HomeMy WebLinkAbout12.12.22
2
1
1
12/12/2022
07:00:00
15:00:00
8
8
8
8
8
8
8
8
6
8
EQUIPMENT AND/OR LABOR:
HOURS – ITEM No.
Equip.
No.
Idle
Remarks
(Reason for idleness or other remarks)
Description (Of Equipment or Labor)</
Report No.
Page
of
M
T
W
F
S
Circle Day
Shift Hours -
LOCATION AND DESCRIPTION OF OPERATION:
Signature:
Start
Stop
Date
Weather: Sunny</
Class
Title: Engineer Inspector 3
FM
Lab
Bill Fagundes
DAILY INSPECTION REPORT
Materials: N/A
CADPS Phase 1A
Monterey and Broad Streets
John Madonna Construction
David Bowen
Equipment
Christian Sarabia
Colby Fox
Jacob Wilhite
Ford F350 Service Truck
Ford F450 Service Truck
CAT 305.5E Excavator
Ditch Witch Vacuum
Ford F750 Dump Truck, w/ trailer
GMC Service Truck
Description of work:
Potholing began today. Prior to potholing, the following areas were sawcut: A 5-foot by 13-foot pavement section at lower Broad near the AT&T/Charter pull boxes, (2) approxmitately
1-foot square areas on the sidewalk near Pull box #5 and (1) approximately 1-foor by 2-foot area on the sidewalk at Pull Box #6.
(2) pothole areas remain within the street on upper Broad, and (1) within the street at the corner of Monterey and upper Broad.
The 5x13 foot area will be paved tomorrow with 2 inches of 1/2-inch HMA.