Loading...
HomeMy WebLinkAbout303310-002 2023-02-08 City of SLO Parking Structure 1A-CMP-MMEarth Systems Pacific DAILY FIELD REPORT Date: Map/Sketch: NOTE: No guarantee or warranty of the contractor's work is made, expressed or implied. Project No.: OSHPD No.: DSA File: DSA App.: 303310-002 0 N/A N/A 2/8/2023 JMCContractor: Bill F.Met With: Building Pad Parking/Roadway Observation Embankment Trench Backfill TYPE OF WORK Project Name: Project Location: Project Manager: Copies To: SEC of Palm and Nipomo Streets R. Down ESP City of San Luis Obispo - Cultural Arts Parking Structure 1A Moisture STD:13220Observation & Testing Nuc. Gauge Make: CPN Nuc. Gauge Model No. 5745 Test Only Retaining Wall Other Density STD:24102 EQUIPMENT ONSITE: Summary: Onsite late am. I spoke with Bill F. and he asked that I test the joint trench and vaults at different elevations. 95% compaction is required 6" above top of pipe per City of Slo Trench detail. I observed the compaction of the 1st 1' lift over electrical pipe using a whacker then they placed the 2 2" comm conduits then I tested the 1st lift over that and final lift to 10" BFS. All comp tests taken today met passing requirements Test Location Depth/ Elevation (ft)Moisture (%)Dry Density (pcf) Max Dry Density (pcf) Relative Comp. (%) Rel. Comp. Spec Failing Test * Passing Retest ** Field Rep: Mark Meeks San Luis Obispo Santa Maria (805) 544-3276 (805) 928-2991 (805) 544-1786 fax (805) 928-9253 fax Hollister Fremont (831) 637-2133 (510) 353-3883 (831) 637-0510 fax (888) 567-4293 fax 1 2 3 4 5678 Montery Street 9