Loading...
HomeMy WebLinkAbout23.4.11 7010C2-City_of_SLO_Cultural_District_Parking_Structure_Phase_1BKitchell CEM, Inc. 2450 Venture Oaks Way Ste 500 Sacramento, California 95833 P: (916) 648-9700 Project: 7010C2 - City of SLO Cultural District Parking Structure Phase 1B 600 Palm Street San Louis Obispo, California 93401     Daily Log: Tuesday 4/11/2023     Daily Log Completed  The Daily Log was completed by Ryan Stefanek on Tue, Apr 11, 2023 at 03:58 PM PDT.   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 50°F 67°F 56°F 0.00 in.0.00 in.0.00 in.63%80%97%50°F 5.1 mph 10 mph 13 mph   DAILY SNAPSHOT 06:00 AM 09:00 AM 12:00 PM 03:00 PM 06:00 PM 09:00 PM Partly Cloudy 51°F Cloudy 56°F Cloudy 67°F Cloudy 67°F Cloudy 57°F Cloudy 52°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 03:10:00 PM No   2 03:45:00 PM No     NOTES LOG    No.Created By Issue?Location Comments   1 Ryan Stefanek No Work continued in the north west corner of the parking lot for the early archeological testing. No culturally sensitive items were found. During the testing for lead in the soil, multiple test pits tested above the thread hold of 50 ppm. Lead tested in the soil anywhere from surface level down to 8”, out of a precaution for worker safety digging was imminently ceased once lead was detected. Soil samples were sent to a testing lab to confirm onsite testing results. All soil that tested positive was set aside in an industry standard containment area and to be disposed of once the official lab results are received. A total of 7 test pits tested above the threshold. All pits were backfilled with new soil or decomposed granite and compacted, and any pits in the asphalt parking area got infilled with concrete. No injuries or issues reported to KITCHELL by onsite staff above what was document in the above notes.   MANPOWER LOG 6 Workers  |   40.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 2 8.0 16.0  Notes:Kirk Construction- Omar and Balthazar Removal of asphalt, digging, backfill and compaction, pouring concrete patches. Created By: Ryan Stefanek       Kitchell CEM, Inc.Page 1 of 4 Printed On: Apr 14, 2023 at 04:46 PM PDT        No.Contact/Company Workers # Hours Man Hours Location     2 Rincon Environment Earth Systems, LLC 2 8.0 16.0  Notes:Project lead Ali Created By: Ryan Stefanek   3 Kitchell CEM, Inc.1 5.0 5.0  Notes:Ryan Stefanek Created By: Ryan Stefanek   4 City of San Luis Obispo 1 3.0 3.0  Notes:Ben M Created By: Ryan Stefanek      6  40.0      PHOTOS FA8F379A-5C2C-42AD-A32C-7FC364988774.jpeg  1F0ED7BE-B29B-4601-99A2-BA45383C0938.jpeg  E02B7E82-22D0-4DC1-90A2-A6EFB54F4108.jpeg  8482B0AC-6309-4AE8-BC41-768E1F5196C7.jpeg      Kitchell CEM, Inc.Page 2 of 4 Printed On: Apr 14, 2023 at 04:46 PM PDT        8F7047A4-BA0C-4785-9EF0-B93F10748426.jpeg  7D3420F9-0812-4082-A431-B7BCA7AAA469.jpeg  B913B700-AB9D-4206-9F9B-DB8C5671DB1F.jpeg  F57274D5-D581-4831-9149-B14DA693DB3E.jpeg  CFBEBF8A-803A-4377-A24A-BD7B825FCAC0.jpeg  459E06A2-9757-4210-B57C-FF09A3680440.jpeg  446DDFB0-54CE-4350-AA1A-555CDCF08114.jpeg  CE46B44B-0757-4AB1-8BDF-FC34DEFFCEC3.jpeg      Kitchell CEM, Inc.Page 3 of 4 Printed On: Apr 14, 2023 at 04:46 PM PDT        B6861218-462D-47FD-B4AC-76B7342C0386.jpeg      By  Date  Copies To   Kitchell CEM, Inc.Page 4 of 4 Printed On: Apr 14, 2023 at 04:46 PM PDT