Loading...
HomeMy WebLinkAbout12.19.22 6 1 1 12/19/2022 09:00:00 10:00:00 8 8 8 8 8 8 8 EQUIPMENT AND/OR LABOR: HOURS – ITEM No. Equip. No. Idle Remarks (Reason for idleness or other remarks) Description (Of Equipment or Labor)</ Report No. Page of M T W F S Circle Day Shift Hours - LOCATION AND DESCRIPTION OF OPERATION: Signature: Start Stop Date Weather: Sunny</ Class Title: Engineer Inspector 3 Bill Fagundes DAILY INSPECTION REPORT Materials: N/A CADPS Phase 1A Monterey and Broad Streets John Madonna Construction David Bowen Equipment Ford F450 Service Truck CAT 305.5E Excavator Ford F750 Dump Truck, w/ trailer GMC Service Truck Jacob Wilhite Christian Sarabia Description of work: Pothole continued for the PG&E conduit coming out of the Transformer Vault near Pull Box #6, and the AT&T conduit at the corner of Monterey and upper Broad Streets. The conduit coming out of the transformer was not encased in concrete. The concrete previously discovered in this area was located only at the inside bend of the conduit. Garrett Otto informed us that PG&E will allow a Pull Box #5, instead of a #6 Pull Box, to be installed in the sidewalk, north of the Transformer Vault at 975 Broad Street.