Loading...
HomeMy WebLinkAbout2.3.23 15 1 1 2/3/2023 07:00:00 7 7 7 EQUIPMENT AND/OR LABOR: HOURS – ITEM No. Equip. No. Idle Remarks (Reason for idleness or other remarks) Description (Of Equipment or Labor)</ Report No. Page of M T W F S Circle Day Shift Hours - LOCATION AND DESCRIPTION OF OPERATION: Signature: Start Stop Date Weather: Sunny</ Class Title: Engineer Inspector 3 Bill Fagundes DAILY INSPECTION REPORT Materials: N/A CADPS Phase 1A Monterey and Broad Streets Equipment Ford F450 Service Truck GMC Service Truck JMC Alex Rosas Lab Mini Excavator Rincon Earth Systems Pacific Christian Sarabia Richard Simmer Sup 14:30 AM Description of work: Cold mix was placed and compacted within the concreted trench, from the pull boxes at lower Broad Street, to near the pull boxes at Parking Lot 9.