Loading...
HomeMy WebLinkAbout2023-09-29Kitchell CEM, Inc. 2450 Venture Oaks Way Ste 500 Sacramento, California 95833 P: (916) 648-9700 Project: 7101C2 - City of SLO Cultural District Parking Structure Phase 1B 600 Palm Street San Louis Obispo, California 93401     Daily Log: Friday 9/29/2023     Daily Log Completed  The Daily Log was completed by Ryan Stefanek on Fri, Sep 29, 2023 at 06:27 PM PDT.   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 51°F 74°F 61°F 0.00 in.0.00 in.0.00 in.56%82%100%55°F 1.9 mph 5 mph 7 mph   DAILY SNAPSHOT 06:00 AM 09:00 AM 12:00 PM 03:00 PM 06:00 PM 09:00 PM Clear 53°F Fog 56°F Clear 74°F Clear 72°F Fog 63°F Fog 60°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 11:15:00 AM No     NOTES LOG    No.Created By Issue?Location Comments   1 Tally Richtsmeier No Edwards, Coastal Demo, Kitchell, Rincon, and Rockin CJ met on site for a pre soil remediation kick off meeting to discuss the upcoming soils removal. Meeting minutes were sent out after the meeting with discussion points and follow up items. Due to the roughly 40% chance of rain on Saturday, Edwards installed additional gravel bags at the storm drains as additional SWPPP for possible weekend rain. Edwards also added waddles and gravel bags at the top of the asphalt in front of the exit. Kitchell reminded Edwards to contact HIVE QSP to verify if any additional measures were needed and if what was installed is acceptable from the QSP. No accidents or incidents were reported to Kitchell.       Kitchell CEM, Inc.Page 1 of 4 Printed On: Oct 4, 2023 at 02:33 PM PDT        PHOTOS B14BA7A7-C69C-4583-A7EB-AB838DBF562E.jpeg  B62F9180-A6D4-4AAA-8716-08D9D8A0D1B9.jpeg  33D9FE65-A8A2-460E-ADC4-CA9294CF5309.jpeg  7F9D6DB6-4555-4510-BFAB-12E86E3AB2A4.jpeg  CC52F6AB-628A-4671-BD62-A61435EEA284.jpeg  71386767-A9C0-4944-B2BB-280F2E82B9BF.jpeg  B2A2E75E-4CA4-48CE-9D48-69EB1C959765.jpeg  BFEB3688-74AC-4F64-B2EB-1B29AE8E2569.jpeg      Kitchell CEM, Inc.Page 2 of 4 Printed On: Oct 4, 2023 at 02:33 PM PDT        43312B0A-8E5B-4B70-A81A-2E0546AA0171.jpeg  ADA90F18-7331-4FFA-9D35-1DC2C12AF7FC.jpeg  E09E29A7-F0CE-4332-BA5C-0632312ECCE9.jpeg  9A3E0F2B-CF65-4274-A020-49449254C296.jpeg  D97F6C6B-2249-4D94-B951-1A5807DF007F.jpeg  883867C8-363B-496E-85B7-55D7C2419139.jpeg  213C031E-71FE-4084-8B85-21AF98737087.jpeg  BCB85F0E-1284-41A9-8CA0-DC43A1F4213D.jpeg      Kitchell CEM, Inc.Page 3 of 4 Printed On: Oct 4, 2023 at 02:33 PM PDT        9445B70F-4B57-4B1D-B349-CB406E2C9779.jpeg  1C569DC6-4336-4B89-BEBE-B884496053AF.jpeg  2F288D41-D78D-4C0A-B858-AE72D0291324.jpeg      By  Date  Copies To   Kitchell CEM, Inc.Page 4 of 4 Printed On: Oct 4, 2023 at 02:33 PM PDT