Loading...
HomeMy WebLinkAbout2024-05-13Kitchell CEM, Inc. 1304 Broad Street San Luis Obispo, California 93401 Project: 7101 - City of SLO Cultural Arts District Parking Structure 609 Palm Street San Luis Obispo, California     Daily Log: Monday 5/13/2024     Daily Log Completed  The Daily Log was completed by Ryan Stefanek on Tue, May 14, 2024 at 10:28 AM PDT.   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 50°F 54°F 52°F 0.00 in.0.00 in.0.00 in.95%98%99%51°F 2.7 mph 4 mph 6 mph   DAILY SNAPSHOT 06:00 AM 09:00 AM 12:00 PM 03:00 PM 06:00 PM 09:00 PM Fog 51°F Cloudy 55°F Cloudy 58°F Partly Cloudy 60°F Cloudy 56°F Fog 52°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 07:10:00 AM No     MANPOWER LOG 12 Workers  |   90.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 Kitchell CEM, Inc.3 8.0 24.0  Comments:Created By: Meghan Schmeiser   2 Swinerton 1 8.0 8.0  Comments:Created By: Meghan Schmeiser   3 Rincon Environment Earth Systems, LLC 1 8.0 8.0  Comments:Cat Created By: Meghan Schmeiser   4 Rincon Environment Earth Systems, LLC 1 4.0 4.0  Comments:Soils - Elsa Created By: Meghan Schmeiser   5 Earth Systems 1 8.0 8.0  Comments:Tim Created By: Meghan Schmeiser   6 Earth Systems 1 6.0 6.0  Comments:IOR Paul Created By: Meghan Schmeiser       Kitchell CEM, Inc.Page 1 of 13 Printed On: May 21, 2024 at 01:22 PM PDT        No.Contact/Company Workers # Hours Man Hours Location     7 2 8.0 16.0  Comments:McMahon Created By: Meghan Schmeiser   8 2 8.0 16.0  Comments:Smith MEP Created By: Meghan Schmeiser      12  90.0      NOTES LOG    No.Created By Issue?Location Comments   1 Ryan Stefanek No Swinerton, Kitchell, McMahon, and Smith arrived onsite before 7am and no noise producing activities occurred before 7am. McMahon continued work on stressing tieback 26. By end of day all tiebacks had been stressed. At roughly 11:00am an excavator arrived onsite to begin removing the final lift in front of the retaining wall. By end of day soils was being removed from the northern most corner at Palm street with an anticipated time frame of 3 days for dirt removal this week. Due to subcontractor issues, no work on the site pad is anticipated to occur this week. Smith continued work on Dana street removing a majority of the trench plates in the street and all of the trench plates on the sidewalks. Smith cleaned up the area for any slurry overpour and broom swept the sidewalk and street. No accidents or incidents were reported to Kitchell today. 2 Tally Richtsmeier No McMahon began the day with performance testing of Tieback 26. No concerns were brought to Kitchell's attention regarding the performance testing. Griffeth did not show up on site as expected and Swinerton rented an excavator for McMahon to begin the next lift of soil at the lagging. This was delivered around 11:30 AM. Trench Plates were removed from Dana street by Smith. 3 Meghan Schmeiser No Walked perimeter; approved signage in-place. Fence screen still down in areas due to previous weather events. Temp fence and screen in-place between site and apartment parking area. Snow fence in place at south end of apartment parking lot. See photos for further detail.   PHOTOS IMG_2024_05_13_07_14_18_096.jpg IMG_2024_05_13_07_14_20_729.jpg      Kitchell CEM, Inc.Page 2 of 13 Printed On: May 21, 2024 at 01:22 PM PDT        IMG_2024_05_13_07_14_23_677.jpg  IMG_2024_05_13_07_14_28_032.jpg  IMG_2024_05_13_07_14_32_447.jpg  182F4FF2-2A8E-4DE9-ACAC-0392921A1892.jpeg  IMG_2024_05_13_07_14_26_172.jpg  IMG_2024_05_13_07_14_30_239.jpg  IMG_2024_05_13_07_15_01_897.jpg  0D22B978-88A2-4084-A265-63DA57B25067.jpeg      Kitchell CEM, Inc.Page 3 of 13 Printed On: May 21, 2024 at 01:22 PM PDT        6B96E61A-B03D-41F7-8003-1D4C347EDAFB.jpeg  IMG_2024_05_13_07_33_04_712.jpg  IMG_2024_05_13_07_33_13_772.jpg  IMG_2024_05_13_07_33_57_914.jpg  IMG_2024_05_13_07_15_21_721.jpg  IMG_2024_05_13_07_33_07_173.jpg  IMG_2024_05_13_07_33_30_859.jpg  IMG_2024_05_13_07_34_12_294.jpg      Kitchell CEM, Inc.Page 4 of 13 Printed On: May 21, 2024 at 01:22 PM PDT        IMG_2024_05_13_07_34_18_511.jpg  IMG_2024_05_13_07_34_41_733.jpg  IMG_2024_05_13_07_44_21_874.jpg  IMG_2024_05_13_07_45_11_458.jpg  IMG_2024_05_13_07_34_21_736.jpg  664A75DC-4270-45E3-AF68-15CE5E979177.jpeg  IMG_2024_05_13_07_44_34_646.jpg  IMG_2024_05_13_07_45_56_705.jpg      Kitchell CEM, Inc.Page 5 of 13 Printed On: May 21, 2024 at 01:22 PM PDT        IMG_2024_05_13_07_47_29_483.jpg  IMG_2024_05_13_08_03_45_303.jpg  IMG_2024_05_13_08_06_37_017.jpg  IMG_2024_05_13_08_06_40_577.jpg  IMG_2024_05_13_07_59_01_077.jpg  IMG_2024_05_13_08_06_28_968.jpg  IMG_2024_05_13_08_06_38_395.jpg  IMG_2024_05_13_08_06_45_261.jpg      Kitchell CEM, Inc.Page 6 of 13 Printed On: May 21, 2024 at 01:22 PM PDT        558FD97E-FD18-44D6-9F93-E692CFF1CC25.jpeg  CF5AC893-E7CE-4571-9114-BF10983072E1.jpeg  09E3D98F-602E-45C8-8490-9E77AD42ED57.jpeg  BF8BAC30-5F2F-4E43-B31C-D3C2940C81BE.jpeg  DF7CA43F-BFDE-4E17-B3C4-ECD4E81560ED.jpeg  D829779C-AB3E-46D9-B299-743BB9085DA2.jpeg  19DD7098-EC3E-404C-9AEE-D66D14FC64A8.jpeg  227D4C4D-BC7B-40FF-9A45-92ADDA46F8DC.jpeg      Kitchell CEM, Inc.Page 7 of 13 Printed On: May 21, 2024 at 01:22 PM PDT        87A7226E-E854-4273-A758-75A56267C480.jpeg  8D43096F-E63E-4CD4-B607-CDF581A75802.jpeg  30E4E7B6-0FAB-4E24-BB46-15EF42AD9457.jpeg  1708A6A2-8E58-4DA5-BACE-C37A46F41BC9.jpeg  D36B65B0-067D-4EF9-A554-18A961D5E278.jpeg  0EDE2F64-C939-4B4C-8AB9-4B328C499E4A.jpeg  2D5C46D3-50BA-4D21-A28D-BE0F0D36E934.jpeg  777479A8-5BE1-4177-AE59-8B7DB513A881.jpeg      Kitchell CEM, Inc.Page 8 of 13 Printed On: May 21, 2024 at 01:22 PM PDT        75EB42FF-173F-4831-9C72-6AAC941B4439.jpeg  BEA29B13-6736-4BA8-B17B-A1E35FE55B2E.jpeg  25E64AEC-6315-42D3-A850-C9FF132C404A.jpeg  6DA097D3-51A8-4898-8EC8-FA4D59D8BEA3.jpeg  0AF4773D-896B-4845-AED5-FD163AFF92B3.jpeg  06B236AA-A368-4430-9F78-C4A96860DB72.jpeg  87A4EDE7-28A4-4343-BCA9-FCD3D101E640.jpeg  7427BAEA-6037-4075-A8BA-4E1E4061429F.jpeg      Kitchell CEM, Inc.Page 9 of 13 Printed On: May 21, 2024 at 01:22 PM PDT        013382C4-70A0-4490-B4F9-2EE6EE5729AA.jpeg  B4574EFF-533C-498C-8C5D-4687A134BCBC.jpeg  59D624B8-7A47-4A52-9AA9-6AB470510E26.jpeg  ACB1C976-9DF6-4321-9581-FFC91BBBC5FA.jpeg  750096F9-6143-4437-9844-81BBD0258BE5.jpeg  50CA2FD2-3027-4274-A17F-5B056E49EC53.jpeg  A0CDD1B7-84C7-45FB-86FE-87A5F808D6B4.jpeg  D314D2D9-99D8-4F7E-AE37-EAE0657451AA.jpeg      Kitchell CEM, Inc.Page 10 of 13 Printed On: May 21, 2024 at 01:22 PM PDT        BEBF03F1-35A1-4A41-B1EB-3F610DA1BCDA.jpeg  E65C136F-8AF5-472D-AE5A-2CA7D884C091.jpeg  048E3A20-AEF9-421F-8C13-3EB89CC03B7F.jpeg  70F9816A-3300-4922-9AFD-61AD0BCA43F7.jpeg  C22AB7A3-07CC-4594-9C8C-51DEF5E499C9.jpeg  48C4D9F5-B14A-4BCC-B350-D4C8D58ECFFD.jpeg  441FD56B-5919-4DC2-BD8E-F0DDF7D7D203.jpeg  7D8D430B-99B0-42A3-97CD-812DBC4F1E5D.jpeg      Kitchell CEM, Inc.Page 11 of 13 Printed On: May 21, 2024 at 01:22 PM PDT        F1531B6B-5C32-481E-827D-6D8313C9F8B5.jpeg  386455D1-83DB-4B4F-8726-6FA3CFEAB7C4.jpeg  0D440B9B-45BC-4E69-98CB-1FFCDE88315A.jpeg  5D693E16-B2C5-4520-B015-72DC73BEB73E.jpeg  45918E88-5101-4107-AE89-9C38AFC94075.jpeg  8C04F682-F3D9-44BD-81AC-40CFD21116AF.jpeg  0001A6E9-4795-43D5-84EF-5FE085710AAC.jpeg  E2CA2B25-56A4-4026-9245-5085C877CD8A.jpeg      Kitchell CEM, Inc.Page 12 of 13 Printed On: May 21, 2024 at 01:22 PM PDT        BA381746-B68B-4D77-AE5D-123EB2B51748.jpeg  4B8DE8F2-EBD7-41DE-ADC5-83A3ED8332E7.jpeg  5D901696-FA1D-459D-8055-BBC771C39C94.jpeg  CFB3EA77-6CD3-4462-BCDF-7892EC802CD4.jpeg  7A280CBD-AC60-42EE-A0C1-B3CF6FDC4F01.jpeg  B7FD827F-A2BA-4631-A55C-D44F42350546.jpeg        By  Date  Copies To   Kitchell CEM, Inc.Page 13 of 13 Printed On: May 21, 2024 at 01:22 PM PDT