Loading...
HomeMy WebLinkAbout12.12.22 2 1 1 12/12/2022 07:00:00 15:00:00 8 8 8 8 8 8 8 8 6 8 EQUIPMENT AND/OR LABOR: HOURS – ITEM No. Equip. No. Idle Remarks (Reason for idleness or other remarks) Description (Of Equipment or Labor)</ Report No. Page of M T W F S Circle Day Shift Hours - LOCATION AND DESCRIPTION OF OPERATION: Signature: Start Stop Date Weather: Sunny</ Class Title: Engineer Inspector 3 FM Lab Bill Fagundes DAILY INSPECTION REPORT Materials: N/A CADPS Phase 1A Monterey and Broad Streets John Madonna Construction David Bowen Equipment Christian Sarabia Colby Fox Jacob Wilhite Ford F350 Service Truck Ford F450 Service Truck CAT 305.5E Excavator Ditch Witch Vacuum Ford F750 Dump Truck, w/ trailer GMC Service Truck Description of work: Potholing began today. Prior to potholing, the following areas were sawcut: A 5-foot by 13-foot pavement section at lower Broad near the AT&T/Charter pull boxes, (2) approxmitately 1-foot square areas on the sidewalk near Pull box #5 and (1) approximately 1-foor by 2-foot area on the sidewalk at Pull Box #6. (2) pothole areas remain within the street on upper Broad, and (1) within the street at the corner of Monterey and upper Broad. The 5x13 foot area will be paved tomorrow with 2 inches of 1/2-inch HMA.