Loading...
HomeMy WebLinkAbout12.13.22 3 1 1 12/13/2022 09:00:00 10:00:00 4 5.5 5.5 6 6 5.5 5.5 2 2 4 EQUIPMENT AND/OR LABOR: HOURS – ITEM No. Equip. No. Idle Remarks (Reason for idleness or other remarks) Description (Of Equipment or Labor)</ Report No. Page of M T W F S Circle Day Shift Hours - LOCATION AND DESCRIPTION OF OPERATION: Signature: Start Stop Date Weather: Sunny</ Class Title: Engineer Inspector 3 FM Lab Bill Fagundes DAILY INSPECTION REPORT Materials: N/A CADPS Phase 1A Monterey and Broad Streets John Madonna Construction David Bowen Equipment Christian Sarabia Colby Fox Jacob Wilhite Ford F350 Service Truck Ford F450 Service Truck CAT 305.5E Excavator Ditch Witch Vacuum Ford F750 Dump Truck, w/ trailer GMC Service Truck Description of work: The 5x13 foot area on lower Broad was paved with 2 inches of 1/2-inch HMA. (3) 8-inch potholes were done witihin the Street on Upper Broad. The pothole locations above the PG&E markings near Pull Box #6 and at the corner of Monterey and upper Broad, encountered concrete at 33 inches and 26.5 inches below top of AC, respectively. It was determined that additonal exploration is required at these locations to determine the extents of the PG&E trenches. Additional work in these areas is scheduled for 12/19.