HomeMy WebLinkAbout2023-09-29Kitchell CEM, Inc.
2450 Venture Oaks Way Ste 500
Sacramento, California 95833
P: (916) 648-9700
Project: 7101C2 - City of SLO Cultural District
Parking Structure Phase 1B
600 Palm Street
San Louis Obispo, California 93401
Daily Log: Friday 9/29/2023
Daily Log Completed
The Daily Log was completed by Ryan Stefanek on Fri, Sep 29, 2023 at 06:27 PM PDT.
WEATHER REPORT
Temperature Precipitation Since Humidity Windspeed
Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust
51°F 74°F 61°F 0.00 in.0.00 in.0.00 in.56%82%100%55°F 1.9 mph 5 mph 7 mph
DAILY SNAPSHOT
06:00 AM 09:00 AM 12:00 PM 03:00 PM 06:00 PM 09:00 PM
Clear
53°F
Fog
56°F
Clear
74°F
Clear
72°F
Fog
63°F
Fog
60°F
OBSERVED WEATHER CONDITIONS
No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea
1 11:15:00 AM No
NOTES LOG
No.Created By Issue?Location Comments
1 Tally Richtsmeier No Edwards, Coastal Demo, Kitchell, Rincon, and Rockin CJ met on
site for a pre soil remediation kick off meeting to discuss the
upcoming soils removal. Meeting minutes were sent out after the
meeting with discussion points and follow up items. Due to the
roughly 40% chance of rain on Saturday, Edwards installed
additional gravel bags at the storm drains as additional SWPPP
for possible weekend rain. Edwards also added waddles and
gravel bags at the top of the asphalt in front of the exit. Kitchell
reminded Edwards to contact HIVE QSP to verify if any additional
measures were needed and if what was installed is acceptable
from the QSP. No accidents or incidents were reported to Kitchell.
Kitchell CEM, Inc.Page 1 of 4 Printed On: Oct 4, 2023 at 02:33 PM PDT
PHOTOS
B14BA7A7-C69C-4583-A7EB-AB838DBF562E.jpeg
B62F9180-A6D4-4AAA-8716-08D9D8A0D1B9.jpeg
33D9FE65-A8A2-460E-ADC4-CA9294CF5309.jpeg
7F9D6DB6-4555-4510-BFAB-12E86E3AB2A4.jpeg
CC52F6AB-628A-4671-BD62-A61435EEA284.jpeg
71386767-A9C0-4944-B2BB-280F2E82B9BF.jpeg
B2A2E75E-4CA4-48CE-9D48-69EB1C959765.jpeg
BFEB3688-74AC-4F64-B2EB-1B29AE8E2569.jpeg
Kitchell CEM, Inc.Page 2 of 4 Printed On: Oct 4, 2023 at 02:33 PM PDT
43312B0A-8E5B-4B70-A81A-2E0546AA0171.jpeg
ADA90F18-7331-4FFA-9D35-1DC2C12AF7FC.jpeg
E09E29A7-F0CE-4332-BA5C-0632312ECCE9.jpeg
9A3E0F2B-CF65-4274-A020-49449254C296.jpeg
D97F6C6B-2249-4D94-B951-1A5807DF007F.jpeg
883867C8-363B-496E-85B7-55D7C2419139.jpeg
213C031E-71FE-4084-8B85-21AF98737087.jpeg
BCB85F0E-1284-41A9-8CA0-DC43A1F4213D.jpeg
Kitchell CEM, Inc.Page 3 of 4 Printed On: Oct 4, 2023 at 02:33 PM PDT
9445B70F-4B57-4B1D-B349-CB406E2C9779.jpeg
1C569DC6-4336-4B89-BEBE-B884496053AF.jpeg
2F288D41-D78D-4C0A-B858-AE72D0291324.jpeg
By Date Copies To
Kitchell CEM, Inc.Page 4 of 4 Printed On: Oct 4, 2023 at 02:33 PM PDT