Loading...
HomeMy WebLinkAbout2.10.23 20 1 1 2/10/2023 07:00:00 8 8 8 8 8 1 1 1 1 1 2 2 1 6 EQUIPMENT AND/OR LABOR: HOURS – ITEM No. Equip. No. Idle Remarks (Reason for idleness or other remarks) Description (Of Equipment or Labor)</ Report No. Page of M T W F S Circle Day Shift Hours - LOCATION AND DESCRIPTION OF OPERATION: Signature: Start Stop Date Weather: Sunny</ Class Title: Engineer Inspector 3 Bill Fagundes DAILY INSPECTION REPORT Materials: N/A CADPS Phase 1A Monterey and Broad Streets Equipment Ford F450 Service Truck GMC Service Truck JMC Alex Rosas 15:30 AM Lab Mini Excavator Rincon Earth Systems Pacific Christian Sarabia Colby Fox Jacob Wilhite Op Ford F350 Service Truck Skip Loader F750 Dump Trucks Wackers FM Davey Bowen Ditch Witch Vacuum Trailer Kaylie Rogers Description of work: Kaylie Rogers, with Rincon, was on site during excavations. Installation of PG&E and City Communication conduits continued up Broad Street, approximately 20 feet south of the Ficus tree. An existing, 4-inch conduit was damaged. The conduit was repaired by gluing a split 5-inch PVC over the damaged area, and wrapping with Wonder PVC 10-mil pipe wrap tape.