Loading...
HomeMy WebLinkAbout12.16.22 5 1 1 12/13/2022 09:00:00 10:00:00 EQUIPMENT AND/OR LABOR: HOURS – ITEM No. Equip. No. Idle Remarks (Reason for idleness or other remarks) Description (Of Equipment or Labor)</ Report No. Page of M T W F S Circle Day Shift Hours - LOCATION AND DESCRIPTION OF OPERATION: Signature: Start Stop Date Weather: Sunny</ Class Title: Engineer Inspector 3 Bill Fagundes DAILY INSPECTION REPORT Materials: N/A CADPS Phase 1A Monterey and Broad Streets John Madonna Construction David Bowen Equipment Ford F350 Service Truck Ford F450 Service Truck CAT 305.5E Excavator Ditch Witch Vacuum Ford F750 Dump Truck, w/ trailer GMC Service Truck Richard Simmer Description of work: Met on site with Richard Simmer, David Bowen and Bryce Crespin to discuss pothole work completed to date; including contract and/or extra work for potholing. Garrett Otto arrived on site to discuss underground conditions discovered during potholing activities. 1. The proposed Pull Box #6 seems to be too large for the area given the presence of existing AT&T/Charter conduits. 2. The proposed location of the Communications trench on lower Broad will cross a PG&E conduit. Garrett was requested to contact PG&E regarding possible use of a smaller Pull Box. The crossing of the proposed conduits over a PG&E conduit should not be a concern. However, PG&E will be notified.