HomeMy WebLinkAbout2023-09-08Kitchell CEM, Inc.
2450 Venture Oaks Way Ste 500
Sacramento, California 95833
P: (916) 648-9700
Project: 7101C2 - City of SLO Cultural District
Parking Structure Phase 1B
600 Palm Street
San Louis Obispo, California 93401
Daily Log: Friday 9/8/2023
Daily Log Completed
The Daily Log was completed by Ryan Stefanek on Fri, Sep 8, 2023 at 05:45 PM PDT.
WEATHER REPORT
Temperature Precipitation Since Humidity Windspeed
Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust
54°F 82°F 65°F 0.00 in.0.00 in.0.00 in.42%77%100%56°F 1.8 mph 3 mph 4 mph
DAILY SNAPSHOT
06:00 AM 09:00 AM 12:00 PM 03:00 PM 06:00 PM 09:00 PM
Fog
56°F
Clear
59°F
Clear
79°F
Clear
83°F
Clear
68°F
Clear
62°F
OBSERVED WEATHER CONDITIONS
No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea
1 07:20:00 AM No
NOTES LOG
No.Created By Issue?Location Comments
1 Ryan Stefanek No KITCHELL, Edwards, and Coastal all arrived at site around 6:45.
No Noise producing construction activities occurred before 7am.
Rincon arived around 7:30 to continue onsite Archeological
observations. Work proceed on the planters on the Nipomo side
of site with removal of planter curbs, pathways, and shrubs.
At roughly 9:45 am it was noticed that the excavator had
dislodged the lighting transformer and electrical wiring was
exposed. Once this was noticed all workers onsite were informed
and the site was secured with caution tape in a roughly 30’x30’
area around the wiring. PG&E was notified and dispatched staff to
investigate and address the issue. KITCHELL also notified City
staff to ensure they were aware of the situation. PG&E arrived
within 30 minutes of the discovery and quickly assessed and
disconnected their feed to the lighting transformer. PG&E
preformed their work in their burial box in the side walk on
Nipomo street. PG&E staff were onsite for roughly 20 minutes.
Once PG&E informed KITCHELL the power had been isolated the
caution tape was removed and all onsite workers were notified.
For the remainder of the day demolition of concrete, asphalt and
other onsite items was concentrated around the north west area
of site. Other Coastal staff were seen installing SWPP BMPs as
areas became available, and modifying the fencing to lessen the
impact to the sidewalks. Once all fencing had been moved tight to
the site perimeter around Nipomo and Palm, signage was
removed by Edwards.
No accidents were reported to KITCHELL today and the only
incident was the striking of the lighting transformer.
Kitchell CEM, Inc.Page 1 of 6 Printed On: Oct 4, 2023 at 02:27 PM PDT
PHOTOS
7E201D67-C5E2-4CEC-934E-14F5797ED9ED.jpeg
E8518403-F317-4D2D-BDF8-B0F59DFD2905.jpeg
719D11CB-429E-4EE8-9D67-53AF1A1543C2.jpeg
05CB63FD-DEFE-443E-917F-FB96D26F48F6.jpeg
0D406C13-A060-4E3E-A1B9-294A710C25BF.jpeg
6F5CEB01-DBE5-4423-B252-250BB2819724.jpeg
A349889C-D9AF-4F88-80B0-981CA0567E94.jpeg
57E95DFD-285F-4182-A5BF-C17D3C689150.jpeg
Kitchell CEM, Inc.Page 2 of 6 Printed On: Oct 4, 2023 at 02:27 PM PDT
A84A93D2-80EF-4C99-8B8F-D08912E0DEA8.jpeg
8B002697-345B-4D8B-8F8D-C86FD62A78CD.jpeg
D4BE50E4-BBF4-44F5-AD33-629E1D27BD9B.jpeg
B69EACA4-4DB5-4DE9-BC43-20782B9583B2.jpeg
1A9E5ABA-7E6D-4A0E-AA4E-1AC471BA8747.jpeg
C6C3E2E8-BCC1-40B6-8EF3-1508C9F27CFA.jpeg
AEA3FAE7-9BC1-4DD7-B5BA-B234981D2B92.jpeg
E05F1E3C-2087-467D-A62E-F33755F3C5B2.jpeg
Kitchell CEM, Inc.Page 3 of 6 Printed On: Oct 4, 2023 at 02:27 PM PDT
0982ECA2-B50F-4EB9-9CFB-0A509C904126.jpeg
B7370D88-F554-4E78-89AE-74E4C354F7DB.jpeg
D1117243-B5EB-49CF-87C5-1AD854A21BEC.jpeg
5DD92C2C-1159-425F-B871-B26337B4722D.jpeg
CE4989C9-26A5-4307-B688-3CF578E06EA3.jpeg
3E1CE94C-8CA0-44B9-9E21-8FC1EBA94F10.jpeg
A42ADFFC-9D64-4714-ABB9-9F3735A6D32C.jpeg
BE93DCF6-C511-448B-A74B-17845EB3EB7F.jpeg
Kitchell CEM, Inc.Page 4 of 6 Printed On: Oct 4, 2023 at 02:27 PM PDT
B421DF98-1BBA-4637-B3A8-2C3EB2CB26DA.jpeg
34F7A5D1-6E69-482A-A4FD-907EF0AB2655.jpeg
10C192D7-6F12-4D1C-92B8-B4B1BDE8CA88.jpeg
935A2A50-F940-41D1-9AC6-650F3838D3D9.jpeg
C6696A87-A717-44F2-B99B-B9B05E29A3F2.jpeg
52F9234C-73E9-4DAF-8B8B-07F9B86EECE9.jpeg
612EC70C-56ED-4134-9A11-6713ADC67724.jpeg
7C3CC06A-4357-4BA2-B8A8-D18E8CFAC919.jpeg
Kitchell CEM, Inc.Page 5 of 6 Printed On: Oct 4, 2023 at 02:27 PM PDT
58EA16D0-7EA0-4053-B1DE-1B1B78C0614F.jpeg
8FE82AD8-7C6D-4656-9129-DD4125D38847.jpeg
2380BA2A-8A4F-4B67-8E35-ADDF92F3447D.jpeg
B87996AC-A512-4B01-AE9A-A70BC7AF142D.jpeg
By Date Copies To
Kitchell CEM, Inc.Page 6 of 6 Printed On: Oct 4, 2023 at 02:27 PM PDT