Loading...
HomeMy WebLinkAbout2.6.23 16 1 1 2/6/2023 07:00:00 8 8 8 8 8 1 2 1 1 1 1 7 EQUIPMENT AND/OR LABOR: HOURS – ITEM No. Equip. No. Idle Remarks (Reason for idleness or other remarks) Description (Of Equipment or Labor)</ Report No. Page of M T W F S Circle Day Shift Hours - LOCATION AND DESCRIPTION OF OPERATION: Signature: Start Stop Date Weather: Sunny</ Class Title: Engineer Inspector 3 Bill Fagundes DAILY INSPECTION REPORT Materials: N/A CADPS Phase 1A Monterey and Broad Streets Equipment Ford F450 Service Truck GMC Service Truck JMC Alex Rosas 15:30 AM Lab Mini Excavator Rincon Earth Systems Pacific Christian Sarabia Richard Simmer Sup Colby Fox Jacob Wilhite Op Catherine Johnson Ford F350 Service Truck Skip Loader Brian Newsom Description of work: Excavation coninued into the landscape area for Pull Boxes in Parking Lot 9, and north on Monterey Street for the two 2-inch city communication conduits. Sidewalk was demoed on Monterey Street. Catherine Johnson was on site during excavations.