Loading...
HomeMy WebLinkAbout2.21.23 26 1 1 2/21/2023 07:00:00 8 8 2 8 8 4 1 1 1 1 1 2 1 2 EQUIPMENT AND/OR LABOR: HOURS – ITEM No. Equip. No. Idle Remarks (Reason for idleness or other remarks) Description (Of Equipment or Labor)</ Report No. Page of M T W F S Circle Day Shift Hours - LOCATION AND DESCRIPTION OF OPERATION: Signature: Start Stop Date Weather: Sunny</ Class Title: Engineer Inspector 3 Bill Fagundes DAILY INSPECTION REPORT Materials: N/A CADPS Phase 1A Monterey and Broad Streets Equipment Ford F450 Service Truck GMC Service Truck JMC 15:30 AM Lab Mini Excavator Rincon Earth Systems Pacific Christian Sarabia Colby Fox Jacob Wilhite Op Ford F350 Service Truck Skip Loader F750 Dump Trucks FM Davey Bowen Catherine Johnson Water Truck Brian Newsom Sup Richard Simmer Wackers Description of work: Catherine Johnson was on site during excavations. Excavation, installation, and backfill of the PG&E, AT&T, and Charter conduits began in Parking Lot 9. The trench was backfilled and compacted with two wackers, from the power pole to approximately 20 feet short of the pull boxes.