Loading...
HomeMy WebLinkAbout2.14.23 22 1 1 2/14/2023 07:00:00 8 8 8 8 8 2 1 1 1 1 1 2 1 1 7 EQUIPMENT AND/OR LABOR: HOURS – ITEM No. Equip. No. Idle Remarks (Reason for idleness or other remarks) Description (Of Equipment or Labor)</ Report No. Page of M T W F S Circle Day Shift Hours - LOCATION AND DESCRIPTION OF OPERATION: Signature: Start Stop Date Weather: Sunny</ Class Title: Engineer Inspector 3 Bill Fagundes DAILY INSPECTION REPORT Materials: N/A CADPS Phase 1A Monterey and Broad Streets Equipment Ford F450 Service Truck GMC Service Truck JMC Alex Rosas 15:30 AM Lab Mini Excavator Rincon Earth Systems Pacific Christian Sarabia Colby Fox Jacob Wilhite Op Ford F350 Service Truck Skip Loader F750 Dump Trucks FM Davey Bowen Ditch Witch Vacuum Trailer Catherine Johnson Water Truck Sup Richard Simmer Description of work: Catherine Johnson was on site during excavations. Garrett Otto was on site to discuss tie in of PG&E conduit(s) into proposed #5 PG&E pull box near in ground transformer on Broad Street. Daniel Luna, PG&E, was on site mid morning to discuss tie in of conduits to PG&E #5 vault. Excavation continued within the Ficus tree roots, using a ditchwitch vacuum and pressure washer. Excavation for the PG&E #5 pull box continued. Trench line in Parking Lot #9 was saw cut. I left site just before 11am. Bryce Crespin filled in during my absence.