HomeMy WebLinkAbout12.13.22
3
1
1
12/13/2022
09:00:00
10:00:00
4
5.5
5.5
6
6
5.5
5.5
2
2
4
EQUIPMENT AND/OR LABOR:
HOURS – ITEM No.
Equip.
No.
Idle
Remarks
(Reason for idleness or other remarks)
Description (Of Equipment or Labor)</
Report No.
Page
of
M
T
W
F
S
Circle Day
Shift Hours -
LOCATION AND DESCRIPTION OF OPERATION:
Signature:
Start
Stop
Date
Weather: Sunny</
Class
Title: Engineer Inspector 3
FM
Lab
Bill Fagundes
DAILY INSPECTION REPORT
Materials: N/A
CADPS Phase 1A
Monterey and Broad Streets
John Madonna Construction
David Bowen
Equipment
Christian Sarabia
Colby Fox
Jacob Wilhite
Ford F350 Service Truck
Ford F450 Service Truck
CAT 305.5E Excavator
Ditch Witch Vacuum
Ford F750 Dump Truck, w/ trailer
GMC Service Truck
Description of work:
The 5x13 foot area on lower Broad was paved with 2 inches of 1/2-inch HMA. (3) 8-inch potholes were done witihin the Street on Upper Broad.
The pothole locations above the PG&E markings near Pull Box #6 and at the corner of Monterey and upper Broad, encountered concrete at 33 inches and 26.5 inches below top of AC, respectively.
It was determined that additonal exploration is required at these locations to determine the extents of the PG&E trenches.
Additional work in these areas is scheduled for 12/19.