Loading...
HomeMy WebLinkAbout2.2.23 13 1 1 2/1/2023 07:00:00 8 8 8 EQUIPMENT AND/OR LABOR: HOURS – ITEM No. Equip. No. Idle Remarks (Reason for idleness or other remarks) Description (Of Equipment or Labor)</ Report No. Page of M T W F S Circle Day Shift Hours - LOCATION AND DESCRIPTION OF OPERATION: Signature: Start Stop Date Weather: Sunny</ Class Title: Engineer Inspector 3 Bill Fagundes DAILY INSPECTION REPORT Materials: N/A CADPS Phase 1A Monterey and Broad Streets Equipment Ford F450 Service Truck GMC Service Truck JMC Alex Rosas 15:30 AM Lab Mini Excavator Rincon Earth Systems Pacific Christian Sarabia Richard Simmer Sup Description of work: 18 inch long 1/2-inch smooth dowels were installed in the concrete pavement section within the trench walls with 6 inch embedment and 5-foot spacing, staggered at 30-inch intervals where needed. Grease was applied to the embedded side. 9 cubic yards of Class 2 concrete, Cal Portland mix 590GN1040, was placed and vibrated within lower Broad and part of the Monterey trench. The area concreted will be paved tomorrow.