EQUIPMENT AND/OR LABOR:
HOURS – ITEM No.
Equip.
No.
Idle
Remarks
(Reason for idleness or other remarks)
Description (Of Equipment or Labor)</
Report No.
Page
of
M
T
W
F
S
Circle Day
Shift Hours -
LOCATION AND DESCRIPTION OF OPERATION:
Signature:
Start
Stop
Date
Weather: Sunny</
Class
Title: Engineer Inspector 3
Bill Fagundes
DAILY INSPECTION REPORT
Materials: N/A
CADPS Phase 1A
Monterey and Broad Streets
Equipment
Ford F450 Service Truck
GMC Service Truck
JMC
Alex Rosas
15:30 AM
Lab
Mini Excavator
Rincon
Earth Systems Pacific
Christian Sarabia
Colby Fox
Jacob Wilhite
Op
Ford F350 Service Truck
Skip Loader
F750 Dump Trucks
FM
Davey Bowen
Ditch Witch Vacuum Trailer
Catherine Johnson
Water Truck
Description of work:
Catherine Johnson was on site during excavations.
PG&E #5 pull box was set near in ground transformer on Broad Street. Conduits were tied into Pull Box and In-ground transformer. Conduit trench was backfilled, compacted and section
of Class 2 concrete was placed from intersection of Broad/Monterey to the in-ground transformer. Excavation between in-ground transformer and #5 pull box was backfilled and compacted.