Loading...
HomeMy WebLinkAbout1.30.23 11 1 1 1/30/2023 07:00:00 8 8 8 4 8 3 3 3 3 6 1 EQUIPMENT AND/OR LABOR: HOURS – ITEM No. Equip. No. Idle Remarks (Reason for idleness or other remarks) Description (Of Equipment or Labor)</ Report No. Page of M T W F S Circle Day Shift Hours - LOCATION AND DESCRIPTION OF OPERATION: Signature: Start Stop Date Weather: Sunny</ Class Title: Engineer Inspector 3 Bill Fagundes DAILY INSPECTION REPORT Materials: N/A CADPS Phase 1A Monterey and Broad Streets Equipment Ford F450 Service Truck GMC Service Truck Jacob Wilhite Christian Sarabia JMC Colby Fox Ford F750 Dump Truck Davey Bowen Alex Rosas 15:30 AM Brian Newsom FM Lab Water Truck Ford F350 Service Truck Air Compressor Mini Excavator Skip Loader Rincon Catherine Johnson Earth Systems Pacific Sam Venable Description of work: Installation of conduits began from the pull boxes on Lower Broad to approximately 15 feet short of the proposed City Communication Manhole on Monterey. Catherine Johnson was present during excavations. An unmarked steel utility line, approximately 4-inch diameter, was exposed on the north side of the proposed City Communication Manhole. SoCal Gas and our utilities department could not identify the line. The line is parallel to Monterey Street. The trench, from the pull boxes to approximately 5 feet east of the City Comm. MH, was backfilled and compacted with import sand. Sam Venable tested compaction of backfill material.