HomeMy WebLinkAbout2.21.23
26
1
1
2/21/2023
07:00:00
8
8
2
8
8
4
1
1
1
1
1
2
1
2
EQUIPMENT AND/OR LABOR:
HOURS – ITEM No.
Equip.
No.
Idle
Remarks
(Reason for idleness or other remarks)
Description (Of Equipment or Labor)</
Report No.
Page
of
M
T
W
F
S
Circle Day
Shift Hours -
LOCATION AND DESCRIPTION OF OPERATION:
Signature:
Start
Stop
Date
Weather: Sunny</
Class
Title: Engineer Inspector 3
Bill Fagundes
DAILY INSPECTION REPORT
Materials: N/A
CADPS Phase 1A
Monterey and Broad Streets
Equipment
Ford F450 Service Truck
GMC Service Truck
JMC
15:30 AM
Lab
Mini Excavator
Rincon
Earth Systems Pacific
Christian Sarabia
Colby Fox
Jacob Wilhite
Op
Ford F350 Service Truck
Skip Loader
F750 Dump Trucks
FM
Davey Bowen
Catherine Johnson
Water Truck
Brian Newsom
Sup
Richard Simmer
Wackers
Description of work:
Catherine Johnson was on site during excavations. Excavation, installation, and backfill of the PG&E, AT&T, and Charter conduits began in Parking Lot 9.
The trench was backfilled and compacted with two wackers, from the power pole to approximately 20 feet short of the pull boxes.