Loading...
HomeMy WebLinkAbout1.26.23 9 1 1 1/26/2023 08:00:00 11:00:00 3 3 3 EQUIPMENT AND/OR LABOR: HOURS – ITEM No. Equip. No. Idle Remarks (Reason for idleness or other remarks) Description (Of Equipment or Labor)</ Report No. Page of M T W F S Circle Day Shift Hours - LOCATION AND DESCRIPTION OF OPERATION: Signature: Start Stop Date Weather: Sunny</ Class Title: Engineer Inspector 3 Bill Fagundes DAILY INSPECTION REPORT Materials: N/A CADPS Phase 1A Monterey and Broad Streets Equipment JMC Richard Simmer Davey Bowen Brian Newsom Description of work: JMC marked out proposed sawcut locations. Met with Richard Simmer, Davey Bowen, Brian Newsom, Daniel Luna (PG&E), and Neil Zakaria (AT&T) to discuss moving AT&T box and cables onto a different side of the power pole so that the 5-inch PG&E primary can fit on the east quadrant. No definitive decision was made. Neil provided a number for the maintenance person, Jake Mohmike, to contact regarding relocation of the AT&T box and cables. Left a message with Jake Mohmike; he is out until Monday, January 30th. Neil informed me that 5-foot horizonatal sweeps should be used for their conduit.