Loading...
HomeMy WebLinkAbout2.8.23 18 1 1 2/8/2023 07:00:00 1 8 8 8 8 8 2 1 1 1 1 2 2 6 4 EQUIPMENT AND/OR LABOR: HOURS – ITEM No. Equip. No. Idle Remarks (Reason for idleness or other remarks) Description (Of Equipment or Labor)</ Report No. Page of M T W F S Circle Day Shift Hours - LOCATION AND DESCRIPTION OF OPERATION: Signature: Start Stop Date Weather: Sunny</ Class Title: Engineer Inspector 3 Bill Fagundes DAILY INSPECTION REPORT Materials: N/A CADPS Phase 1A Monterey and Broad Streets Equipment Ford F450 Service Truck GMC Service Truck JMC Alex Rosas 15:30 AM Lab Mini Excavator Rincon Earth Systems Pacific Christian Sarabia Richard Simmer Sup Colby Fox Jacob Wilhite Op Catherine Johnson Ford F350 Service Truck Skip Loader F750 Dump Trucks Wackers FM Davey Bowen Mark Meeks Description of work: Daniel Luna (PG&E), Catherine Johnson (Rincon), and Mark Meeks (Earth Systems) were on site. AT&T and Charter pull boxes were installed in the landscape area of Parking Lot 9. Installation of City communication conduits and PG&E conduit were installed to approximately 8 feet north on upper Broad Street. The contractor spent 4 hours coordinating, excavating and installing conduits beneath a unmarked SS lateral and an AT&T concrete duct bank, located in Monterey Street.