Loading...
HomeMy WebLinkAbout2023-05-08Kitchell CEM, Inc. 2450 Venture Oaks Way Ste 500 Sacramento, California 95833 P: (916) 648-9700 Project: 7010C2 - City of SLO Cultural District Parking Structure Phase 1B 600 Palm Street San Louis Obispo, California 93401     Daily Log: Monday 5/8/2023     Daily Log Completed The Daily Log was completed by Ryan Stefanek on Mon, May 8, 2023 at 04:48 PM PDT.   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 46°F 65°F 54°F 0.00 in.0.00 in.0.00 in.53%78%94%48°F 4.7 mph 10 mph 16 mph DAILY SNAPSHOT 06:00 AM 09:00 AM 12:00 PM 03:00 PM 06:00 PM 09:00 PM Clear 46°F Clear 55°F Clear 65°F Clear 65°F Clear 57°F Clear 52°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea 1 09:20:00 AM No   2 04:10:00 PM No   NOTES LOG No.Created By Issue?Location Comments 1 Ryan Stefanek No KITCHELL arrived onsite at 6:00am to ensure no new habitants were in the buildings, that the gas meters had been removed, and that parking was vacant next to the buildings. Edwards construction arrived before 6:30 and began setting up delineations at the entrance to site and general coordination with their subcontractors . No construction noise was produced before 7:00am. Fencing was installed around the perimeter of the entire project site and the pedestrian plan was implemented with signage around the general construction area. KITCHELL walked the area to confirmed that signage was placed in the appropriate areas to communicate impacts to the general public. Costal Demolition began bringing equipment onsite around 7:15. The 1st water truck brought onsite was seen leaking water and this was brought to Edwards and Costals attention. Truck was left parked over asphalt and temporary BMPs were set up with materials onsite to help with water run off into the storm drains. Costal demolition, promptly replaced the water truck with a unit that did not leak and temporary BMPs were left in place out of an abundance of caution. Demolition began on 633A Palm and by end of day 633A was completely demolished and roughly half of 633B Palm was down as well. No incidents or accidents were reported to KITCHELL today.     Kitchell CEM, Inc.Page 1 of 7 Printed On: Jun 8, 2023 at 02:44 PM PDT        MANPOWER LOG 6 Workers | 47.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location 1 Kitchell CEM, Inc.2 7.5 15.0  Notes:Created By: Ryan Stefanek   2 1 8.0 8.0  Notes:Edwards Construction -Micheleen C. Created By: Ryan Stefanek   3 3 8.0 24.0  Notes:Coastal Demolition Created By: Ryan Stefanek     6  47.0    PHOTOS D0813064-000A-4E2A-A8C3-571E14A98298.jpeg  AF16DAD6-5F5F-42DA-B519-70F8986241F1.jpeg  98F0532B-CEA2-4CC6-B141-F2C425FC1D18.jpeg  02F2145B-5780-4594-ABA6-F90AC322F5FE.jpeg      Kitchell CEM, Inc.Page 2 of 7 Printed On: Jun 8, 2023 at 02:44 PM PDT        027A1D48-94DF-47B8-A7FC-18A87C71F3E1.jpeg  B7C6F95A-F3C1-40D9-B5BC-2E5CDBBCDB0B.jpeg  57270C21-D580-4093-A66E-10E358E68C29.jpeg  D85D4F91-C08C-4D97-B329-E7117D04CBDD.jpeg  C5ED2521-FC6A-4D9D-93E4-2237BE68A143.jpeg  BCAA6AA1-75E4-4454-B8DB-96B58C3C8DFE.jpeg  9C7FB93D-F637-42F0-B605-1FC8F7C377C7.jpeg  20904187-69C3-4C8B-9058-0B031CB8AEA9.jpeg      Kitchell CEM, Inc.Page 3 of 7 Printed On: Jun 8, 2023 at 02:44 PM PDT        8AA25542-5B02-4B39-982B-9C7C4605FAD5.jpeg  4BC2C0AF-B5FB-476A-9C55-EC764D90101C.jpeg  C105C671-E7A4-47EF-9D2C-23FBFB5552CD.jpeg  79B967C1-520D-47F4-A65B-56989BC67589.jpeg  BE5FAE69-1870-4FDB-AF59-F17DF30F2AF0.jpeg  4CB0B8E4-C358-44E0-8383-94290F98E738.jpeg  4D234443-4337-441B-B8CA-5A26B81A0977.jpeg  45CE1E6A-3A2F-42BC-A713-332052CA356A.jpeg      Kitchell CEM, Inc.Page 4 of 7 Printed On: Jun 8, 2023 at 02:44 PM PDT        A58B6827-A797-4E00-A3EB-AA87C59695CF.jpeg  60FD840D-4BD0-41F5-91D8-642BC15D1DBA.jpeg  5DCD3D29-46D5-4DD7-8EBD-2C93086D7E27.jpeg  459C4EAC-3436-4787-AD7D-BDEF0E92537B.jpeg  3390FAD6-5AA8-4A0B-A94F-907F6D36369E.jpeg  43E80018-73E6-4B45-A554-8EB375EDD510.jpeg  074BE122-CC11-485F-AF17-0040331BB444.jpeg  68C4FA06-6878-4BEC-9274-AFEF6406BAD3.jpeg      Kitchell CEM, Inc.Page 5 of 7 Printed On: Jun 8, 2023 at 02:44 PM PDT        DA212748-94AD-4215-BE09-3087006D8B9D.jpeg  A83EEFFC-0B59-492E-B326-68A327691014.jpeg  995668A1-4F8A-4F0F-A2CC-3FC3ED059D57.jpeg  F4131812-2C17-4704-8722-C0D1136BD0EF.jpeg  00544BFE-AF06-4FA7-AB11-FEB5E16045BB.jpeg  7DA06279-50B9-426A-B7A6-6D8D851E796A.jpeg  5E2AAECF-6DA4-43B2-9FCA-BE68C8833BFE.jpeg      Kitchell CEM, Inc.Page 6 of 7 Printed On: Jun 8, 2023 at 02:44 PM PDT        VISITOR LOG No.Created By Visitor Start Time End Time Details 1 Ryan Stefanek 11:00 AM 11:30 AM  KSBY     By  Date  Copies To   Kitchell CEM, Inc.Page 7 of 7 Printed On: Jun 8, 2023 at 02:44 PM PDT