6
EQUIPMENT AND/OR LABOR:
HOURS – ITEM No.
Equip.
No.
Idle
Remarks
(Reason for idleness or other remarks)
Description (Of Equipment or Labor)</
Report No.
Page
of
M
T
W
F
S
Circle Day
Shift Hours -
LOCATION AND DESCRIPTION OF OPERATION:
Signature:
Start
Stop
Date
Weather: Sunny</
Class
Title: Engineer Inspector 3
Bill Fagundes
DAILY INSPECTION REPORT
Materials: N/A
CADPS Phase 1A
Monterey and Broad Streets
Equipment
Ford F450 Service Truck
GMC Service Truck
JMC
Alex Rosas
15:30 AM
Lab
Mini Excavator
Rincon
Earth Systems Pacific
Christian Sarabia
Colby Fox
Jacob Wilhite
Op
Ford F350 Service Truck
Skip Loader
F750 Dump Trucks
Wackers
FM
Davey Bowen
Ditch Witch Vacuum Trailer
Kaylie Rogers
Description of work:
Kaylie Rogers, with Rincon, was on site during excavations.
Installation of PG&E and City Communication conduits continued up Broad Street, approximately 20 feet south of the Ficus tree. An existing, 4-inch conduit was damaged. The conduit
was repaired by gluing a split 5-inch PVC over the damaged area, and wrapping with Wonder PVC 10-mil pipe wrap tape.