2/7/2023
07:00:00
8
8
8
8
8
2
1
1
1
1
2
2
6
EQUIPMENT AND/OR LABOR:
HOURS – ITEM No.
Equip.
No.
Idle
Remarks
(Reason for idleness or other remarks)
Description (Of Equipment or Labor)</
Report No.
Page
of
M
T
W
F
S
Circle Day
Shift Hours -
LOCATION AND DESCRIPTION OF OPERATION:
Signature:
Start
Stop
Date
Weather: Sunny</
Class
Title: Engineer Inspector 3
Bill Fagundes
DAILY INSPECTION REPORT
Materials: N/A
CADPS Phase 1A
Monterey and Broad Streets
Equipment
Ford F450 Service Truck
GMC Service Truck
JMC
Alex Rosas
15:30 AM
Lab
Mini Excavator
Rincon
Earth Systems Pacific
Christian Sarabia
Richard Simmer
Sup
Colby Fox
Jacob Wilhite
Catherine Johnson
Ford F350 Service Truck
Skip Loader
F750 Dump Trucks
Wackers
Description of work:
Daniel Luna, PG&E, and Catherine Johnson, Rincon, were on site.
The #5 utility vault was installed within the sidewalk, just north of Parking Lot 9. Installation of City communication conduits and PG&E conduit were installed to approximately 50
feet along Monterey Street toward the Mission. The trench was backfilled and compacted.
The PG&E quadrant on the pole at the rear of Parking Lot 9 is clear of AT&T and Charter cables.
At approxiamtely noon, the contractor excavated into cement slurry, approximately 12 feet south of the intersection of Upper Broad and Monterey. The slurry is 11 inches extending to
23 inches below the top of the asphalt surface. Kurt Long, City of SLO, tried to locate the line by tying onto the tracer wire within a nearby 4-inch sanitary sewer cleanout. There
was no signal within the street. JMC will need to tunnel beneath this area.