Loading...
HomeMy WebLinkAbout2.15.23 23 1 1 2/15/2023 07:00:00 8 8 8 8 8 1 1 1 1 1 2 1 2 1 3.5 EQUIPMENT AND/OR LABOR: HOURS – ITEM No. Equip. No. Idle Remarks (Reason for idleness or other remarks) Description (Of Equipment or Labor)</ Report No. Page of M T W F S Circle Day Shift Hours - LOCATION AND DESCRIPTION OF OPERATION: Signature: Start Stop Date Weather: Sunny</ Class Title: Engineer Inspector 3 Bill Fagundes DAILY INSPECTION REPORT Materials: N/A CADPS Phase 1A Monterey and Broad Streets Equipment Ford F450 Service Truck GMC Service Truck JMC Alex Rosas 15:30 AM Lab Mini Excavator Rincon Earth Systems Pacific Christian Sarabia Colby Fox Jacob Wilhite Op Ford F350 Service Truck Skip Loader F750 Dump Trucks FM Davey Bowen Ditch Witch Vacuum Trailer Catherine Johnson Water Truck Description of work: Catherine Johnson was on site during excavations. PG&E #5 pull box was set near in ground transformer on Broad Street. Conduits were tied into Pull Box and In-ground transformer. Conduit trench was backfilled, compacted and section of Class 2 concrete was placed from intersection of Broad/Monterey to the in-ground transformer. Excavation between in-ground transformer and #5 pull box was backfilled and compacted.