Loading...
HomeMy WebLinkAbout2023-09-07Kitchell CEM, Inc. 2450 Venture Oaks Way Ste 500 Sacramento, California 95833 P: (916) 648-9700 Project: 7101C2 - City of SLO Cultural District Parking Structure Phase 1B 600 Palm Street San Louis Obispo, California 93401     Daily Log: Thursday 9/7/2023     Daily Log Completed  The Daily Log was completed by Tally Richtsmeier on Thu, Sep 7, 2023 at 04:10 PM PDT.   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 53°F 80°F 63°F 0.00 in.0.00 in.0.00 in.47%77%95%55°F 1.4 mph 4 mph 5 mph   DAILY SNAPSHOT 06:00 AM 09:00 AM 12:00 PM 03:00 PM 06:00 PM 09:00 PM Clear 54°F Clear 60°F Clear 77°F Clear 78°F Clear 67°F Clear 59°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 07:25:00 AM No     NOTES LOG    No.Created By Issue?Location Comments   1 Tally Richtsmeier No Kitchell, Coastal Demo, and Edwards arrived on site around 6:45 AM. Coastal Demo began to pick up a dumpster before 7 AM, but Edwards reminded the driver that noise producing activities needed to wait until 7am and the driver ceased operations. Rincon arrived on site at 8 AM to make site observations for archeological monitoring. Kitchell walked pedestrian plan for compliance with City approved plan and the plan was in compliance. Excavator part was delivered in the late morning and excavator was repaired. However, skid steer broke down shortly after, but was fixed within a couple of hours. No water truck was on site, although dust was minimal and well maintained through careful operation. Coastal Demo proceeded with curb demolition, grubbing, and tree removal at the corner of Palm Street and Nipomo Street. Coastal Demo completed salvaging punch poles, signage on poles, and palletizing wheel stops. At approximately 2 PM, Rincon archaeologist found a bone that onsite staff could not identify as non-human. During the investigation all ground disturbing work in the area was halted and the surrounding area within 100 feet was taped off with caution tape to identify the no impact zone. Coastal Demo continued with work elsewhere onsite, including grubbing and tree removal on the south end of site. Rincon brought an archeologist who was more familiar with bone identification who consulted with their company expert. After close examination and consolation the     Kitchell CEM, Inc.Page 1 of 7 Printed On: Oct 4, 2023 at 02:26 PM PDT          NOTES LOG    No.Created By Issue?Location Comments   bone was determined to be non-human. The tape around the no impact zone was removed and work can proceed in the area. No accidents or incidents were reported to Kitchell today.   MANPOWER LOG 3 Workers  |   23.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 Kitchell CEM, Inc.2 8.0 16.0  Comments:Coastal Demo: 3 Edwards : 1 Created By: Tally Richtsmeier   2 Rincon Environment Earth Systems, LLC 1 7.0 7.0  Comments:Created By: Tally Richtsmeier      3  23.0      PHOTOS 78062767-C865-4585-A6B4-C77311A4F5CB.jpeg  B214FB44-A313-4CC1-9250-993D2515B24F.jpeg  FD018056-507C-4B37-B8EF-27B58A66B710.jpeg  D83EC75D-C0A5-4C70-97C3-F056B059196A.jpeg      Kitchell CEM, Inc.Page 2 of 7 Printed On: Oct 4, 2023 at 02:26 PM PDT        9B1DF022-3C7C-4ED1-A282-4E171A377F55.jpeg  96CC9A66-F48D-44CD-A22F-7516A61FBFB6.jpeg  15B54A78-A0A8-4BE1-9C26-446AF33FEC2E.jpeg  208A99F7-BF95-4E72-96F7-08121E2C4BCF.jpeg  08E8DC85-9FCA-4EBE-BE5E-FCCCB22B657D.jpeg  60F6BCFB-32AF-456D-B643-B9A4377E3835.jpeg  252F0C66-273C-4832-8CB8-73D6BE8D6935.jpeg  82F3D142-174B-4602-86E0-2D7B015A0792.jpeg      Kitchell CEM, Inc.Page 3 of 7 Printed On: Oct 4, 2023 at 02:26 PM PDT        B3DAAD52-4E8E-4185-80A6-49404E4197E7.jpeg  36DD657B-9174-4687-9521-A69C0DF0F5A7.jpeg  153371B5-2037-4C31-BA51-7C03237B7877.jpeg  7299E8A1-A250-4063-973C-80793A3AF734.jpeg  9666E6E2-AB16-4758-9846-24C04EE8DEE7.jpeg  371263D0-2E26-4607-9758-93440C9FC311.jpeg  B3918F9E-FC77-4483-8208-FA8F8801F818.jpeg  97E1E0CF-7C17-4074-969C-F96B614A2EB2.jpeg      Kitchell CEM, Inc.Page 4 of 7 Printed On: Oct 4, 2023 at 02:26 PM PDT        2C07A083-C3C6-4B8A-A2A7-25719EC2F1B9.jpeg  5BCBBA1C-6F07-4B86-911E-F7DF6F48192F.jpeg  738C6E81-9878-491F-886B-C059CE253C86.jpeg  678EF8AD-50EE-44DA-A8C9-33FED1F733AC.jpeg  EBEB0B4F-BA7E-4433-BE8A-B996EB616167.jpeg  CD987BA3-796C-4ADB-953C-8DCB7C8F6DB7.jpeg  9B0379FD-80DD-4F63-BB3E-48D6C9AC51BA.jpeg  10CDC964-0667-47DE-9BCB-5A78D00FA072.jpeg      Kitchell CEM, Inc.Page 5 of 7 Printed On: Oct 4, 2023 at 02:26 PM PDT        B1A7A8CF-C854-453A-8A8E-7FC8BEC5474C.jpeg  BC2A68E2-F898-4904-94C5-707CEBCEB88E.jpeg  E9ADB842-85B8-454B-8E4D-44D61C2AC322.jpeg  E6E7C9BF-54BC-4E5D-9D94-6991F0C0F7EB.jpeg  164122EC-9E32-4701-B3E5-F6BBFBDA0CC4.jpeg  A530142D-E9E2-4174-A735-249946C2BD3E.jpeg  B2EF68CA-850D-4B81-80AA-52BB412BF2B7.jpeg  7727F69C-6607-41DD-BA24-02C268AC99E6.jpeg      Kitchell CEM, Inc.Page 6 of 7 Printed On: Oct 4, 2023 at 02:26 PM PDT        3AD17F02-A777-42C4-8A84-E4D993AE6CE5.jpeg  8A4AA069-36DC-46C1-8B34-92BF619932E7.jpeg  6032CCE7-3243-48B8-BD88-56FF0E36E957.jpeg      By  Date  Copies To   Kitchell CEM, Inc.Page 7 of 7 Printed On: Oct 4, 2023 at 02:26 PM PDT