Loading...
HomeMy WebLinkAbout1.27.23 10 1 1 1/27/2023 07:00:00 8 8 8 2 6 6 3 3 3 3 EQUIPMENT AND/OR LABOR: HOURS – ITEM No. Equip. No. Idle Remarks (Reason for idleness or other remarks) Description (Of Equipment or Labor)</ Report No. Page of M T W F S Circle Day Shift Hours - LOCATION AND DESCRIPTION OF OPERATION: Signature: Start Stop Date Weather: Sunny</ Class Title: Engineer Inspector 3 Bill Fagundes DAILY INSPECTION REPORT Materials: N/A CADPS Phase 1A Monterey and Broad Streets Equipment Ford F450 Service Truck GMC Service Truck Jacob Wilhite Christian Sarabia JMC Colby Fox Ditch-Witch Vacuum Trailer Ford F750 Dump Truck Richard Simmer Davey Bowen Alex Rosas 15:30 AM Description of work: Sawcutting began today, beginning at lower Broad. Import sand backfill material and cold-patch were stockpiled in Parking Lot 9. I informed Davey Bowen that Neil Zakaria informed me that 5-foot horizontal sweeps should be used for the AT&T conduit. Davey telephoned Richard Simmer and informed him of Neil's request. Richard Simmer, when he arrived on site, informed me that 5-foot sweeps were not necessary.