HomeMy WebLinkAbout2.1.23 12 1 1 2/1/2023 07:00:00 8 8 8 8 8 8 4 2 2 6 4 EQUIPMENT AND/OR LABOR: HOURS – ITEM No. Equip. No. Idle Remarks (Reason for idleness or other remarks) Description (Of Equipment or Labor)</ Report No. Page of M T W F S Circle Day Shift Hours - LOCATION AND DESCRIPTION OF OPERATION: Signature: Start Stop Date Weather: Sunny</ Class Title: Engineer Inspector 3 Bill Fagundes DAILY INSPECTION REPORT Materials: N/A CADPS Phase 1A Monterey and Broad Streets Equipment Ford F450 Service Truck GMC Service Truck Jacob Wilhite JMC Colby Fox Ford F750 Dump Truck Davey Bowen Alex Rosas 15:30 AM Brian Newsom FM Lab Water Truck Ford F350 Service Truck Air Compressor Mini Excavator Skip Loader Rincon Catherine Johnson Earth Systems Pacific wackers Christian Sarabia Richard Simmer Sup Jose Zarate Ditch Witch Vacuum Trailer Description of work: Installation of conduits continued to the curb near the proposed pull boxes in Parking Lot 9. The unmarked 4-inch steel line was removed during trenching. Two unmarked steel lines, one 8-inch and one 4-inch, were found perpendicular to the trench on the north side of Monterey. JMC brought out a vacuum trailer to excavate around these lines. The trench was backfilled and compacted approximately 6 feet from the curb. Jose Zarate tested compaction. I asked Richard and Davey if the number of bends for the AT&T conduit is acceptable for pulling the proposed fiber line, and if not, then changes need to be made prior to moving forward. Richard informed me that it is acceptable. Steve, with AT&T, removed the box from the power pole, and all but 3 lines that wrap on the proposed PG&E quadrant. Jake Mohmike was contacted regarding the remaining 3 lines that need to be moved. Catherine Johnson was present during excavations.