HomeMy WebLinkAbout2023-05-08Kitchell CEM, Inc.
2450 Venture Oaks Way Ste 500
Sacramento, California 95833
P: (916) 648-9700
Project: 7010C2 - City of SLO Cultural District
Parking Structure Phase 1B
600 Palm Street
San Louis Obispo, California 93401
Daily Log: Monday 5/8/2023
Daily Log Completed
The Daily Log was completed by Ryan Stefanek on Mon, May 8, 2023 at 04:48 PM PDT.
WEATHER REPORT
Temperature Precipitation Since Humidity Windspeed
Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust
46°F 65°F 54°F 0.00 in.0.00 in.0.00 in.53%78%94%48°F 4.7 mph 10 mph 16 mph
DAILY SNAPSHOT
06:00 AM 09:00 AM 12:00 PM 03:00 PM 06:00 PM 09:00 PM
Clear
46°F
Clear
55°F
Clear
65°F
Clear
65°F
Clear
57°F
Clear
52°F
OBSERVED WEATHER CONDITIONS
No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea
1 09:20:00 AM No
2 04:10:00 PM No
NOTES LOG
No.Created By Issue?Location Comments
1 Ryan Stefanek No KITCHELL arrived onsite at 6:00am to ensure no new habitants
were in the buildings, that the gas meters had been removed, and
that parking was vacant next to the buildings. Edwards
construction arrived before 6:30 and began setting up
delineations at the entrance to site and general coordination with
their subcontractors . No construction noise was produced before
7:00am.
Fencing was installed around the perimeter of the entire project
site and the pedestrian plan was implemented with signage
around the general construction area. KITCHELL walked the area
to confirmed that signage was placed in the appropriate areas to
communicate impacts to the general public.
Costal Demolition began bringing equipment onsite around 7:15.
The 1st water truck brought onsite was seen leaking water and
this was brought to Edwards and Costals attention. Truck was left
parked over asphalt and temporary BMPs were set up with
materials onsite to help with water run off into the storm drains.
Costal demolition, promptly replaced the water truck with a unit
that did not leak and temporary BMPs were left in place out of an
abundance of caution.
Demolition began on 633A Palm and by end of day 633A was
completely demolished and roughly half of 633B Palm was down
as well.
No incidents or accidents were reported to KITCHELL today.
Kitchell CEM, Inc.Page 1 of 7 Printed On: Jun 8, 2023 at 02:44 PM PDT
MANPOWER LOG 6 Workers | 47.0 Man Hours
No.Contact/Company Workers #
Hours
Man
Hours
Location
1 Kitchell CEM, Inc.2 7.5 15.0
Notes:Created By: Ryan Stefanek
2 1 8.0 8.0
Notes:Edwards Construction -Micheleen C.
Created By: Ryan Stefanek
3 3 8.0 24.0
Notes:Coastal Demolition
Created By: Ryan Stefanek
6 47.0
PHOTOS
D0813064-000A-4E2A-A8C3-571E14A98298.jpeg
AF16DAD6-5F5F-42DA-B519-70F8986241F1.jpeg
98F0532B-CEA2-4CC6-B141-F2C425FC1D18.jpeg
02F2145B-5780-4594-ABA6-F90AC322F5FE.jpeg
Kitchell CEM, Inc.Page 2 of 7 Printed On: Jun 8, 2023 at 02:44 PM PDT
027A1D48-94DF-47B8-A7FC-18A87C71F3E1.jpeg
B7C6F95A-F3C1-40D9-B5BC-2E5CDBBCDB0B.jpeg
57270C21-D580-4093-A66E-10E358E68C29.jpeg
D85D4F91-C08C-4D97-B329-E7117D04CBDD.jpeg
C5ED2521-FC6A-4D9D-93E4-2237BE68A143.jpeg
BCAA6AA1-75E4-4454-B8DB-96B58C3C8DFE.jpeg
9C7FB93D-F637-42F0-B605-1FC8F7C377C7.jpeg
20904187-69C3-4C8B-9058-0B031CB8AEA9.jpeg
Kitchell CEM, Inc.Page 3 of 7 Printed On: Jun 8, 2023 at 02:44 PM PDT
8AA25542-5B02-4B39-982B-9C7C4605FAD5.jpeg
4BC2C0AF-B5FB-476A-9C55-EC764D90101C.jpeg
C105C671-E7A4-47EF-9D2C-23FBFB5552CD.jpeg
79B967C1-520D-47F4-A65B-56989BC67589.jpeg
BE5FAE69-1870-4FDB-AF59-F17DF30F2AF0.jpeg
4CB0B8E4-C358-44E0-8383-94290F98E738.jpeg
4D234443-4337-441B-B8CA-5A26B81A0977.jpeg
45CE1E6A-3A2F-42BC-A713-332052CA356A.jpeg
Kitchell CEM, Inc.Page 4 of 7 Printed On: Jun 8, 2023 at 02:44 PM PDT
A58B6827-A797-4E00-A3EB-AA87C59695CF.jpeg
60FD840D-4BD0-41F5-91D8-642BC15D1DBA.jpeg
5DCD3D29-46D5-4DD7-8EBD-2C93086D7E27.jpeg
459C4EAC-3436-4787-AD7D-BDEF0E92537B.jpeg
3390FAD6-5AA8-4A0B-A94F-907F6D36369E.jpeg
43E80018-73E6-4B45-A554-8EB375EDD510.jpeg
074BE122-CC11-485F-AF17-0040331BB444.jpeg
68C4FA06-6878-4BEC-9274-AFEF6406BAD3.jpeg
Kitchell CEM, Inc.Page 5 of 7 Printed On: Jun 8, 2023 at 02:44 PM PDT
DA212748-94AD-4215-BE09-3087006D8B9D.jpeg
A83EEFFC-0B59-492E-B326-68A327691014.jpeg
995668A1-4F8A-4F0F-A2CC-3FC3ED059D57.jpeg
F4131812-2C17-4704-8722-C0D1136BD0EF.jpeg
00544BFE-AF06-4FA7-AB11-FEB5E16045BB.jpeg
7DA06279-50B9-426A-B7A6-6D8D851E796A.jpeg
5E2AAECF-6DA4-43B2-9FCA-BE68C8833BFE.jpeg
Kitchell CEM, Inc.Page 6 of 7 Printed On: Jun 8, 2023 at 02:44 PM PDT
VISITOR LOG
No.Created By Visitor Start Time End Time Details
1 Ryan Stefanek 11:00 AM 11:30 AM KSBY
By Date Copies To
Kitchell CEM, Inc.Page 7 of 7 Printed On: Jun 8, 2023 at 02:44 PM PDT