Report No.
Page
of
M
T
W
F
S
Circle Day
Shift Hours -
LOCATION AND DESCRIPTION OF OPERATION:
Signature:
Start
Stop
Date
Weather: Sunny</
Class
Title: Engineer Inspector 3
Bill Fagundes
DAILY INSPECTION REPORT
Materials: N/A
CADPS Phase 1A
Monterey and Broad Streets
Equipment
Ford F450 Service Truck
GMC Service Truck
JMC
Alex Rosas
15:30 AM
Lab
Mini Excavator
Rincon
Earth Systems Pacific
Christian Sarabia
Colby Fox
Jacob Wilhite
Op
Ford F350 Service Truck
Skip Loader
F750 Dump Trucks
Wackers
FM
Davey Bowen
Ditch Witch Vacuum Trailer
Brian Newsom
Catherine Johnson
Water Truck
Description of work:
Catherine Johnson was on site during excavations. Daniel Luna, PG&E, was on site in early morning.
Excavation continued within the Ficus tree roots, using a ditchwitch vacuum and pressure washer. Sidewalk was removed in front of 975 Broad St. Excavation began for the #5 PG&E vault
in front of 975 Broad Street.