Loading...
HomeMy WebLinkAbout2.9.23 19 1 1 2/9/2023 07:00:00 3 8 8 8 8 1 1 1 1 1 2 2 6 EQUIPMENT AND/OR LABOR: HOURS – ITEM No. Equip. No. Idle Remarks (Reason for idleness or other remarks) Description (Of Equipment or Labor)</ Report No. Page of M T W F S Circle Day Shift Hours - LOCATION AND DESCRIPTION OF OPERATION: Signature: Start Stop Date Weather: Sunny</ Class Title: Engineer Inspector 3 Bill Fagundes DAILY INSPECTION REPORT Materials: N/A CADPS Phase 1A Monterey and Broad Streets Equipment Ford F450 Service Truck GMC Service Truck JMC Alex Rosas 15:30 AM Lab Mini Excavator Rincon Earth Systems Pacific Christian Sarabia Colby Fox Jacob Wilhite Op Catherine Johnson Ford F350 Service Truck Skip Loader F750 Dump Trucks Wackers FM Davey Bowen Description of work: Daniel Luna (PG&E), Catherine Johnson (Rincon), and Anthony Whipple were on site today. The PG&E pad mounted transformer pad was set. The area was backfilled with sand and compacted. Smooth dowels, 18 inches long with 6-inch embedment were intalled in the concrete trench section, per City Standard Trench Detail 1 (6020). Class 2 concrete was placed and consolidated with a vibrator, in the trench on Monterey, from the proposed new curb and gutter to 3 feet north on upper Broad. Trenching continued on upper Broad. Anthony Whipple arrived on site to assess a large root that was uncovered during trench excavations.