Loading...
HomeMy WebLinkAbout2.17.23 25 1 1 2/17/2023 07:00:00 8 8 8 8 8 8 1 1 1 1 1 1 2 1 1 EQUIPMENT AND/OR LABOR: HOURS – ITEM No. Equip. No. Idle Remarks (Reason for idleness or other remarks) Description (Of Equipment or Labor)</ Report No. Page of M T W F S Circle Day Shift Hours - LOCATION AND DESCRIPTION OF OPERATION: Signature: Start Stop Date Weather: Sunny</ Class Title: Engineer Inspector 3 Bill Fagundes DAILY INSPECTION REPORT Materials: N/A CADPS Phase 1A Monterey and Broad Streets Equipment Ford F450 Service Truck GMC Service Truck JMC Alex Rosas 15:30 AM Lab Mini Excavator Rincon Earth Systems Pacific Christian Sarabia Colby Fox Jacob Wilhite Op Ford F350 Service Truck Skip Loader F750 Dump Trucks FM Davey Bowen Catherine Johnson Water Truck Brian Newsom Ditch Witch Vacuum Sup Richard Simmer Mark Meeks Description of work: Catherine Johnson was on site during excavations. Mark Meeks performed compaction testing of trench backfill. Daniel Luna, PG&E, was on site to inspect and evaluate existing PG&E conduits that are warped due to tree roots. Daniel took photos of the conduits and will present to PG&E design team. Trenching continued to the proposed City Comm manhole. City communication conduit at the intersection of Palm and Broad was found to be 8.5 feet below finished surface, deeper than the contractor bid for in CRB#1. CRB#2 will address extra work for existing conditions. 18-inch smooth dowels were installed and Class 2 concrete placed from near the PG&E #5 pull box to Palm Street.