Loading...
HomeMy WebLinkAbout1.31.23 12 1 1 1/31/2023 07:00:00 8 8 8 8 8 2 6 EQUIPMENT AND/OR LABOR: HOURS – ITEM No. Equip. No. Idle Remarks (Reason for idleness or other remarks) Description (Of Equipment or Labor)</ Report No. Page of M T W F S Circle Day Shift Hours - LOCATION AND DESCRIPTION OF OPERATION: Signature: Start Stop Date Weather: Sunny</ Class Title: Engineer Inspector 3 Bill Fagundes DAILY INSPECTION REPORT Materials: N/A CADPS Phase 1A Monterey and Broad Streets Equipment Ford F450 Service Truck GMC Service Truck Jacob Wilhite JMC Colby Fox Ford F750 Dump Truck Davey Bowen Alex Rosas 15:30 AM Brian Newsom FM Lab Water Truck Ford F350 Service Truck Air Compressor Mini Excavator Skip Loader Rincon Catherine Johnson Earth Systems Pacific wackers Description of work: Installation of conduits continued, northward 30 feet, from the City Comm MH. The unmarked 4-inch steel line was verified not to be active, and was removed during trenching. The trench was backfilled and compacted. Catherine Johnson was present during excavations.