 MA T C H L I N E SE E BE L O W 8' 12 . 5 ' 12 . 5 ' 8' 8' 12 . 5 ' 12 . 5 ' 8' 8' 12 . 5 ' 12 . 5 ' 8' "HUMP" LEGEND 25 SQFT, Typ. SHARROW 11.5 SQFT, Typ. INSTALL W84(CA) ON (N) 12' PUNCH POST INSTALL W84(CA) ON (N) 12' PUNCH POST RED CURB 20 LF FROM E.O.C. Typ. THIS INTERSECTION RED CURB 20 LF FROM E.O.C. Typ. THIS INTERSECTION 12" WHITE 16.5 LF 12" WHITE 14 LF DETAIL 2 103 LF DETAIL 22 50 LF DETAIL 22 50 LF DETAIL 22 50 LF DETAIL 22 50 LF "STOP" LEGEND 22 SQFT, Typ. N 80400 C I V I L BR IA N A . NEL S O N No. C 79870 44 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. HI G H L A N D S MAY 2024 Page 700 of 888 MA T C H L I N E SE E SH E E T S 4 4 5 . 5 ' 1 0 . 5 ' 4 . 5 ' 1 9 . 5 ' 4 . 5 ' 6. 5 ' 2'12 ' 13 ' 8' 8' 8' EDGE GRIND 223 LF CASE 2 BIKE LANE PER DETAIL D, SHEET D1 52 LF BIKE ARROW 3.5 SQFT, Typ. BIKE RIDER 7 SQFT, Typ. CASE 3 BIKE LANE PER DETAIL D, SHEET D1 85 LF INSTALL (N) 12" PUNCH POST WITH (N) R7-9 SIGNBIKE BUFFER PER DETAIL C SHEET D1 221 LF (5) FLEX POSTS RED CURB 224 LF INSTALL (N) 12" PUNCH POST WITH MODIFIED R61-36(CA) SIGN WITH A LEFT / THRU-LEFT / THRU-RIGHT CONFIGURATION "HUMP" LEGEND 25 SQFT, Typ. INSTALL W84(CA) ON (N) 12' PUNCH POST DETAIL 29 79 LF DETAIL 2 79 LF DETAIL 22 50 LF DETAIL 22 50 LF SHARROW 11.5 SQFT, Typ. N 12 ' 12 ' RED CURB 77 LF 80400 C I V I L BRI A N A . NEL S O N No. C 79870 45 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. HI G H L A N D S MAY 2024 Page 701 of 888 MA T C H L I N E SE E AB O V E 7. 5 ' 5' 10 ' 10 ' 7. 5 ' BIKE ARROW 3.5 SQFT, Typ. BIKE RIDER 7 SQFT, Typ. CROSSWALK 37 LF 12" WHITE 18.5 LF"STOP" LEGEND 22 SQFT "AHEAD" LEGEND 31 SQFT DETAIL 22 376 LF DETAIL 27B 366 LF DETAIL 27B 687 LF, Cont. N M A T C H L I N E SE E B E L O W MATCHLINE SEE SHEET S47 CROSSWALK 29 LF 12" WHITE 18 LF CROSSWALK 19 LF 12" WHITE 19 LF DETAIL 22 268 LFDETAIL 27B 687 LF DETAIL 27B 259 LF SHARROW 11.5 SQFT N 80400 C I V I L BRI A N A . NEL S O N No. C 79870 46 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. CH O R R O S MAY 2024 Page 702 of 888 MA T C H L I N E SE E SH E E T S 4 6 GREENBACK SHARROW 40 SQFT, Typ. "STOP" LEGEND 22 SQFT 12" WHITE 18 LF N 80400 C I V I L BRI A N A . NELS O N No. C 79870 47 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. MU R R A Y S MAY 2024 Page 703 of 888 MA T C H L I N E SE E SH E E T S 4 9 MA T C H L I N E SE E AB O V E GREENBACK SHARROW 40 SQFT, Typ.INSTALL W84(CA) ON (N) 12' PUNCH POST INSTALL W84(CA) ON (N) 12' PUNCH POST INSTALL W84(CA) ON (N) 12' PUNCH POST "HUMP" LEGEND 25 SQFT, Typ. "HUMP" LEGEND 25 SQFT, Typ. N DETAIL 22 350 LF 12" WHITE 16 LF"STOP" LEGEND 22 SQFT, Typ. 12" WHITE 15 LF DETAIL 22 825 LF, Cont. M A T C H L I N E S E E B E L O W GREENBACK SHARROW 40 SQFT, Typ. INSTALL W84(CA) ON (N) 12' PUNCH POST INSTALL W84(CA) ON (N) 12' PUNCH POST "HUMP" LEGEND 25 SQFT, Typ. N DETAIL 22 50 LF "STOP" LEGEND 22 SQFT 12" WHITE 17 LF 80400 C I V I L BRI A N A . NEL S O N No. C 79870 48 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. BR O A D S MAY 2024 Page 704 of 888 MA T C H L I N E SE E AB O V E "25" LEGEND 17.5 SQFT, Typ. N DETAIL 22 247 LF MA T C H L I N E SE E BE L O W MA T C H L I N E SE E SH E E T S 4 8 GREENBACK SHARROW 40 SQFT, Typ.INSTALL W84(CA) ON (N) 12' PUNCH POST INSTALL W84(CA) ON (N) 12' PUNCH POST INSTALL W84(CA) ON (N) 12' PUNCH POST "HUMP" LEGEND 25 SQFT, Typ. N DETAIL 22 279 LF 80400 C I V I L BRI A N A . NEL S O N No. C 79870 49 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. BR O A D S MAY 2024 Page 705 of 888 MATCHLINE SEE SHEET S32 MAT C H L I N E SEE SHE E T S 2 6 MA T C H L I N E SE E BE L O W 9. 5 ' 10 ' 10 ' 9. 5 ' CASE 3 BIKE LANE PER DETAIL D, SHEET D1 37 LF INSTALL (N) "MILL GREENWAY" SIGN PER DETAIL I, SHEET D1 ON (N) PUNCH POST INSTALL (N) "MILL GREENWAY" SIGN PER DETAIL I, SHEET D1 ON (N) PUNCH POST 12" WHITE 19 LF GREENWAY SYMBOL PER DETAIL J, SHEET D1 45.5 SQFT, Typ. "STOP" LEGEND 22 SQFT, Typ. DETAIL 22 50 LF HI-VIS CROSSWALK 43 LF HI-VIS CROSSWALK 35 LF BIKE LOOP 2 SQFT, Typ.DETAIL 27B 448 LF DETAIL 27B 450 LF DETAIL 22 439 LF 12" WHITE 19.5 LF RED CURB 20 LF RED CURB 20 LF MA T C H L I N E MA T C H L I N E SE E SE E MA T C H L I N E SE E SH E E T S 5 1 SH E E T S 5 0 MA T C H L I N E MA T C H L I N E SE E SE E MA T C H L I N E SE E AB O V E BE L O W 11 ' 10 ' 10 ' 11 ' (N) SPEED CUSHION PER DETAIL B, SHEET D2 CASE 3 BIKE LANE PER DETAIL D, SHEET D1 37 LF ADA MARKING 23 SQFT DETAIL 2 271 LF INSTALL W17-1 ON (N) 12' PUNCH POST INSTALL W17-1 ON (N) 12' PUNCH POST "HUMP" LEGEND 25 SQFT, Typ. GREENWAY SYMBOL PER DETAIL J, SHEET D1 45.5 SQFT, Typ. INSTALL (N) "MILL GREENWAY" SIGN PER DETAIL I, SHEET D1 ON (N) PUNCH POST "STOP" LEGEND 22 SQFT, Typ. 12" WHITE 17.5 LF 12" WHITE 18.5 LF DETAIL 22 50 LFDETAIL 22 50 LF DETAIL 27B 385 LF DETAIL 27B 386 LF DETAIL 22 50 LF BIKE LOOP 2 SQFT, Typ. HI-VIS CROSSWALK 35 LF N N 80400 C I V I L BRI A N A . NEL S O N No. C 79870 50 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. MI L L S MAY 2024 Page 706 of 888 MA T C H L I N E SE E SH E E T S 5 0 10 ' 10 ' 10 ' 10 ' (N) SPEED CUSHION PER DETAIL B, SHEET D2 INSTALL W17-1 ON (N) 12' PUNCH POST INSTALL W17-1 ON (N) 12' PUNCH POST "HUMP" LEGEND 25 SQFT, Typ. DETAIL 22 50 LF DETAIL 2 391 LF DETAIL 27B 712 LF DETAIL 27B 506 LF SHARROW 11.5 SQFT, Typ. N MA T C H L I N E SE E BE L O W 9. 5 ' 10 ' 10 ' 9. 5 ' GREENWAY SYMBOL PER DETAIL J, SHEET D1 45.5 SQFT, Typ. DETAIL 2 55 LF DETAIL 27B 156 LF DETAIL 22 50 LF MA T C H L I N E SE E AB O V E HI-VIS CROSSWALK 40 LF "STOP" LEGEND 22 SQFT DETAIL 22 25 LF 12" WHITE 19.5 LF INSTALL (N) "MILL GREENWAY" SIGN PER DETAIL I, SHEET D1 ON (N) PUNCH POST IF ADD. ALT. A IS AWARDED, SEE SHEET 64 80400 C I V I L BRI A N A . NEL S O N No. C 79870 51 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. MI L L S MAY 2024 Page 707 of 888 MA T C H L I N E SE E SH E E T S 5 3 MA T C H L I N E SE E AB O V E 8' 6' 2' 10 ' 12 ' 10 ' 2' 6' 8' 12 ' 14 . 5 ' 13 ' 12 . 5 ' 5' 7' CASE 3 BIKE LANE PER DETAIL D, SHEET D1 77 LF CASE 2 BIKE LANE PER DETAIL D, SHEET D1 100 LF CASE 1 BIKE LANE PER DETAIL D, SHEET D1 30 LF DETAIL 32 428 LF, Cont. DETAIL 27B 767 LF, Cont. DETAIL 27B 918 LF, Cont. DETAIL 27B 709 LF, Cont.DETAIL 27B 525 LF, Cont. BIKE RIDER SYMBOL 2 SQFT, Typ. BIKE ARROW 3.5 SQFT, Typ. TYPE IV ARROW 15 SQFT, Typ. BIKE BUFFER PER DETAIL C, SHEET D1 282 LF DETAIL 32 200 LF"SLOW" LEGEND 23 SQFT "SCHOOL" LEGEND 35 LF BIKE BUFFER PER DETAIL C SHEET D1 123 LF DETAIL 27B 148 LF "XING" LEGEND 21 LFEDGE GRIND 101 LF N MA T C H L I N E SE E BE L O W 6. 5 ' 10 . 5 ' 10 ' 10 ' 10 ' 11 ' 6' 5. 5 ' 5' 10 ' 10 ' 10 ' 10 ' 5' 7' 6. 5 ' 5' 8' 13 ' 9. 5 ' 10 ' 5' 7' EDGE GRIND 170 LF HI-VIS CROSSWALK 38 LF CASE 2 BIKE LANE PER DETAIL D, SHEET D1 88 LF HI-VIS CROSSWALK 65 LF HI-VIS CROSSWALK 65 LF DETAIL 32 492 LFDETAIL 22 65 LF BIKE ARROW 3.5 SQFT, Typ. BIKE RIDER 7 SQFT, Typ. HI-VIS CROSSWALK 70 LF TYPE I 10' ARROW 14 SQFT, Typ. TYPE IV ARROW 15 SQFT, Typ. DETAIL 39 60 LFDETAIL 27B 50 LF DETAIL 27B 50 LF DETAIL 9 751 LF DETAIL 39 767 LF DETAIL 27B 918 LF DETAIL 22 420 LF DETAIL 9 319 LF DETAIL 39 706 LF DETAIL 27B 525 LF TYPE VI ARROW 42 SQFT, Typ. EDGE GRIND 171 LF N 80400 C I V I L BR IA N A . NEL S O N No. C 79870 52 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. JO H N S O N S MAY 2024 Page 708 of 888 M A T C H L I N E S E E S H E E T S 5 4 MA T C H L I N E SE E AB O V E 2' 6. 5 ' 8' 8' 6. 5 ' 2' 10 . 5 ' 10 . 5 ' 12 . 5 ' 6. 5 ' 8' BIKE RIDER SYMBOL 2 SQFT, Typ. BIKE ARROW 3.5 SQFT, Typ. CASE 1 BIKE LANE PER DETAIL D, SHEET D1 30 LF CASE 3 BIKE LANE PER DETAIL D, SHEET D1 92 LF CASE 2 BIKE LANE PER DETAIL D, SHEET D1 88 LF CASE 3 BIKE LANE PER DETAIL D, SHEET D1 87 LF DETAIL 27B 361 LF BIKE BUFFER PER DETAIL C, SHEET D1 333 LF DETAIL 32 467 LFBIKE BUFFER PER DETAIL C, SHEET D1 1883 LF, Cont. DETAIL 27B 1774 LF, Cont. TYPE IV ARROW 15 SQFT, Typ. N MA T C H L I N E SE E BE L O W MA T C H L I N E SE E SH E E T S 5 2 8' 6. 5 ' 2' 10 ' 10 ' 10 . 5 ' 2' 6. 5 ' 8' 11 . 5 ' 2' 5' 8. 5 ' 11 . 5 ' 4. 5 ' 13 ' 7. 5 ' 8. 5 ' 11 . 5 ' 4. 5 ' 13 . 5 ' 6' 11 . 5 ' 2' 7' INSTALL R4-7 SIGN ON (N) 12' PUNCH POST INSTALL R4-7 SIGN ON (N) 12' PUNCH POST INSTALL R4-7 SIGN ON (N) 12' PUNCH POST DETAIL 29 77 LF REMOVE AND REINSTALL (E) PUNCH POST WITH RRFB EDGE GRIND 201 LF CASE 2 BIKE LANE PER DETAIL D, SHEET D1 148 LF CASE 1 BIKE LANE PER DETAIL D, SHEET D1 30 LF CASE 2 BIKE LANE PER DETAIL D, SHEET D1 148 LF CASE 3 BIKE LANE PER DETAIL D, SHEET D1 52 LF CASE 3 BIKE LANE PER DETAIL D, SHEET D1 42 LF CASE 1 BIKE LANE PER DETAIL D, SHEET D1 25 LF CASE 1 BIKE LANE PER DETAIL D, SHEET D1 30 LF CASE 1 BIKE LANE PER DETAIL D, SHEET D1 25 LF CASE 1 BIKE LANE PER DETAIL D, SHEET D1 30 LF DETAIL 22, 50 LF DETAIL 22, 50 LF MEDIAN PER DETAIL A, SHEET D2 62 LF REMOVE POST AND SIGNS ENGINEER TO CONFIRM IN FIELD EDGE GRIND 254 LF 4" WHITE 81 LF 12" WHITE 45° 5' O.C. 22 LF (5) FLEX POSTS YIELD LINE 8Δ 12 SQFT YELLOW HI-VIS CROSSWALK 65 LF 4" WHITE 105 LF 12" WHITE 45° 5' O.C. 37 LF (5) FLEX POSTS YIELD LINE 9Δ 13.5 SQFT DETAIL 39 25 LF "SLOW" LEGEND 23 SQFT "SCHOOL" LEGEND 35 LF "XING" LEGEND 21 LF MEDIAN PER DETAIL A, SHEET D2 66 LF TYPE IV ARROW 15 SQFT, Typ. DETAIL 27B 219 LF BIKE BUFFER PER DETAIL C, SHEET D1 187 LF DETAIL 32 294 LF BIKE BUFFER PER DETAIL C, SHEET D1 1883 LF DETAIL 27B 1788 LF RED CURB 25 LF RED CURB 25 LF ADJUST GAS VALVE TO ELEVATION 12" WHITE 17 LF 12" WHITE 18 LF "STOP" LEGEND 22 SQFT, Typ. N 80400 C I V I L BRI A N A . NEL S O N No. C 79870 53 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. JO H N S O N S MAY 2024 Page 709 of 888 MA T C H L I N E SE E SH E E T S 5 5 MA T C H L I N E SE E AB O V E 11 . 5 ' 5' 6. 5 ' 14 . 5 ' 8' 6. 5 ' 2' 10 ' 8' 6. 5 ' 2' 10 . 5 ' 10 . 5 ' 10 ' 2' 6. 5 ' 8' 12 ' 6. 5 ' 10 ' 12 ' CASE 3 BIKE LANE PER DETAIL D, SHEET D1 92 LF CASE 3 BIKE LANE PER DETAIL D, SHEET D1 92 LF CASE 2 BIKE LANE PER DETAIL D, SHEET D1 88 LF CASE 1 BIKE LANE PER DETAIL D, SHEET D1 164 LF CASE 1 BIKE LANE PER DETAIL D, SHEET D1 30 LF RED CURB 45 LF DETAIL 27B 800 LF, Cont. BIKE BUFFER PER DETAIL C, SHEET D1 949 LF, Cont. DETAIL 32 941 LF, Cont. BIKE BUFFER PER DETAIL C, SHEET D1 1883 LF, Cont. DETAIL 27B 1774 LF, Cont. TYPE IV ARROW 15 SQFT, Typ. BIKE RIDER SYMBOL 2 SQFT, Typ. BIKE ARROW 3.5 SQFT, Typ. DETAIL 29 61 LF DETAIL 22 62 LF DETAIL 38 50 LF TYPE I ARROW 14 SQFT EDGE GRIND 80 LF N MA T C H L I N E SE E BE L O W MA T C H L I N E SE E SH E E T S 5 3 8' 6. 5 ' 2' 10 . 5 ' 10 . 5 ' 10 . 5 ' 2' 6. 5 ' 8' CASE 2 BIKE LANE PER DETAIL D, SHEET D1 88 LF DETAIL 27B 800 LF BIKE BUFFER PER DETAIL C, SHEET D1 949 LF DETAIL 32 941 LFBIKE BUFFER PER DETAIL C, SHEET D1 1883 LF, Cont. DETAIL 27B 1774 LF, Cont. TYPE IV ARROW 15 SQFT, Typ. N 80400 C I V I L BRI A N A . NEL S O N No. C 79870 54 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. JO H N S O N S MAY 2024 Page 710 of 888 MA T C H L I N E SE E SH E E T S 5 6 M A T C H L I N E S E E A B O V E 7' 6' 3' 10 . 5 ' 10 . 5 ' 10 . 5 ' 3' 6' 8' DETAIL 32 1209 LF, Cont. DETAIL 27B 1268 LF, Cont. BIKE BUFFER PER DETAIL C, SHEET D1 1180 LF, Cont. BIKE BUFFER PER DETAIL C, SHEET D1 1342 LF, Cont. DETAIL 27B 1338 LF, Cont. TYPE IV ARROW 15 SQFT, Typ. N MA T C H L I N E SE E BE L O W MA T C H L I N E SE E SH E E T S 5 4 8' 5' 3' 11 ' 10 . 5 ' 10 . 5 ' 5. 5 ' 10 . 5 ' 8' 6'2' 10 . 5 ' 10 . 5 ' 10 . 5 ' 2'6' 8' CASE 1 BIKE LANE PER DETAIL D, SHEET D1 75 LF CASE 2 BIKE LANE PER DETAIL D, SHEET D1 100 LF HI-VIS CROSSWALK 63 LF HI-VIS CROSSWALK 62 LF HI-VIS CROSSWALK 34 LF DETAIL 32 1209 LF DETAIL 27B 1268 LF BIKE BUFFER PER DETAIL C, SHEET D1 1180 LF BIKE BUFFER PER DETAIL C, SHEET D1 1342 LF DETAIL 27B 1338 LF DETAIL 22 154 LFDETAIL 38 TYPE I 10' ARROW 14 SQFT, Typ. TYPE IV ARROW 15 SQFT, Typ. BIKE RIDER SYMBOL 2 SQFT, Typ. BIKE ARROW 3.5 SQFT, Typ. N 80400 C I V I L BRI A N A . NEL S O N No. C 79870 55 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. JO H N S O N S MAY 2024 Page 711 of 888 MA T C H L I N E SE E SH E E T S 5 7 MA T C H L I N E SE E AB O V E BIKE RIDER SYMBOL 2 SQFT, Typ. BIKE ARROW 3.5 SQFT, Typ. CASE 2 BIKE LANE PER DETAIL D, SHEET D1 88 LF CASE 1 BIKE LANE PER DETAIL D, SHEET D1 30 LF CASE 2 BIKE LANE PER DETAIL D, SHEET D1 52 LF CASE 3 BIKE LANE PER DETAIL D, SHEET D1 97 LFCASE 1 BIKE LANE PER DETAIL D, SHEET D1 30 LFCASE 2 BIKE LANE PER DETAIL D, SHEET D1 40 LF CASE 3 BIKE LANE PER DETAIL D, SHEET D1 107 LF CASE 1 BIKE LANE PER DETAIL D, SHEET D1 30 LF BIKE RIDER SYMBOL 2 SQFT, Typ. BIKE ARROW 3.5 SQFT, Typ. DETAIL 22 99 LF BIKE BUFFER PER DETAIL C, SHEET D1 91 LF DETAIL 27B 60 LF DETAIL 38 50 LFDETAIL 32 90 LF BIKE BUFFER PER DETAIL C, SHEET D1 96 LF DETAIL 27B 66 LF DETAIL 32 202 LFBIKE BUFFER PER DETAIL C, SHEET D1 553 LF DETAIL 27B 553 LF TYPE IV ARROW 15 SQFT, Typ. DETAIL 32 94 LF N DETAIL 27B 30 LF BIKE BUFFER PER DETAIL C, SHEET D1 84 LF 8. 5 ' 6' 2' 10 . 5 ' 11 . 5 ' 10 . 5 ' 2' 6' 7. 5 ' 13 ' MA T C H L I N E SE E BE L O W M A T C H L I N E S E E S H E E T S 5 5 6 . 5 ' 6 ' 3 ' 1 0 . 5 ' 1 0 . 5 ' 1 0 . 5 ' 3 ' 6 ' 8 ' CASE 3 BIKE LANE PER DETAIL D, SHEET D1 22 LF CASE 2 BIKE LANE PER DETAIL D, SHEET D1 100 LF CASE 3 BIKE LANE PER DETAIL D, SHEET D1 32 LF CASE 2 BIKE LANE PER DETAIL D, SHEET D1 112 LF INSTALL (N) R26 SIGN ON (N) 12' PUNCH POST INSTALL (N) R26 SIGN ON (N) 12' PUNCH POST BULBOUT PER DETAIL F, SHEET D1 8" WHITE 400 LF 12" WHITE 197 LF (9) FLEX POSTS BULBOUT PER DETAIL F, SHEET D1 8" WHITE 148 LF 12" WHITE 105 LF (9) FLEX POSTS BULBOUT PER DETAIL F, SHEET D1 8" WHITE 117 LF 12" WHITE 117 LF (11) FLEX POSTS (5) FLEX POSTS 4" WHITE 104 LF 12" WHITE 45° 12' O.C. 26 LF (3) FLEX POSTS 4" WHITE 104 LF 12" WHITE 45° 12' O.C. 26 LF (3) FLEX POSTS DETAIL 29, 123 LF DETAIL 22, 28 LF (14) FLEX POSTS BIKE RIDER SYMBOL 2 SQFT, Typ. BIKE ARROW 3.5 SQFT, Typ. DETAIL 29, 126 LF DETAIL 22, 45 LF (12) FLEX POSTS DETAIL 32 1209 LF, Cont. DETAIL 27B 1268 LF, Cont. BIKE BUFFER PER DETAIL C, SHEET D1 1180 LF, Cont. BIKE BUFFER PER DETAIL C, SHEET D1 1324 LF, Cont. DETAIL 27B 1338 LF, Cont. TYPE IV ARROW 15 SQFT, Typ. N 8. 5 ' 6' 2' 10 . 5 ' 11 . 5 ' 10 . 5 ' 2' 6' 7. 5 ' 3. 5 ' 10 . 5 ' 10 . 5 ' 2' 6' 10 . 5 ' 6' 5' 5' 6' 4. 5 ' 4. 5 ' 3. 5 ' 10 . 5 ' 8. 5 ' 6' 2' 10 . 5 ' 7. 5 ' 1 3 . 5 ' 10 . 5 ' 10 . 5 ' 6' 10 . 5 ' 3' 5. 5 ' 8. 5 ' 10 . 5 ' 3' 6' 8' 5' 13 ' DETAIL 22, 28 LF (2) FLEX POSTS DETAIL 22, 19 LF (2) FLEX POSTS 80400 C I V I L BR IA N A . NEL S O N No. C 79870 56 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. JO H N S O N S MAY 2024 Page 712 of 888 MA T C H L I N E SE E SH E E T S 5 6 CASE 1 BIKE LANE PER DETAIL D, SHEET D1 21 LF DETAIL 22 104 LF GREENBACK SHARROW SYMBOL PER DETAIL G, SHEET D1 36 SQFT, Typ. EDGE GRIND 194 LF EDGE GRIND 336 LF CASE 1 BIKE LANE PER DETAIL D, SHEET D1 30 LF CASE 3 BIKE LANE PER DETAIL D, SHEET D1 82 LF CASE 1 BIKE LANE PER DETAIL D, SHEET D1 30 LF CASE 2 BIKE LANE PER DETAIL D, SHEET D1 100 LF CASE 3 BIKE LANE PER DETAIL D, SHEET D1 97 LF DETAIL 38 100 LF DETAIL 27B 152 LF "STOP" LEGEND 22 SQFT, Typ. 12" WHITE 10' O.C. 45° 42 LF 12" WHITE 43 LF DETAIL 22 153 LF DETAIL 39A 40 LF DETAIL 27B 314 LF DETAIL 32 183 LF TYPE IV ARROW 15 SQFT, Typ.DETAIL 38 50 LF BIKE BUFFER PER DETAIL C, SHEET D1 236 LF DETAIL 27B 236 LF N 80400 C I V I L BRI A N A . NEL S O N No. C 79870 57 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. JO H N S O N S MAY 2024 Page 713 of 888 MA T C H L I N E SE E CE N T E R 4. 5 ' 4. 5 ' 4. 5 ' 4. 5 ' BIKE LOOP SYMBOL 2 SQFT, Typ. SEE DETAIL A, SHEET D1 327 LF DETAIL 27B 1480 LF DETAIL 27B 939 LF DETAIL 24 43 LF DETAIL 24 205 LFDETAIL 27B 160 LF DETAIL 27B 161 LF 12" WHITE 5 LF N MA T C H L I N E SE E BE L O W MA T C H L I N E SE E AB O V E 4. 5 ' 4. 5 ' DETAIL 24 39 LF BIKE ARROW 3.5 SQFT, Typ. BIKE RIDER 7 SQFT, Typ. SEE DETAIL A, SHEET D1 327 LF, Cont. DETAIL 27B 1480 LF, Cont. DETAIL 27B 939 LF, Cont. N MA T C H L I N E SE E CE N T E R 4. 5 ' 4. 5 ' DETAIL 24 75 LF DETAIL 24 100 LF SEE DETAIL A, SHEET D1 327 LF DETAIL 27B 1480 LF, Cont. DETAIL 27B 525 LF N 80400 C I V I L BRI A N A . NEL S O N No. C 79870 58 2000615 DATE 1" = 40' BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 PLAN FILE NO. / LOCATION SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. RA I L R O A D S A F E T Y T R A I L S MAY 2024 Page 714 of 888 Southwood Drive SENIOR CITIZENS CENTER 5 1 2 3 4 6 9.00' (TYP.)63.00' 7 SPACES @ 9' 0" 14' 8.5" 1.96' (TYP.) 17.00' 2 SPACES @ 8' 6" N 2.50' 3.35' 9.00' 8.25' 9.00' 8.25' 9.00' 7 7 CITY SPECIFICATION NO. DATE: PR O J E C T T I T L E : SH E E T T I T L E : of SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION CONSTRUCTION NOTES: 1. PROTECT EXISTING CONCRETE CURB (TYP.) 2. ACCESSIBLE PARKING SYMBOL IN ACCORDANCE WITH CBC SECTION 11B-502.6 REQUIREMENTS 3. 4" WIDE WHITE PARKING STALL LINE 4. ACCESSIBLE PARKING AISLE WITH 4" WIDE BLUE BORDER STRIPE AND 4" WIDE DIAGONAL BLUE 5. REMOVE AND REINSTALL EXISTING WHEEL STOPS 6. EXISTING SIDEWALK - PROTECT IN PLACE 7. NO PARKING SYMBOL IN ACCORDANCE WITH CALTRANS STD A24E NGN NGN SM BN 1" = 10' 2000615 RO A D W A Y S E A L I N G 2 0 2 4 MI T C H E L L P A R K P A R K I N G L O T S59010 20 No. C 79870 B R I A N A .NELS O N CI V I L DATE  MAY 2024 Page 715 of 888 SAN LUIS OBISPO COUNTY YMCA S O U T H W O O D D R STORAGE CONTAINE R STORAGE CONTAINE RSTORAGE CONTAINE R STORAGE C O N T A I N E R STORAGE CONTAIN E R STORAGE C O N T A I N E R 7 7 7 7 6 17 . 5 ' ( T Y P . ) 7 5.0' 37.3' 4 SPACES @ 9 ' - 4 " 9.0'6.0' 6.0'6.0' 9.12'8.88'9.25'7.10'10.43' 9.07' 8.93' 9.00' 6.0'12.68'9.06'36.00' 4 SPACES @ 9 '- 0" 36.67' 4 SPACES @ 9' - 2" 45.00' 5 SPACES @ 9' - 0"8.86'8.84'25.50' 3 SPACES @ 8' - 6" 9.89' N 39.00' 4 SPACES @ 9 - 8"9.60' 11.37' 33.66' 4 SPACES @ 8 ' - 5 " 1 2 3 4 5 CITY SPECIFICATION NO. DATE: PR O J E C T T I T L E : SH E E T T I T L E : of SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION CONSTRUCTION NOTES: 1. PROTECT EXISTING CONCRETE CURB (TYP.) 2. ACCESSIBLE PARKING SYMBOL IN ACCORDANCE WITH CBC SECTION 11B-502.6 REQUIREMENTS 3. 4" WIDE WHITE PARKING STALL LINE 4. ACCESSIBLE PARKING AISLE WITH 4" WIDE BLUE BORDER STRIPE AND 4" WIDE DIAGONAL WHITE 5. REMOVE AND REINSTALL EXISTING WHEEL STOPS 6. EXISTING SIDEWALK - PROTECT IN PLACE 7. EXISTING TREE - PROTECT IN PLACE 8. NO PARKING SYMBOL IN ACCORDANCE WITH CALTRANS STD A24E NGN NGN SM BN 1" = 20' 2000615 RO A D W A Y S E A L I N G 2 0 2 4 JO H N S O N P A R K P A R K I N G L O T S60 No. C 79870 B R I A N A .NELS O N C I V I L020 40  MAY 2024 Page 716 of 888 smh smh INDUSTRIAL WAYsmh smh 2 9 11 3 3 3 3 10 7 4 12 5 6 255' 30 SPACES @ 8' 6" 28' 7 SPACES @ 4' 0 205' 24 (TYP) SPACES @ 8' 6" 127.5' 15 SPACES @ 8' - 6' 12" WHITE 10 LF "STOP" LEGEND 22 SQFT, TYP. 8.5' (TYP.) 18 . 0 0 ' 4.0 ' 4.17' 9.27'11.51'11.11'11.39'8.46' 8.46'8.50'9.01'11.12' 9.01'8.00'8.48'9.12'5.00'8.86'9.18'8.08' 119' 14 SPACES @ 8' - 6" 119' 14 SPACES @ 8' - 6" 34' 4 SPACES @ 8' - 6" 18.00' (TYP) 8.0' N 8.5' (TYP.) 17 . 0 0 ' 8. 5 0 ' 102.00' 12 SPACES @ 8' 6"8.96' 11.71' CITY SPECIFICATION NO. DATE: PR O J E C T T I T L E : SH E E T T I T L E : of SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION CONSTRUCTION NOTES: 1. REMOVE AND REINSTALL EXISTING WHEEL STOPS 2. PROTECT EXISTING CONCRETE CURB (TYP.) 3. PROTECT IN PLACE EXISTING PARKING ISLANDS (TYP.) 4. PROTECT IN PLACE EXISTING LIGHTS (TYP.) 5. ACCESSIBLE PARKING SYMBOL IN ACCORDANCE WITH CBC SECTION 11B-502.6 REQUIREMENTS 6. ACCESSIBLE PARKING AISLE WITH 4" WIDE BLUE BORDER STRIPE AND 4" WIDE DIAGONAL WHITE 7. 4" WIDE WHITE PARKING STALL LINE 8. PROTECT IN PLACE EXISTING CONCRETE PAD 9. 4" WIDE WHITE MOTORCYCLE PARKING STALL LINE 10. EXISTING MANHOLE TO BE PROTECTED IN PLACE 11. EXISTING CURB AND GUTTER TO BE PROTECTED IN PLACE 12. EXISTING DRAINAGE DITCH TO BE PROTECT IN PLACE 13. NO PARKING SYMBOL IN ACCORDANCE WITH CALTRANS STD A24E NGN NGN SM BN 1" = 30' 2000615 RO A D W A Y S E A L I N G 2 0 2 4 DA M O N G A R C I A P A R K I N G L O T S61 69 No. C 79870 B R I A N A .NELS O N CI V I L 0 30 60 DATEMAY 2024 Page 717 of 888 SE E MA T C H L I N E SH E E T S 5 9 DETAIL 39A, 16 LF DETAIL 82, 204 LF RED CURB 50 LF CASE 1 BIKE LANE PER DETAIL D, SHEET D1, 17 LF CASE 1 BIKE LANE PER DETAIL D, SHEET D1, 17 LF BIKE BUFFER PER DETAIL C, SHEET D1, 27 LF CASE 3 BIKE LANE PER DETAIL D, SHEET D1 52 LF CASE 3 BIKE LANE PER DETAIL D, SHEET D1 17 LF TYPE VII ARROW 27 SQFT, Typ. YELLOW HI-VIS CROSSWALK 44 LF DETAIL 24, 204 LF BIKE BUFFER PER DETAIL C, SHEET D1, 30 LF (5) ZICLA ZEBRA PER DETAIL B, SHEET D1 BIKE BUFFER PER DETAIL C, SHEET D1 257 LF BIKE BUFFER PER DETAIL C, SHEET D1 116 LF DETAIL 22, 122 LF 12" WHITE 69 LF (12) 36" YELLOW FLEX POSTS 12" WHITE 40 LF RED CURB 6 LF YELLOW HI-VIS CROSSWALK 86 LF N PROTECT IN PLACE (E) DECORATIVE CROSSWALK REFUGE PER DETAIL G, SHEET D2 SHARROW 11.5 SQFT, Typ. DETAIL 39A 28 LF BIKE ARROW 3.5 SQFT BIKE RIDER 7 SQFT 12" WHITE 10 LF REMOVE (E) SIGN POLE AND (E) SIGNS. REINSTALL (E) R1-1, (E) R1-3P, AND (N) STREET NAME SIGNS SIGNS ON (N) 12' PUNCH POST IN SAME LOCATION REMOVE (E) SR4-1(CA) AND INSTALL (N) W4-2 & R26(CA) DETAIL 9 55 LF BIKE BUFFER PER DETAIL F, SHEET D2, 202 LF R8' INSTALL R4-1 SIGN ON (N) 12' PUNCH POST INSTALL SR4-1(CA) ON (E) PUNCH POST INSTALL R4-1 SIGN ON (N) 12' PUNCH POST INSTALL (N) STREET NAME SIGNS ON (E) PUNCH POST. INSTALL R10-15(MOD) SIGN ON (N) PUNCH POST BIKE BUFFER PER DETAIL F, SHEET D2, 102 LF (9) ZICLA AND (3) FLEX POSTS 1' 10 ' 10 ' 3' 8' 9. 5 ' 8' 13 . 5 ' 1' REFUGE PER DETAIL G, SHEET D2 31 . 5 ' 28 . 5 ' R9' R10.5' 5' 6' 10'5.5'8' 8'5.5' RED CURB 29.5 LF RED CURB 64 LF TYPE VI ARROW 40 SQFT, Typ. DETAIL 38 50 LF 12 SIZE "STOP" LEGEND 11 SQFT, Typ. DETAIL 38A 17 LF 12 SIZE TYPE IV ARROW 7.5 SQFT INSTALL W9-1 SIGN ON (N) 12' PUNCH POST 11 ' 11 ' 4' 8' 3' 10 ' 5' 8' 3' 8' CASE 1 BIKE LANE PER DETAIL D, SHEET D1, 20 LF 1" = 30' 60300 C I V I L BRI A N A . NEL S O N No. C 79870 62 2000615 DATE BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. NOTES REMOVE CONFLICTING (E) STRIPING FOR ANY CONFLICT WITH BASE BID STRIPING, ADD. ALT. A STRIPING PREVAILS S BI D A L T . A . G R A N D MAY 2024 Page 718 of 888 SE E MA T C H L I N E SH E E T S 6 0 SE E MA T C H L I N E SH E E T S 5 8 HI-VIS CROSSWALK 81 LF CASE 1 BIKE LANE PER DETAIL D, SHEET D1, 17 LF CASE 1 BIKE LANE PER DETAIL D, SHEET D1, 17 LF DETAIL 22 95 LF DETAIL 27B 32 LF 10' O.C. INSTALL RRFB SYSTEM WITH W11-2 and W16-7P SIGNS BACK TO BACK REMOVE (E) SR4-1, INSTALL RRFB SYSTEM WITH W11-2 and W16-7P SIGNS BACK TO BACK ON LUMINAIRE POLE INSTALL RRFB SYSTEM WITH W11-2 and W16-7P SIGNS RELOCATE BUS STOP SIGN TO NEXT BLOCK SOUTH INSTALL R1-5 SIGN ON (N) 12' PUNCH POST INSTALL W11-2 and W16-9P SIGNS ON (N) 12' PUNCH POST INSTALL R6-1(R) SIGN ON (N) 12' PUNCH POST CASE 3 BIKE LANE PER DETAIL D, SHEET D1 42 LF CASE 3 BIKE LANE PER DETAIL D, SHEET D1 52 LF CASE 1 BIKE LANE PER DETAIL D, SHEET D1 52 LF (2) WHITE FLEX POSTS AND (3) ZICLA ZEBRA PER DETAIL F, SHEET D2 CASE 3 BIKE LANE PER DETAIL D, SHEET D1, 57 LF CASE 1 BIKE LANE PER DETAIL D, SHEET D1 56 LF (2) WHITE FLEX POSTS AND (3) ZICLA ZEBRA PER DETAIL F, SHEET D2 N YIELD LINE 6Δ RED CURB 17 LF DETAIL 24 332 LF DETAIL 24 331 LF DETAIL 22, 34 LF (4) 36" YELLOW FLEX POSTS BIKE BUFFER PER DETAIL C, SHEET D1, 72 LF BIKE BUFFER PER DETAIL C, SHEET D1, 115 LF BIKE BUFFER PER DETAIL F, SHEET D2 181 LF BIKE BUFFER PER DETAIL C, SHEET D1 207 LF BIKE BUFFER PER DETAIL F, SHEET D2 135 LF R8' CASE 1 BIKE LANE PER DETAIL D, SHEET D1, 30 LF INSTALL R3-5(R) SIGN ON (E) PUNCH POST RED CURB 13 LF INSTALL SR4-1(CA) SIGN ON (N) 12' PUNCH POST 8' 10 . 5 ' 10 ' 3' 8' 11 ' 10 ' 2. 5 ' 10 ' 1' BIKE BUFFER PER DETAIL C, SHEET D1 294 LF HI-VIS CROSSWALK 27 LF CASE 3 BIKE LANE PER DETAIL D, SHEET D1 42 LF BIKE BUFFER PER DETAIL C, SHEET D1 116 LF 1' 10 ' 2. 5 ' INSTALL R2-1(35) SIGN ON (E) PUNCH POST HI-VIS CROSSWALK 37 LF (3) WHITE FLEX POSTS (2) ZICLA ZEBRA PER DETAIL B, SHEET D1 REFUGE PER DETAIL G, SHEET D2 3' 10 ' 5' 8' 3' 8. 5 ' 3' 1" = 30' 60300 C I V I L BR IA N A . NEL S O N No. C 79870 63 2000615 DATE BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. NOTES REMOVE CONFLICTING (E) STRIPING FOR ANY CONFLICT WITH BASE BID STRIPING, ADD. ALT. A STRIPING PREVAILS S BI D A L T . A . G R A N D MAY 2024 Page 719 of 888 SE E MA T C H L I N E SH E E T S 6 1 SE E MA T C H L I N E SH E E T S 5 9 CASE 1 BIKE LANE PER DETAIL D, SHEET D1, 17 LFCASE 1 BIKE LANE PER DETAIL D, SHEET D1, 50 LF RED CURB 141 LF RELOCATED BUS STOP SIGN CASE 3 BIKE LANE PER DETAIL D, SHEET D1 57 LF CASE 1 BIKE LANE PER DETAIL D, SHEET D1 54 LF (2) WHITE FLEX POSTS AND (3) ZICLA ZEBRA PER DETAIL F, SHEET D2 CASE 2 BIKE LANE PER DETAIL D, SHEET D1 88 LF CASE 3 BIKE LANE PER DETAIL D, SHEET D1 52 LF CASE 1 BIKE LANE PER DETAIL D, SHEET D1 56 LF (2) WHITE FLEX POSTS AND (3) ZICLA ZEBRA PER DETAIL F, SHEET D2 CASE 2 BIKE LANE PER DETAIL D, SHEET D1 88 LF CASE 3 BIKE LANE PER DETAIL D, SHEET D1 52 LF BIKE BUFFER PER DETAIL C, SHEET D1 74 LF N RED CURB 41 LF DETAIL 22 23 LF DETAIL 24 260 LF DETAIL 24, 260 LF DETAIL 22 12 LF RED CURB 56 LF RED CURB 104 LF TYPE IV ARROW 15 SQFT, Typ. YIELD LINE 15 Δ DETAIL 22, 107 LF DETAIL 27B, 54 LF (4) 36" YELLOW FLEX POSTSBIKE BUFFER PER DETAIL F, SHEET D2 13 LF BIKE BUFFER PER DETAIL C, SHEET D1 30 LF BIKE BUFFER PER DETAIL C, SHEET D1 115 LF INSTALL STREET NAME SIGNS ON (E) PUNCH POST 9. 5 ' 8' 10 ' 1. 5 ' 8' 11 ' 10 ' 1' 2. 5 ' 10 ' 7. 5 ' 3' 8' 5' 10 ' 3' BIKE BUFFER PER DETAIL F, SHEET D2 105 LF BIKE BUFFER PER DETAIL F, SHEET D2, 108 LF BIKE BUFFER PER DETAIL C, SHEET D1 152 LF 1' 10 '2' 15 ' 8' 12 ' 1" = 30' 60300 C I V I L BR IA N A . NEL S O N No. C 79870 64 2000615 DATE BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. NOTES REMOVE CONFLICTING (E) STRIPING FOR ANY CONFLICT WITH BASE BID STRIPING, ADD. ALT. A STRIPING PREVAILS S BI D A L T . A . G R A N D MAY 2024 Page 720 of 888 SE E MA T C H L I N E SH E E T S 6 0 SE E MA T C H L I N E SH E E T S 6 2 HI-VIS CROSSWALK 48 LF ADJUST SPACING SUCH THAT SPACES BETWEEN MARKING MUST BE PLACED IN WHEEL TRACKS CASE 1 BIKE LANE PER DETAIL D, SHEET D1, 23 LF INSTALL R3-5(R) SIGN ON (E) PUNCH POST CASE 3 BIKE LANE PER DETAIL D, SHEET D1 57 LF CASE 3 BIKE LANE PER DETAIL D, SHEET D1 62 LF CASE 3 BIKE LANE PER DETAIL D, SHEET D1 37 LF N DETAIL 24, 271 LFDETAIL 24, 268 LF DETAIL 22, 72 LF (3) 36" YELLOW FLEX POSTS (2) ZICLA ZEBRAS PER DETAIL B, SHEET D1 DETAIL 24 192 LFDETAIL 24 188 LF TYPE IV ARROW 15 SQFT, Typ.RED CURB 37 LF BIKE BUFFER PER DETAIL F, SHEET D2 276 LFBIKE BUFFER PER DETAIL C, SHEET D1, 96 LF (2) ZICLA ZEBRA PER DETAIL B, SHEET D1 (1) 36" WHITE FLEX POST BIKE BUFFER PER DETAIL C, SHEET D1 162 LF "ONLY" LEGEND 22 SQFT 3' DETAIL 38 45 LF 10 ' 6' 12 ' TYPE I 10' ARROW 14 SQFT BIKE BUFFER PER DETAIL C, SHEET D1 85 LF CASE 2 BIKE LANE PER DETAIL D, SHEET D1 100 LF CASE 1 BIKE LANE PER DETAIL D, SHEET D1, 42 LF 12" WHITE 73 LF (4) 36" WHITE FLEX POSTS 12" WHITE 29 LF (1) 36" WHITE FLEX POST 8. 5 ' 12 . 5 ' 11 . 5 ' 8' BIKE BUFFER PER DETAIL F, SHEET D2 285 LF INSTALL R3-7R ON (N) 12' PUNCH POST INSTALL R4-4 ON (N) 12' PUNCH POST 1' 10 ' 10 ' 14 ' 8' BIKE BUFFER PER DETAIL C, SHEET D1 243 LF BIKE BUFFER PER DETAIL C, SHEET D1 65 LF 10 ' 9. 5 ' 2' 10 ' 5' 8' 3' 8' 1' CASE 1 BIKE LANE PER DETAIL D, SHEET D1 51 LF (2) WHITE FLEX POSTS AND (3) ZICLA ZEBRA PER DETAIL F, SHEET D2 CASE 1 BIKE LANE PER DETAIL D, SHEET D1, 20 LF 1" = 30' 60300 C I V I L BRI A N A . NEL S O N No. C 79870 65 2000615 DATE BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. NOTES REMOVE CONFLICTING (E) STRIPING FOR ANY CONFLICT WITH BASE BID STRIPING, ADD. ALT. A STRIPING PREVAILS S BI D A L T . A . G R A N D MAY 2024 Page 721 of 888 SE E MA T C H L I N E SH E E T S 6 3 SE E MA T C H L I N E SH E E T S 6 1 HI-VIS CROSSWALK 25 LF ADJUST SPACING SUCH THAT SPACES BETWEEN MARKING MUST BE PLACED IN WHEEL TRACKS CASE 1 BIKE LANE PER DETAIL D, SHEET D1, 17 LF CASE 3 BIKE LANE PER DETAIL D, SHEET D1 77 LF CASE 2 BIKE LANE PER DETAIL D, SHEET D1 100 LFCASE 3 BIKE LANE PER DETAIL D, SHEET D1 47 LF CASE 3 BIKE LANE PER DETAIL D, SHEET D1 42 LF CASE 1 BIKE LANE PER DETAIL D, SHEET D1 53 LF DETAIL 22 22 LF DETAIL 24 120 LFDETAIL 24, 117 LF RED CURB 99 LF PROTECT IN PLACE TYPE IV ARROW 15 SQFT, Typ. HI-VIS CROSSWALK 30 LF 12" WHITE 33 LF DETAIL 38, 39 LF BIKE BUFFER PER DETAIL C, SHEET D1 64 LF BIKE BUFFER PER DETAIL C, SHEET D1 32 LF BIKE BUFFER PER DETAIL C, SHEET D1 60 LF BIKE BUFFER PER DETAIL C, SHEET D1 148 LF BIKE BUFFER PER DETAIL C, SHEET D1 256 LFRED CURB 123 LF 14 ' 10 ' 3' 11 ' 9' 14 ' 8' 3' 7. 5 ' 3' 8' 3' 10 ' 3' 10 ' 2. 5 ' 10 ' 3' 8' 3' 8' RED CURB 30 LF 3' 11 ' 11 ' 2' 9' 8' CASE 2 BIKE LANE PER DETAIL D, SHEET D1, 100 LF 10 . 5 ' 8' 2' 12 ' 10 ' 7' 12" WHITE 30 LF TYPE I 10' ARROW 14 SQFT 1" = 30' 60300 C I V I L BRI A N A . NEL S O N No. C 79870 66 2000615 DATE BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. NOTES REMOVE CONFLICTING (E) STRIPING FOR ANY CONFLICT WITH BASE BID STRIPING, ADD. ALT. A STRIPING PREVAILS S BI D A L T . A . G R A N D USE CAUTION WHEN REMOVING (E) STRIPING TO PROTECT IN PLACE (E) TRAFFIC SIGNAL LOOP DETECTORS MAY 2024 Page 722 of 888 S E E M A T C H L I N E S H E E T S 6 4 SE E MA T C H L I N E SH E E T S 6 2 CASE 1 BIKE LANE PER DETAIL D, SHEET D1, 17 LF CASE 1 BIKE LANE PER DETAIL D, SHEET D1, 17 LF CASE 1 BIKE LANE PER DETAIL D, SHEET D1, 17 LF CASE 3 BIKE LANE PER DETAIL D, SHEET D1 67 LF N TYPE IV ARROW 15 SQFT, Typ. (4) 36" WHITE FLEX POSTS DETAIL 24 398 LF DETAIL 24 405 LF DETAIL 29 83 LF BIKE BUFFER PER DETAIL C, SHEET D1 444 LF BIKE BUFFER PER DETAIL C, SHEET D1 457 LF BIKE BUFFER PER DETAIL C, SHEET D1 294 LF BIKE BUFFER PER DETAIL C, SHEET D1 349 LF 10 ' 2.5 ' 10 ' 3' 8' 3' 8' 8 ' 3 ' 8 ' 3 ' 1 0 ' 3 ' 4 ' 1 0 ' 3 ' 8 ' 3 ' 8 ' RED CURB 4 LF RED CURB 4 LF RED CURB 16 LF RED CURB 3 LF RED CURB 3 LF RED CURB 3 LF RED CURB 5 LF RED CURB 5 LF (2) YELLOW FLEX POSTS INSTALL OM2-1V SIGN ON (N) 12' PUNCH POST ON MEDIAN NOSE (3) 36" WHITE FLEX POSTS 1 0 3 ' 4 ' 1 0 ' 3 ' 8 ' 3 ' 8 ' 1" = 30' 60300 C I V I L BRI A N A . NEL S O N No. C 79870 67 2000615 DATE BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. NOTES REMOVE CONFLICTING (E) STRIPING FOR ANY CONFLICT WITH BASE BID STRIPING, ADD. ALT. A STRIPING PREVAILS S BI D A L T . A . G R A N D MAY 2024 Page 723 of 888 SE E MA T C H L I N E SH E E T S 6 5 SE E MA T C H L I N E SH E E T S 6 3 RED CURB 58 LF CASE 1 BIKE LANE PER DETAIL D, SHEET D1, 17 LF CASE 2 BIKE LANE PER DETAIL D, SHEET D1 124 LFCASE 3 BIKE LANE PER DETAIL D, SHEET D1 37 LF CASE 2 BIKE LANE PER DETAIL D, SHEET D1 160 LF CASE 2 BIKE LANE PER DETAIL D, SHEET D1 52 LF N DETAIL 22 115 LF TYPE IV ARROW 15 SQFT, Typ. RED CURB 20 LF RED CURB 25 LF DETAIL 22 43 LF DETAIL 27B 16 LF BIKE BUFFER PER DETAIL C, SHEET D1 105 LF BIKE BUFFER PER DETAIL C, SHEET D1 63 LF 8' 13 ' 10 ' 3. 5 ' 11 . 5 ' 8' 11 ' 30.5' BIKE BUFFER PER DETAIL C, SHEET D1 30 LF 8' 3' 8' 3' 10 ' 3' 4' 10 ' 3' 8' 3' 8' 1" = 30' 60300 C I V I L BRI A N A . NEL S O N No. C 79870 68 2000615 DATE BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. NOTES REMOVE CONFLICTING (E) STRIPING FOR ANY CONFLICT WITH BASE BID STRIPING, ADD. ALT. A STRIPING PREVAILS S BI D A L T . A . G R A N D MAY 2024 Page 724 of 888 SE E MA T C H L I N E SH E E T S 6 4 S E E M A T C H L I N E S H E E T S 2 8 REMOVE (E) STRIPING 12" WHITE, 11 LF DETAIL 22, 10 LF 12" WHITE 16 LF CASE 2 BIKE LANE PER DETAIL D, SHEET D1 64 LF CASE 1 BIKE LANE PER DETAIL D, SHEET D1, 17 LF CASE 1 BIKE LANE PER DETAIL D, SHEET D1 40 LF N TYPE IV ARROW 15 SQFT, Typ. HI-VIS CROSSWALK 49 LF DETAIL 38 61 LF 12" WHITE 11 LF 12" WHITE 22 LF 12" WHITE 14 LF 12" WHITE 21 LF 12" WHITE 12 LF DETAIL 38 56 LF HI-VIS CROSSWALK 63 LF HI-VIS CROSSWALK 87 LF GREENBACK SHARROW 11.5 SQFT, Typ. TYPE VII ARROW 27 SQFT RED CURB 63 LFDETAIL 24 209 LF RED CURB 47 LF DETAIL 24 209 LF DETAIL 29 59 LF BIKE BUFFER PER DETAIL C, SHEET D1 103 LF BIKE BUFFER PER DETAIL C, SHEET D1 60 LF BIKE BUFFER PER DETAIL C, SHEET D1 233 LF BIKE BUFFER PER DETAIL C, SHEET D1 239 LF REMOVE (E) STRIPING DETAIL 22, 10 LF DETAIL 27B, 45 LF 2. 5 ' 10 ' 3' 8' 3' 8' 8' 22 ' 12 ' 11 . 5 ' INSTALL R61-5(CA) SIGN ON (E) LUMINAIRE POLE INSTALL R61-5(CA) SIGN ON (N) 12' PUNCH POST INSTALL R81(CA) AND R81A(CA) SIGNS ON (N) PUNCH POST 2' 10 ' 3' 8' 3' 8' 2' 2' 9' TRUNCATED DOMES PER CITY STD 4440 & CALTRANS STDA88 BUFFER PER DETAIL F, SHEET D1 29 LF R5' HI-VIS CROSSWALK 33 LF HI-VIS CROSSWALK 45 LF DETAIL 22, 14 LF (3) WHITE FLEX POSTS (2) ZICLA ZEBRA PER DETAIL B, SHEET D1 1" = 30' 60300 C I V I L BRI A N A . NEL S O N No. C 79870 69 2000615 DATE BN WBH KH NGN RO A D W A Y S E A L I N G 2 0 2 4 SCALE: APPROVED BY: CHECKED BY: DRAWN BY: DESIGNED BY: SHEET NO. of SH E E T T I T L E : PR O J E C T T I T L E : DATE: CITY SPECIFICATION NO. NOTES REMOVE CONFLICTING (E) STRIPING FOR ANY CONFLICT WITH BASE BID STRIPING, ADD. ALT. A STRIPING PREVAILS S BI D A L T . A . G R A N D USE CAUTION WHEN REMOVING (E) STRIPING TO PROTECT IN PLACE (E) TRAFFIC SIGNAL LOOP DETECTORS MAY 2024 Page 725 of 888 Page 726 of 888 SPECIAL PROVISIONS FOR CITY OF SAN LUIS OBISPO Roadway Sealing 2024 Specification No. 2000615 MAY 2024 PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION 919 Palm Street San Luis Obispo, CA 93401 (805) 781-7200 Page 727 of 888 Roadway Sealing 2024 Specification No. 2000615 Approval Date: May 21, 2024 <<Signature Date>> Page 728 of 888 TABLE OF CONTENTS NOTICE TO BIDDERS ..................................................................................................... I BID SUBMISSION ...................................................................................................................................... I BID DOCUMENTS .................................................................................................................................... II PROJECT INFORMATION ........................................................................................................................ II QUALIFICATIONS .................................................................................................................................... III AWARD .................................................................................................................................................... IV ACCOMMODATION .................................................................................................................................. V BID FORMS .................................................................................................................... A BID ITEM LIST FOR ROADWAY SEALING 2024, SPECIFICATION NO. 2000615 ................................ A LIST OF SUBCONTRACTORS ................................................................................................................. F PUBLIC CONTRACT CODE SECTION 10285.1 STATEMENT .............................................................. G PUBLIC CONTRACT CODE SECTION 10162 QUESTIONNAIRE ......................................................... G PUBLIC CONTRACT CODE SECTION 10232 STATEMENT ................................................................. G LABOR CODE SECTION 1725.5 STATEMENTS ................................................................................... G NON-COLLUSION DECLARATION ........................................................................................................... I BIDDER ACKNOWLEDGEMENTS ........................................................................................................... J QUALIFICATIONS ..................................................................................................................................... K ATTACH BIDDER'S BOND TO ACCOMPANY BID .................................................................................. L SPECIAL PROVISIONS .................................................................................................. 1 DIVISION I GENERAL PROVISIONS ....................................................................................................... 1 1 GENERAL ........................................................................................................................................... 1 3 CONTRACT AWARD AND EXECUTION ........................................................................................... 1 4 SCOPE OF WORK ............................................................................................................................. 2 5 CONTROL OF WORK ........................................................................................................................ 2 6 CONTROL OF MATERIALS ............................................................................................................... 3 7 LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC ....................................................... 3 8 PROSECUTION AND PROGRESS ................................................................................................... 5 DIVISION II GENERAL CONSTRUCTION ............................................................................................... 5 12 TEMPORARY TRAFFIC ONTROL ................................................................................................... 5 13 WATER POLLUTION CONTROL ..................................................................................................... 6 15 EXISTING FACILITIES ..................................................................................................................... 6 DIVISION V SURFACINGS AND PAVEMENTS ....................................................................................... 6 37 BITUMINOUS SEALS ....................................................................................................................... 6 DIVISION VIII MISCELLANEOUS CONSTRUCTION .............................................................................. 8 77 LOCAL INFRASTRUCTURE ............................................................................................................ 8 DIVISION IX TRAFFIC CONTROL DEVICES ........................................................................................... 8 Page 729 of 888 84 MARKINGS ....................................................................................................................................... 8 DIVISION X ELECTRICAL WORK ............................................................................................................ 9 86 ELECTRICAL SYSTEMS ................................................................................................................. 9 DIVISION XIII APPENDICES .................................................................................................................... 9 ADD SECTION 100 APPENDICES ....................................................................................................... 9 APPENDIX A - FORM OF AGREEMENT ......................................................................... APPENDIX B – CALTRANS ENCROACHMENT PERMIT ................................................ APPENDIX C - SCHOOL ZONES ..................................................................................... APPENDIX D - SEALMASTER COLOR ............................................................................ Page 730 of 888 NOTICE TO BIDDERS i NOTICE TO BIDDERS BID SUBMISSION Sealed bids will be received by the City of San Luis Obispo at the Public Works Administration Office located at 919 Palm Street, San Luis Obispo, California 93401, until 11:00 a.m. on June 20, 2024 at which time they will be publicly opened and read aloud. Public bid opening may also be viewed via Microsoft Teams video conference and conference call. Use the following link: https://teams.microsoft.com/l/meetup- join/19%3ameeting_YTIyMGYyYWEtMTExYS00NTkxLWJlYWEtOTEwNGQxNzI3ODQ w%40thread.v2/0?context=%7b%22Tid%22%3a%22a78b182d-94e4-4507-a9a9- 330dcb148164%22%2c%22Oid%22%3a%22eec32d58-d6a8-4d68-8923- 9cce58e6b2a9%22%7d or join by phone with this number: (209) 645-4165 with Conference ID:950 007 038# Submit bid in a sealed envelope plainly marked: ROADWAY SEALING 2024, SPECIFICATION NO. 2000615 Any bid received after the time and date specified will not be considered and will be returned to the bidder unopened. Bids received by Fax or Email will not be considered. By submission of bid you agree to comply with all instruction and requirements in this notice and the contract documents. All bids must be submitted on the Bid Item List form(s) provided and submitted with all other Bid Forms included in these Special Provisions. Each bid must be accompanied by either a: 1. certified check 2. cashier's check 3. bidder's bond made payable to the City of San Luis Obispo for an amount equal to ten percent of the bid amount as a guaranty. Guaranty will be forfeited to the City San Luis Obispo if the bidder, to whom the contract is awarded, fails to enter into the contract. The City of San Luis Obispo reserves the right to accept or reject any or all bids or waive any informality in a bid. All bids are to be compared based on the City Engineer's estimate of the quantities of work to be done, as shown on the Bid Item List. Page 731 of 888 NOTICE TO BIDDERS NOTICE TO BIDDERS ii Bids will only be accepted from bidders that are licensed in compliance with the provisions of Chapter 9, Division III of Business and Professions Code. The award of the contract, if awarded, will be to the lowest responsive bid submitted by a responsible contractor whose bid complies with the requirements prescribed. If the contract is awarded, the contract will be awarded within 60 calendar days after the opening of the bids. Failure to raise defects in the notice to bidders or bid forms prior to bid opening constitute a waiver of those defects. BID DOCUMENTS A copy of the plans and special provisions may be downloaded, free of charge, from the City’s website at: www.slocity.org/government/department-directory/public-works/public-works-bids- proposals No printed copies are available for purchase at the City office. Standard Specifications and Engineering Standards referenced in the Special Provisions may be downloaded, free of charge, from the City’s website at: www.slocity.org/government/department-directory/public-works/documents- online/construction-documents You are responsible to obtain all issued addenda prior to bid opening. Addenda will be available to download at the City’s website listed above or at the office of the City Engineer. All questions must be submitted through Bidsync and if the City determines that a response is required, the City will post an addendum on Bidsync. Contact the project manager, Nathan Garcia Nava at (805) 783-7865 or the Public Works Department at (805) 781-7200 prior to bid opening to verify the number of addenda issued. PROJECT INFORMATION In general, the project consist of applying slurry seal, striping, pavement markings, and signage to pavement areas 1 & 8 and various other streets and parking lots as identified in the project plans. The project estimated construction cost and contract time established for the project is as follows: BASE BID: $5,100,000 60 working days Page 732 of 888 NOTICE TO BIDDERS NOTICE TO BIDDERS iii ADDITIVE ALTERNATIVE “A”: $300,000 15 working days TOTAL PROJECT BID (BASE BID + ADD ALT. “A”): $5,400,000 The fixed liquidated damages amount is established at $1,000 per day for failure to complete the work within the contract time. In compliance with section 1773 of the Labor Code, the State of California Department of Industrial Relations has established prevailing hourly wage rates for each type of workman. Current wage rates may be obtained from the Division of Labor at: https://www.dir.ca.gov/oprl/DPreWageDetermination.htm This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. QUALIFICATIONS You must possess a valid Class A or C-12 Contractor's License at the time of the bid opening. You and any subcontractors required to pay prevailing wage must be registered with the Department of Industrial Relations pursuant to Section 1725.5 of the Labor Code. You must have experience constructing projects similar to the work specified for this project. Provide three similar reference projects completed as either the prime or subcontractor. All referenced projects must have been completed within the last five years from this project’s bid opening date. One of the three reference projects must have been completed under contract with a city, county, state or federal government agency as the prime contractor. All of the referenced projects must be for roadway maintenance by slurry sealing. Failure to provide reference projects as specified in this section and as required on the qualification form is cause to reject a bid as being non-responsive. The City reserves the right to reject any bid based on non-responsiveness if a bidder fails to provide a bid that complies with all bidding instructions. The City reserves the right to reject a responsive bid based on the non-responsibility of the bidder if the Director of Public Works or Designee finds, after providing notice and a hearing to the bidder, that the bidder lacks the 1. knowledge Page 733 of 888 NOTICE TO BIDDERS NOTICE TO BIDDERS iv 2. experience, 3. or is otherwise not responsible as defined in Section 3.24 of the San Luis Obispo Municipal Code to complete the project in the best interest of the City. Rejected bidders may appeal this determination. Appeal must comply with the requirements in this Notice to Bidders. It is the City of San Luis Obispo’s intent to award the contract to the lowest responsive bid submitted by a responsible bidder. If in the bidder’s opinion the contract has been or may be improperly awarded, the bidder may protest the contract award. Protests must be filed no later than five working days after either: 1. bid opening date 2. notification of rejected bid. Protest must be in writing and received by the project manager located at: 919 Palm Street San Luis Obispo, CA 93401. Valid protests must contain the following information: 1. the reasons for the protest 2. any supporting documentation 3. the ruling expected by the City to remedy the protest. Any protest not containing all required information will be deemed invalid and rejected. The City will consider additional documentation or other supporting information regarding the protest if submitted in compliance to the specified time limits. Anything submitted after the specified time limit will be rejected and not be considered. The Director of Public Works or Designee may request additional information to be submitted within three days of the request, unless otherwise specified, and will notify the protester of ruling within ten days of determination. If the protester is not satisfied with ruling, the protester may appeal the ruling to the City Council in compliance with Chapter 1.20 of the City of San Luis Obispo Municipal Code. Pursuant to the Public Records Act (Government Code, § 6250, et seq.), the City will make public records available upon request. AWARD The lowest bidder will be determined in compliance with Public Contract Code Section 20103.8(c) with the Publicly Disclosed Funding Amount of $5,400,000 using either: • TOTAL PROJECT BID, if bid for the Base Bid + Add. Alt. “A” is less than $5,400,000 or Page 734 of 888 NOTICE TO BIDDERS NOTICE TO BIDDERS v • BASE BID, if Base Bid is less than $5,400,000 and Base Bid + Add Alt “A” is greater than $5,400,000 As a condition to executing a contract with the City, two bonds each equal to one hundred percent of the total contract price are required in compliance with Section 3-1.05 of the Standard Specifications. You may substitute securities for moneys withheld under the contract in compliance with the provisions of the Public Contract Code, Section 10263. ACCOMMODATION If any accommodations are needed to participate in the bid process, please contact Ellen Boyle (805) 781-7274 or by Telecommunications Device for the Deaf at (805) 781-7107. Requests should be made as early as possible in the bidding process to allow time for accommodation. Page 735 of 888 BID FORMS A BID FORMS All bid forms must be completed and submitted with your bid. Failure to submit these forms and required bid bond is cause to reject the bid as nonresponsive. Staple all bid forms together. THE UNDERSIGNED, agrees that they have carefully examined: 1. the location of the proposed work 2. the plans and specifications 3. read the accompanying instructions to bidders and propose to furnish all: 1. materials 2. labor to complete all the required work satisfactorily in compliance with 3. plans 4. specifications 5. special provisions for the prices set forth in the bid item list: BID ITEM LIST FOR ROADWAY SEALING 2024, SPECIFICATION NO. 2000615 Item Item Unit of Estimated Item Price Total No. SS(1) Description Measure Quantity (in figures) (in figures) 1 37 TYPE II SLURRY SEAL SQYD 452,647 2 84 4" WHITE /BLUE/YELLOW LF 8,361 3 84 8" WHITE LF 1,564 4 84 12" YELLOW/WHITE LF 10,179 5 84 24" YELLOW/WHITE LF 2,958 6 84 DETAIL 2 LF 8,613 7 84 DETAIL 9 LF 566 8 84 DETAIL 22 LF 20,377 9 84 DETAIL 24 LF 578 10 84 DETAIL 27B LF 30,410 11 84 DETAIL 29 LF 1,069 12 84 DETAIL 32 LF 4,143 13 84 DETAIL 38 LF 1,032 14 84 DETAIL 39 LF 4,060 15 84 DETAIL 39A LF 756 16 84 DETAIL 40 LF 29 17 84 DETAIL 41 LF 200 Page 736 of 888 BID FORMS BID FORMS B Item Item Unit of Estimated Item Price Total No. SS(1) Description Measure Quantity (in figures) (in figures) 18 84 DETAIL CH9 F9C-2 LF 1,182 19 84 BOTS DOTS EA 68 20 82 ROUND FLEX POSTS EA 106 21 84 WHITE/BLUE PARKING L OR T EA 55 22 84 ADA NO PARKING EA 10 23 84 ADA ISA SYMBOL EA 20 24 84 BLUE/RED CURB PAINT LF 4,875 25 39 HMA DIKE LF 172 26 15 REMOVE AND RE-INSTALL EXISTING WHEEL STOP PER ENG. STD 2260 EA 42 27 15 EDGE GRIND LF 2,116 28 84 CONCRETE MEDIAN SQFT 842 29 84 GREEN BIKE LANE CASE 1 LF 793 30 84 GREEN BIKE LANE CASE 2 LF 1,433 31 84 GREEN BIKE LANE CASE 3 LF 1,255 32 84 BIKE BUFFER LF 10,359 33 86 RRFB SYSTEM - JOHNSON AVE AND SYDNEY ST LS 1 34(S) 86 RRFB SYSTEM - MARSH ST AND TORO ST (NORTHEAST CORNER) LS 1 35(S) 86 RRFB SYSTEM - MARSH ST AND TORO ST (NORTHWEST CORNER) LS 1 36(S) 82 REMOVE (E) POST BY CORING AND PATCHING EA 3 37 82 INSTALL (N) 12' PUNCH POST EA 66 38 82 INSTALL (N) 14' PUNCH POST EA 2 39 82 BIKE LANE ENDS SIGN EA 1 40 82 GREENWAY SIGN (ISLAY) EA 2 41 82 GREENWAY SIGN (MILL) EA 4 42 82 GREENWAY SIGN (TORO) EA 7 43 82 MODIFIED R61-36 SIGN EA 1 44 82 OM1-3 OBJECT MARKER EA 4 45 82 R1-1 SIGN EA 21 46 82 R1-3P SIGN EA 9 47 82 R4-7 SIGN EA 3 Page 737 of 888 BID FORMS BID FORMS C Item Item Unit of Estimated Item Price Total No. SS(1) Description Measure Quantity (in figures) (in figures) 48 82 R6-5 SIGN EA 2 49 82 R7-9 SIGN EA 2 50 82 R26 SIGN EA 3 51 82 R81(CA) SIGN EA 1 52 82 R99 & 99B SIGNS EA 2 53 82 W11-15 SIGN EA 3 54 82 W16-7P SIGN EA 3 55 82 W17-1 SIGN EA 4 56 82 W84(CA) SIGN EA 16 57 73 REMOVE (E) TRUNCATED DOMES AND REPLACE WITH NEW TRUNCATED DOMES SQFT 29 58 39 SPEED HUMP EA 4 59 39 SPEED CUSHION (MILL) EA 2 60 82 RETROREFLECTIVE MARKER TYPE D EA 10 61 84 BLUE HYDRANT MARKERS PER CITY STD 7920 EA 298 62 84 GREENBACK SHARROW EA 45 63 84 YELLOW/WHITE/BLUE PAVEMENT MARKING/LEGENDS (ARROWS, WORDS, SYMBOLS, ETC) SQFT 10,232 --- 64 13 STREET SWEEPING IN SLURRY AREAS (1 DAY) LS 1 --- 65 13 STREET SWEEPING IN SLURRY AREAS (30 DAYS) LS 1 --- 66 7, 12 TRAFFIC CONTROL PLAN AND IMPLEMENTATION LS 1 --- 67 73 CONSTRUCTION SURVEY LS 1 --- 68 7 COMPLY WITH NIGHT WORK PERMIT LS 1 --- 69 3 COMPLY WITH CALTRANS ENCROACHMENT PERMIT LS 1 --- 70 20 TREE TRIMMING LS 1 --- 71 12 TEMPORARY STRIPING AND PAVEMENT MARKINGS LS 1 --- Base Bid $ 72 84 TRAFFIC PAINT - 12" WHITE LF 1,325 73 84 TRAFFIC PAINT -12" YELLOW LF 354 74 84 TRAFFIC PAINT - 24" WHITE LF 1,019 Page 738 of 888 BID FORMS BID FORMS D Item Item Unit of Estimated Item Price Total No. SS(1) Description Measure Quantity (in figures) (in figures) 75 84 TRAFFIC PAINT - 24" YELLOW LF 250 76 84 TRAFFIC PAINT - DETAIL 9 LF 55 77 TRAFFIC PAINT - DETAIL 22 LF 864 78 TRAFFIC PAINT - DETAIL 24 LF 3890 79 TRAFFIC PAINT - DETAIL 27B LF 100 80 84 TRAFFIC PAINT - DETAIL 29 LF 74 81 84 TRAFFIC PAINT - DETAIL 38 LF 273 82 84 TRAFFIC PAINT - DETAIL 38A LF 17 83 84 TRAFFIC PAINT - DETAIL 39 LF 1,117 84 84 TRAFFIC PAINT - DETAIL 39A LF 44 85 84 ZICLA ZEBRA CYCLE TRACK LANE SEPARATORS EA 160 86 84 ROUND FLEX POSTS EA 126 87 82 RED CURB PAINT LF 1072 88 84 TRAFFIC PAINT - GREEN BIKE LANE CASE 1 LF 714 89 84 TRAFFIC PAINT - GREEN BIKE LANE CASE 2 LF 876 90 84 TRAFFIC PAINT - GREEN BIKE LANE CASE 3 LF 849 91 84 BIKE BUFFER LF 6,611 92 (S) 84 RRFB SYSTEM - GRAND & MCCOLLUM NORTHBOUND LS 1 93 (S) 86 RRFB SYSTEM - GRAND & MCCOLLUM SOUTHBOUND LS 1 94 (S) 86 RRFB SYSTEM - GRAND & MCCOLLUM CONCRETE MEDIAN LS 1 95 (S) 86 REMOVE (E) POST BY CORING AND PATCHING EA 1 96 82 INSTALL (N) 12' PUNCH POST EA 16 97 82 OM2-1V OBJECT MARKER EA 1 98 82 R1-5 SIGN EA 1 99 82 R3-5 R SIGN EA 4 100 82 R6-1 R SIGN EA 1 101 82 W11-2 SIGN EA 3 102 82 W16-9P SIGN EA 1 103 82 R1-5 SIGN EA 1 104 82 R2-1 (35) SIGN EA 2 105 82 R3-7 SIGN EA 1 106 82 R4-1 SIGN EA 2 Page 739 of 888 BID FORMS BID FORMS E Item Item Unit of Estimated Item Price Total No. SS(1) Description Measure Quantity (in figures) (in figures) 107 82 R4-4 SIGN EA 1 108 82 R6-1 R SIGN EA 1 109 82 R10-15 MOD EA 1 110 82 R26 SIGN EA 1 111 82 R61-5 SIGN EA 1 112 82 R81(CA) SIGN EA 5 113 82 R81A SIGN EA 5 114 82 SR4-1 SIGN EA 1 115 82 W4-2 SIGN EA 4 116 82 W9-1 SIGN EA 1 117 82 W11-2 SIGN EA 3 118 82 W16-9P SIGN EA 1 119 82 STREET NAME SIGNS EA 6 120 73 TRUNCATED DOMES SQFT 49 121 82 BLUE HYDRANT MARKERS PER CITY STD 7920 EA 9 122 84 TRAFFIC PAINT - GREENBACK SHARROW EA 3 123 84 TRAFFIC PAINT - PAVEMENT MARKINGS/ LEGENDS SQFT 1,041 124 84 TRAFFIC CONTROL PLAN AND IMPLEMENTATION LS 1 125 7, 12 COMPLY WITH CALTRANS ENCROACHMENT PERMIT LS 1 Alternative Bid Total $ Total Project Bid = (base Bid + Additive Alternative A) $ Company Name: (1) refers to section in the Standard Specifications, with modifications in the Special Provisions, that describe required work. Page 740 of 888 BID FORMS BID FORMS F LIST OF SUBCONTRACTORS Pursuant to Section 4100 of the Public Contracts Code and section 2-1.33C of the standard specifications, the Bidder is required to furnish the following information for each Subcontractor performing more than 1/2 percent (0.5%) of the total base bid. Do not list alternative subcontractors for the same work. Subcontracting must not total more than fifty percent (50%) of the submitted bid except as allowed in section 5-1.13 of the standard specifications. For Streets & Highways projects, subcontractors performing less than ten thousand dollars ($10,000) worth of work need not be mentioned. Subcontractors required to pay prevailing wage, must be registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 to be listed. NOTE: If there are no subcontractors, write “NONE” and submit with bid. Name Under Which Subcontractor is Licensed License Number DIR Public Works Registration Number Address and Phone Number of Office, Mill or Shop Specific Description of Subcontract % of Total Base Bid Attach additional sheets as needed. Page 741 of 888 BID FORMS BID FORMS G PUBLIC CONTRACT CODE SECTION 10285.1 STATEMENT In compliance with Public Contract Code Section 10285.1 (Chapter 376, Stats. 1985), the bidder hereby declares under penalty of perjury under the laws of the State of California that the bidder, or any subcontractor to be engaged by the bidder, has ____, has not ____ been convicted within the preceding three years of any offenses referred to in that section, including any charge of fraud, bribery, collusion, conspiracy, or any other act in violation of any state or federal antitrust law in connection with the bidding upon, award of, or performance of, any public works contract, as defined in Public Contract Code Section 1101, with any public entity, as defined in Public Contract Code Section 1100, including the Regents of the University of California or the Trustees of the California State University. The term "bidder" is understood to include any partner, member, officer, director, responsible managing officer, or responsible managing employee thereof, as referred to in Section 10285.1. NOTE: The bidder must place a check mark after "has" or "has not" in one of the blank spaces provided. The above Statement is part of the Bid. Signing this Bid on the signature portion constitute signature of this Statement. Bidders are cautioned that making a false certification may subject the certifier to criminal prosecution. PUBLIC CONTRACT CODE SECTION 10162 QUESTIONNAIRE In compliance with Public Contract Code Section 10162, the Bidder must complete, under penalty of perjury, the following questionnaire: Has the bidder, any officer of the bidder, or any employee of the bidder who has a proprietary interest in the bidder, ever been disqualified, removed, or otherwise prevented from bidding on, or completing a federal, state, or local government project because of a violation of law or a safety regulation? Yes No If the answer is yes, attach a letter explaining the circumstances PUBLIC CONTRACT CODE SECTION 10232 STATEMENT In compliance with Public Contract Code Section 10232, you hereby state under penalty of perjury, that no more than one final unappealable finding of contempt of court by a federal court has been issued against you within the immediately preceding two-year period because of your failure to comply with an order of a federal court which orders you to comply with an order of the National Labor Relations Board. LABOR CODE SECTION 1725.5 STATEMENTS The bidder has delinquent liability to an employee or the state for any assessment of back wages or related damages, interest, fines, or penalties pursuant to any final judgment, order, or determination by a court or any federal, state, or local administrative agency, including a confirmed arbitration award. Any judgment, order, or determination that is Page 742 of 888 BID FORMS BID FORMS H under appeal is excluded, provided that the contractor has secured the payment of any amount eventually found due through a bond or other appropriate means. Yes No The bidder is currently debarred under Section 1777.1 or under any other federal or state law providing for the debarment of contractors from public works. Yes No NOTE: The above Statements and Questionnaire are part of the Bid. Signing this Bid on the signature portion constitute signature of this Statement and Questionnaire. Bidders are cautioned that making a false certification may subject the certifier to criminal prosecution. Page 743 of 888 BID FORMS BID FORMS I NON-COLLUSION DECLARATION I, , declare that I am of , the party making the foregoing bid that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone refrained from bidding; that the bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid. Executed on , 20 , in __ I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct. (Signature and Title of Declarant) (SEAL) Subscribed and sworn to before me this _______day of _________, 20_____ Notary Public Company Name:____________________ Page 744 of 888 BID FORMS BID FORMS J BIDDER ACKNOWLEDGEMENTS By signing below, the bidder acknowledges and confirms that this bid is based on the information contained in all contract documents, including the notice to bidders, plans, specifications, special provisions, and addendum number(s) . (Note: You are responsible to verify the number of addenda prior to the bid opening.) The undersigned further agrees that in case of default in executing the required contract, with necessary bonds, within eight days, (not including Saturdays, Sundays, and legal holidays), after having received a mailed notice that the contract is ready for signature, the proceeds of the check or bond accompanying his bid will become the property of the City of San Luis Obispo. Licensed in accordance with an act providing for the registration of contractors, License No. , Expiration Date . The above statement is made under penalty of perjury, and any bid not containing this information "will be considered non-responsive and will be rejected” by the City. Signature of Bidder (Print Name and Title of Bidder) DIR– Public Works Registration No: Business Name (DBA): Owner/Legal Name: Indicate One: Sole-proprietor  Partnership Corporation List Partners/Corporate Officers: Name Title Name Title Name Title Business Address Street Address Mailing Address City, State, Zip Code Phone Number Fax Number Email Address Date Page 745 of 888 BID FORMS BID FORMS K QUALIFICATIONS Failure to furnish complete reference information ON THIS FORM, as specified in this project’s Notice to Bidders and indicated below, is cause to reject the bid. Additional information may be attached but is not a substitute for this form. Reference Number 1 Customer Name & Contact Individual Telephone & Email Project Name (Site Address): Did this project include roadway maintenance by slurry sealing? Yes □ No □ Describe the services provided and how this project is similar to that which is being bid: Date project completed: Was this contract for a public agency? Yes □ No □ Reference Number 2 Customer Name & Contact Individual Telephone & Email Project Name (Site Address): Did this project include roadway maintenance by slurry sealing? Yes □ No □ Describe the services provided and how this project is similar to that which is being bid: Date project completed: Was this contract for a public agency? Yes □ No □ Reference Number 3 Customer Name & Contact Individual Telephone & Email Project Name (Site Address): Did this project include roadway maintenance by slurry sealing? Yes □ No □ Describe the services provided and how this project is similar to that which is being bid: Date project completed: Was this contract for a public agency? Yes □ No □ Page 746 of 888 BID FORMS BID FORMS L ATTACH BIDDER'S BOND TO ACCOMPANY BID Know all men by these presents: That we ____________________________________________, AS PRINCIPAL, and _______________________________________________________, AS SURETY, are held and firmly bound unto the City of San Luis Obispo in the sum of: ____________________________________________________ Dollars (_____________) to be paid to said City or its certain attorney, its successors and assigns; for which payment, well and truly to be made, we bind ourselves, our heirs, executors and administrators, successors or assigns, jointly and severally, firmly by these presents: THE CONDITION OF THIS OBLIGATION IS SUCH, that if the certain bid of the above bounden ______________________________________________________________________ to construct ___________________________________________________________________ (insert name of street and limits to be improved or project) dated _____________________ is accepted by the City of San Luis Obispo, and if the above bounden _______________________________________________________, his heirs, executors, administrators, successors, and assigns shall duly enter into and execute a contract for such construction and shall execute and deliver the two bonds described within ten (10) days (not including Saturdays, Sundays, or legal holidays) after the above bounden, ______________________________________________________, has received notice by and from the said City of San Luis Obispo that said contract is ready for execution, then this obligation shall become null and void; otherwise, it shall be and remain in full force and virtue. IN WITNESS WHEREOF, we hereunto set our hands and seals this ___ day of ______, 20____. Bidder Principal: Signature Date Title: Surety: Bidder's signature is not required to be notarized. Surety's signature must be notarized. Equivalent form may be substituted (Rev. 6-30-14) Page 747 of 888 SPECIAL PROVISIONS 1 SPECIAL PROVISIONS ORGANIZATION Special provisions are under headings that correspond with the main section heading of the Standard Specifications. Each special provision begins with a revision clause that describes or introduces a revision to the Standard Specifications. Any paragraph added or deleted by a revision clause does not change the paragraph number of the Standard Specifications for any other reference to a paragraph of the Standard Specifications. DIVISION I GENERAL PROVISIONS 1 GENERAL Add to Section 1-1.01 GENERAL: The work must be done in compliance with the City of San Luis Obispo, Department of Public Works: 1. Roadway Sealing 2024 Special Provisions 2. City of San Luis Obispo Standard Specifications and Engineering Standards – 2020 edition 3. State of California, Department of Transportation Standard Specifications and Standard Plans – 2015 edition In case of conflict between documents, governing ranking must comply with section 5- 1.02 of the City of San Luis Obispo’s Standard Specifications. Failure to comply with the provisions of these sections is a material breach of contract: 1. Sections 5 through 8 of the Standard Specifications 2. Section 12 through 15 of the Standard Specifications 3. Section 77-1 of the Standard Specifications 4. Section 81 of the Standard Specifications 5. authorized working hours 6. OSHA compliance 3 CONTRACT AWARD AND EXECUTION Replace the 1st and 2nd paragraph in Section 3-1.18 CONTRACT EXECUTION with: Upon notification of project award, return: 1. executed contract 2. insurance 3. contract bonds within five business days after the bidder receives the contract. Add Section 3-1.18B CONTRACT EXECUTION, Caltrans Encroachment Permit with: Compliance with Caltrans Encroachment permit and traffic control shall conform to the provisions of Section 12 “Temporary Traffic Control”, of the Standard Specifications and these Special Provisions. Page 748 of 888 SPECIAL PROVISIONS SPECIAL PROVISIONS 2 Measurement and Payment The lump sum contract price paid to comply with Caltrans Encroachment Permit shall include full compensation for furnishing all labor, materials, tools, equipment, personnel, and for doing all the work involved to comply with all Caltrans encroachment permit requirements. Add Section 3-1.18C CONTRACT EXECUTION, Building Permit with: The contractor must obtain a no-fee building permit from the Community Development Department. All requirements of the building permit shall be applied to the project. The contractor is responsible for coordinating inspection with the building division for the project. Request for inspection must be scheduled 72 hours in advanced of the required inspection. Prior to project construction, the Contractor must completely fill out the Construction & Demolition Recycling Plan and Disposal Report, found on the City’s Construction & Demolition Recycling Program website to obtain a Building Permit. The Construction & Demolition Recycling Plan and Disposal Report must be turned into Utilities Department located at 879 Morro Street, San Luis Obispo, CA 93401 for review and approval. Upon completion of the project, the Contractor must submit waste receipts and final permit, see page 2 of the Construction & Demolition Recycling Plan and Disposal Report, to 879 Morro for sign off. 4 SCOPE OF WORK Add to Section 4-1.03 WORK DESCRIPTION: Comply with the provisions of Sections 3, 7, 10, 12, 13, 15, 20, 37, 39, 73, 82, 84 and 96 for general, material, construction, and payment specifics. 5 CONTROL OF WORK Add to Section 5-120B(5) COORDINATION WITH OTHER ENTITIES, Permits, Licenses, Agreements, and Certifications - Comply with Local, State and Federal Regulations: The City applied for and received a pending encroachment permit (Permit No.) from the State of California, Department of Transportation for work within and affecting Caltrans public right of way. The Contractor is required to obtain and pull the pending permit, comply with all conditions, and pay all associated fees. A copy of the pending permit is included in Appendix B. Parking Lots are to maintain 20% capacity at all times during the duration of work unless previously discussed and approved by the Engineer. Prior to the sealing of any parking lot, contractor must post signage informing the public about upcoming sealing work. All signage must be submitted to the Engineer for review prior to posting. Page 749 of 888 SPECIAL PROVISIONS SPECIAL PROVISIONS 3 redirecting traffic to the available spots or area open. Parking lots must not be closed not to remain closed for longer than 6 CONTROL OF MATERIALS Add to Section 6-2.03 DEPARTMENT ACCEPTANCE: The Engineer will furnish Sale Tax signs mounted to moveable Barricades. Maintain Sales Tax signage in work area. Return Sales Tax signs at the end of the project or upon the Engineer’s request. The Engineer will furnish one (1) GREEN WAY SYMBOL stencil as detailed in the project plans. Contractor can obtain additional stencil(s) at its own discretion and must be approved by the Engineer prior to use for this project. sale Tax signs are stored at the City’s corporation Yard at Prado Road. The contractor is responsible to load and transport from City Corporation Yard to job site and return them when the project is completed under direction of project inspector. Water to be used in the slurry seal emulsion must be potable water. The City will provide a hydrant location for the slurry mix. The Contractor will be responsible to pay for the potable water. 7 LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC Add to Section 7-1.03B PUBLIC CONVENIENCE, Traffic Control Plan: Unless stated otherwise below, work hours are restricted to 7:00 a.m. to 4:00 p.m. (Monday through Friday) on all affected streets. Unless otherwise approved by Caltrans and the Engineer, work within Caltrans Right of Way must be performed between the hours of 9:00 a.m. to 3:00 p.m. (Monday through Thursday) and 9:00 a.m. to 2:00 p.m. Friday. SCHOOL ZONES All work within school zones (Appendix C) must be completed as the first order of work. The Contractor must prioritize work in school zones to finish the work before the start of the school year on August 15th, 2024. If these streets within school zones are not completed before school is back in session on August 15th, 2024, these streets will not be allowed full closure. The Contractor will be responsible to provide flaggers and maintain traffic for student drop off and pick up at no additional cost to the City. When school is in session, work hours within school zones are limited to 9:00 a.m. to 3:00 p.m. (Tuesday through Friday) and 9:30 a.m. to 3:00 p.m. on Mondays. Working hours Page 750 of 888 SPECIAL PROVISIONS SPECIAL PROVISIONS 4 along Johnson Street when school is in session are 9:00 a.m. to 3:00 p.m. (Tuesday through Friday) and 10:30 a.m. to 3:00 p.m. on Mondays Changeable Message Signs Contractor shall provide Changeable Message Signs (CMS) for the following locations: One CMS for any US 101 off ramp closure. See Appendix B – Caltrans Encroachment Permit for additional details and requirements. Additionally, two (2) changeable message signs (CMS) must be installed and operational 2 weeks prior to the start of construction and be maintained throughout the duration of the project. Locations must be approved by the Engineer prior to the installation of the CMS and location must be included in the submitted Traffic Control Plan. CMS will be relocated as needed at the direction of the Engineer. NIGHT WORK Night work is permitted separately. Night work shall comply with the restrictions set forth in the permit by the City of San Luis Obispo Community Development. It is the contractor’s responsibility to keep track of night work expiration date. Request to extend the night work permit must be submitted to the Engineer at least three weeks prior to permit expiration date. Night work is defined as work between the hours of 7:00 P.M. and 7:00 A.M (Sunday through Thursday). Night work will not be allowed on Friday or Saturday. Prior to commencing the project, the contractor must notify businesses and residences within 300 feet of the worksite about proposed night work. Any portable or fixed equipment that produces noise (such as generators, concrete saws, jack hammers, etc.) must be equipped with sound blankets, temporary sound barriers, or other attenuating devices so as to limit impacts to adjoining properties. When not in use, equipment must be kept in its lowest (quietest) idling state or switched off to limit noise impacts. Any portable lighting must be shielded and/or directed away from adjacent properties. Loudspeakers or other similar forms of communication is prohibited. Contractor will provide lighting for all operations, no exceptions are to be made. Any Contractor personnel working outside the lights will be directed to return to a lighted area or the operation must be stopped. All contractor work vehicles, including heavy equipment, backhoes, trenching machines must have two working headlights and taillights. Vehicles without appropriate lighting will be kept from working until they are brought to compliance. Page 751 of 888 SPECIAL PROVISIONS SPECIAL PROVISIONS 5 Illumination level of 10-foot candles is required for all nighttime operations, which will normally be achieved with light plants or balloon lights. All lighting fixtures must be mounted and directed in manner precluding glare to approaching traffic. Provide traffic control plan and traffic control application at or before the preconstruction meeting. Traffic control plan must be drawn to scale. Traffic control application may be obtained on the City’s website: www.slocity.org/government/department-directory/public-works/documents- online/construction-documents Upon approval of the traffic control plan, the City will issue a no-fee Encroachment Permit. Permittee is responsible to comply with all conditions of the traffic control plan. Complete work using due diligence to restore free flowing of traffic. 8 PROSECUTION AND PROGRESS Replace the 1st paragraph in Section 8-1.02A SCHEDULE, General with: Provide a Level 1 schedule for this work. A one week look ahead schedule shall be provided to the Engineer before commencing the following week’s work. This requirement shall be completed in order to continue construction work. Add to Section 8-1.04B START OF JOB SITE ACTIVITIES, Standard Start: Contract time will start on the second Monday after preconstruction meeting. DIVISION II GENERAL CONSTRUCTION 12 TEMPORARY TRAFFIC ONTROL Replace Section 12-6.03D(1) TEMPORARY TRAFFIC STRIPE, PAVEMENT MARKING AND PAVEMENT MAKRERS, General with: After existing traffic stripes and pavement markings have been removed, temporary stripping and pavement markings must be installed to match proposed lane configuration and remain in place until slurry operations have begun. Temporary striping tabs may be used in low traffic areas with the approval of the Engineer. Temporary striping and pavement markings must be installed to match proposed lane configuration after the application of slurry sealing and must remain in place until final striping can be completed. Temporary striping tabs may be used in low traffic areas with the approval of the Engineer. Replace Section 12-6.04 PAYMENT with: The lump sum price paid for “Temporary Striping and Pavement Markings” include payment for the following: • Temporary stripping and pavement markings to match proposed lane configuration after existing traffic stripes and pavement markings have been removed. Page 752 of 888 SPECIAL PROVISIONS SPECIAL PROVISIONS 6 • Temporary striping and pavement markings to match proposed lane configuration after the application of slurry sealing. • Removal of traffic stripes and pavement markings 13 WATER POLLUTION CONTROL Add to Section 13-7.02C STREET SWEEPING, Construction with: Street sweeping shall be performed 24 hours and 30 days after application of Type II slurry seal. The Contractor must post streets for no parking in advance and during the 24 hour and 30-day street sweeping. The Contractor must submit a street sweeping schedule for approval by the Engineer. Street sweeping must be done in a manner that street parking is available within 600 ft from affected addresses, unless approved by the Engineer. Add to Section 13-7.02D STREET SWEEPING, Payment with: The lump sum item price for Street Sweeping shall include full compensation for furnishing all labor, materials, tools, equipment, personnel, “No Parking” notices, door hangers, and incidentals, and for doing all the work involved with Street Sweeping and no additional compensation therefor. 15 EXISTING FACILITIES Add Section 15-2.02 Obliterate Roads, Detours, and Surfacing Micro-milling must be utilized for bike lane and at existing curb ramps edge grinds located in slurry pavement treatment. Micro-milling machines shall: Be equipped with a micro-milling drum with tungsten-carbide-tipped cutting teeth spaced no greater than ¼ inch apart on center. The configuration of the teeth shall be such that the deviation in elevation between any 2 teeth does not exceed 1/16 inch. Be capable of removing asphalt concrete pavement to a tolerance of +/- 1/8 inch. Be equipped with an automatic grade control system operating in “profile” mode. Micro-milling shall result in a grid-patterned textured pavement surface with longitudinal ridges approximately the same distance apart as the cutting teeth. The ridges shall be consistent in depth, width, and profile. The distance between the top of the ridge and the adjacent valleys shall not exceed 1/8 inch. Add Section 15-2.02B Payment The linear feet price for Edge Grind shall include full compensation for furnishing all labor, materials, tools, equipment, personnel, and incidentals, and for doing all the work involved with edge grinds and no additional compensation therefor. DIVISION V SURFACINGS AND PAVEMENTS 37 BITUMINOUS SEALS Add to Section 37-3.02A MATERIALS, General with: Page 753 of 888 SPECIAL PROVISIONS SPECIAL PROVISIONS 7 Slurry seal must be Type II. Use Polymer Modified Asphaltic Emulsion with 2% latex additive. Add to Section 37-3.03A CONSTRUCTION, General with: Not all frames, covers, grates, or manholes are shown on the Plans. The Contractor is responsible for examining the site of work. A submission of a bid is conclusive evidence that the bidder has investigated the local conditions to be encountered. Add to Section 37-3.03(D)(2)(A) PLACING, Surface Preparation, General with: Roll all seal material with a pneumatic tire roller, a minimum of four (4) coverages, prior to allowing traffic on the surfaced roads. After placement of seal material surfaced roads must be opened to traffic no later than 3 hours after the seal material has been placed and no later than 4:00 p.m. in the evening. Quantities of seal placed daily must be adjusted to accommodate road-opening schedule. A coverage must consist of the number of passes a roller needs to cover the width. A pass must be 1 roller movement parallel to the slurry seal application in either direction. Overlapping passes are part of the coverage being made and are not part of a subsequent coverage. Do not start a coverage until completing the previous coverage. Roll all seal material with a pneumatic tire roller, a minimum of four (4) coverages, prior to allowing foot traffic on the surfaced pathways. After placement of seal material, surfaced pathway must be opened to traffic no later than 3 hours after the seal material has been placed and no later than 4:00 p.m. in the evening. Quantities of seal placed daily must be adjusted to accommodate road-opening schedule. A coverage must consist of the number of passes a roller needs to cover the width. A pass must be 1 roller movement parallel to the slurry seal application in either direction. Overlapping passes are part of the coverage being made and are not part of a subsequent coverage. Do not start a coverage until completing the previous coverage. Failure to roll any of the streets sealed for a given day, will result in a $1,000 Liquidated Damage penalty for that day and will not be prorated. Add to Section 37-3.03(D)(4)(b) CONSTUCTION, Placing, Placement, Slurry Seal with: Thru-traffic lanes must be spread in full lane widths only. Slurry seal must be spread at a rate within the ranges shown in the following table for pounds of dry aggregate per square yard: Slurry Seal Type Location Spread Rate Type II Full Lane Width 14+/-1 Notes: 1. For slurry over asphalt concrete pavement During slurry sealing operations, You are responsible for: Page 754 of 888 SPECIAL PROVISIONS SPECIAL PROVISIONS 8 1. Verifying that the slurry seal emulsion being used will allow for rolling within the specified time frame. 2. Adjusting the mixture for changes in weather conditions, as appropriate. 3. Sweeping the surface approximately 24 hours and 30 days after placement and as directed by the Engineer. See section 13-7.02 Street Sweeping. 4. Sweeping in such a manner as to remove loosened or shed aggregate particles without damaging the new surface. DIVISION VIII MISCELLANEOUS CONSTRUCTION 77 LOCAL INFRASTRUCTURE Add to Section 77-1.01 EXCAVATIONS AND RESTORATION, General: Protection and restoration of survey monuments and benchmarks must comply with section 5-1.26 and 5-1.36 DIVISION IX TRAFFIC CONTROL DEVICES 84 MARKINGS Add to Section 84-2.01A Summary with: Traffic striping to be applied shall be per Caltrans Standard Plans 2015. See section 84- 2.04 of the City Standard Specifications for payment of traffic striping. Contractor shall install temporary reflective tape to crosswalks near schools and for marking in speed bumps prior to opening traffic. New crosswalk markings shall not be installed until all crosswalk warning signage are installed. Otherwise, temporary signage must be installed to convey “CROSSWALK CLOSED” to the satisfaction of the engineer. Add to Section 84-2.03C Application of Stripes and Markings: Preformed thermoplastic will not be allowed. All striping requiring pavement markers (i.e. Detail 9, Detail 37B, etc.) on one-way streets shall be Type RED-CLEAR RETROREFLECTIVE per Caltrans Standard Plans 2015 Add to Section 84-2.04 Payment with: Bike lane buffer is measured along the linear foot and accounts for all striping and cross hatching regardless of width of buffer. Green bike lane coating is measured by the square foot for the area applied. Details containing white pavement markings and green pavement paint (left turn bike box, greenback sharrow, greenback chevron, etc.) will be paid per detail and no additional compensations will be allowed. Page 755 of 888 SPECIAL PROVISIONS SPECIAL PROVISIONS 9 Green bike lane markings (Case 1, 2, & 3) paid by the linear foot include bike lane symbol, green paint, white markings and striping and no additional compensation will be allowed. Add Section 84-6 BIKE LANE MARKINGS Add Section 84-6.01 Bike Lane Coatings: Bike lane coating must be SealMaster Color safe (Appendix D) or approved equal at all locations except for Grand Street ( Sheets S61 – S69) where green traffic-rated paint shall be used. Prior to installation of green bike lane coating, the contractor shall submit a color sample and manufacturer specifications to the City for approval. Prior to installation of green bike lane coating, contractor is responsible for noticing adjacent properties to provide advance warning of planned work and potential odors during installation and while the coating cures. Add Section 84-6.04 Payment: Payment must comply with Section 84-2.04 Replace Section 84-9.04 Payment with: Full compensation for work specified in Section 84 and applicable Engineering Standards is included in the payment of other bid items unless a bid item of work is shown on the Bid item list. DIVISION X ELECTRICAL WORK 86 ELECTRICAL SYSTEMS As shown on the bid item list, installation of the Rapid Rectangular Flashing Beacon system will be paid per the limits shown on the plans at each intersection. The lump sum unit price includes furnishing and installation of all equipment needed for intended operation of beacon system. Unit costs include all work shown on the plans, as specified in the Standard Specifications and these Special Provisions. Unless otherwise indicated on plans, each beacon system includes, but is not limited to: 1. Solar engine kit 2. Beacon light bars 3. Battery system 4. Pushbuttons 5. Pushbutton frame and sign placards 6. Mounting hardware 7. Electrical conductors/wiring Punch posts and signage to be installed at each beacon location are included as individual bid items. DIVISION XIII APPENDICES ADD SECTION 100 APPENDICES Add SECTION 100-1.01 GENERAL Page 756 of 888 SPECIAL PROVISIONS SPECIAL PROVISIONS 10 Refer to APPENDIX A: Form of Agreement Refer to APPENDIX B: Caltrans Encroachment Permit Refer to APPENDIX C: School Zones Refer to APPENDIX D: Bike Lane Coating Page 757 of 888 APPENDIX APPENDIX 0 APPENDIX A - FORM OF AGREEMENT THIS AGREEMENT, made on _____________, by and between the City of San Luis Obispo, a municipal corporation and charter city, San Luis Obispo County, California (hereinafter called the Owner) and COMPANY NAME (hereinafter called the Contractor). WITNESSETH: That the Owner and the Contractor for the consideration stated herein agree as follows: ARTICLE 1, SCOPE OF WORK: The Contractor shall perform everything required to be performed, shall provide and furnish all of the labor, materials, necessary tools, expendable equipment, and all utility and transportation services required to complete all the work of construction of NAME OF PROJECT, SPEC NO. in strict compliance with the plans and specifications therefor, including any and all Addenda, adopted by the Owner, in strict compliance with the Contract Documents hereinafter enumerated. It is agreed that said labor, materials, tools, equipment, and services shall be furnished and said work performed and completed under the direction and supervision and subject to the approval of the Owner or its authorized representatives. ARTICLE II, CONTRACT PRICE: The Owner shall pay the Contractor as full consideration for the faithful performance of this Contract, subject to any additions or deductions as provided in the Contract Documents, the contract prices as follows: Item No. Item Unit of Measure Estimated Quantity Item Price (in figures) Total (in figures) 1. 2. 3. BID TOTAL: $ .00 Payments are to be made to the Contractor in compliance with and subject to the provisions embodied in the documents made a part of this Contract. Should any dispute arise respecting the true value of any work omitted, or of any extra work which the Contractor may be required to do, or respecting the size of any payment to the Contractor, during the performance of this Contract, said dispute shall be decided by the Owner and its decision shall be final, and conclusive. Page 758 of 888 APPENDIX APPENDIX 1 ARTICLE III, COMPONENT PARTS OF THIS CONTRACT: The Contract consists of the following documents, all of which are as fully a part thereof as if herein set out in full, and if not attached, as if hereto attached: 1. Notice to Bidders and Information for Bidders 2. Standard Specifications and Engineering Standards 3. Special Provisions, any Addenda, Plans and Contract Change Orders 4. Caltrans Standard Specifications and Standard Plans 2015 5. Accepted Bid and Bid Bond 6. List of Subcontractors 7. Public Contract Code Sections 10285.1 Statement 8. Public Contract Code Section 10162 Questionnaire 9. Public Contract Code Section 10232 Statement 10. Labor Code Section 1725.5 Statements 11. Bidder Acknowledgements 12. Qualifications 13. Non-collusion Declaration 14. Agreement and Bonds 15. Insurance Requirements and Forms ARTICLE IV INDEMNIFICATION: The Contractor shall indemnify, defend with legal counsel approved by City, and hold harmless City, its officers, officials, employees and volunteers from and against all liability, loss, damage, expense, cost (including without limitation reasonable legal counsel fees, expert fees and all other costs and fees of litigation) of every nature arising out of or in connection with the Contractor’s negligence, recklessness or willful misconduct in the performance of work hereunder or its failure to comply with any of its obligations contained in this Agreement, except such loss or damage which is caused by the sole or active negligence or willful misconduct of the City. Should conflict of interest principles preclude a single legal counsel from representing both the City and the Contractor, or should the City otherwise find the Contractor’s legal counsel unacceptable, then the Contractor shall reimburse the City its costs of defense, including without limitation reasonable legal counsel fees, expert fees and all other costs and fees of litigation. The Contractor shall promptly pay any final judgment rendered against the City (and its officers, officials, employees and volunteers) with respect to claims determined by a trier of fact to have been the result of the Contractor’s negligent, reckless or wrongful performance. It is expressly understood and agreed that the foregoing provisions are intended to be as broad and inclusive as is permitted by the law of the State of California and will survive termination of this Agreement. The Contractor obligations under this section apply regardless of whether such claim, charge, damage, demand, action, proceeding, loss, stop notice, cost, expense, judgment, civil fine or penalty, or liability was caused in part or contributed to by an Indemnitee. However, without affecting the rights of the City under any provision of this agreement, the Contractor shall not be required to indemnify and hold harmless the City for liability attributable to the active negligence of City, provided such active negligence is determined by agreement between the parties or by the findings of a court of competent jurisdiction. In Page 759 of 888 APPENDIX APPENDIX 2 instances where the City is shown to have been actively negligent and where the City’s active negligence accounts for only a percentage of the liability involved, the obligation of the Contractor will be for that entire portion or percentage of liability not attributable to the active negligence of the City. ARTICLE V. It is further expressly agreed by and between the parties hereto that should there be any conflict between the terms of this instrument and the bid of said Contractor, then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said bid conflicting herewith. IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands this year and date first above written. CITY OF SAN LUIS OBISPO A Municipal Corporation __________________________________ Derek Johnson, City Manager APPROVED AS TO FORM CONTRACTOR: Name of Company ________________________________ By:________________________________ J. Christine Dietrick City Attorney Name of CAO/President Its: CAO/PRESIDENT (2nd signature required if Corporation): By:________________________________ Name of Corporate Officer Its: ____________________ Page 760 of 888 Page 761 of 888 APPENDIX APPENDIX C - LOCATION MAP APPENDIX 4 Page 762 of 888 PUBLIC WORKS DEPARTMENT 919 Palm Street, San Luis Obispo, CA 93401 Roadway Sealing 2024 Location Map N Page 763 of 888 Page 764 of 888 Page 765 of 888 Page 766 of 888 Page 767 of 888 Page 768 of 888 Page 769 of 888 Page 770 of 888 Page 771 of 888 APPENDIX APPENDIX 4 APPENDIX C - SCHOOL ZONES Page 772 of 888 APPENDIX APPENDIX 5 APPENDIX D - SEALMASTER COLOR Page 773 of 888 Page 774 of 888