Loading...
HomeMy WebLinkAbout2024-01-10Kitchell CEM, Inc. 1304 Broad Street San Luis Obispo, California 93401 Project: 7101 - City of SLO Cultural Arts District Parking Structure 609 Palm Street San Luis Obispo, California     Daily Log: Wednesday 1/10/2024     Daily Log Completed  The Daily Log was completed by Ryan Stefanek on Thu, Jan 11, 2024 at 01:39 PM PST.   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 44°F 58°F 49°F 0.00 in.0.00 in.0.00 in.52%72%82%40°F 3.5 mph 4 mph 10 mph   DAILY SNAPSHOT 06:00 AM 09:00 AM 12:00 PM 03:00 PM 06:00 PM 09:00 PM Clear 45°F Clear 48°F Clear 57°F Cloudy 55°F Cloudy 52°F Cloudy 52°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 06:50:00 AM No     MANPOWER LOG 11 Workers  |   82.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 Kitchell CEM, Inc.2 8.0 16.0  Comments:Created By: Ryan Stefanek   2 Swinerton 3 8.0 24.0  Comments:Created By: Ryan Stefanek   3 Rincon Environment Earth Systems, LLC 1 8.0 8.0  Comments:Environmental Created By: Ryan Stefanek   4 Rincon Environment Earth Systems, LLC 1 5.0 5.0  Comments:Archeologist Created By: Ryan Stefanek   5 3 8.0 24.0  Comments:Griffith Created By: Ryan Stefanek   6 1 5.0 5.0  Comments:Salinan Tribal Monitor Created By: Ryan Stefanek       Kitchell CEM, Inc.Page 1 of 5 Printed On: May 21, 2024 at 08:06 AM PDT        No.Contact/Company Workers # Hours Man Hours Location        11  82.0      NOTES LOG    No.Created By Issue?Location Comments   1 Ryan Stefanek No Swinerton and Kitchell arrived onsite around 6:45am and no construction noise occurred before 7am. Griffith environmental staff arrived before 7am. Griffiths environmental team was introduced to Rincon and site safety was discussed due to the excavation for samples. Potholing for samples proceed and Griffith left site with samples around noon. For the remainder of the day site was graded and contoured by Griffith. Rincon's archeologist and the tribal monitor left site before 1:00 as no native soils were being disturbed. Rincon's environmental staff stayed on site to maintain compliance with the projects APCD permit. No accidents or incidents were reported to Kitchell today.   PHOTOS 3C655E07-3D1E-4C0D-87FF-8161EC45FE06.jpeg  F3C1494E-E12F-4C91-AC81-FA456DBF663D.jpeg  2E8B8DDB-7DE7-4FBC-BF6E-A500D1D127F2.jpeg  1BAC2856-2D39-453F-AA24-1EC9F232FAC0.jpeg      Kitchell CEM, Inc.Page 2 of 5 Printed On: May 21, 2024 at 08:06 AM PDT        B62C99F8-4854-46D4-982F-698CF9B5D71B.jpeg  B49ECFEA-15EC-43BD-93EE-C9B24BEB571B.jpeg  5D0AB230-75B4-41B5-AFAC-3C417506988D.jpeg  231777F1-A5D8-4178-99F2-49F47159B454.jpeg  5647B1FF-58A4-4E9C-B4CD-2EA4FBDF9F43.jpeg  795CC19E-6FC3-4800-ACE6-B91C34F63B9E.jpeg  D06BE0AF-485C-4BCE-8C97-BB588EF4124F.jpeg  30036643-16E9-4A08-9180-34863EF7307F.jpeg      Kitchell CEM, Inc.Page 3 of 5 Printed On: May 21, 2024 at 08:06 AM PDT        1225C00E-9AD8-4F70-8F2E-D156D60D12D7.jpeg  ECEA403B-4771-4F19-92BA-CEFF8651B0AF.jpeg  F660B384-6C0E-440E-A21E-6483458DFA6A.jpeg  999A0222-B78A-415E-AE68-F7270A06D78C.jpeg  C8817EB3-FA71-4B99-9AC5-FE637410CCD2.jpeg  34F7621B-0173-4F20-8813-7583F8EA7DBD.jpeg  FEF9B87D-21FE-4D0E-ADA6-74B96D685A80.jpeg  32B6F076-5972-4100-B893-61CAD77FBBAF.jpeg      Kitchell CEM, Inc.Page 4 of 5 Printed On: May 21, 2024 at 08:06 AM PDT        897B5B51-1D9B-4759-9ECD-7E95ED922F19.jpeg CEB4D0C1-1D7B-48B9-AEA7-2532351D6E0A.jpeg        By  Date  Copies To   Kitchell CEM, Inc.Page 5 of 5 Printed On: May 21, 2024 at 08:06 AM PDT