Loading...
HomeMy WebLinkAbout2.13.23 21 1 1 2/13/2023 07:00:00 8 8 8 8 8 8 1 1 1 1 1 2 2 1 1 7 EQUIPMENT AND/OR LABOR: HOURS – ITEM No. Equip. No. Idle Remarks (Reason for idleness or other remarks) Description (Of Equipment or Labor)</ Report No. Page of M T W F S Circle Day Shift Hours - LOCATION AND DESCRIPTION OF OPERATION: Signature: Start Stop Date Weather: Sunny</ Class Title: Engineer Inspector 3 Bill Fagundes DAILY INSPECTION REPORT Materials: N/A CADPS Phase 1A Monterey and Broad Streets Equipment Ford F450 Service Truck GMC Service Truck JMC Alex Rosas 15:30 AM Lab Mini Excavator Rincon Earth Systems Pacific Christian Sarabia Colby Fox Jacob Wilhite Op Ford F350 Service Truck Skip Loader F750 Dump Trucks Wackers FM Davey Bowen Ditch Witch Vacuum Trailer Brian Newsom Catherine Johnson Water Truck Description of work: Catherine Johnson was on site during excavations. Daniel Luna, PG&E, was on site in early morning. Excavation continued within the Ficus tree roots, using a ditchwitch vacuum and pressure washer. Sidewalk was removed in front of 975 Broad St. Excavation began for the #5 PG&E vault in front of 975 Broad Street.