Loading...
HomeMy WebLinkAbout2.7.23 17 1 1 2/7/2023 07:00:00 8 8 8 8 8 2 1 1 1 1 2 2 6 EQUIPMENT AND/OR LABOR: HOURS – ITEM No. Equip. No. Idle Remarks (Reason for idleness or other remarks) Description (Of Equipment or Labor)</ Report No. Page of M T W F S Circle Day Shift Hours - LOCATION AND DESCRIPTION OF OPERATION: Signature: Start Stop Date Weather: Sunny</ Class Title: Engineer Inspector 3 Bill Fagundes DAILY INSPECTION REPORT Materials: N/A CADPS Phase 1A Monterey and Broad Streets Equipment Ford F450 Service Truck GMC Service Truck JMC Alex Rosas 15:30 AM Lab Mini Excavator Rincon Earth Systems Pacific Christian Sarabia Richard Simmer Sup Colby Fox Jacob Wilhite Catherine Johnson Ford F350 Service Truck Skip Loader F750 Dump Trucks Wackers Description of work: Daniel Luna, PG&E, and Catherine Johnson, Rincon, were on site. The #5 utility vault was installed within the sidewalk, just north of Parking Lot 9. Installation of City communication conduits and PG&E conduit were installed to approximately 50 feet along Monterey Street toward the Mission. The trench was backfilled and compacted. The PG&E quadrant on the pole at the rear of Parking Lot 9 is clear of AT&T and Charter cables. At approxiamtely noon, the contractor excavated into cement slurry, approximately 12 feet south of the intersection of Upper Broad and Monterey. The slurry is 11 inches extending to 23 inches below the top of the asphalt surface. Kurt Long, City of SLO, tried to locate the line by tying onto the tracer wire within a nearby 4-inch sanitary sewer cleanout. There was no signal within the street. JMC will need to tunnel beneath this area.