Loading...
HomeMy WebLinkAbout2023-09-21Kitchell CEM, Inc. 2450 Venture Oaks Way Ste 500 Sacramento, California 95833 P: (916) 648-9700 Project: 7101C2 - City of SLO Cultural District Parking Structure Phase 1B 600 Palm Street San Louis Obispo, California 93401     Daily Log: Thursday 9/21/2023     Daily Log Completed  The Daily Log was completed by Tally Richtsmeier on Thu, Sep 28, 2023 at 04:43 PM PDT.   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 60°F 70°F 63°F 0.00 in.0.00 in.0.00 in.56%77%87%56°F 1.9 mph 4 mph 6 mph   DAILY SNAPSHOT 06:00 AM 09:00 AM 12:00 PM 03:00 PM 06:00 PM 09:00 PM Cloudy 61°F Cloudy 62°F Cloudy 67°F Clear 71°F Clear 64°F Clear 59°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 07:00:00 AM No     NOTES LOG    No.Created By Issue?Location Comments   1 Tally Richtsmeier No Coastal Demo, Edwards, and Kitchell arrived on site before 7 am and no construction noise was made before 7 am. Coastal Demo worked on the removal of woodchips in all areas of site except the tree protection zone per arborist request. Woodchip removal was the primary task of the day. Sidewalk and rumble strips were swept at the end of the day. No accidents or incidents were reported to Kitchell.   PHOTOS F2093A11-A1D5-4501-AB78-369BEE4507DB.jpeg 9569DC04-7469-4D50-8C8F-F97F5772D487.jpeg      Kitchell CEM, Inc.Page 1 of 5 Printed On: Oct 4, 2023 at 02:33 PM PDT        9F4B5FFA-35D5-4A34-BCC6-6FCB9D14F373.jpeg  7574C69C-0D0A-4AFA-BD7D-CC5908ED02B1.jpeg  5D077CAF-81C8-4AED-9C95-F17B6562A905.jpeg  1D00BA07-15A5-4C80-B172-3C86CECD1632.jpeg  12CA97E8-4DBD-4D83-A450-3C78887BF2E5.jpeg  054D8C03-DBA5-4452-B7D7-BDD7D4F09991.jpeg  07C5D785-504D-4171-A2D2-23822A6F6504.jpeg  A5572FBF-CDD0-4209-A489-E70F560950BF.jpeg      Kitchell CEM, Inc.Page 2 of 5 Printed On: Oct 4, 2023 at 02:33 PM PDT        08289190-F64D-44C2-81AC-6FD10C90B481.jpeg  8DCF9E8F-86D4-4AC0-92F5-D2AFFCAD97D6.jpeg  C03D6AEE-616C-4F3B-B198-73210D239A20.jpeg  70E358B9-6A90-417D-97C5-3C6C98F2DEDC.jpeg  FD2633BB-5505-45C0-964F-A9DC9323F927.jpeg  E25BAB80-469A-42D3-8854-BEECE0B11785.jpeg  13D4B406-53CD-473A-94C2-D2E6070694A7.jpeg  8520DE50-5592-4B77-BBD5-F09C83EB4957.jpeg      Kitchell CEM, Inc.Page 3 of 5 Printed On: Oct 4, 2023 at 02:33 PM PDT        AC9064C4-B450-44A1-B70C-D6AAD65F51D9.jpeg  DEB270E9-3C51-4DC5-9F02-4698285C5ECD.jpeg  4CAAD741-0A4D-48CB-AE7B-0A57ABD6A6A6.jpeg  B7F38B4E-8F96-4C9F-AF40-236BB4871CB9.jpeg  EAAB4EA6-943B-4CFC-B738-97D313145245.jpeg  95EF0919-BC9C-42E9-8BA8-1CE7C1A5DCFB.jpeg  8B4384BF-CEC5-4018-9CB0-7498F1B0C4BE.jpeg  2E328BF9-3261-4B45-9F7B-5D294C095D6C.jpeg      Kitchell CEM, Inc.Page 4 of 5 Printed On: Oct 4, 2023 at 02:33 PM PDT        59FBA1EE-02D6-4307-BB83-3BB2844F128E.jpeg      By  Date  Copies To   Kitchell CEM, Inc.Page 5 of 5 Printed On: Oct 4, 2023 at 02:33 PM PDT