Loading...
HomeMy WebLinkAbout303310-002 2023-02-16 City of SLO Parking Structure 1A-CMP-CREarth Systems Pacific DAILY FIELD REPORT Date: Map/Sketch: NOTE: No guarantee or warranty of the contractor's work is made, expressed or implied.Field Rep:Chris Robbins Test Location Depth/ Elevation (ft)Moisture (%)Dry Density (pcf) Max Dry Density (pcf) Relative Comp. (%) Rel. Comp. Spec Failing Test * Passing Retest ** EQUIPMENT ONSITE:Jumping jack compactor Summary: I arrived onsite as requested & met with Bill Fagundes with the City of SLO. Bill requested I check the compaction of import sand for the PG&E #5 Box/Inground Transformer. Test results did not meet 95% compaction. I check the compaction of utility sand for 2" conduit @ 975 Broad St. Test results did not meet 95% compaction. I informed Bill & Madonna Construction of the failing results. I remained on standby while Madonna backfilled sand to past 963 Broad St. & waited to compact the material due to lunch time shut down ordinance on compacting. A jumping jack compactor was being used once compaction began. I check the compaction below subgrade by 963 Broad St. The sand appeared to be wet. Test results did not meet 95% compaction. Madonna continued with the compaction effort @ the transformer area & by 975 Broad St. Retest results did not meet 95% compaction. Bill requested I sample a moisture check sample from a test location. I sampled from the 2" conduit test location @ 975 Broad & also sampled a bulk sample from the stockpile @ the lay down yard. I returned the samples to the Earth Systems laboratory for testing. **The test results from the Earth Systems laboratory for the moisture check was 11.5% moisture for a comparison to test #5 @ 11.6% which confirms the accuracy of the moisture readings*** Test Only Retaining Wall Other Density STD:26022 Moisture STD:12670Observation & Testing Nuc. Gauge Make:CPN Nuc. Gauge Model No.5994Building Pad Parking/Roadway Observation Embankment Trench Backfill TYPE OF WORK Project Name: Project Location: Project Manager: Copies To: SEC of Palm and Nipomo Streets R. Down City of San Luis Obispo - Cultural Arts Parking Structure 1A 2/16/2023 J. MadonnaContractor: City of SLOMet With:Bill F./ Project No.: OSHPD No.: DSA File: DSA App.: 303310-002 0 N/A N/A San Luis Obispo Santa Maria (805) 544-3276 (805) 928-2991 (805) 544-1786 fax (805) 928-9253 fax Hollister Fremont (831) 637-2133 (510) 353-3883 (831) 637-0510 fax (888) 567-4293 fax 2,5 1,4 3